05000423/LER-1997-013, Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 23: Line 23:
| Mode =  
| Mode =  
| Docket = 05000423
| Docket = 05000423
| LER year = 2097
| LER year = 1997
| LER number = 13
| LER number = 13
| LER revision =  
| LER revision = 0
| Event date =  
| Event date =  
| Report date =  
| Report date =  
Line 33: Line 33:


=text=
=text=
{{#Wiki_filter:.                                                                       -            .                            _
{{#Wiki_filter:.
: t. e 1
t.
gtObd                                                     Ibg.c l'erry lld. (Itouie 1.%), Waterford. UT 06385 Nuclear Energy                                             wn. ..o, Noa,.or Po. r si.iwu Northenar Nudcar F.nergy Guniumy P.O. Ilom 128 Waterford, CT 06385-0128 (860) 447-1791 fax (860) 444-4277 The Northeast Utilities Syotem i
e gtObd Ibg.c l'erry lld. (Itouie 1.%), Waterford. UT 06385 1
Docket No. 50-423                             i B16509                     l May 30,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk
Nuclear Energy wn...o, Noa,.or Po. r si.iwu Northenar Nudcar F.nergy Guniumy P.O. Ilom 128 Waterford, CT 06385-0128 (860) 447-1791 fax (860) 444-4277 The Northeast Utilities Syotem i
Docket No. 50-423 i
B16509 May 30,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk
{
{
Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Revised Schedule Submittal of License Amendment Reauests The purpose of this letter is to provide our revised schedule for the submittal of                                       l License Amendment Requests as identified in Licensee Event Reports 97-013-                                               j 00 T3ilure to Meet General Desian Criteria 57 for the Main Steam Supolv                                                 l Containment isolation Valves to the Auxiliary Feedwater Pumo Turbine". This                                             l License Amendment Request, originally scheduled to be submitted in April 1997                                           i and previously extended until May,1997, is currently scheduled to be submitted                                           j by June 30,1997. Our revised commitment is provided in Attachment 1. The                                               -l l            remaining commitments in our letter of February 28,1997 are unchanged.
Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Revised Schedule Submittal of License Amendment Reauests The purpose of this letter is to provide our revised schedule for the submittal of License Amendment Requests as identified in Licensee Event Reports 97-013-j 00 T3ilure to Meet General Desian Criteria 57 for the Main Steam Supolv Containment isolation Valves to the Auxiliary Feedwater Pumo Turbine". This License Amendment Request, originally scheduled to be submitted in April 1997 i
l                                                                                                                                     l l            Should you have any questions regarding this matter please contact Mr. David                                             j
and previously extended until May,1997, is currently scheduled to be submitted j
;            A. Smith at (860) 437-5840.                                                                                             l Very truly yours,
by June 30,1997. Our revised commitment is provided in Attachment 1. The l
                                                                    ~
remaining commitments in our letter of February 28,1997 are unchanged.
NORT EA-ST                 R-       ERGV COMPANY m         . .
l l
l                                                 G. D     A.
Should you have any questions regarding this matter please contact Mr. David j
g,g ector - Millstone Unit 3 cc:     H. J. Miller, Region i Administrator W.D. Travers, PhD, Director, Special Projects Office                                               Ls0- ( I  i J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 4
A. Smith at (860) 437-5840.
                                    ~
Very truly yours, NORT EA-ST
9706050043 970530                                                \ l((l*hk} k,kkll *'*,
~
PDR   ADOCK 05000423 PDR d*S
R-ERGV COMPANY m
l G. D A.
ector - Millstone Unit 3 g,g Ls0- ( I cc:
H. J.
Miller, Region i Administrator i
W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 4
\\ l((l*hk} k,kkll
~
9706050043 970530 PDR ADOCK 05000423 PDR d*S


                                                                                                              }
}
I i t ..:
I i t..:
i M
i M
l f
f l
i
i e.
: e.                                                                                         :
i a
a
Docket No. 50-423 B16509 I
* i Docket No. 50-423               !
1 I
B16509         I 1
i h
i a
i i
I i
I i
h i
?
a i
i I
i
                                                                                                              ?
I
I
                                                                                                              .i Attachment 1                                          ,
. i Millstone Nuclear Power Station Unit No. 3 l
Millstone Nuclear Power Station Unit No. 3                                 l Revised Commitments                                       (
Revised Commitments
(
i I
i I
l 4
l 4
                                                                                                              }
}
                                                                                                              )
)
i i
i i
i 1
i 1
l I.
l I
i.
i t
,                                                                                                              t i
i f
f
\\
                                                                                                              \
MaY 1997 f
,                                                                                            MaY 1997         ,
a i
f a
b s
,                                                                                                              i b
i h
s                                                                                                              i h
i
i
$f                                                                                                             l I
$f l
e
I e
                              . - -          .am .A                   w     y ,    - - ---          -
.am.A w
1
y 1


                                                                                            ~ . -
~.
                                                                                                  +
+
n
n i
* i i
i U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
, E}16509\\ Attachment 1\\Page 1 Enclosure i
            , E}16509\ Attachment 1\Page 1                                                       ,
List of Regulatory Commitments
Enclosure                                     i List of Regulatory Commitments
{
{
The following table identifies those actions committed to by NNECO in this         ;
The following table identifies those actions committed to by NNECO in this
              ' document. Please notify the Manager - Nuclear. Licensing at the Millstone         ;
' document. Please notify the Manager - Nuclear. Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or j
Nuclear Power Station Unit No. 3 of any questions regarding this document or       j any associated regulatory commitments.                                             :
any associated regulatory commitments.
Commitment                             Committed           i Date or Outage       .
 
B16234 02         A Technical Specification change will       June 30,1997 (LER 97-013-00)   be submitted to add the bypass valves used to pre-warm the AFW pump                                   ;
==Commitment==
turbine to the list of valves permitted to                     i be operated under administrative                                 :
Committed i
control in accordance with Surveillance                         :
Date or Outage B16234 02 A Technical Specification change will June 30,1997 (LER 97-013-00) be submitted to add the bypass valves used to pre-warm the AFW pump turbine to the list of valves permitted to i
Requirement 4.6.1.1.a.
be operated under administrative control in accordance with Surveillance Requirement 4.6.1.1.a.
l l
l 1
l 1
i 1
i 1
2 e
2 e
                  &
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 11:44, 11 December 2024

Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630
ML20148F783
Person / Time
Site: Millstone 
Issue date: 05/30/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16509, NUDOCS 9706050043
Download: ML20148F783 (3)


LER-1997-013, Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630
Event date:
Report date:
4231997013R00 - NRC Website

text

.

t.

e gtObd Ibg.c l'erry lld. (Itouie 1.%), Waterford. UT 06385 1

Nuclear Energy wn...o, Noa,.or Po. r si.iwu Northenar Nudcar F.nergy Guniumy P.O. Ilom 128 Waterford, CT 06385-0128 (860) 447-1791 fax (860) 444-4277 The Northeast Utilities Syotem i

Docket No. 50-423 i

B16509 May 30,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk

{

Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Revised Schedule Submittal of License Amendment Reauests The purpose of this letter is to provide our revised schedule for the submittal of License Amendment Requests as identified in Licensee Event Reports 97-013-j 00 T3ilure to Meet General Desian Criteria 57 for the Main Steam Supolv Containment isolation Valves to the Auxiliary Feedwater Pumo Turbine". This License Amendment Request, originally scheduled to be submitted in April 1997 i

and previously extended until May,1997, is currently scheduled to be submitted j

by June 30,1997. Our revised commitment is provided in Attachment 1. The l

remaining commitments in our letter of February 28,1997 are unchanged.

l l

Should you have any questions regarding this matter please contact Mr. David j

A. Smith at (860) 437-5840.

Very truly yours, NORT EA-ST

~

R-ERGV COMPANY m

l G. D A.

ector - Millstone Unit 3 g,g Ls0- ( I cc:

H. J.

Miller, Region i Administrator i

W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 4

\\ l((l*hk} k,kkll

~

9706050043 970530 PDR ADOCK 05000423 PDR d*S

}

I i t..:

i M

f l

i e.

i a

Docket No. 50-423 B16509 I

1 I

i h

i a

i i

I i

?

I

. i Millstone Nuclear Power Station Unit No. 3 l

Revised Commitments

(

i I

l 4

}

)

i i

i 1

l I

i t

i f

\\

MaY 1997 f

a i

b s

i h

i

$f l

I e

.am.A w

y 1

~.

+

n i

i U.S. Nuclear Regulatory Commission

, E}16509\\ Attachment 1\\Page 1 Enclosure i

List of Regulatory Commitments

{

The following table identifies those actions committed to by NNECO in this

' document. Please notify the Manager - Nuclear. Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or j

any associated regulatory commitments.

Commitment

Committed i

Date or Outage B16234 02 A Technical Specification change will June 30,1997 (LER 97-013-00) be submitted to add the bypass valves used to pre-warm the AFW pump turbine to the list of valves permitted to i

be operated under administrative control in accordance with Surveillance Requirement 4.6.1.1.a.

l 1

i 1

2 e