05000324/FIN-2008002-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{finding
{{finding
| title = Review Adequacy of Suppression Pool Temperature Monitoring System Calibration Relative to Technical Specification SR 3.3.3.1.3 Channel Calibration
| title = Review Adequacy of Suppression Pool Temperature Monitoring System Calibration Relative to Technical Specification SR 3.3.3.1.3 Channel Calibration
| docket = 05000324, 05000325
| docket = 05000324, 05000325
| inspection report = IR 05000324/2008002
| inspection report = IR 05000324/2008002

Latest revision as of 22:04, 29 May 2018

01
Site: Brunswick Duke Energy icon.png
Report IR 05000324/2008002 Section 1R15
Date counted Mar 31, 2008 (2008Q1)
Type: URI:
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) J Austin
R Moore
R Musser
R Lewis
C Even
M Coursey
G Kolcum
B Collins
J Eargler
Musserg Kolcum
J Fuller
H Gepford
J Austin
INPO aspect
'