ML20137L337: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:. _ _ . _ .- _                     . . _ _     . _ . _ -         _         .. -           -. _.   -                           -.         ._ .
{{#Wiki_filter:. _ _ . _ .- _
          @ RIGg                                                                     UNITED STATES
. . _ _
                          Do                                           NUCLEAR REGULATORY COMMISSION
. _ . _ -
  *
_
    g '''                 '',                                                           REGION ll                                                           i
.. -
    <                        j                                                 101 MARIETTA STREET, N.W.
-. _.
        *
-
    *                       g                                                 ATL ANTA, GEORGI A 30323
-.
    % *s. .* /
._
    Report Nos.:                     50-424/85-52 and 50-425/85-37
.
@ RIGg
UNITED STATES
Do
NUCLEAR REGULATORY COMMISSION
g '''
' ' ,
REGION ll
i
*
j
101 MARIETTA STREET, N.W.
<
*
*
g
ATL ANTA, GEORGI A 30323
%
.* /
*s.
Report Nos.:
50-424/85-52 and 50-425/85-37
'
Licensee:
Georgia Power Company
P.O. Box 4545
Atlanta, GA 30302
Docket Nos.:
50-424 and 50-425
License Nos.: CPPR-108 and CPPR-109
Facility Name:
Vogtle Units 1 and 2
Inspection Conducted:
November 1 - December 2, 1985
Inspectors: @ M
///o/86
H. H. Livermore, Senior Resident
Date Signed
'
'
      Licensee:              Georgia Power Company
Inspector, Construction
                              P.O. Box 4545
D M @&
                              Atlanta, GA 30302
1/ soles
    Docket Nos.:                    50-424 and 50-425                                        License Nos.: CPPR-108 and CPPR-109
g J. F. Rog'ge, Senior Resident
      Facility Name:                        Vogtle Units 1 and 2
D' ate Signed
      Inspection Conducted:                                November 1 - December 2, 1985
~
      Inspectors: @ M                                                                                                          ///o/86
Inspector, Operations
                              H. H. Livermore, Senior Resident                                                                Date Signed
>
'
C A @d
                                Inspector, Construction
_///o / f6
                            D M @&                     ~
7
                                                                                                                                1/ soles
M
                                                                                                                                D' ate Signed
n. J. Schepens, Resident
>
Date Signed
              g J. F.Inspector,    Rog'ge, Operations  Senior Resident
R
                            C AR
I spector
                                              7 @d                                                                       _///o Date Signed
ons ruction
                                                                                                                                          / f6
ApprovedBy:)(/!
                M               In.spector  J. Schepens,     ons ruction   Resident
u.%M
    ApprovedBy:)(/!                                       u.%M                                                                 /!/o           ffe
/!/o
                              M. V. Sirikule, Section Chief                                                                           te S'igned
ffe
                              Division of Reactor Projects
M. V. Sirikule, Section Chief
                                                                                      SUMMARY
te S'igned
    Scope:                 This routine, unannounced inspection entailed 238                                                                 resident
Division of Reactor Projects
SUMMARY
Scope:
This
routine,
unannounced
inspection
entailed
238
resident
inspector-hours on site (40 hours were on backshifts) inspecting:
containment
4
4
      inspector-hours on site (40 hours were on backshifts) inspecting:                                                                        containment
and safety related structures, piping systems and supports, safety related
    and safety related structures, piping systems and supports, safety related
components, auxiliary systems, electrical equipment and cables, instrumentation,
    components, auxiliary systems, electrical equipment and cables, instrumentation,
quality programs and administrative controls affecting quality, and follow-up on
    quality programs and administrative controls affecting quality, and follow-up on
previous inspection identified items.
    previous inspection identified items.
Results: One violation was identified in the area of maintenance, paragraph 4.
    Results: One violation was identified in the area of maintenance, paragraph 4.
9601270416 860113
      9601270416 860113
PDR
      PDR   ADOCK 05000425
ADOCK 05000425
      O                                       PDR
O
                                __ __ ___-                -
PDR
                                                                        ._ ____         .           . . . _ _ _ .   ___ - _ . _ _ . _ _ .           -
__ __ ___-
._ ____
.
. . . _ _ _ .
___ - _ . _ _ . _ _ .
-
-


        - -             -                   - -         - -       . _ = - - . .                       _ - . _ -                               _ _ .       . _ - . .   - _ _
- -
-
- -
- -
. _ = - - . .
_ - . _ -
_ _ .
. _ -
.
.
- _ _
:
:
,  .
                                                                          DETAILS
            1.    Persons Contacted
,
,
                  Licensee Employees
.
;               R. E. Conway, Senior Vice-President, Vogtle Project Director
DETAILS
]                 D. O. Foster, Vice-President, Project Support
1.
;             *R. H. Pinson, Vice-President, Project Construction
Persons Contacted
;                 P. D. Rice, Vice-President Project Engineering
Licensee Employees
                  W. T. Nickerson, Assistant to the Project Director
,
                *D. G. Smith, Assistant to the Assistant Project Director
;
                  D. S. Read, General Manager, Corporate Quality Assurance
R. E. Conway, Senior Vice-President, Vogtle Project Director
]
D. O. Foster, Vice-President, Project Support
;
*R. H. Pinson, Vice-President, Project Construction
;
P. D. Rice, Vice-President Project Engineering
W. T. Nickerson, Assistant to the Project Director
*D.
G. Smith, Assistant to the Assistant Project Director
D. S. Read, General Manager, Corporate Quality Assurance
W. C. Ramsey, Readiness Review Manager
,
:
H. H. Gregory III, General Manager, Site Prudence Audit Activities
M. H. Googe, Project Construction Manager
G. Bockhold, Jr., General Manager Nuclear Operations
*H. P. Walker, Manager Unit Operation
,
,
                  W. C. Ramsey, Readiness Review Manager
!
:                H. H. Gregory III, General Manager, Site Prudence Audit Activities
0. Batum, Deputy to the Vice-President Engineering
                  M. H. Googe, Project Construction Manager
j
                  G. Bockhold, Jr., General Manager Nuclear Operations
*C. W. Hayes, Vogtle Quality Assurance Manager
,              *H. P. Walker, Manager Unit Operation
j
!                0. Batum, Deputy to the Vice-President Engineering
*C. E. Belflower, Quality Assurance Site Manager - Operations
j               *C. W. Hayes, Vogtle Quality Assurance Manager
*E. D. Groover, Quality Assurance Site Manager - Construction
j               *C. E. Belflower, Quality Assurance Site Manager - Operations
-
-
                *E. D. Groover, Quality Assurance Site Manager - Construction
S. D. Haltom, Quality Assurance Engineering Support Supervisor
                  S. D. Haltom, Quality Assurance Engineering Support Supervisor
W. E. Mundy, Quality Assurance Audit Supervisor
                  W. E. Mundy, Quality Assurance Audit Supervisor
J. E. Sanders, Project Construction Manager - Unit 1
                  J. E. Sanders, Project Construction Manager - Unit 1
D. M. Fiquett, Project Construction Manager - Unit 2
                  D. M. Fiquett, Project Construction Manager - Unit 2                                                                                                         ,
,
                *B. C. Harbin, Manager Quality Control
*B. C. Harbin, Manager Quality Control
                  C. R. Brewer, Assistant Quality Control Manager
C. R. Brewer, Assistant Quality Control Manager
T. L. Weatherspoon, Assistant Quality Control Manager
,
'
*G. A. McCarley, Project Compliance Coordinator
,
W. C. Gabbard, Assistant Project Compliance Coordinator
J. O. Dorough, Administrative Manager
W. F. Kitchens, Operations Superintendent
;
*P. T. Ciccanesi, Regulatory Compliance Specialist
i.
T. Dannemiller, Senior QA Engineer
J. F. D' Amico, Regulatory Compliance Superintendent
H. W. Swain, Mechanical QC Section Supervisor
,
,
                  T. L. Weatherspoon, Assistant Quality Control Manager
!
,
*C, L. Coursey, Maintenance Superintendent
'
*M. A. Griffis, Maintenance Superintendent
                *G. A. McCarley, Project Compliance Coordinator
Other licensee employees contacted included craftsmen,
                  W. C. Gabbard, Assistant Project Compliance Coordinator
technicians,
                  J. O. Dorough, Administrative Manager
supervisors, engineers, inspectors, and office personnel.
                  W. F. Kitchens, Operations Superintendent
Other Organizations
;              *P. T. Ciccanesi, Regulatory Compliance Specialist
*H. M. Handfinger, Preoperational Test Superintendent - Bechtel
i.                T. Dannemiller, Senior QA Engineer
M. L. Bagale, QA Surveillance Specialist - Bechtel
                  J. F. D' Amico, Regulatory Compliance Superintendent
l-
,                H. W. Swain, Mechanical QC Section Supervisor
B. F. Hurless, QA Surveillance Specialist - Bechtel
!              *C, L. Coursey, Maintenance Superintendent
!
                *M. A. Griffis, Maintenance Superintendent
*F. B. Marsh, Project Engineering Manager - Bechtel
                  Other licensee employees contacted included craftsmen,                                                                             technicians,
.
                  supervisors, engineers, inspectors, and office personnel.
* Attended Exit Interview.
                  Other Organizations
                *H. M. Handfinger, Preoperational Test Superintendent - Bechtel
                  M. L. Bagale, QA Surveillance Specialist - Bechtel
l-               B. F. Hurless, QA Surveillance Specialist - Bechtel
!             *F. B. Marsh, Project Engineering Manager - Bechtel
.               * Attended Exit Interview.
i
i
I
I
.
.
    . - . _ . . _
.
                          _ _ _ _ _ . _ . _    _ _ . -     _ _ _ _ _ _, __ _ _ _ - , _ . _ . _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- . _ . .
                                                                                        .                                                             _
_
                                                                                                                                                                      __
.
.
. -
_ , _
_ - , _ . _ . _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
__
.
_


  _ _ . _ _ _ __                         _   _ __                   _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ . . _ _____
_ _ . _ _ _ __
!
_
I           .
_ __
                                                                                          2
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ . . _ _____
i
!
I
.
2
i
'
'
                        2.         Exit Interview (30703C)
2.
                                    The inspection scope and findings were summarized on September 26, 1985 with                                         '
Exit Interview (30703C)
                                    those persons indicated in paragraph 1 above. The inspector described the
The inspection scope and findings were summarized on September 26, 1985 with
{                                   areas inspected and discussed in detail the inspection finding listed below.
'
j                                   No dissenting comments were received from the licensee.                                 The licensee did
those persons indicated in paragraph 1 above. The inspector described the
{
areas inspected and discussed in detail the inspection finding listed below.
j
No dissenting comments were received from the licensee.
The licensee did
1
1
                                    not identify as proprietary any of the materials provided to or reviewed by
not identify as proprietary any of the materials provided to or reviewed by
                                    the inspector during this inspection,
the inspector during this inspection,
j                                   A separate meeting was held during the inspection period with the General                                             t
j
:                                   Manager, Nuclear Operations to discuss control of access to plant equipment
A separate meeting was held during the inspection period with the General
j                                   and necessary interfaces between Operations and Construction.                                                         ,
t
!
:
!                                   (Closed) Inspector Follow-up Item 50-424/85-13-01 " Review Implementation of
Manager, Nuclear Operations to discuss control of access to plant equipment
i                                   FECO N-17-BF to Install 2 Piece Balance Drum Locknuts into the CVCS Charging
j
                                    Pumps" - Paragraph 4.
and necessary interfaces between Operations and Construction.
;                                                                                                                                                         .
,
                                    (0 pen) Violation, 50-424/85-52-01 " Failure to Provide Adequate Maintenance
!
                                    Procedures for Work on Safety-Related Equipment Appropriate to the
!
                                    Circumstances".
(Closed) Inspector Follow-up Item 50-424/85-13-01 " Review Implementation of
i
FECO N-17-BF to Install 2 Piece Balance Drum Locknuts into the CVCS Charging
Pumps" - Paragraph 4.
;
.
(0 pen) Violation, 50-424/85-52-01 " Failure to Provide Adequate Maintenance
Procedures for Work on Safety-Related Equipment Appropriate to the
Circumstances".
4
4
s                                  The following NRC exit interviews were attended during the inspection period
The following NRC exit interviews were attended during the inspection period
I                                   by a resident inspector:
s
i                                                                                                                     -                               .
I
                                                  November 22, 1985                                   J. R. Harris
by a resident inspector:
                                                  November 27, 1985                                   0. Masnyk
i
                        3.         Licensee Action on Previous Enforcement Matters (92702)
-
                                                                                                                                                          i
.
l                                  (Open) Violation 50-424/85-43-01, 50-425/85-32-01; " Failure to Provide
November 22, 1985
                                    Adequate Protection to Safety-Related Components During In-Plant Storage" A
J. R. Harris
November 27, 1985
0. Masnyk
3.
Licensee Action on Previous Enforcement Matters (92702)
l
(Open) Violation 50-424/85-43-01, 50-425/85-32-01; " Failure to Provide
i
Adequate Protection to Safety-Related Components During In-Plant Storage" A
!
!
                                    meeting was held on November 22, 1985 at the Resident's office to discuss
meeting was held on November 22, 1985 at the Resident's office to discuss
the licensee's response to NRC Violation 50-424/85-43-01, 50-425-85-32-01,
,
,
                                    the licensee's response to NRC Violation 50-424/85-43-01, 50-425-85-32-01,
dated November 15, 1985. The licensee informed the inspectors that they
'
'
                                    dated November 15, 1985. The licensee informed the inspectors that they
will be issuing a supplement to their response.
                                    will be issuing a supplement to their response.
!
!
4.
Licensee Action on Previous Inspection Items (92701)
!
!
!                        4.        Licensee Action on Previous Inspection Items (92701)
(Closed) Inspector Followup Item, 50-424/85-13-01 " Review Implementation of
!                                  (Closed) Inspector Followup Item, 50-424/85-13-01 " Review Implementation of
l
l                                   FECO N-17-BF to install two piece balance drum locknuts into the CVCS
FECO N-17-BF to install two piece balance drum locknuts into the CVCS
}                                   centrifugal charging pumps". The inspector reviewed maintenance work orders
}
;                                   (MWO) No's. 1811851 and 1811852 for the installation of the new two piece
centrifugal charging pumps". The inspector reviewed maintenance work orders
                                    balance drum locknut assembly per FECO N-17-BF, Rev. O on the Train "A" &
;
.
(MWO) No's. 1811851 and 1811852 for the installation of the new two piece
                                    "B" CVCS centrifugal charging pumps. In addition, the inspector witnessed
balance drum locknut assembly per FECO N-17-BF, Rev. O on the Train "A" &
!                                  the installation of the new two piece balance drum locknut assembly on the
.
l                                  Train "B" CVCS centrifugal charging pump.
"B" CVCS centrifugal charging pumps.
In addition, the inspector witnessed
!
!
                                    During the inspection of the Train "B"                                   CVCS centrifugal charging pump
the installation of the new two piece balance drum locknut assembly on the
;                                  balance drum locknut assembly change out on November 16 & 18, 1985, the
l
j                                    inspector reviewed the following MWO's and procedures and the MWO associated
Train "B" CVCS centrifugal charging pump.
!
During the inspection of the Train
"B" CVCS centrifugal charging pump
;
;
                                    with a lube oil flush and speed increaser gear inspection.
balance drum locknut assembly change out on November 16 & 18, 1985, the
i                                                                                                                                                         ,
j
inspector reviewed the following MWO's and procedures and the MWO associated
;
with a lube oil flush and speed increaser gear inspection.
i
,
!
!
l
l
                _ __--.. _ _ _____ _                                                    _ _ _ . _ _                                      - - - . _. -_
--..
.
- - - .
. -


    -             -   . - - . - - .                                                       _-. _..   . - -                       .     - . . _ _         _               .     - --
-
  4
-
      .
. - - . - - .
  ;                                                                                               3
_-. _..
  1
. - -
  i
.
                                MWO 18511851                         MWO To Install New Two-Piece Balance Drum Locknut
- .
i                                                                   Assembly on Train "A" CVCS Centrifugal Charging
. _ _
  i                                                                 Pump
_
,                              MWO 18511852                         MWO To Install New Two-Piece Balance Drum Locknut
.
  i                                                                 Assembly on Train "B" CVCS Centrifugal Charging
-
j                                                                   Pump
--
                                                                    MWO to Provide Maintenance Support for Lube Oil
4
  '
.
'
3
                                MWO 18511088
;
                                                                    Flush and Inspection / Cleaning of Speed Increaser                                                                         ;
1
:                                                                   Gear
i
i                               SUM-22, Rev. 10                     Maintenance Work Orders
MWO 18511851
                                27116-C, Rev. 1                     Pacific RL/IJ Pump Inspection
MWO To Install New Two-Piece Balance Drum Locknut
  1
i
j                   During the inspection the inspector noted the following discrepancies
Assembly on Train "A" CVCS Centrifugal Charging
<                  regarding the implementation of SUM-22:                                                                                                                                     i
i
l                   a.         A MWO was issued without all of the applicable documents. FECC N-17-BF                                                                                           ;
Pump
                                specifies the installation instructions for a new two piece balance                                                                                             ,
MWO 18511852
                                drum locknut assembly.                                       MWO 18511852 was issued to implement                                                               j
MWO To Install New Two-Piece Balance Drum Locknut
i                               installation of two piece balance drum locknut assembly utilizing FECO                                                                                         t
,
                                N-17-BF. However, upon inspection at the work site FECO N-17-BF was
i
                                not part of the MWO package. In addition, when FECO N-17-BF was
Assembly on Train "B" CVCS Centrifugal Charging
                                obtained and added to the MWO the inspector noted that it was marked as
j
                                an uncontrolled copy and not for construction use.
Pump
                    b.         MWO was issued without appropriate work procedures and instructions.
'
i                               MWO 18511852 & 18511851 were issued with maintenance procedure
MWO 18511088
i                               No. 27116-C.             This maintenance procedure was for the complete
MWO to Provide Maintenance Support for Lube Oil
!                               disassembly, inspection, and reassembly of a CVCS Pump.                                                               The scope of
'
i                               work, however, only required the disassembly of the outboard bearing
Flush and Inspection / Cleaning of Speed Increaser
                                and seal to achieve access for replacement of the two piece balance
;
i                               drum locknut assembly.                                       During the preparation of the MWO the
:
i                               unnecessary steps were not deleted nor was the necessary step to affect
Gear
                                replacement of the new locknut added,
i
j                               MWO 18511088 was issued without appropriate work procedures and
SUM-22, Rev. 10
i                               instructions for the disassembly, inspection, and reassembly of the
Maintenance Work Orders
                                speed increase gear for performing the lube oil flush. In essence the
27116-C, Rev. 1
!                               three MW0's should have been closely coordinated to achieve the overall
Pacific RL/IJ Pump Inspection
1
j
During the inspection the inspector noted the following discrepancies
regarding the implementation of SUM-22:
i
<
l
a.
A MWO was issued without all of the applicable documents. FECC N-17-BF
;
specifies the installation instructions for a new two piece balance
,
drum locknut assembly.
MWO 18511852 was issued to implement
j
i
installation of two piece balance drum locknut assembly utilizing FECO
t
N-17-BF.
However, upon inspection at the work site FECO N-17-BF was
not part of the MWO package.
In addition, when FECO N-17-BF was
obtained and added to the MWO the inspector noted that it was marked as
an uncontrolled copy and not for construction use.
b.
MWO was issued without appropriate work procedures and instructions.
i
MWO 18511852 & 18511851 were issued with maintenance procedure
i
No. 27116-C.
This maintenance procedure was for the complete
!
disassembly, inspection, and reassembly of a CVCS Pump.
The scope of
i
work, however, only required the disassembly of the outboard bearing
and seal to achieve access for replacement of the two piece balance
i
drum locknut assembly.
During the preparation of the MWO the
i
unnecessary steps were not deleted nor was the necessary step to affect
replacement of the new locknut added,
j
MWO 18511088 was issued without appropriate work procedures and
i
instructions for the disassembly, inspection, and reassembly of the
speed increase gear for performing the lube oil flush. In essence the
!
three MW0's should have been closely coordinated to achieve the overall
work scope intended for the CVCS Centrifugal Charging Pumps.
;
;
                                work scope intended for the CVCS Centrifugal Charging Pumps.
[
[                    c.         MV0's were processed without the ability to perform adequate reviews.
c.
!                               As identified in paragraph b above, the MWO's contained numerous steps
MV0's were processed without the ability to perform adequate reviews.
i                               that would not be performed and some steps were not included. Since
!
                                each MWO undergoes reviews by representatives from engineering,
As identified in paragraph b above, the MWO's contained numerous steps
1-                             operation, maintenance and quality control, it was evident that proper
i
that would not be performed and some steps were not included.
Since
each MWO undergoes reviews by representatives from engineering,
1-
operation, maintenance and quality control, it was evident that proper
reviews could not be performed due to a lack of detailed instructions
.
.
                                reviews could not be performed due to a lack of detailed instructions
to implement the work scope. In the instance of the QC review for MWO
                                to implement the work scope. In the instance of the QC review for MWO
l
l
!
!
,
,
4                                                                                                                                                                               ~
4
l
~
        ----- -, ,       - _ ,,     r--, - - - - , - , -   , , - - . . - , . _ , - . - _               .-n , , . - - - - - - - - - - -
l
                                                                                                                                                  -
----- -, ,
                                                                                                                                                    , ,r-   . - . . - . - - -.       . . , , -
- _ ,,
r--,
- - - - , - , -
, , - - . . - , . _ , - . - _
.-n
, , . - - - - - - - - - - -
,
,r-
. - . . - . - - -.
. . , , -
-


          -                   -     -               -     - .   - -     - _           . - .           -. .
-
  ,
-
  i
-
    .
-
                                                                4
- .
                          18411852, hold points were established for steps that were not
- -
                          performed and no hold point was established for witnessing the
- _
i                         installation of the new locknut. This hold point was later established
. - .
  ,                      after FEC0 N-17-BF was added to the work package as mentioned in
-.
                          paragraph a. above.
.
  !           d.         During the performance of work under MWO 18511852 it was ooserved that
,
                          a QC inspector verbally waived a hold point upon recommendation by the
i
                          vendor; however, SUM-22 requires an approved and documented consent
.
                          waiver prior to work proceeding.
4
  :                       The above discreparcies are examples of failure to provide adequate
18411852, hold points were established for steps that were not
,
performed and no hold point was established for witnessing the
                          control of maintenance activities regarding preplanning and review of
i
J                       work.
installation of the new locknut. This hold point was later established
                          Several meetings were held with the licensee to fully discuss NRC
after FEC0 N-17-BF was added to the work package as mentioned in
                          concerns in this area.       The NRC concern centers on thr- fact that the
,
                          MWO process relies on the worker to identify the problems in execution
paragraph a. above.
                          of the maintenance and seek resolution of the problem while under
!
  i
d.
                          pressure to complete the work.             In the initial execution of MWO
During the performance of work under MWO 18511852 it was ooserved that
  ;                        18511852 it was observed, and later confirmed by the licensee, that the
a QC inspector verbally waived a hold point upon recommendation by the
                          workers had not read nor were following the work procedure but instead
vendor; however, SUM-22 requires an approved and documented consent
  '
waiver prior to work proceeding.
                          were following the verbal directions of the vendor representative.
:
The above discreparcies are examples of failure to provide adequate
control of maintenance activities regarding preplanning and review of
,
J
work.
Several meetings were held with the licensee to fully discuss NRC
concerns in this area.
The NRC concern centers on thr- fact that the
MWO process relies on the worker to identify the problems in execution
of the maintenance and seek resolution of the problem while under
i
pressure to complete the work.
In the initial execution of MWO
18511852 it was observed, and later confirmed by the licensee, that the
;
'
workers had not read nor were following the work procedure but instead
were following the verbal directions of the vendor representative.
.
.
                          The foregoing is considered to be in violation of 10 CFR Part 50,
The foregoing is considered to be in violation of 10 CFR Part 50,
4
4
  '
Appendix
                          Appendix    B, Criterion V and will be identified as Violation
B,
                          50-424/85-52-01 " Failure to provide adequate maintenance procedures for
Criterion V and will be identified as Violation
                          work on safety-related equipment appropriate to the circumstances".
'
!                       Subsequently, the licensee took the following corrective steps prior to
50-424/85-52-01 " Failure to provide adequate maintenance procedures for
                          resuming work:
work on safety-related equipment appropriate to the circumstances".
[                         -
!
                                A maintenance foreman was assigned to supervise all of the MWO's
Subsequently, the licensee took the following corrective steps prior to
:                               associated with the CVCS centrifugal charging pumps through their
resuming work:
                                completion.
[
-
A maintenance foreman was assigned to supervise all of the MWO's
:
associated with the CVCS centrifugal charging pumps through their
completion.
MWO's 18511851 & 18511852 were enhanced by specifying the exact
-
_
_
                          -
steps required to be performed in maintenance procedure No.
                                MWO's 18511851 & 18511852 were enhanced by specifying the exact
l
l                                steps required to be performed in maintenance procedure No.
i
i                               27116-C.
27116-C.
                          -
-
                                MWO 18511088 was voided due to inadequate instructions and
MWO 18511088 was voided due to inadequate instructions and
!                               reissued as MWO 18512832.
!
reissued as MWO 18512832.
I
I
r
r
                          -
MWO 18512832 was issued with detailed instructions for performing
                                MWO 18512832 was issued with detailed instructions for performing
-
l                               the lube oil flush. Instructions were also providea pertaining to
l
,                                the completion of some of the work in support of the lube oil
the lube oil flush. Instructions were also providea pertaining to
the completion of some of the work in support of the lube oil
,
flush on MWO 18512833,
:
:
                                flush on MWO 18512833,
i
i
l
l
l
l
.
.
      - .   -.   . - - -                                                                             - . -
- .
-.
. - - -
.-. - - - - - -
-.
..
. ._
- _
- . -


                  _ . __           _ _ _ .       _ _ _   ._ __ _. ._                                         _ _ _ _ _ _ .   _ - _ _ _ _ .
_ . __
;
_ _ _ .
  !
_ _ _
    .
._ __ _. ._
'
_ _ _ _ _ _ .
                                                                                      5
_ - _ _ _ _ .
;
!
.
'
5
i
i
  ;
;
-
{
-
-
{
Maintenance procedure No. 27115-C, Rev. O for the disassembly,
                                -
inspection, and reassembly of the speed increaser gear was issued
                                            Maintenance procedure No. 27115-C, Rev. O for the disassembly,
,
,                                          inspection, and reassembly of the speed increaser gear was issued
I
  I
on November 19, 1985.
                                            on November 19, 1985.
.
.
l                               -
l
                                            MWO 18512833 was issued to disassemble, clean, inspect and
MWO 18512833 was issued to disassemble, clean, inspect and
!
-
                                            reassemble speed increaser gear per the maintenance procedure.
!
  ,                                        Additional instructions were also provided pertaining to the
reassemble speed increaser gear per the maintenance procedure.
Additional instructions were also provided pertaining to the
,
J
J
                                            intermediate reassembly process in support of the lube oil flush
intermediate reassembly process in support of the lube oil flush
,
,
                                            per MWO 18512832.
per MWO 18512832.
'
'
                                                                                                                                                    ,
,
      5.                 Construction Inspection - Units 1 & 2
5.
i
Construction Inspection - Units 1 & 2
                          Periodic inspections were made throughout this reporting period in the form
i
                          of general type inspections in different areas of both facilities.                                                 The
Periodic inspections were made throughout this reporting period in the form
                          areas were selected on the basis of the scheduled activities and were varied
of general type inspections in different areas of both facilities.
                          to provide wide coverage. Observations were made of activities in progress
The
.
areas were selected on the basis of the scheduled activities and were varied
                          to note defective items or items of noncompliance with the required codes
to provide wide coverage. Observations were made of activities in progress
i                         and regulatory requirements. On these inspections, particular note was made
.
i                       of the presence of quality control inspectors, supervisors, and quality
to note defective items or items of noncompliance with the required codes
i
and regulatory requirements. On these inspections, particular note was made
i
of the presence of quality control inspectors, supervisors, and quality
control evidence in the form of available process sheets, drawings, material
4
4
                          control evidence in the form of available process sheets, drawings, material
                          identification, material protection, performance of tests, and housekeeping.
]
]
                          Interviews were made with craft personnel, supervisors, coordinators,
identification, material protection, performance of tests, and housekeeping.
Interviews were made with craft personnel, supervisors, coordinators,
quality control inspectors, and others as they were available in the work
,
,
                          quality control inspectors, and others as they were available in the work
areas.
;
;
                          areas.
t
t
i                       The inspector reviewed numerous construction deviation reports to determine
i
:                         if requirements were met in the areas of documentation, action to resolve,
The inspector reviewed numerous construction deviation reports to determine
4                        justification, and approval signatures in accordance with GPC Field
:
if requirements were met in the areas of documentation, action to resolve,
justification, and approval signatures in accordance with GPC Field
4
Procedure No. GD-T-01.
;
!
On November 19, the inspectors attended one of the licensee briefings given
i
to their QC inspectors to inform them of how protection under federal law is
i
provided.
These briefings were an hour long and were scheduled to be
;
;
                          Procedure No. GD-T-01.
presented nine (9) times during the day to reach as many QC personnel on
!                        On November 19, the inspectors attended one of the licensee briefings given
both shifts. The presentation was given by W. C. Whitney, B. C. Harbin and
i                        to their QC inspectors to inform them of how protection under federal law is
i                        provided.          These briefings were an hour long and were scheduled to be
;                        presented nine (9) times during the day to reach as many QC personnel on
4
4
                          both shifts. The presentation was given by W. C. Whitney, B. C. Harbin and
L. B. Glenn.
Mr. Whitney described the legal basis for protection
-
-
                          L. B. Glenn.              Mr. Whitney described the legal basis for protection
j
j                        available to the employee from the Department of Labor and outlined the
available to the employee from the Department of Labor and outlined the
,                        legal process that could take place thru the Supreme Court. He stated that
legal process that could take place thru the Supreme Court. He stated that
i                         Vogtle takes the position that the writing of Deficiency Reports are
,
i                         protected activities. Mr. Whitney stressed that no-one on the project will
i
i                         be retaliated against for identifying a quality concern. The proper level
Vogtle takes the position that the writing of Deficiency Reports are
;                         for resolving a concern was identified as first with supervisor then the
i
!                         Quality Concerns Program and finally the NRC which is available at any                                                   .
protected activities. Mr. Whitney stressed that no-one on the project will
l                         point.     In summary, it was stressed that no-one should get the impression
i
                          that concerns were not wanted, but instead must bring them forth as part of                                               ,
be retaliated against for identifying a quality concern. The proper level
;                         your employment. Mr. Glenn presented an overview of the Quality Concerns
;
                          Program. In the presentation, i t was pointed out that concerns would be                                                 ,
for resolving a concern was identified as first with supervisor then the
;                         processed and investigated within seven days to preserve the thirty-day time
!
Quality Concerns Program and finally the NRC which is available at any
.
l
point.
In summary, it was stressed that no-one should get the impression
that concerns were not wanted, but instead must bring them forth as part of
,
;
your employment. Mr. Glenn presented an overview of the Quality Concerns
Program. In the presentation, i t was pointed out that concerns would be
;
processed and investigated within seven days to preserve the thirty-day time
,
4
4
;
;
?
?
4
4
      -,.------.s             ,,v.                                   .---..-,-...----e.-.__---.--.,--,-.--.w
r%,- . , _ _- . - , -
                                                                                                            -               --                   --
-,.------.s
c
,,v.
-, . , , , _ ,
,.,..--- --.,--,
.---..-,-...----e.-.__---.--.,--,-.--.w
m
, . ,
,
,..-m-
--
.m-.,...mr
-
--


.
.
                                          6
6
    frame the employee would have to submit a complaint to the Department of
frame the employee would have to submit a complaint to the Department of
    Labor. It was also stressed that this program was not in place to be used
Labor. It was also stressed that this program was not in place to be used
    as a threat to a supervisor. Mr. Harbin stressed the avenues for raising a
as a threat to a supervisor. Mr. Harbin stressed the avenues for raising a
    concern; and stated that he thought that Vogtle had the best QC inspectors.
concern; and stated that he thought that Vogtle had the best QC inspectors.
    He also made the point that as the QC Manager he was available to discuss
He also made the point that as the QC Manager he was available to discuss
    any concerns. The meeting was opened for questions. The inspector noted
any concerns. The meeting was opened for questions.
    that several times during the presentation that emphasis was made to stress
The inspector noted
    the importance of QC inspectors bringing quality concerns forward for
that several times during the presentation that emphasis was made to stress
    identification and resolution.
the importance of QC inspectors bringing quality concerns forward for
    No violations or deviations were identified.
identification and resolution.
  6. Fire Prevention / Protection and Housekeeping Measures - Units 1 & 2 (42051C)
No violations or deviations were identified.
    The inspector observed fire prevention / protection measures throughout the
6.
      inspection period. Welders were using welding permits with fire watches and
Fire Prevention / Protection and Housekeeping Measures - Units 1 & 2 (42051C)
    extinguishers.   Post indicator valves were being maintained in the open
The inspector observed fire prevention / protection measures throughout the
    position. Fire fighting equipment is in its designated areas throughout the
inspection period. Welders were using welding permits with fire watches and
    plant.
extinguishers.
    The inspector reviewed and examined portions of the following procedures
Post indicator valves were being maintained in the open
    pertaining to the fire prevention / protection measures and housekeeping
position. Fire fighting equipment is in its designated areas throughout the
    measures to determine whether they comply with applicable codes, standards,
plant.
    NRC Regulatory Guides and licensee commitments.
The inspector reviewed and examined portions of the following procedures
          -GD-T-05, Rev. 6 Fire-Protection Equipment Inspection and Testing
pertaining to the fire prevention / protection measures and housekeeping
          -GD-T-15   Rev. 5 Welding and Cutting
measures to determine whether they comply with applicable codes, standards,
          -GD-T-17, Rev. 3 Housekeeping
NRC Regulatory Guides and licensee commitments.
    The inspector observed fire prevention / protection measures in work areas
-GD-T-05, Rev. 6 Fire-Protection Equipment Inspection and Testing
    containing safety related equipment during the inspection period to verify
-GD-T-15
    the following:
Rev. 5 Welding and Cutting
    -
-GD-T-17, Rev. 3 Housekeeping
          Combustible waste material and rubbish was removed from the work areas
The inspector observed fire prevention / protection measures in work areas
          as rapidly as practicable to avoid unnecessary accumulation of
containing safety related equipment during the inspection period to verify
          combustibles.
the following:
    -
-
          Flammable liquids are stored in appropriate containers and in
Combustible waste material and rubbish was removed from the work areas
          designated areas throughout the plant.
as rapidly as practicable to avoid unnecessary accumulation of
    -
combustibles.
          Cutting and welding operations in progress have been authorized by an
-
          appropriate permit, combustibles have been moved away or safely
Flammable liquids are stored in appropriate containers and in
          covered, and a fire watch and extinguisher was posted as required.
designated areas throughout the plant.
    -
Cutting and welding operations in progress have been authorized by an
          Fire protection / suppression equipment was provided and controlled in
-
          accordance with applicable requirements.
appropriate permit, combustibles have been moved away or safely
      No violations or deviations were identified.
covered, and a fire watch and extinguisher was posted as required.
-
Fire protection / suppression equipment was provided and controlled in
accordance with applicable requirements.
No violations or deviations were identified.


                                                    7
7
      7. Containment (Structural Concrete) - Unit 2 (47053C)
7.
          a. Procedure and Document Review
Containment (Structural Concrete) - Unit 2 (47053C)
              The inspector reviewed and examined portions of the following
a.
              procedures pertaining to the placement of concrete to determine whether
Procedure and Document Review
              they comply with applicable codes, standards, NRC Regulatory Guides and
The inspector reviewed and examined portions of the following
              licensee commitments.
procedures pertaining to the placement of concrete to determine whether
              -
they comply with applicable codes, standards, NRC Regulatory Guides and
                    CD-T-02, Rev. 15       Concrete Quality Control
licensee commitments.
              -
-
                    CD-T-06, Rev. 9       Rebar and Cadweld Quality Control
CD-T-02, Rev. 15
              -
Concrete Quality Control
                    CD-T-07, Rev. 8       Embed Installation and Inspection
CD-T-06, Rev. 9
              -
Rebar and Cadweld Quality Control
                    CD-T-20, Rev. 6       Installation and Inspection of Trumpets,
-
-
CD-T-07, Rev. 8
Embed Installation and Inspection
-
CD-T-20, Rev. 6
Installation and Inspection of Trumpets,
Rigid Extensions, and Duct Sheathing
>
>
                                              Rigid Extensions, and Duct Sheathing
b.
          b.   Installation Activities
Installation Activities
              The inspector witnessed portions of the concrete placement indicated
The inspector witnessed portions of the concrete placement indicated
              below to verify the following:
below to verify the following:
              (1)   Forms, Embedment, and Reinforcing Steel Installation
(1)
Forms, Embedment, and Reinforcing Steel Installation
-
Forms were p operly placed, secure, leak tight and clean.
'
'
                    -
-
                            Forms were p operly placed, secure, leak tight and clean.
Rebar and other embedment installation was installed
                    -
in
                            Rebar and other embedment installation was installed
accordance
                            in accordance with construction specifications and
with
                            drawings, secured, free of concrete and excessive rust,
construction
                            specified distance from forms, proper on-site rebar
specifications
                            bending (where applicable) and clearances consistent
and
                            with aggregate size.
drawings, secured, free of concrete and excessive rust,
              (2) Delivery, Placement and Curing
specified distance
                    -
from forms,
                            Preplacement inspection was completed and approved prior
proper on-site rebar
                            to placement utilizing a Pour Card (Procedure Exhibit
bending
                            CD-T-02*18).
(where
                    -
applicable)
                            Construction joints were prepared as specified.
and clearances
                    -
consistent
                            Proper mix was specified and delivered.
with aggregate size.
                    -
(2) Delivery, Placement and Curing
                            Temperature control of the mix, mating surfaces, and
-
                            ambient were monitored.
Preplacement inspection was completed and approved prior
                    -
to placement utilizing a Pour Card (Procedure Exhibit
                            Consolidation was performed correctly.
CD-T-02*18).
                    -
Construction joints were prepared as specified.
                            Testing at placement location was properly performed in
-
                            accordance with the acceptance criteria and recorded on a
-
                            Concrete Pikacement Pour Log (Procedure Exhibit CD-T-02*20).
Proper mix was specified and delivered.
                    -
-
                            Adequate crew, equipment and techniques were utilized.
Temperature control
                    -
of the mix, mating surfaces, and
                            Inspections during placements were conducted effectively
ambient were monitored.
                            by a sufficient number of qualified personnel.
-
                    -
Consolidation was performed correctly.
                            Curing temperature was monitored.
-
  __ _                   ._     __     ._.   _ _ _                           __ ,   __
Testing at placement location was properly performed in
accordance with the acceptance criteria and recorded on a
Concrete Pikacement Pour Log (Procedure Exhibit CD-T-02*20).
-
Adequate crew, equipment and techniques were utilized.
Inspections during placements were conducted effectively
-
by a sufficient number of qualified personnel.
-
Curing temperature was monitored.
__
_
._
__
._.
_ _ _
__
,
__


      .   _ - -
.
                    _ . - _         __   . _ _ _ _ _ _ .         _   ._   _ _ .         . . _ _ . _ _ . _ . . . _ .
_ -
                                                                                                                      l
-
                                                                                                                      1
_ . - _
i       .                                                                                                             <
__
  .
. _ _ _ _ _ _ .
i                                                                 8
_
._
_ _ .
. . _ _ . _ _ . _ . . . _ .
l
1
i
<
.
.
i
8
;
;
                              Pour No.                       Location               Inspection Activity
Pour No.
.
Location
                    A-1111-087                       Control Building Wall       Preplacement and Placement
Inspection Activity
                    2-59A003, 2-59A-004 Auxiliary Feedwater                       Preplacement, Placement,
.
                                                      Pump House Base Slab         and Curing
A-1111-087
I                   2-010-042/043                     Containment Dome             Preplacement and Placement
Control Building Wall
                No violations or deviations were identified.
Preplacement and Placement
!         8.   Containment (Prestressing) - Unit 1 (47063C)
2-59A003, 2-59A-004 Auxiliary Feedwater
Preplacement, Placement,
Pump House Base Slab
and Curing
I
2-010-042/043
Containment Dome
Preplacement and Placement
No violations or deviations were identified.
!
8.
Containment (Prestressing) - Unit 1 (47063C)
!
I
a.
Procedure and Document Review
The inspector reviewed and examined portions of the following
!
!
I              a.      Procedure and Document Review
specification, procedure, and drawings pertaining to the installation
                        The inspector reviewed and examined portions of the following
!
'
                          specification, procedure, and drawings pertaining to the installation
                        of horizontal tendons, to determine whether they comply with applicable
1                        codes, standards, NRC Regulatory Guides and licensee commitments.
                              -X2AF04                    Technical Provisions for Containment
                                                          Post-Tensioning System
                              -AX2AF04-100-12            Field Instruction Manual for Installation
                                                          of VSL E5-55 Post-Tensioning System Within
l                                                        Nuclear Containment Structures, Rev. 9
,                              -1X2AF04-50-5              Horizontal Tendon Elevation-Unit 1
                                                          Buttress #1 to #2
                              -1X2AF04-51-4              Horizontal Tendon Elevation-Unit 1
'
'
                                                          Buttress #3 to #1
of horizontal tendons, to determine whether they comply with applicable
;                              -1X2AF04-52-3               Horizontal Tendon Elevation-Unit 1
codes, standards, NRC Regulatory Guides and licensee commitments.
                                                          Buttress #2 to #3
1
-X2AF04
Technical Provisions for Containment
Post-Tensioning System
-AX2AF04-100-12
Field Instruction Manual for Installation
of VSL E5-55 Post-Tensioning System Within
l
Nuclear Containment Structures, Rev. 9
-1X2AF04-50-5
Horizontal Tendon Elevation-Unit 1
,
Buttress #1 to #2
'
-1X2AF04-51-4
Horizontal Tendon Elevation-Unit 1
Buttress #3 to #1
-1X2AF04-52-3
Horizontal Tendon Elevation-Unit 1
;
Buttress #2 to #3
-AX2AF04-78-4
Horizontal Tendon Stressing Data
:4
:4
                              -AX2AF04-78-4               Horizontal Tendon Stressing Data
-AX2AF04-79-4
                              -AX2AF04-79-4              Horizontal Tendon Stressing Data
Horizontal Tendon Stressing Data
i
i
                b.       Installation Activities
b.
                        The inspector witnessed portions of the installation activities
Installation Activities
:                       indicated below to verify the following:
The inspector witnessed portions of the installation activities
                        -
:
                              The latest issue (revision) of applicable dra. ngs or procedures
indicated below to verify the following:
-
The latest issue (revision) of applicable dra. ngs or procedures
are available to the installers and were being used.
4
4
                              are available to the installers and were being used.
!
!
                        -
Tendons were free of nicks, kinks, corrosion; were installed in
                              Tendons were free of nicks, kinks, corrosion; were installed in
-
;
;
                              designated locations; and that the installation sequence and
designated locations; and that the installation sequence and
l                             technique was per specified requirements.
l
technique was per specified requirements.
1
1
;
;
                        -
Installation crew was properly trained and qualified.
                              Installation crew was properly trained and qualified.
-
QC inspection was properly performed by qualified personnel in
-
'
'
                        -
accordance with applicable requirements.
                              QC inspection was properly performed by qualified personnel in
                              accordance with applicable requirements.
!
!
t
t
    %,
%,


  _.                         ..     -                       .         -. .         _.
_.
..
-
.
-. .
_.
.
.
                                              9
9
            -
Adequate protective measures were being taken to ensure mechanical
                  Adequate protective measures were being taken to ensure mechanical   ,
,
                  and corrosion protection during storage, handling,                   '
-
                    installation, and post installation.
and corrosion protection during storage, handling,
            -
'
                  Tendons were stressed in the proper sequence.
installation, and post installation.
            -
-
                  All strands in the tendon were moving together during the
Tendons were stressed in the proper sequence.
                  stressing and the tendon is being stressed from both ends
All strands in the tendon were moving together during the
                  simultaneously.
-
            -
stressing and the tendon is being stressed from both ends
                  Elongatiari measurements were being taken properly and being
simultaneously.
                  compared to the calculated elongation.
-
            -
Elongatiari measurements were being taken properly and being
                  Anchor head lift-off force was being taken and documented
compared to the calculated elongation.
                  properly.
-
            -
Anchor head lift-off force was being taken and documented
                  The stressing operation was being monitored to identify any strand
properly.
                  slippage.
The stressing operation was being monitored to identify any strand
            The following tendons were observed:
-
              Horizontal       From Buttress
slippage.
              Tendon No.       to Buttress     Seq. No.   Activity
The following tendons were observed:
                  116         2 East-1 South       20       Pull Through Dummy
Horizontal
                                                              Tendon
From Buttress
                  117         3 West-2 West       20       Tendon Installation
Tendon No.
                  139*         1 North-3 East       24       Tendon Stressing
to Buttress
                  240         2 East-1 South       24       Tendon Stressing
Seq. No.
            * Surveillance Tendon
Activity
          No violations or deviations were identified.
116
    9. Containment (Steel Structures and Supports) - Units 1 & 2 (48053C)
2 East-1 South
        Periodic inspections were conducted to observe containment steel and support
20
        installation activities in progress, to verify the following:
Pull Through Dummy
        -
Tendon
            Compenents were being       properly handled   (included bending   or
117
            straightening).
3 West-2 West
        -
20
            Specified clearances were being maintained.
Tendon Installation
        -
139*
            Edge finishes and hole sizes were within tolerances.
1 North-3 East
        -
24
            Control, marking, protection and segregation were maintained during
Tendon Stressing
              storage.
240
2 East-1 South
24
Tendon Stressing
* Surveillance Tendon
No violations or deviations were identified.
9.
Containment (Steel Structures and Supports) - Units 1 & 2 (48053C)
Periodic inspections were conducted to observe containment steel and support
installation activities in progress, to verify the following:
-
Compenents were being
properly
handled
(included bending
or
straightening).
Specified clearances were being maintained.
-
-
Edge finishes and hole sizes were within tolerances.
-
Control, marking, protection and segregation were maintained during
storage.


                                                    . -.   - -               -.                                 . -_ -                             _-         _
. -.
                                                                                                                                                                    _, .
- -
-.
. -_ -
_-
_
_,
.
4
4
        s
s
                                                                                10
10
                                                                                                                                                                          i
i
                        -
Fit-up/ alignment meets the tolerances in the specifications and
                                          Fit-up/ alignment meets the tolerances in the specifications and
-
                                          drawings.
drawings.
                            No violations or deviations were identified.
No violations or deviations were identified.
,
10.
          10.           Safety-Related Structures (Structural Steel and Supports) - Units 1 & 2
Safety-Related Structures (Structural Steel and Supports) - Units 1 & 2
                        (48063C)
,
'
(48063C)
                        Periodic inspections were conducted to observe construction activities of
'
                        safety-related structures / equipment supports for major equipment outside the
Periodic inspections were conducted to observe construction activities of
                        containment to verify that:
safety-related structures / equipment supports for major equipment outside the
                        -
containment to verify that:
                                          Materials and components were being properly handled to prevent damage.                                                         ,
-
                        -
Materials and components were being properly handled to prevent damage.
                                          Fit-up/ alignment were within tolerances in specifications and drawing
,
                                          requirements.
-
                        -
Fit-up/ alignment were within tolerances in specifications and drawing
                                          Specified clearances from adjacent components were being met.
requirements.
                        No violations or deviations were identified.
-
          11.           Reactor Coolant Pressure Boundary Piping - Observation of work and work
Specified clearances from adjacent components were being met.
                        activities - Unit 1 (49053C) (52063C) (52153C) (37301)
No violations or deviations were identified.
                        During the inspection period, pipe run walkdowns were performed where piping
11.
                        installation is near completion to determine whether the piping run was
Reactor Coolant Pressure Boundary Piping - Observation of work and work
                        installed as shown on approved drawings and in accordance with applicable
activities - Unit 1 (49053C) (52063C) (52153C) (37301)
                        construction specifications.                       Specific pipe run walkdowns included a
During the inspection period, pipe run walkdowns were performed where piping
                        walkdown of portions of the following lines:
installation is near completion to determine whether the piping run was
                            P&ID NO. REVISION                       PIPE RUN INSPECTED
installed as shown on approved drawings and in accordance with applicable
                            1X4DB112, Rev. 17                       Pressurizer Surge Line (053-14")
construction specifications.
:                                                                   Pressurizer Connections to Root Valves
Specific pipe run walkdowns included a
                                                                    Pressurizer Spray Line (030-4"/030-6")
walkdown of portions of the following lines:
                                                                    Pressurizer PORV & Code Safety
P&ID NO. REVISION
                                                                    Relief Lines to the PRT (059-6", 063-6", 060-3",
PIPE RUN INSPECTED
                                                                    063-6", 064-12", 058-6", 057-6", 056-6", 065-6",
1X4DB112, Rev. 17
                                                                    066-6", 067-6" & 068-3/4")
Pressurizer Surge Line (053-14")
:
Pressurizer Connections to Root Valves
Pressurizer Spray Line (030-4"/030-6")
Pressurizer PORV & Code Safety
Relief Lines to the PRT (059-6", 063-6", 060-3",
063-6", 064-12", 058-6", 057-6", 056-6", 065-6",
066-6", 067-6" & 068-3/4")
.
.
                        Specific areas examined during the pipe run walkdown for compliance with the
Specific areas examined during the pipe run walkdown for compliance with the
                        applicable isometric drawings and the Plant Design and Instrumentation
applicable isometric drawings and the Plant Design and Instrumentation
                        Construction Specification No. X4AZ01, were as follows:
l
l
                                          Vent and Drain Connections and Locations
Construction Specification No. X4AZ01, were as follows:
                                          Instrumentation Connections and Locations
Vent and Drain Connections and Locations
                                          Valve Installation and Orientation
Instrumentation Connections and Locations
                                          Line Size and Location
Valve Installation and Orientation
                                          Fittings Type and Location
Line Size and Location
;                                        Pipe / Valve / Fitting End Connections
Fittings Type and Location
                                        Hanger Locations and Types
Pipe / Valve / Fitting End Connections
                        No violations or deviations were identified.
;
Hanger Locations and Types
No violations or deviations were identified.
,
,.-o
, . , , - - , - - - , , _ . _ - , . , _ _ . , ,
_.
--
, , , , , _ . , _ _ _ , , _ . -
.-,,,.---w.
,.c.. . - -. - -
.-,,--%
,
,
  ,.-o    , . , , - - , - - - , , _ . _ - , . , _ _ . , ,    _. --             , , , , , _ . , _ _ _ , , _ . -        .-,,,.---w. ,.c.. . - -. - -    .-,,--%  -
-
.__ - _ _ - , . - _ . .


  - _ .   -         -
- _ .
                                                  -.   ._ .                                                   _. _ __                 . _ .               .     . _. __.
-
-
-.
._ .
_.
_
__
. _ .
.
.
_. __.
J
J
,
,
        t
t
                                                                                          11
11
,
,
k
k
                  12.   Reactcr Vessel Protection - Units 1 & 2 (50053C)
12.
Reactcr Vessel Protection - Units 1 & 2 (50053C)
Periodic . inspections were conducted during the inspection period to
*
*
                        Periodic . inspections were conducted during the inspection period to
determine that proper storage protection practices were in place, entry of
4
4
                        determine that proper storage protection practices were in place, entry of
foreign objects and debris was prevented, and that access was controlled for
                        foreign objects and debris was prevented, and that access was controlled for
the following:
'
'
                        the following:
Unit 1 & 2 Reactor Vessel
                                            Unit 1 & 2 Reactor Vessel
Unit 1 Integrated Head Package
                                            Unit 1 Integrated Head Package
Unit 1 Upper and Lower Internals
                                            Unit 1 Upper and Lower Internals
i
i                       No violations or deviations were identified.
No violations or deviations were identified.
'
'
                  13.   Safety Related Components - Units 1 & 2 (50073C)
13.
                        The inspection consisted of plant tours to observe storage, handling, and
Safety Related Components - Units 1 & 2 (50073C)
,                      protection, installation; and preventive maintenance after installation of
The inspection consisted of plant tours to observe storage, handling, and
                        safety-related components to determine that work is being performed in
protection, installation; and preventive maintenance after installation of
                        accordance with applicable codes, NRC Regulatory Guides, and licensee
,
                        commitments.
safety-related components to determine that work is being performed in
                        During the inspection the below listed equipment was observed at various
accordance with applicable codes, NRC Regulatory Guides, and licensee
                        times during the inspection period to verify the following as applicable:
commitments.
                        -
During the inspection the below listed equipment was observed at various
                                            Storage, environment, and protection of components were in accordance
times during the inspection period to verify the following as applicable:
                                            with manufacturer's instructions and/or established procedures.
-
                        -
Storage, environment, and protection of components were in accordance
                                            Implementation of special storage and maintenance requirements such                                                                 !
with manufacturer's instructions and/or established procedures.
                                            as:   rotation of motors, pumps, lubrication, insulation testing
-
                                            (electrical), cleanliness,etc.                                                                                                     ,
Implementation of special storage and maintenance requirements such
                        -
!
                                            Performance of licensee / contractor surveillance                                     activities                 and
as:
                                            documentation thereof was being accomplished.
rotation of motors, pumps, lubrication, insulation testing
                        -
(electrical), cleanliness,etc.
                                            Installation requirements were met such as: proper location, placement,
,
                                            orientation, alignment, mounting (torquing of bolts and expansion
-
j                                           anchors), flow direction, tolerances, and expansion clearance.
Performance
l                       -
of
                                            Appropriate stamps, tags, markings, etc. were in use to prevent
licensee / contractor
4                                          oversight of required inspections, completion of tests, acceptance, and
surveillance
!                                           the prevention of inadvertent operation.
activities
                                                                                                                                                              __
and
                        The following Unit 1 equipment was inspected:
documentation thereof was being accomplished.
;                       -
-
                                            Residual Heat Removal (RHR) Pumps
Installation requirements were met such as: proper location, placement,
                        -
orientation, alignment, mounting (torquing of bolts and expansion
                                            Diesel Generators
j
                        -
anchors), flow direction, tolerances, and expansion clearance.
                                            Containment Spray (CS) Pumps
l
                        -
Appropriate stamps, tags, markings, etc. were in use to prevent
                                            Pressurizer
-
I
oversight of required inspections, completion of tests, acceptance, and
4
!
the prevention of inadvertent operation.
__
The following Unit 1 equipment was inspected:
;
-
Residual Heat Removal (RHR) Pumps
-
Diesel Generators
-
Containment Spray (CS) Pumps
-
Pressurizer
I
!
!
!
!
:i
:i
1
1
          -. - -     _ _ _ . . - . _ . . -             -     . - . . . -, _ - _ _ , _ .                             . , _ . - . - _       - - - . - , , . _             _ _ -
-. - -
                                                                                            -~,..,.,-.,~,_4-                                                      .
_ _ _ . . - . _ . . -
-
. - . . . -, _ - _ _ , _ .
-~,..,.,-.,~,_4-
. , _ . - . - _
- - - . - , , . _
.
_ _ -


      .                   . _ .                       . . _ - --             --. .-                 -         ..   -                                 -                       .
.
. _ .
. . _ -
--
--. .-
-
..
-
-
.
l
l
:l
:l
    .
.
  '
'
'
'
                                                                                      12
12
                  -
-
                                          Main Coolant Pumps
Main Coolant Pumps
4               -
4
                                          Steam Generators
-
                  -
Steam Generators
                                          Safety Injection Pumps
Safety Injection Pumps
                  -
-
                                          Containment Penetration Encapsulation Vessel for Train "B"
-
                  -
Containment Penetration Encapsulation Vessel for Train "B"
                                          RHR and CS
RHR and CS
                  -
-
                                          Component Cooling Water (CCW) Heat Exchangers, Surge Tanks & Pumps
Component Cooling Water (CCW) Heat Exchangers, Surge Tanks & Pumps
-
-
Cable Spreading Room Train A & B
,
,
                  -
-
                                          Cable Spreading Room Train A & B
-
-
Accumulator Tanks
'
'
                  -
Reactor Coolant Drain Tank Pumps
                                          Accumulator Tanks
-
                  -
-
                                          Reactor Coolant Drain Tank Pumps
Chemical and Volume Control System (CVCS) Letdown Heat Exchanger
                  -
-
                                          Chemical and Volume Control System (CVCS) Letdown Heat Exchanger
Reactor Coolant Drain Tank & Heat Exchanger
                  -
-
                                          Reactor Coolant Drain Tank & Heat Exchanger
Reactor Cavity Pumps
                  -
-
                                          Reactor Cavity Pumps
Battery & Charger Rooms Train A, B, C & D
.,
.,
                  -
-
                                          Battery & Charger Rooms Train A, B, C & D
Nuclear Grade Piping, Valves & Fittings
                  -
-
                                          Nuclear Grade Piping, Valves & Fittings
Spent Fuel Pool Heat Exchangers
                  -
-
                                          Spent Fuel Pool Heat Exchangers
Pressurizer Relief Tank
                  -
                                          Pressurizer Relief Tank
                                          CVCS Centrifugal Charging Pumps & Positive Displacement
'
'
                  -
CVCS Centrifugal Charging Pumps & Positive Displacement
                                                    Pump
-
Pump
4
4
;
;
                  -
-
                                          Bottom Mounted Instrumentation (BMI) Seal Table
Bottom Mounted Instrumentation (BMI) Seal Table
!
!
'
'
                  The following Unit 2 equipment was inspectea:
The following Unit 2 equipment was inspectea:
                  -
RHR Pumps
                                          RHR Pumps
-
                  -
-
                                          CS Pumps
CS Pumps
I                 -
I
                                          CVCS Centrifugal Charging Pumps & Positive Displacement Pump
-
                  -
CVCS Centrifugal Charging Pumps & Positive Displacement Pump
                                          Steam Generators
Steam Generators
-               -
-
                                          Safety Injection Pumps
-
                  -
-
                                          CCW Heat Exchangers Surge Tanks & Pumps
Safety Injection Pumps
-
CCW Heat Exchangers Surge Tanks & Pumps
-
Accumulator Tanks
,
,
                  -
!
                                          Accumulator Tanks
-
!                -
Pressurizer Relief Tank
                                          Pressurizer Relief Tank
-
                  -
Diesel Generator Fuel Oil Tanks
                                          Diesel Generator Fuel Oil Tanks
!
!                 -
-
                                          Nuclear Grade Piping, Valves, & Fittings
Nuclear Grade Piping, Valves, & Fittings
.
.
                  No violations or deviations were identified.
No violations or deviations were identified.
<
<
'
      14.        Safety Related Pipe Support and Restraint Systems - Unit 1 (50090C)
I                Periodic inspections were conducted during the inspection period to observe
i                construction activities during installation of safety-related pipe supports
'
'
                  to determine that the following work was performed in accordance with
14.
                  applicable codes, NRC Regulatory Guides, and licensee commitments:
Safety Related Pipe Support and Restraint Systems - Unit 1 (50090C)
I
Periodic inspections were conducted during the inspection period to observe
i
construction activities during installation of safety-related pipe supports
to determine that the following work was performed in accordance with
'
applicable codes, NRC Regulatory Guides, and licensee commitments:
l
l
                  -
-
                                          Spring hangers were provided with indicators to show the approximate
Spring hangers were provided with indicators to show the approximate
                                          " hot" or " cold" position, as appropriate.
" hot" or " cold" position, as appropriate.
                  -
-
                                          No deformation or forced bending was evident.
No deformation or forced bending was evident.
                  -
-
                                          Where pipe clamps are used to support vertical lines, shear lugs were
Where pipe clamps are used to support vertical lines, shear lugs were
                                          welded to the pipe (if required by Installation Drawings) to prevent
welded to the pipe (if required by Installation Drawings) to prevent
                                          slippage.
slippage.
,
,
l
l
l         , - - , . . , - . - - . - - . . _ - . , .                 -
l
                                                                      - - . , ,         ... - . ., -
.
                                                                                                    . . . - .,, .   , - - - . - - - - , . - - - - . - - _ , . , - - - - . - - - -
, - - , . . , - . - - . - - . . _ - . , .
-
- - . , ,
... - . .,
. . . - .,, .
, - - - . - - - - , . - - - - . - - _ , . , - - - - . - - -
-
-


  '
'
.
.
                                            13
13
        -
-
              Sliding or rolling supports were provided with material and/or
Sliding or rolling supports were provided with material and/or
              lubricants suitable for the environment and compatible with sliding
lubricants suitable for the environment and compatible with sliding
              contact surfaces.
contact surfaces.
        -
-
              Supports are located and installed as specified.
Supports are located and installed as specified.
        -
-
              The surface of welds meet applicable code requirements and are free
The surface of welds meet applicable code requirements and are free
              from unacceptable grooves, abrupt ridges, valleys, undercuts, cracks,
from unacceptable grooves, abrupt ridges, valleys, undercuts, cracks,
              discontinuities, or other indications which can be observed on the
discontinuities, or other indications which can be observed on the
              welded surface.
welded surface.
        No violations or deviations were identified.
No violations or deviations were identified.
    15. Electrical (Components and Systems) - Units 1 & 2 (51053C)
15.
        Periodic inspections were conducted during the inspection period to observe
Electrical (Components and Systems) - Units 1 & 2 (51053C)
        safety-related electrical     equipment to verify   that the storage,
Periodic inspections were conducted during the inspection period to observe
        installation, and preventive maintenance were accomplished in accordance
safety-related electrical
        with applicable codes, NRC Regulatory Guides, and licensee commitments.
equipment
        During the inspection period the inspector conducted an inspection of the
to verify
        below listed equipment during storage, installation, and cable terminating
that
        to verify the following as applicable:
the
        -
storage,
              Location and alignment
installation, and preventive maintenance were accomplished in accordance
        -
with applicable codes, NRC Regulatory Guides, and licensee commitments.
              Type and size of anchor bolt:
During the inspection period the inspector conducted an inspection of the
        -
below listed equipment during storage, installation, and cable terminating
              Identification
to verify the following as applicable:
        -
Location and alignment
              Segregation and identification of nonconforming items
-
        -
-
              Location, separation and redundancy requirements
Type and size of anchor bolt:
        -
-
              Equipment space heating
Identification
        -
-
              Cable identification
Segregation and identification of nonconforming items
        -
-
              Proper lugs used
Location, separation and redundancy requirements
        -
-
              Condition of wire (not nicked, etc.), tightness of connection
Equipment space heating
        -
-
              Bending radius not exceeded
Cable identification
        -
-
              Cable entry to terminal point
Proper lugs used
        -
-
              Separation
Condition of wire (not nicked, etc.), tightness of connection
        The following Unit 1 equipment was inspected:
-
              1-1605-PS-SDA Train "A" Shutdown Panel
Bending radius not exceeded
              1-1605-PS-SDB . Train "B" Shutdown Panel
-
              1-1805-S3-DAD Reactor Coolant Pumps 13.8KV Switchgear             ~~
Cable entry to terminal point
              1-1805-S3-CAC Reactor Coolant Pumps 13.8KV Switchgear
-
              1-1804-53-A03 4160V Switchgear 1BA03
Separation
              1-1804-S3-A02 4160V Switchgear 1AA02
The following Unit 1 equipment was inspected:
              1-1805-S3-BBE MCC 1BBE
1-1605-PS-SDA Train "A" Shutdown Panel
                                                                                    1
1-1605-PS-SDB . Train "B" Shutdown Panel
1-1805-S3-DAD Reactor Coolant Pumps 13.8KV Switchgear
~~
1-1805-S3-CAC Reactor Coolant Pumps 13.8KV Switchgear
1-1804-53-A03 4160V Switchgear 1BA03
1-1804-S3-A02 4160V Switchgear 1AA02
1-1805-S3-BBE MCC 1BBE
1


      -                     _ _                 _ _ .   ...   -- .   _ _ ___ . _ _ _
-
  1
_ _
  .
_ _ .
  l
...
  1
-- .
          *
_ _ ___ . _ _
        .
_
                                                      14                                             .
1
                      1-1805-S3-806 IBB06 Switchgear
.
                      1-1805-53-807 1BB07 Switchgear
l
                      1-1805-S3-BBC MCC IBBC
1
                      1-1805-S3-804 1AB04 Switchgear
*
  .
.
  +
14
                      1-1805-S3-805 1AB05 Switchgear
.
                      1-1805-S3-BBD MCC 1880 Train "B"                                             '
1-1805-S3-806 IBB06 Switchgear
                      1-1805-S3-ABD MCC 1ABD Train "A"
1-1805-53-807 1BB07 Switchgear
j             The following Unit 2 equipment was inspected:
1-1805-S3-BBC MCC IBBC
~                               '
1-1805-S3-804 1AB04 Switchgear
                    2-1805-S3-806     2BB06 Svitchgear
.
                    2-1805-S3-807 28807 Switchgear
1-1805-S3-805 1AB05 Switchgear
                    2-1605-S3-SDA Train "A" Shutdown Panel
+
                    2-1605-S3-SDB Train "B" Shutdown Panel
1-1805-S3-BBD MCC 1880 Train "B"
                No violations or deviations were identified.
'
  !         16. Electrical (Cables and Terminations) - Unit 1 (51063C)
1-1805-S3-ABD MCC 1ABD Train "A"
  !
j
    .          a.   Raceway / Cable Installation
The following Unit 2 equipment was inspected:
i
~
                    The inspector reviewed and examined portions of the following
'
                    procedures pertaining to raceway / cable installation to determine
2BB06 Svitchgear
                    whether they comply with appiicable codes, NRC Regulatory Guides and
2-1805-S3-806
l                     licensee commitments.
2-1805-S3-807 28807 Switchgear
2-1605-S3-SDA Train "A" Shutdown Panel
2-1605-S3-SDB Train "B" Shutdown Panel
No violations or deviations were identified.
!
16.
Electrical (Cables and Terminations) - Unit 1 (51063C)
!
a.
Raceway / Cable Installation
.
i
The inspector reviewed and examined portions of the following
procedures pertaining to raceway / cable installation to determine
whether they comply with appiicable codes, NRC Regulatory Guides and
l
licensee commitments.
4
4
                    - ED-T-02, Rev. 8 Raceway Installation
- ED-T-02, Rev. 8 Raceway Installation
!                   - ED-T-07, Rev. 9 Cable Installation
!
- ED-T-07, Rev. 9 Cable Installation
4
4
'
'
                    Periodic inspections were conducted to observe construction activities
Periodic inspections were conducted to observe construction activities
i                   of Safety Related Raceway / Cable Installation in the Containment,
i
                    '
of Safety Related Raceway / Cable Installation in the Containment,
                        itrol and Auxiliary Buildings.
'
itrol and Auxiliary Buildings.
2
2
                    In reference to the raceway installation, the following areas were
In reference to the raceway installation, the following areas were
inspected to verify compliance with the applicable requirements:
4
4
                      inspected to verify compliance with the applicable requirements:
i
i
;
;
                    -
-
                            Identification
Identification
-                   -
Alignment
                            Alignment
-
                    -
-
                            Bushings (Conduit)
Bushings (Conduit)
4                   -
-
                            Grounding
4
                    -
-
                            Supports and Anchorages
Grounding
;
-
                    In reference to the cable installation the following areas were
Supports and Anchorages
                    inspected to verify compliance with the applicable requirements:
;
In reference to the cable installation the following areas were
inspected to verify compliance with the applicable requirements:
i
i
:
:
Protection from adjacent construction activities (welding, etc.)
-
'
'
                    -
-
                            Protection from adjacent construction activities (welding, etc.)
Coiled cable ends properly secured
                    -
-
                            Coiled cable ends properly secured
Non-terminated cable ends taped
                    -
                            Non-terminated cable ends taped
i
i
A
A
                                                                                            .-_ --
-
- .
.
.
.
.
.
. . .
. . .
.
. .
.-_
--


                                                                                          :
j
    -                                                                                     j
-
                                                15                                       l
15
  .
.
                -
-
                        Cable trays, junction boxes, etc., reasonably free of debris
Cable trays, junction boxes, etc., reasonably free of debris
                -
-
                        Conduit capped, if no cable installed
Conduit capped, if no cable installed
                -
Cable supported
                        Cable supported
-
                -
Bend radius not exceeded
                        Bend radius not exceeded
-
                -
Separation
                        Separation
-
          b.     Cable Terminations
b.
                The inspector reviewed and examined portions of the following
Cable Terminations
                procedures pertaining to cable termination to determine whether they
The inspector reviewed and examined portions of the following
                comply with applicable codes, NRC Regulatory Guides and licensee
procedures pertaining to cable termination to determine whether they
                commitments.
comply with applicable codes, NRC
                -
Regulatory Guides and licensee
                      .ED-T-08, Rev. 7 Cable Termination
commitments.
                  In reference to cable terminations the following areas were inspected
-
                to verify compliance with the applicable requirements.
.ED-T-08, Rev. 7 Cable Termination
                -
In reference to cable terminations the following areas were inspected
                        Cable identification
to verify compliance with the applicable requirements.
                -
-
                        Proper lugs used
Cable identification
                -
Proper lugs used
                        Condition of wire (not nicked, etc.), tightness of connection
-
                                                                *
-
                -
Condition of wire (not nicked, etc.), tightness of connection
                        Bending radius not exceeded
*
                -
-
                        Cable entry to terminal point
Bending radius not exceeded
                -
-
                        Separation
Cable entry to terminal point
          No violations or deviations were identified.                                 ~
-
      17. Safety Related Piping (Welding) - Unit 1 & 2 (55083C)
Separation
          Periodic inspections were conducted on safety-related pipe welding at
No violations or deviations were identified.
          various stages of weld completion. The purpose of the inspection was to
~
          determine whether the requirements of applicable specifications, codes,
17.
          standards, work performance procedures and QC procedures are being met as
Safety Related Piping (Welding) - Unit 1 & 2 (55083C)
          follows:
Periodic inspections were conducted on safety-related pipe welding at
I         -
various stages of weld completion.
                Work was conducted in accordance with a process sheet which identifies
The purpose of the inspection was to
,                the weld and its location by system, references procedures or
determine whether the requirements of applicable specifications, codes,
;               instructions, and provides for production and QC signoffs.
standards, work performance procedures and QC procedures are being met as
follows:
I
-
Work was conducted in accordance with a process sheet which identifies
the weld and its location by system, references procedures or
,
;
instructions, and provides for production and QC signoffs.
!
!
          -
-
                Welding procedures, detailed drawings and instructions, were readily
Welding procedures, detailed drawings and instructions, were readily
                available and technically adequate for the welds being made.
available and technically adequate for the welds being made.
l         -
l
                Welding procedure specification (WPS) were in accordance with the
Welding procedure specification (WPS) were in accordance with the
;               applicable ASME Code requirements and that a Procedure Qualification
-
                Record (PQR) is referenced and exists for the type of weld being made,
;
applicable ASME Code requirements and that a Procedure Qualification
Record (PQR) is referenced and exists for the type of weld being made,
i
i
I
I
!
!


                                              .
  *
,
                                              16
        -
              That the base metals, welding filler materials, fluxes, gases, and
              insert materials were of the specified type and grade, have been
              properly inspected, tested and were traceable to test reports or
              certifications.
        -
              That the purge and/or shielding gas flow and composition were
              as specified in the welding procedure specification and that protection
              was provided to shield the welding operation from adverse environmental
              conditions.
.
.
        -
*
              That the weld joint geometry including pipe wall thickncss was specified
,
              and that surfaces to be welded have been prepared, cleaped and inspected
16
              in accordance with applicable procedures or instructions.
-
                                                                                                  '
That the base metals, welding filler materials, fluxes, gases, and
            -
insert materials were of the specified type and grade, have been
        -
properly inspected, tested and were traceable to test reports or
              That a sufficient number of adequately qualified QA and QC inspection
certifications.
              personnel were present at the work site, commensurate with the worA in         '
-
              progress.
That the purge and/or shielding gas flow and composition were
        -
as specified in the welding procedure specification and that protection
              That the weld area cleanliness was maintained and that pipe alignment
was provided to shield the welding operation from adverse environmental
              and fit-up tolerances were within specified units.
conditions.
        -
-
              That . weld filler material being used was in accordance with welding
That the weld joint geometry including pipe wall thickncss was specified
              specifications, that unused filler material was separated from other
.
              types of material and was stored in heated cans, and stubs properly
and that surfaces to be welded have been prepared, cleaped and inspected
              removed from the work location.
in accordance with applicable procedures or instructions.
        -
'
              That there were no evident signs of cracks, excessive heat input,
-
              sugaring, or excessive crown.
-
          No violations or deviations were identified.
That a sufficient number of adequately qualified QA and QC inspection
    18. Preoperational Test Program Implementation / Verification - Unit 1 (70302)
personnel were present at the work site, commensurate with the worA in
        (71302)
'
        The inspector reviewed, in part, the implementation of the preoperational
progress.
        test program.     Test program attributes inspected included review of
-
        administrative requirements, document control, documentation of major test
That the weld area cleanliness was maintained and that pipe alignment
        events and deviations to procedures, operating practices, instrumentation
and fit-up tolerances were within specified units.
        calibrations, and correction of problems revealed by testing.         Specific
-
        activities reviewed included the following procedures:
That . weld filler material being used was in accordance with welding
                  Sum No.                     Sum Procedure Title
specifications, that unused filler material was separated from other
              11, Rev. 2           Construction Acceptance Test Program
types of material and was stored in heated cans, and stubs properly
              12, Rev. 1           Construction Acceptance Test Implementation
removed from the work location.
                Preop No.                 Preop Test Procedure Title
-
            1-3BN-17, Rev. O         Refueling Water Storage Tank                                   l
That there were no evident signs of cracks, excessive heat input,
            1-3KJ-01, Rev. 0 &                                                                     l
sugaring, or excessive crown.
            Chg. Reg's. No. 1       Diesel Generator Train "A" Starting Air System                 '
No violations or deviations were identified.
                                                  -_. -         - .                 . _ .   -
18.
Preoperational Test Program Implementation / Verification - Unit 1 (70302)
(71302)
The inspector reviewed, in part, the implementation of the preoperational
test program.
Test program attributes inspected included review of
administrative requirements, document control, documentation of major test
events and deviations to procedures, operating practices, instrumentation
calibrations, and correction of problems revealed by testing.
Specific
activities reviewed included the following procedures:
Sum No.
Sum Procedure Title
11, Rev. 2
Construction Acceptance Test Program
12, Rev. 1
Construction Acceptance Test Implementation
Preop No.
Preop Test Procedure Title
1-3BN-17, Rev. O
Refueling Water Storage Tank
1-3KJ-01, Rev. 0 &
Chg. Reg's. No. 1
Diesel Generator Train "A" Starting Air System
'
-_.
-
- .
. _ .
-


                                                          _-         .                   --     ~                         -                     , _- . _ . _
_-
        *
.
  .
--
                                                                                        17
~
                The inspector also witnessed portions of the following construction
-
                acceptance tests (CAT):
, _-
. _ . _
*
.
17
The inspector also witnessed portions of the following construction
{
{
                        Cat. No.                                                       Equipment / Generic CAT
acceptance tests (CAT):
Cat. No.
Equipment / Generic CAT
85-2903
RHR Train "A" (CAT-M-01) Pump & Motor (CAT-E-11)
*
*
                        85-2903                        RHR Train "A" (CAT-M-01) Pump & Motor (CAT-E-11)
85-908
                        85-908                        ACCW Pump #1 (CAT-M-01)
ACCW Pump #1 (CAT-M-01)
                Other tests witnessed by the inspector during the inspection period
Other tests witnessed by the inspector during the inspection period
consisted of the train
"A"
safety injection pump lube oil flush.
-
-
                consisted of the train "A"                      safety injection pump lube oil flush.
4
4
The inspector also reviewed the following completed maintenance procedure
,
,
                The inspector also reviewed the following completed maintenance procedure
                data sheets for the train "A"                                    RHR pump motor prior to witnessing the above
'
'
                listed CAT for the RHR pump & motor.
data sheets for the train "A" RHR pump motor prior to witnessing the above
l
l
4                   Maintenance Procedure No.                                                 Maintenance Procedure Title
listed CAT for the RHR pump & motor.
                                        25734-C, Rev. O                                       High Potential Testing A-C Motors
4
                                                                                                (4KV Less Than 1000 HP)
Maintenance Procedure No.
,                No violations or deviations were identified.
Maintenance Procedure Title
            19. Meeting With Local Officials (94600) - Unit 1 and 2
25734-C, Rev. O
High Potential Testing A-C Motors
(4KV Less Than 1000 HP)
No violations or deviations were identified.
,
19.
Meeting With Local Officials (94600) - Unit 1 and 2
:
:
                On November 23, a meeting was held to familiarize local officials of the
On November 23, a meeting was held to familiarize local officials of the
                City of Waynesboro and Burke County Board of Commissioners with the NRC.
City of Waynesboro and Burke County Board of Commissioners with the NRC.
                The meeting presented the mission of the NRC, introduction of key NRC
The meeting presented the mission of the NRC, introduction of key NRC
                personnel, discussion of lines of communication available to local
personnel, discussion of lines of communication available to local
                officials, ard discussion of the facility status.                                                   The NRC presentea the
officials, ard discussion of the facility status.
,                scope of the inspection and emergency preparedness programs.
The NRC presentea the
scope of the inspection and emergency preparedness programs.
,
The meeting was open for questions during the presentation.
NRC persons
>
>
                The meeting was open for questions during the presentation.                                                                    NRC persons
involved with the presentation were as follows:
'
'
                involved with the presentation were as follows:
D. M. Collins, Chief, Emergency Preparedness and Radiological
                        D. M. Collins, Chief, Emergency Preparedness and Radiological
Protection Branch, Division of Radiation Safety and Safeguards
                                  Protection Branch, Division of Radiation Safety and Safeguards
M. V. Sinkule, Chief, Reactor Projects Section 20, Division of
                        M. V. Sinkule, Chief, Reactor Projects Section 20, Division of
Reactor Projects
                                  Reactor Projects
J. F. Rogge, Senior Resident Inspector, Operations
4
4
                        J. F. Rogge, Senior Resident Inspector, Operations
R. J. Schepens, Resident Inspector
                        R. J. Schepens, Resident Inspector
20.
            20. Management Meetings (307028) - Unit 1
Management Meetings (307028) - Unit 1
i
i
                On November 25, 1985 the resident inspector attended a management meeting at
On November 25, 1985 the resident inspector attended a management meeting at
:               the Region II office in Atlanta, Georgia. The purpose of this meeting was
:
the Region II office in Atlanta, Georgia. The purpose of this meeting was
i
i
for Georgia Power Company to present Readiness Review Module No. 8
'
'
                for Georgia Power Company to present Readiness Review Module No. 8
" Structural Steel"; Appendix D " Document Control Program; and Appendix E
                " Structural Steel"; Appendix D " Document Control Program; and Appendix E
" Material Control" to the NRC for review.
                " Material Control" to the NRC for review.
i
i
i
i
:
:
    - - - . _        . - _ . , _ . . _           _ . , .   _ . . _ , . _ . . , _ . -         -   _ , . . _ _ _ .     ._,-.______,_..___.____m,
- - - .
. - _ . , _ . . _
_ . , .
_ . . _ , . _ . . , _ . -
-
_ , . . _ _ _ .
._,-.______,_..___.____m,
}}
}}

Latest revision as of 22:54, 11 December 2024

Insp Repts 50-424/85-52 & 50-425/85-37 on 851101-1202. Violation Noted:Failure to Provide Adequate Maint Procedures for Work on safety-related Equipment Appropriate to Circumstances
ML20137L337
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/10/1986
From: Livermore H, Rogge J, Schepens R, Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20137L329 List:
References
50-424-85-52, 50-425-85-37, NUDOCS 8601270416
Download: ML20137L337 (18)


See also: IR 05000424/1985052

Text

. _ _ . _ .- _

. . _ _

. _ . _ -

_

.. -

-. _.

-

-.

._

.

@ RIGg

UNITED STATES

Do

NUCLEAR REGULATORY COMMISSION

g

' ' ,

REGION ll

i

j

101 MARIETTA STREET, N.W.

<

g

ATL ANTA, GEORGI A 30323

%

.* /

  • s.

Report Nos.:

50-424/85-52 and 50-425/85-37

'

Licensee:

Georgia Power Company

P.O. Box 4545

Atlanta, GA 30302

Docket Nos.:

50-424 and 50-425

License Nos.: CPPR-108 and CPPR-109

Facility Name:

Vogtle Units 1 and 2

Inspection Conducted:

November 1 - December 2, 1985

Inspectors: @ M

///o/86

H. H. Livermore, Senior Resident

Date Signed

'

Inspector, Construction

D M @&

1/ soles

g J. F. Rog'ge, Senior Resident

D' ate Signed

~

Inspector, Operations

>

C A @d

_///o / f6

7

M

n. J. Schepens, Resident

Date Signed

R

I spector

ons ruction

ApprovedBy:)(/!

u.%M

/!/o

ffe

M. V. Sirikule, Section Chief

te S'igned

Division of Reactor Projects

SUMMARY

Scope:

This

routine,

unannounced

inspection

entailed

238

resident

inspector-hours on site (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> were on backshifts) inspecting:

containment

4

and safety related structures, piping systems and supports, safety related

components, auxiliary systems, electrical equipment and cables, instrumentation,

quality programs and administrative controls affecting quality, and follow-up on

previous inspection identified items.

Results: One violation was identified in the area of maintenance, paragraph 4.

9601270416 860113

PDR

ADOCK 05000425

O

PDR

__ __ ___-

._ ____

.

. . . _ _ _ .

___ - _ . _ _ . _ _ .

-

-

- -

-

- -

- -

. _ = - - . .

_ - . _ -

_ _ .

. _ -

.

.

- _ _

,

.

DETAILS

1.

Persons Contacted

Licensee Employees

,

R. E. Conway, Senior Vice-President, Vogtle Project Director

]

D. O. Foster, Vice-President, Project Support

  • R. H. Pinson, Vice-President, Project Construction

P. D. Rice, Vice-President Project Engineering

W. T. Nickerson, Assistant to the Project Director

  • D.

G. Smith, Assistant to the Assistant Project Director

D. S. Read, General Manager, Corporate Quality Assurance

W. C. Ramsey, Readiness Review Manager

,

H. H. Gregory III, General Manager, Site Prudence Audit Activities

M. H. Googe, Project Construction Manager

G. Bockhold, Jr., General Manager Nuclear Operations

  • H. P. Walker, Manager Unit Operation

,

!

0. Batum, Deputy to the Vice-President Engineering

j

  • C. W. Hayes, Vogtle Quality Assurance Manager

j

  • C. E. Belflower, Quality Assurance Site Manager - Operations
  • E. D. Groover, Quality Assurance Site Manager - Construction

-

S. D. Haltom, Quality Assurance Engineering Support Supervisor

W. E. Mundy, Quality Assurance Audit Supervisor

J. E. Sanders, Project Construction Manager - Unit 1

D. M. Fiquett, Project Construction Manager - Unit 2

,

  • B. C. Harbin, Manager Quality Control

C. R. Brewer, Assistant Quality Control Manager

T. L. Weatherspoon, Assistant Quality Control Manager

,

'

  • G. A. McCarley, Project Compliance Coordinator

,

W. C. Gabbard, Assistant Project Compliance Coordinator

J. O. Dorough, Administrative Manager

W. F. Kitchens, Operations Superintendent

  • P. T. Ciccanesi, Regulatory Compliance Specialist

i.

T. Dannemiller, Senior QA Engineer

J. F. D' Amico, Regulatory Compliance Superintendent

H. W. Swain, Mechanical QC Section Supervisor

,

!

  • C, L. Coursey, Maintenance Superintendent
  • M. A. Griffis, Maintenance Superintendent

Other licensee employees contacted included craftsmen,

technicians,

supervisors, engineers, inspectors, and office personnel.

Other Organizations

  • H. M. Handfinger, Preoperational Test Superintendent - Bechtel

M. L. Bagale, QA Surveillance Specialist - Bechtel

l-

B. F. Hurless, QA Surveillance Specialist - Bechtel

!

  • F. B. Marsh, Project Engineering Manager - Bechtel

.

  • Attended Exit Interview.

i

I

.

.

- . _ . .

_

.

.

. -

_ , _

_ - , _ . _ . _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

__

.

_

_ _ . _ _ _ __

_

_ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ . . _ _____

!

I

.

2

i

'

2.

Exit Interview (30703C)

The inspection scope and findings were summarized on September 26, 1985 with

'

those persons indicated in paragraph 1 above. The inspector described the

{

areas inspected and discussed in detail the inspection finding listed below.

j

No dissenting comments were received from the licensee.

The licensee did

1

not identify as proprietary any of the materials provided to or reviewed by

the inspector during this inspection,

j

A separate meeting was held during the inspection period with the General

t

Manager, Nuclear Operations to discuss control of access to plant equipment

j

and necessary interfaces between Operations and Construction.

,

!

!

(Closed) Inspector Follow-up Item 50-424/85-13-01 " Review Implementation of

i

FECO N-17-BF to Install 2 Piece Balance Drum Locknuts into the CVCS Charging

Pumps" - Paragraph 4.

.

(0 pen) Violation, 50-424/85-52-01 " Failure to Provide Adequate Maintenance

Procedures for Work on Safety-Related Equipment Appropriate to the

Circumstances".

4

The following NRC exit interviews were attended during the inspection period

s

I

by a resident inspector:

i

-

.

November 22, 1985

J. R. Harris

November 27, 1985

0. Masnyk

3.

Licensee Action on Previous Enforcement Matters (92702)

l

(Open) Violation 50-424/85-43-01, 50-425/85-32-01; " Failure to Provide

i

Adequate Protection to Safety-Related Components During In-Plant Storage" A

!

meeting was held on November 22, 1985 at the Resident's office to discuss

the licensee's response to NRC Violation 50-424/85-43-01, 50-425-85-32-01,

,

dated November 15, 1985. The licensee informed the inspectors that they

'

will be issuing a supplement to their response.

!

!

4.

Licensee Action on Previous Inspection Items (92701)

!

(Closed) Inspector Followup Item, 50-424/85-13-01 " Review Implementation of

l

FECO N-17-BF to install two piece balance drum locknuts into the CVCS

}

centrifugal charging pumps". The inspector reviewed maintenance work orders

(MWO) No's. 1811851 and 1811852 for the installation of the new two piece

balance drum locknut assembly per FECO N-17-BF, Rev. O on the Train "A" &

.

"B" CVCS centrifugal charging pumps.

In addition, the inspector witnessed

!

the installation of the new two piece balance drum locknut assembly on the

l

Train "B" CVCS centrifugal charging pump.

!

During the inspection of the Train

"B" CVCS centrifugal charging pump

balance drum locknut assembly change out on November 16 & 18, 1985, the

j

inspector reviewed the following MWO's and procedures and the MWO associated

with a lube oil flush and speed increaser gear inspection.

i

,

!

l

--..

.

- - - .

. -

-

-

. - - . - - .

_-. _..

. - -

.

- .

. _ _

_

.

-

--

4

.

3

1

i

MWO 18511851

MWO To Install New Two-Piece Balance Drum Locknut

i

Assembly on Train "A" CVCS Centrifugal Charging

i

Pump

MWO 18511852

MWO To Install New Two-Piece Balance Drum Locknut

,

i

Assembly on Train "B" CVCS Centrifugal Charging

j

Pump

'

MWO 18511088

MWO to Provide Maintenance Support for Lube Oil

'

Flush and Inspection / Cleaning of Speed Increaser

Gear

i

SUM-22, Rev. 10

Maintenance Work Orders

27116-C, Rev. 1

Pacific RL/IJ Pump Inspection

1

j

During the inspection the inspector noted the following discrepancies

regarding the implementation of SUM-22:

i

<

l

a.

A MWO was issued without all of the applicable documents. FECC N-17-BF

specifies the installation instructions for a new two piece balance

,

drum locknut assembly.

MWO 18511852 was issued to implement

j

i

installation of two piece balance drum locknut assembly utilizing FECO

t

N-17-BF.

However, upon inspection at the work site FECO N-17-BF was

not part of the MWO package.

In addition, when FECO N-17-BF was

obtained and added to the MWO the inspector noted that it was marked as

an uncontrolled copy and not for construction use.

b.

MWO was issued without appropriate work procedures and instructions.

i

MWO 18511852 & 18511851 were issued with maintenance procedure

i

No. 27116-C.

This maintenance procedure was for the complete

!

disassembly, inspection, and reassembly of a CVCS Pump.

The scope of

i

work, however, only required the disassembly of the outboard bearing

and seal to achieve access for replacement of the two piece balance

i

drum locknut assembly.

During the preparation of the MWO the

i

unnecessary steps were not deleted nor was the necessary step to affect

replacement of the new locknut added,

j

MWO 18511088 was issued without appropriate work procedures and

i

instructions for the disassembly, inspection, and reassembly of the

speed increase gear for performing the lube oil flush. In essence the

!

three MW0's should have been closely coordinated to achieve the overall

work scope intended for the CVCS Centrifugal Charging Pumps.

[

c.

MV0's were processed without the ability to perform adequate reviews.

!

As identified in paragraph b above, the MWO's contained numerous steps

i

that would not be performed and some steps were not included.

Since

each MWO undergoes reviews by representatives from engineering,

1-

operation, maintenance and quality control, it was evident that proper

reviews could not be performed due to a lack of detailed instructions

.

to implement the work scope. In the instance of the QC review for MWO

l

!

,

4

~

l


-, ,

- _ ,,

r--,

- - - - , - , -

, , - - . . - , . _ , - . - _

.-n

, , . - - - - - - - - - - -

,

,r-

. - . . - . - - -.

. . , , -

-

-

-

-

-

- .

- -

- _

. - .

-.

.

,

i

.

4

18411852, hold points were established for steps that were not

performed and no hold point was established for witnessing the

i

installation of the new locknut. This hold point was later established

after FEC0 N-17-BF was added to the work package as mentioned in

,

paragraph a. above.

!

d.

During the performance of work under MWO 18511852 it was ooserved that

a QC inspector verbally waived a hold point upon recommendation by the

vendor; however, SUM-22 requires an approved and documented consent

waiver prior to work proceeding.

The above discreparcies are examples of failure to provide adequate

control of maintenance activities regarding preplanning and review of

,

J

work.

Several meetings were held with the licensee to fully discuss NRC

concerns in this area.

The NRC concern centers on thr- fact that the

MWO process relies on the worker to identify the problems in execution

of the maintenance and seek resolution of the problem while under

i

pressure to complete the work.

In the initial execution of MWO

18511852 it was observed, and later confirmed by the licensee, that the

'

workers had not read nor were following the work procedure but instead

were following the verbal directions of the vendor representative.

.

The foregoing is considered to be in violation of 10 CFR Part 50,

4

Appendix

B,

Criterion V and will be identified as Violation

'

50-424/85-52-01 " Failure to provide adequate maintenance procedures for

work on safety-related equipment appropriate to the circumstances".

!

Subsequently, the licensee took the following corrective steps prior to

resuming work:

[

-

A maintenance foreman was assigned to supervise all of the MWO's

associated with the CVCS centrifugal charging pumps through their

completion.

MWO's 18511851 & 18511852 were enhanced by specifying the exact

-

_

steps required to be performed in maintenance procedure No.

l

i

27116-C.

-

MWO 18511088 was voided due to inadequate instructions and

!

reissued as MWO 18512832.

I

r

MWO 18512832 was issued with detailed instructions for performing

-

l

the lube oil flush. Instructions were also providea pertaining to

the completion of some of the work in support of the lube oil

,

flush on MWO 18512833,

i

l

l

.

- .

-.

. - - -

.-. - - - - - -

-.

..

. ._

- _

- . -

_ . __

_ _ _ .

_ _ _

._ __ _. ._

_ _ _ _ _ _ .

_ - _ _ _ _ .

!

.

'

5

i

-

{

-

Maintenance procedure No. 27115-C, Rev. O for the disassembly,

inspection, and reassembly of the speed increaser gear was issued

,

I

on November 19, 1985.

.

l

MWO 18512833 was issued to disassemble, clean, inspect and

-

!

reassemble speed increaser gear per the maintenance procedure.

Additional instructions were also provided pertaining to the

,

J

intermediate reassembly process in support of the lube oil flush

,

per MWO 18512832.

'

,

5.

Construction Inspection - Units 1 & 2

i

Periodic inspections were made throughout this reporting period in the form

of general type inspections in different areas of both facilities.

The

areas were selected on the basis of the scheduled activities and were varied

to provide wide coverage. Observations were made of activities in progress

.

to note defective items or items of noncompliance with the required codes

i

and regulatory requirements. On these inspections, particular note was made

i

of the presence of quality control inspectors, supervisors, and quality

control evidence in the form of available process sheets, drawings, material

4

]

identification, material protection, performance of tests, and housekeeping.

Interviews were made with craft personnel, supervisors, coordinators,

quality control inspectors, and others as they were available in the work

,

areas.

t

i

The inspector reviewed numerous construction deviation reports to determine

if requirements were met in the areas of documentation, action to resolve,

justification, and approval signatures in accordance with GPC Field

4

Procedure No. GD-T-01.

!

On November 19, the inspectors attended one of the licensee briefings given

i

to their QC inspectors to inform them of how protection under federal law is

i

provided.

These briefings were an hour long and were scheduled to be

presented nine (9) times during the day to reach as many QC personnel on

both shifts. The presentation was given by W. C. Whitney, B. C. Harbin and

4

L. B. Glenn.

Mr. Whitney described the legal basis for protection

-

j

available to the employee from the Department of Labor and outlined the

legal process that could take place thru the Supreme Court. He stated that

,

i

Vogtle takes the position that the writing of Deficiency Reports are

i

protected activities. Mr. Whitney stressed that no-one on the project will

i

be retaliated against for identifying a quality concern. The proper level

for resolving a concern was identified as first with supervisor then the

!

Quality Concerns Program and finally the NRC which is available at any

.

l

point.

In summary, it was stressed that no-one should get the impression

that concerns were not wanted, but instead must bring them forth as part of

,

your employment. Mr. Glenn presented an overview of the Quality Concerns

Program. In the presentation, i t was pointed out that concerns would be

processed and investigated within seven days to preserve the thirty-day time

,

4

?

4

r%,- . , _ _- . - , -

-,.------.s

c

,,v.

-, . , , , _ ,

,.,..--- --.,--,

.---..-,-...----e.-.__---.--.,--,-.--.w

m

, . ,

,

,..-m-

--

.m-.,...mr

-

--

.

6

frame the employee would have to submit a complaint to the Department of

Labor. It was also stressed that this program was not in place to be used

as a threat to a supervisor. Mr. Harbin stressed the avenues for raising a

concern; and stated that he thought that Vogtle had the best QC inspectors.

He also made the point that as the QC Manager he was available to discuss

any concerns. The meeting was opened for questions.

The inspector noted

that several times during the presentation that emphasis was made to stress

the importance of QC inspectors bringing quality concerns forward for

identification and resolution.

No violations or deviations were identified.

6.

Fire Prevention / Protection and Housekeeping Measures - Units 1 & 2 (42051C)

The inspector observed fire prevention / protection measures throughout the

inspection period. Welders were using welding permits with fire watches and

extinguishers.

Post indicator valves were being maintained in the open

position. Fire fighting equipment is in its designated areas throughout the

plant.

The inspector reviewed and examined portions of the following procedures

pertaining to the fire prevention / protection measures and housekeeping

measures to determine whether they comply with applicable codes, standards,

NRC Regulatory Guides and licensee commitments.

-GD-T-05, Rev. 6 Fire-Protection Equipment Inspection and Testing

-GD-T-15

Rev. 5 Welding and Cutting

-GD-T-17, Rev. 3 Housekeeping

The inspector observed fire prevention / protection measures in work areas

containing safety related equipment during the inspection period to verify

the following:

-

Combustible waste material and rubbish was removed from the work areas

as rapidly as practicable to avoid unnecessary accumulation of

combustibles.

-

Flammable liquids are stored in appropriate containers and in

designated areas throughout the plant.

Cutting and welding operations in progress have been authorized by an

-

appropriate permit, combustibles have been moved away or safely

covered, and a fire watch and extinguisher was posted as required.

-

Fire protection / suppression equipment was provided and controlled in

accordance with applicable requirements.

No violations or deviations were identified.

7

7.

Containment (Structural Concrete) - Unit 2 (47053C)

a.

Procedure and Document Review

The inspector reviewed and examined portions of the following

procedures pertaining to the placement of concrete to determine whether

they comply with applicable codes, standards, NRC Regulatory Guides and

licensee commitments.

-

CD-T-02, Rev. 15

Concrete Quality Control

CD-T-06, Rev. 9

Rebar and Cadweld Quality Control

-

-

CD-T-07, Rev. 8

Embed Installation and Inspection

-

CD-T-20, Rev. 6

Installation and Inspection of Trumpets,

Rigid Extensions, and Duct Sheathing

>

b.

Installation Activities

The inspector witnessed portions of the concrete placement indicated

below to verify the following:

(1)

Forms, Embedment, and Reinforcing Steel Installation

-

Forms were p operly placed, secure, leak tight and clean.

'

-

Rebar and other embedment installation was installed

in

accordance

with

construction

specifications

and

drawings, secured, free of concrete and excessive rust,

specified distance

from forms,

proper on-site rebar

bending

(where

applicable)

and clearances

consistent

with aggregate size.

(2) Delivery, Placement and Curing

-

Preplacement inspection was completed and approved prior

to placement utilizing a Pour Card (Procedure Exhibit

CD-T-02*18).

Construction joints were prepared as specified.

-

-

Proper mix was specified and delivered.

-

Temperature control

of the mix, mating surfaces, and

ambient were monitored.

-

Consolidation was performed correctly.

-

Testing at placement location was properly performed in

accordance with the acceptance criteria and recorded on a

Concrete Pikacement Pour Log (Procedure Exhibit CD-T-02*20).

-

Adequate crew, equipment and techniques were utilized.

Inspections during placements were conducted effectively

-

by a sufficient number of qualified personnel.

-

Curing temperature was monitored.

__

_

._

__

._.

_ _ _

__

,

__

.

_ -

-

_ . - _

__

. _ _ _ _ _ _ .

_

._

_ _ .

. . _ _ . _ _ . _ . . . _ .

l

1

i

<

.

.

i

8

Pour No.

Location

Inspection Activity

.

A-1111-087

Control Building Wall

Preplacement and Placement

2-59A003, 2-59A-004 Auxiliary Feedwater

Preplacement, Placement,

Pump House Base Slab

and Curing

I

2-010-042/043

Containment Dome

Preplacement and Placement

No violations or deviations were identified.

!

8.

Containment (Prestressing) - Unit 1 (47063C)

!

I

a.

Procedure and Document Review

The inspector reviewed and examined portions of the following

!

specification, procedure, and drawings pertaining to the installation

'

of horizontal tendons, to determine whether they comply with applicable

codes, standards, NRC Regulatory Guides and licensee commitments.

1

-X2AF04

Technical Provisions for Containment

Post-Tensioning System

-AX2AF04-100-12

Field Instruction Manual for Installation

of VSL E5-55 Post-Tensioning System Within

l

Nuclear Containment Structures, Rev. 9

-1X2AF04-50-5

Horizontal Tendon Elevation-Unit 1

,

Buttress #1 to #2

'

-1X2AF04-51-4

Horizontal Tendon Elevation-Unit 1

Buttress #3 to #1

-1X2AF04-52-3

Horizontal Tendon Elevation-Unit 1

Buttress #2 to #3

-AX2AF04-78-4

Horizontal Tendon Stressing Data

4

-AX2AF04-79-4

Horizontal Tendon Stressing Data

i

b.

Installation Activities

The inspector witnessed portions of the installation activities

indicated below to verify the following:

-

The latest issue (revision) of applicable dra. ngs or procedures

are available to the installers and were being used.

4

!

Tendons were free of nicks, kinks, corrosion; were installed in

-

designated locations; and that the installation sequence and

l

technique was per specified requirements.

1

Installation crew was properly trained and qualified.

-

QC inspection was properly performed by qualified personnel in

-

'

accordance with applicable requirements.

!

t

%,

_.

..

-

.

-. .

_.

.

9

Adequate protective measures were being taken to ensure mechanical

,

-

and corrosion protection during storage, handling,

'

installation, and post installation.

-

Tendons were stressed in the proper sequence.

All strands in the tendon were moving together during the

-

stressing and the tendon is being stressed from both ends

simultaneously.

-

Elongatiari measurements were being taken properly and being

compared to the calculated elongation.

-

Anchor head lift-off force was being taken and documented

properly.

The stressing operation was being monitored to identify any strand

-

slippage.

The following tendons were observed:

Horizontal

From Buttress

Tendon No.

to Buttress

Seq. No.

Activity

116

2 East-1 South

20

Pull Through Dummy

Tendon

117

3 West-2 West

20

Tendon Installation

139*

1 North-3 East

24

Tendon Stressing

240

2 East-1 South

24

Tendon Stressing

  • Surveillance Tendon

No violations or deviations were identified.

9.

Containment (Steel Structures and Supports) - Units 1 & 2 (48053C)

Periodic inspections were conducted to observe containment steel and support

installation activities in progress, to verify the following:

-

Compenents were being

properly

handled

(included bending

or

straightening).

Specified clearances were being maintained.

-

-

Edge finishes and hole sizes were within tolerances.

-

Control, marking, protection and segregation were maintained during

storage.

. -.

- -

-.

. -_ -

_-

_

_,

.

4

s

10

i

Fit-up/ alignment meets the tolerances in the specifications and

-

drawings.

No violations or deviations were identified.

10.

Safety-Related Structures (Structural Steel and Supports) - Units 1 & 2

,

(48063C)

'

Periodic inspections were conducted to observe construction activities of

safety-related structures / equipment supports for major equipment outside the

containment to verify that:

-

Materials and components were being properly handled to prevent damage.

,

-

Fit-up/ alignment were within tolerances in specifications and drawing

requirements.

-

Specified clearances from adjacent components were being met.

No violations or deviations were identified.

11.

Reactor Coolant Pressure Boundary Piping - Observation of work and work

activities - Unit 1 (49053C) (52063C) (52153C) (37301)

During the inspection period, pipe run walkdowns were performed where piping

installation is near completion to determine whether the piping run was

installed as shown on approved drawings and in accordance with applicable

construction specifications.

Specific pipe run walkdowns included a

walkdown of portions of the following lines:

P&ID NO. REVISION

PIPE RUN INSPECTED

1X4DB112, Rev. 17

Pressurizer Surge Line (053-14")

Pressurizer Connections to Root Valves

Pressurizer Spray Line (030-4"/030-6")

Pressurizer PORV & Code Safety

Relief Lines to the PRT (059-6", 063-6", 060-3",

063-6", 064-12", 058-6", 057-6", 056-6", 065-6",

066-6", 067-6" & 068-3/4")

.

Specific areas examined during the pipe run walkdown for compliance with the

applicable isometric drawings and the Plant Design and Instrumentation

l

Construction Specification No. X4AZ01, were as follows:

Vent and Drain Connections and Locations

Instrumentation Connections and Locations

Valve Installation and Orientation

Line Size and Location

Fittings Type and Location

Pipe / Valve / Fitting End Connections

Hanger Locations and Types

No violations or deviations were identified.

,

,.-o

, . , , - - , - - - , , _ . _ - , . , _ _ . , ,

_.

--

, , , , , _ . , _ _ _ , , _ . -

.-,,,.---w.

,.c.. . - -. - -

.-,,--%

,

-

.__ - _ _ - , . - _ . .

- _ .

-

-

-.

._ .

_.

_

__

. _ .

.

.

_. __.

J

,

t

11

,

k

12.

Reactcr Vessel Protection - Units 1 & 2 (50053C)

Periodic . inspections were conducted during the inspection period to

determine that proper storage protection practices were in place, entry of

4

foreign objects and debris was prevented, and that access was controlled for

the following:

'

Unit 1 & 2 Reactor Vessel

Unit 1 Integrated Head Package

Unit 1 Upper and Lower Internals

i

No violations or deviations were identified.

'

13.

Safety Related Components - Units 1 & 2 (50073C)

The inspection consisted of plant tours to observe storage, handling, and

protection, installation; and preventive maintenance after installation of

,

safety-related components to determine that work is being performed in

accordance with applicable codes, NRC Regulatory Guides, and licensee

commitments.

During the inspection the below listed equipment was observed at various

times during the inspection period to verify the following as applicable:

-

Storage, environment, and protection of components were in accordance

with manufacturer's instructions and/or established procedures.

-

Implementation of special storage and maintenance requirements such

!

as:

rotation of motors, pumps, lubrication, insulation testing

(electrical), cleanliness,etc.

,

-

Performance

of

licensee / contractor

surveillance

activities

and

documentation thereof was being accomplished.

-

Installation requirements were met such as: proper location, placement,

orientation, alignment, mounting (torquing of bolts and expansion

j

anchors), flow direction, tolerances, and expansion clearance.

l

Appropriate stamps, tags, markings, etc. were in use to prevent

-

oversight of required inspections, completion of tests, acceptance, and

4

!

the prevention of inadvertent operation.

__

The following Unit 1 equipment was inspected:

-

Residual Heat Removal (RHR) Pumps

-

Diesel Generators

-

Containment Spray (CS) Pumps

-

Pressurizer

I

!

!

i

1

-. - -

_ _ _ . . - . _ . . -

-

. - . . . -, _ - _ _ , _ .

-~,..,.,-.,~,_4-

. , _ . - . - _

- - - . - , , . _

.

_ _ -

.

. _ .

. . _ -

--

--. .-

-

..

-

-

.

l

l

.

'

'

12

-

Main Coolant Pumps

4

-

Steam Generators

Safety Injection Pumps

-

-

Containment Penetration Encapsulation Vessel for Train "B"

RHR and CS

-

Component Cooling Water (CCW) Heat Exchangers, Surge Tanks & Pumps

-

-

Cable Spreading Room Train A & B

,

-

-

Accumulator Tanks

'

Reactor Coolant Drain Tank Pumps

-

-

Chemical and Volume Control System (CVCS) Letdown Heat Exchanger

-

Reactor Coolant Drain Tank & Heat Exchanger

-

Reactor Cavity Pumps

-

Battery & Charger Rooms Train A, B, C & D

.,

-

Nuclear Grade Piping, Valves & Fittings

-

Spent Fuel Pool Heat Exchangers

-

Pressurizer Relief Tank

'

CVCS Centrifugal Charging Pumps & Positive Displacement

-

Pump

4

-

Bottom Mounted Instrumentation (BMI) Seal Table

!

'

The following Unit 2 equipment was inspectea:

RHR Pumps

-

-

CS Pumps

I

-

CVCS Centrifugal Charging Pumps & Positive Displacement Pump

Steam Generators

-

-

-

Safety Injection Pumps

-

CCW Heat Exchangers Surge Tanks & Pumps

-

Accumulator Tanks

,

!

-

Pressurizer Relief Tank

-

Diesel Generator Fuel Oil Tanks

!

-

Nuclear Grade Piping, Valves, & Fittings

.

No violations or deviations were identified.

<

'

14.

Safety Related Pipe Support and Restraint Systems - Unit 1 (50090C)

I

Periodic inspections were conducted during the inspection period to observe

i

construction activities during installation of safety-related pipe supports

to determine that the following work was performed in accordance with

'

applicable codes, NRC Regulatory Guides, and licensee commitments:

l

-

Spring hangers were provided with indicators to show the approximate

" hot" or " cold" position, as appropriate.

-

No deformation or forced bending was evident.

-

Where pipe clamps are used to support vertical lines, shear lugs were

welded to the pipe (if required by Installation Drawings) to prevent

slippage.

,

l

l

.

, - - , . . , - . - - . - - . . _ - . , .

-

- - . , ,

... - . .,

. . . - .,, .

, - - - . - - - - , . - - - - . - - _ , . , - - - - . - - -

-

-

'

.

13

-

Sliding or rolling supports were provided with material and/or

lubricants suitable for the environment and compatible with sliding

contact surfaces.

-

Supports are located and installed as specified.

-

The surface of welds meet applicable code requirements and are free

from unacceptable grooves, abrupt ridges, valleys, undercuts, cracks,

discontinuities, or other indications which can be observed on the

welded surface.

No violations or deviations were identified.

15.

Electrical (Components and Systems) - Units 1 & 2 (51053C)

Periodic inspections were conducted during the inspection period to observe

safety-related electrical

equipment

to verify

that

the

storage,

installation, and preventive maintenance were accomplished in accordance

with applicable codes, NRC Regulatory Guides, and licensee commitments.

During the inspection period the inspector conducted an inspection of the

below listed equipment during storage, installation, and cable terminating

to verify the following as applicable:

Location and alignment

-

-

Type and size of anchor bolt:

-

Identification

-

Segregation and identification of nonconforming items

-

Location, separation and redundancy requirements

-

Equipment space heating

-

Cable identification

-

Proper lugs used

-

Condition of wire (not nicked, etc.), tightness of connection

-

Bending radius not exceeded

-

Cable entry to terminal point

-

Separation

The following Unit 1 equipment was inspected:

1-1605-PS-SDA Train "A" Shutdown Panel

1-1605-PS-SDB . Train "B" Shutdown Panel

1-1805-S3-DAD Reactor Coolant Pumps 13.8KV Switchgear

~~

1-1805-S3-CAC Reactor Coolant Pumps 13.8KV Switchgear

1-1804-53-A03 4160V Switchgear 1BA03

1-1804-S3-A02 4160V Switchgear 1AA02

1-1805-S3-BBE MCC 1BBE

1

-

_ _

_ _ .

...

-- .

_ _ ___ . _ _

_

1

.

l

1

.

14

.

1-1805-S3-806 IBB06 Switchgear

1-1805-53-807 1BB07 Switchgear

1-1805-S3-BBC MCC IBBC

1-1805-S3-804 1AB04 Switchgear

.

1-1805-S3-805 1AB05 Switchgear

+

1-1805-S3-BBD MCC 1880 Train "B"

'

1-1805-S3-ABD MCC 1ABD Train "A"

j

The following Unit 2 equipment was inspected:

~

'

2BB06 Svitchgear

2-1805-S3-806

2-1805-S3-807 28807 Switchgear

2-1605-S3-SDA Train "A" Shutdown Panel

2-1605-S3-SDB Train "B" Shutdown Panel

No violations or deviations were identified.

!

16.

Electrical (Cables and Terminations) - Unit 1 (51063C)

!

a.

Raceway / Cable Installation

.

i

The inspector reviewed and examined portions of the following

procedures pertaining to raceway / cable installation to determine

whether they comply with appiicable codes, NRC Regulatory Guides and

l

licensee commitments.

4

- ED-T-02, Rev. 8 Raceway Installation

!

- ED-T-07, Rev. 9 Cable Installation

4

'

Periodic inspections were conducted to observe construction activities

i

of Safety Related Raceway / Cable Installation in the Containment,

'

itrol and Auxiliary Buildings.

2

In reference to the raceway installation, the following areas were

inspected to verify compliance with the applicable requirements:

4

i

-

Identification

Alignment

-

-

Bushings (Conduit)

-

4

-

Grounding

-

Supports and Anchorages

In reference to the cable installation the following areas were

inspected to verify compliance with the applicable requirements:

i

Protection from adjacent construction activities (welding, etc.)

-

'

-

Coiled cable ends properly secured

-

Non-terminated cable ends taped

i

A

-

- .

.

.

.

.

.

. . .

. . .

.

. .

.-_

--

j

-

15

.

-

Cable trays, junction boxes, etc., reasonably free of debris

-

Conduit capped, if no cable installed

Cable supported

-

Bend radius not exceeded

-

Separation

-

b.

Cable Terminations

The inspector reviewed and examined portions of the following

procedures pertaining to cable termination to determine whether they

comply with applicable codes, NRC

Regulatory Guides and licensee

commitments.

-

.ED-T-08, Rev. 7 Cable Termination

In reference to cable terminations the following areas were inspected

to verify compliance with the applicable requirements.

-

Cable identification

Proper lugs used

-

-

Condition of wire (not nicked, etc.), tightness of connection

-

Bending radius not exceeded

-

Cable entry to terminal point

-

Separation

No violations or deviations were identified.

~

17.

Safety Related Piping (Welding) - Unit 1 & 2 (55083C)

Periodic inspections were conducted on safety-related pipe welding at

various stages of weld completion.

The purpose of the inspection was to

determine whether the requirements of applicable specifications, codes,

standards, work performance procedures and QC procedures are being met as

follows:

I

-

Work was conducted in accordance with a process sheet which identifies

the weld and its location by system, references procedures or

,

instructions, and provides for production and QC signoffs.

!

-

Welding procedures, detailed drawings and instructions, were readily

available and technically adequate for the welds being made.

l

Welding procedure specification (WPS) were in accordance with the

-

applicable ASME Code requirements and that a Procedure Qualification

Record (PQR) is referenced and exists for the type of weld being made,

i

I

!

.

,

16

-

That the base metals, welding filler materials, fluxes, gases, and

insert materials were of the specified type and grade, have been

properly inspected, tested and were traceable to test reports or

certifications.

-

That the purge and/or shielding gas flow and composition were

as specified in the welding procedure specification and that protection

was provided to shield the welding operation from adverse environmental

conditions.

-

That the weld joint geometry including pipe wall thickncss was specified

.

and that surfaces to be welded have been prepared, cleaped and inspected

in accordance with applicable procedures or instructions.

'

-

-

That a sufficient number of adequately qualified QA and QC inspection

personnel were present at the work site, commensurate with the worA in

'

progress.

-

That the weld area cleanliness was maintained and that pipe alignment

and fit-up tolerances were within specified units.

-

That . weld filler material being used was in accordance with welding

specifications, that unused filler material was separated from other

types of material and was stored in heated cans, and stubs properly

removed from the work location.

-

That there were no evident signs of cracks, excessive heat input,

sugaring, or excessive crown.

No violations or deviations were identified.

18.

Preoperational Test Program Implementation / Verification - Unit 1 (70302)

(71302)

The inspector reviewed, in part, the implementation of the preoperational

test program.

Test program attributes inspected included review of

administrative requirements, document control, documentation of major test

events and deviations to procedures, operating practices, instrumentation

calibrations, and correction of problems revealed by testing.

Specific

activities reviewed included the following procedures:

Sum No.

Sum Procedure Title

11, Rev. 2

Construction Acceptance Test Program

12, Rev. 1

Construction Acceptance Test Implementation

Preop No.

Preop Test Procedure Title

1-3BN-17, Rev. O

Refueling Water Storage Tank

1-3KJ-01, Rev. 0 &

Chg. Reg's. No. 1

Diesel Generator Train "A" Starting Air System

'

-_.

-

- .

. _ .

-

_-

.

--

~

-

, _-

. _ . _

.

17

The inspector also witnessed portions of the following construction

{

acceptance tests (CAT):

Cat. No.

Equipment / Generic CAT

85-2903

RHR Train "A" (CAT-M-01) Pump & Motor (CAT-E-11)

85-908

ACCW Pump #1 (CAT-M-01)

Other tests witnessed by the inspector during the inspection period

consisted of the train

"A"

safety injection pump lube oil flush.

-

4

The inspector also reviewed the following completed maintenance procedure

,

'

data sheets for the train "A" RHR pump motor prior to witnessing the above

l

listed CAT for the RHR pump & motor.

4

Maintenance Procedure No.

Maintenance Procedure Title

25734-C, Rev. O

High Potential Testing A-C Motors

(4KV Less Than 1000 HP)

No violations or deviations were identified.

,

19.

Meeting With Local Officials (94600) - Unit 1 and 2

On November 23, a meeting was held to familiarize local officials of the

City of Waynesboro and Burke County Board of Commissioners with the NRC.

The meeting presented the mission of the NRC, introduction of key NRC

personnel, discussion of lines of communication available to local

officials, ard discussion of the facility status.

The NRC presentea the

scope of the inspection and emergency preparedness programs.

,

The meeting was open for questions during the presentation.

NRC persons

>

involved with the presentation were as follows:

'

D. M. Collins, Chief, Emergency Preparedness and Radiological

Protection Branch, Division of Radiation Safety and Safeguards

M. V. Sinkule, Chief, Reactor Projects Section 20, Division of

Reactor Projects

J. F. Rogge, Senior Resident Inspector, Operations

4

R. J. Schepens, Resident Inspector

20.

Management Meetings (307028) - Unit 1

i

On November 25, 1985 the resident inspector attended a management meeting at

the Region II office in Atlanta, Georgia. The purpose of this meeting was

i

for Georgia Power Company to present Readiness Review Module No. 8

'

" Structural Steel"; Appendix D " Document Control Program; and Appendix E

" Material Control" to the NRC for review.