ML18017B032: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,a~C~
{{#Wiki_filter:,a~C~
REGULATOR     NFORMATION DISTRIBUTION         S   EM (RIDS)
REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR:8004170053           DOC   DATE: 80/0?/29     NOTARIZED:   NO         DOCKET
ACCESSION NBR:8004170053 DOC ~ DATE: 80/0?/29 NOTARIZED:
                                        ~
NO FACIL:50-400 Shearon Harris Nuclear Power Plenty Unit ii Carolina 50 401 Shearon Har ris Nuclear Power Plantr Unit 2P Carolina 50 402 Shearon Herr is Nuclear Power PlantP Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION CHIANGIPN.J ~
FACIL:50-400 Shearon Harris Nuclear Power Plenty Unit             ii   Carolina     05000400 50 401 Shearon Har ris Nuclear Power Plantr Unit 2P Carolina                 05000401 50 402 Shearon Herr is Nuclear Power PlantP Unit 3i Carolina AUTH'AME             AUTHOR AFFILIATION CHIANGIPN.J ~       Carolina Power     L Light Co ~
Carolina Power L Light Co ~
RECIP ~ NAME   . RECIPIENT AFFILIATION                                         05000402'UBJECT:
RECIP ~ NAME RECIPIENT AFFILIATION DOCKET 05000400 05000401 05000402'UBJECT:
Interim deficiency rept re deficiencies- in procurementi fabrication L insp of engineered plates for concrete embedment 8 support of safety related loads, Estimates corrective action will be completed by 800601         ~
Interim deficiency rept re deficiencies-in procurementi fabrication L insp of engineered plates for concrete embedment 8 support of safety related loads, Estimates corrective action will be completed by 800601
DISTRIBUTION CODE: 80198       COPIES   RECEIYED:LTR I     ENCL TITLE: Construction Deficiency Report (10CFR50,55E)
~
ET  SIZE:    J RECIPIENT          COPIES              RECIPIENT           COPIES ID CODE/NAME       LTTR ENCL         ID CODE/NAME         LTTR ENCL ACTION:      14 PM 'At04M                          15 BC~9 9               i 20 LA Lehg  Q                        21 AD ~g                 1 INTERNAL;    0  REG  FIL            1              02 NRC PDR               1 05                      2              07 FDO 8 STAFF           1 08 MPA                  1              09 DEPY DIR DPM 10 QAB                  1              11 STANDRDS DEV           1 13FIELD COOR/IE        1              16 AD FOR ENGR           1 17 AD PLANT SYS        1              17 AD REAC SFTY           1 22 DIR DPM              1              23 OELD                   1 AD/RCI/IE              1              AD/SITE   TECH           1 AEOD                    1              DIRECTOR DSE             1 GEOSCIENCES    BR      1              HANAUERPS ~               1 IHC SYS BR              1              MATL ENG BR MECH ENG BR            1              POWER SYS BR             1 STRUCT ENG BR EXTERNAL: 03 LPDR                    1             04 NSIC
DISTRIBUTION CODE:
            ?4 ACRS                16 0- 8C                                             HER  21 198$
80198 COPIES RECEIYED:LTR I ENCL ET SIZE: J TITLE: Construction Deficiency Report (10CFR50,55E)
date g<8~0     s@c gpss       g- LA TOTAL NUMBER OF COPIES       REQUIRED! LTTR     ~       ENCI
RECIPIENT ID CODE/NAME ACTION:
14 PM 'At04M 20 LALehg Q INTERNAL; 0
REG FIL 05 08 MPA 10 QAB 13FIELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR IHC SYS BR MECH ENG BR STRUCT ENG BR EXTERNAL: 03 LPDR
?4 ACRS COPIES LTTR ENCL 1
2 1
1 1
1 1
1 1
1 1
1 1
16 RECIPIENT ID CODE/NAME 15 BC~9 9 21 AD~g 02 NRC PDR 07 FDO 8
STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERPS ~
MATL ENG BR POWER SYS BR 04 NSIC COPIES LTTR ENCL i
1 1
1 1
1 1
1 1
1 1
1 date 0- 8C g<8~0 s@c gpss g-LA HER 21 198$
TOTAL NUMBER OF COPIES REQUIRED!
LTTR ~
ENCI


1 1
1 1
f g
f g
fl f
fl f
                        'fl tl 1 f                         l                   f f t, I" tf k               t
'fl tl 1 f l
                            , l               W 8 ~ - %e tWt W lt W                               W f f       f t
f f t, I"
[ ~,1           t Wt W tt%':'="s t
tf k
f ll lt V
t
, l W
8
~ -
%e tWt W
lt W
W f f f
t
[ ~,1 t
Wt Wtt%':'="s t f ll lt V
f
f
                                                ,.t f U
,.t f U
t'
t'


                                                                                                            'I CPA'Carolina povver-8'ight'ompany l ~"q
CPA'Carolina povver-8'ight'ompany
                                                              ~
', l
                                      'Februa~ )9,                     $ 9/0
~"q
                                "~ I.~;t-
~
                                  ~                    ~Q Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, NW Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS                                   1, 2,   3 & 4 DOCKET NOS. 50-400, 50-401, 50-402,                                   50-403 DEFICIENCIES IN THE PROCUR12KNT, FABRICATION, AND INSPECTION OF ENGINEER) PLATES FOR CONCRETE EMBEDMENT AND SUPPORT OF SAFETY RELATED LOADS                                 -   INTERIM REPORT (OPEN ITEM 400 & 401/79-14-01                               402 & 403/79-13-01
'I
'Februa~ )9,
$9/0
"~
~ I.~;t-
~Q Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, NW Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3
& 4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 DEFICIENCIES IN THE PROCUR12KNT, FABRICATION, AND INSPECTION OF ENGINEER) PLATES FOR CONCRETE EMBEDMENT AND SUPPORT OF SAFETY RELATED LOADS - INTERIM REPORT (OPEN ITEM 400
& 401/79-14-01 402
& 403/79-13-01


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
 
Per our {{letter dated|date=December 27, 1979|text=December 27, 1979, letter}} on the subject deficiency, we informed you that approximately 195 plates had been reworked.
Per our December 27, 1979, letter on the subject deficiency, we informed you that approximately 195 plates had been reworked. Twenty plates were                                       still on QA hold pending repair and/or NDT examination and that the the date estimated for completion of corrective action was March 1, 1980. The intent of this letter is to inform you that all corrective action has not yet been completed in that three plates   still     remain on QA hold pending completion of corrective action involving NDE. Engineering evaluation of several embedded plates remains to be completed. Also, final accountability for all plates needs to be resolved. It is now estimated that all corrective action will be completed by June 1, 1980, at which time the final 10CFR50.55(e) report will be submitted. We will routinely keep you appraised of our progress on this item during your site inspection visits.
Twenty plates were still on QA hold pending repair and/or NDT examination and that the the date estimated for completion of corrective action was March 1, 1980.
If you have any questions regarding                             this matter, please           do not hesitate to contact   me.
The intent of this letter is to inform you that all corrective action has not yet been completed in that three plates still remain on QA hold pending completion of corrective action involving NDE.
Yours very       truly, N. J.       angi         ager Engin ering       &      struction t   Assurance KVH/bwb cc: Mr. V. Stello (2)                                                                                           $ 0/9 5G j/o 411 Fayetteville Street             ~   P. 0. Box 1551 ~ Raleigh, N. C. 27602
Engineering evaluation of several embedded plates remains to be completed.
                                                                                                      ~
Also, final accountability for all plates needs to be resolved.
It is now estimated that all corrective action will be completed by June 1, 1980, at which time the final 10CFR50.55(e) report will be submitted.
We will routinely keep you appraised of our progress on this item during your site inspection visits.
If you have any questions regarding this matter, please do not hesitate to contact me.
Yours very truly, N. J.
angi ager Engin ering struction t
Assurance KVH/bwb cc:
Mr. V. Stello (2)
$0/9 5G j/o 411 Fayetteville Street
~ P. 0. Box 1551
~ Raleigh, N. C. 27602
~
SOP4gg0053}}
SOP4gg0053}}

Latest revision as of 06:40, 7 January 2025

Interim Deficiency Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Estimates Corrective Action Will Be Completed by 800601
ML18017B032
Person / Time
Site: Harris  
Issue date: 02/29/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
400-401-79-14, 400-401-79-14-0, 402-403-79-13-0, NUDOCS 8004170053
Download: ML18017B032 (4)


Text

,a~C~

REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)

ACCESSION NBR:8004170053 DOC ~ DATE: 80/0?/29 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plenty Unit ii Carolina 50 401 Shearon Har ris Nuclear Power Plantr Unit 2P Carolina 50 402 Shearon Herr is Nuclear Power PlantP Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION CHIANGIPN.J ~

Carolina Power L Light Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DOCKET 05000400 05000401 05000402'UBJECT:

Interim deficiency rept re deficiencies-in procurementi fabrication L insp of engineered plates for concrete embedment 8 support of safety related loads, Estimates corrective action will be completed by 800601

~

DISTRIBUTION CODE:

80198 COPIES RECEIYED:LTR I ENCL ET SIZE: J TITLE: Construction Deficiency Report (10CFR50,55E)

RECIPIENT ID CODE/NAME ACTION:

14 PM 'At04M 20 LALehg Q INTERNAL; 0

REG FIL 05 08 MPA 10 QAB 13FIELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR IHC SYS BR MECH ENG BR STRUCT ENG BR EXTERNAL: 03 LPDR

?4 ACRS COPIES LTTR ENCL 1

2 1

1 1

1 1

1 1

1 1

1 1

16 RECIPIENT ID CODE/NAME 15 BC~9 9 21 AD~g 02 NRC PDR 07 FDO 8

STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERPS ~

MATL ENG BR POWER SYS BR 04 NSIC COPIES LTTR ENCL i

1 1

1 1

1 1

1 1

1 1

1 date 0- 8C g<8~0 s@c gpss g-LA HER 21 198$

TOTAL NUMBER OF COPIES REQUIRED!

LTTR ~

ENCI

1 1

f g

fl f

'fl tl 1 f l

f f t, I"

tf k

t

, l W

8

~ -

%e tWt W

lt W

W f f f

t

[ ~,1 t

Wt Wtt%':'="s t f ll lt V

f

,.t f U

t'

CPA'Carolina povver-8'ight'ompany

', l

~"q

~

'I

'Februa~ )9,

$9/0

"~

~ I.~;t-

~Q Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, NW Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3

& 4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 DEFICIENCIES IN THE PROCUR12KNT, FABRICATION, AND INSPECTION OF ENGINEER) PLATES FOR CONCRETE EMBEDMENT AND SUPPORT OF SAFETY RELATED LOADS - INTERIM REPORT (OPEN ITEM 400

& 401/79-14-01 402

& 403/79-13-01

Dear Mr. O'Reilly:

Per our December 27, 1979, letter on the subject deficiency, we informed you that approximately 195 plates had been reworked.

Twenty plates were still on QA hold pending repair and/or NDT examination and that the the date estimated for completion of corrective action was March 1, 1980.

The intent of this letter is to inform you that all corrective action has not yet been completed in that three plates still remain on QA hold pending completion of corrective action involving NDE.

Engineering evaluation of several embedded plates remains to be completed.

Also, final accountability for all plates needs to be resolved.

It is now estimated that all corrective action will be completed by June 1, 1980, at which time the final 10CFR50.55(e) report will be submitted.

We will routinely keep you appraised of our progress on this item during your site inspection visits.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, N. J.

angi ager Engin ering struction t

Assurance KVH/bwb cc:

Mr. V. Stello (2)

$0/9 5G j/o 411 Fayetteville Street

~ P. 0. Box 1551

~ Raleigh, N. C. 27602

~

SOP4gg0053