Interim Deficiency Rept Re Deficiencies in Procurement, Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Estimates Corrective Action Will Be Completed by 800601
ML18017B032
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/29/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
400-401-79-14, 400-401-79-14-0, 402-403-79-13-0, NUDOCS 8004170053
Download: ML18017B032 (4)


Text

,a~C~

REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)

ACCESSION NBR:8004170053 DOC DATE: 80/0?/29 NOTARIZED: NO DOCKET

~

FACIL:50-400 Shearon Harris Nuclear Power Plenty Unit ii Carolina 05000400 50 401 Shearon Har ris Nuclear Power Plantr Unit 2P Carolina 05000401 50 402 Shearon Herr is Nuclear Power PlantP Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION CHIANGIPN.J ~ Carolina Power L Light Co ~

RECIP ~ NAME . RECIPIENT AFFILIATION 05000402'UBJECT:

Interim deficiency rept re deficiencies- in procurementi fabrication L insp of engineered plates for concrete embedment 8 support of safety related loads, Estimates corrective action will be completed by 800601 ~

DISTRIBUTION CODE: 80198 COPIES RECEIYED:LTR I ENCL TITLE: Construction Deficiency Report (10CFR50,55E)

ET SIZE: J RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM 'At04M 15 BC~9 9 i 20 LA Lehg Q 21 AD ~g 1 INTERNAL; 0 REG FIL 1 02 NRC PDR 1 05 2 07 FDO 8 STAFF 1 08 MPA 1 09 DEPY DIR DPM 10 QAB 1 11 STANDRDS DEV 1 13FIELD COOR/IE 1 16 AD FOR ENGR 1 17 AD PLANT SYS 1 17 AD REAC SFTY 1 22 DIR DPM 1 23 OELD 1 AD/RCI/IE 1 AD/SITE TECH 1 AEOD 1 DIRECTOR DSE 1 GEOSCIENCES BR 1 HANAUERPS ~ 1 IHC SYS BR 1 MATL ENG BR MECH ENG BR 1 POWER SYS BR 1 STRUCT ENG BR EXTERNAL: 03 LPDR 1 04 NSIC

?4 ACRS 16 0- 8C HER 21 198$

date g<8~0 s@c gpss g- LA TOTAL NUMBER OF COPIES REQUIRED! LTTR ~ ENCI

1 1

f g

fl f

'fl tl 1 f l f f t, I" tf k t

, l W 8 ~ - %e tWt W lt W W f f f t

[ ~,1 t Wt W tt%':'="s t

f ll lt V

f

,.t f U

t'

'I CPA'Carolina povver-8'ight'ompany l ~"q

~

'Februa~ )9, $ 9/0

"~ I.~;t-

~ ~Q Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, NW Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1, 2, 3 & 4 DOCKET NOS. 50-400, 50-401, 50-402, 50-403 DEFICIENCIES IN THE PROCUR12KNT, FABRICATION, AND INSPECTION OF ENGINEER) PLATES FOR CONCRETE EMBEDMENT AND SUPPORT OF SAFETY RELATED LOADS - INTERIM REPORT (OPEN ITEM 400 & 401/79-14-01 402 & 403/79-13-01

Dear Mr. O'Reilly:

Per our December 27, 1979, letter on the subject deficiency, we informed you that approximately 195 plates had been reworked. Twenty plates were still on QA hold pending repair and/or NDT examination and that the the date estimated for completion of corrective action was March 1, 1980. The intent of this letter is to inform you that all corrective action has not yet been completed in that three plates still remain on QA hold pending completion of corrective action involving NDE. Engineering evaluation of several embedded plates remains to be completed. Also, final accountability for all plates needs to be resolved. It is now estimated that all corrective action will be completed by June 1, 1980, at which time the final 10CFR50.55(e) report will be submitted. We will routinely keep you appraised of our progress on this item during your site inspection visits.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, N. J. angi ager Engin ering & struction t Assurance KVH/bwb cc: Mr. V. Stello (2) $ 0/9 5G j/o 411 Fayetteville Street ~ P. 0. Box 1551 ~ Raleigh, N. C. 27602

~

SOP4gg0053