i Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO. . _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000
Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.. _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000
                                                                                                                  - Ext. 251 OPERATING STATUS Not'5
- Ext. 251 OPERATING STATUS Not'5 Davis-Besse Unit 1
: 1. Unit Name:
: 1. Unit Name:
Davis-Besse Unit 1
May, 1080
: 2. Reporting Period:
: 2. Reporting Period:
May, 1080 2772
2772
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
: 4. Nameptare Rating (Gross MWe):           925
925
: 4. Nameptare Rating (Gross MWe):
906
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
906
934
: 6. Maximum Dependable Capacity (Gross MWep:           934 890
: 6. Maximum Dependable Capacity (Gross MWep:
890
* 7. Maximum Dependable Capacity (Net MWe):
* 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 10. Reasons For Restrictions,If Any:
: 10. Reasons For Restrictions,If Any:
This Month             Yr.-to-Date           Cumulative 744                   3,647           _ 24,172
This Month Yr.-to-Date Cumulative 744 3,647
: 11. Hours in Reporting Period 0                      2,078              13,042
: 12. Number Of flours Reactor Was Critical 0
: 12. Number Of flours Reactor Was Critical 0                    0                   2,875.8
2,078
: 13. Reactor Reserve Shutdown Hours 0                     2,008.7 1l    14. Hours Generator On-Line 11.881.0 0                     0                  1. .'' 2 8
_ 24,172
: 15. Unit Resene Shutdown Hours 0                     4,687,305           24.886.812                       -
: 11. Hours in Reporting Period 13,042 0
: 16. Gross Thermal Energy Generated (MWH)
0 2,875.8
: 17. Gross Electrical Energy Generated (MWil)         0             , , ,
: 13. Reactor Reserve Shutdown Hours 1l 0
1.583.559          8.307.070 0                    1,483,787           7,654,365
2,008.7 11.881.0
: 18. Net Electrical Energy Generated (MWH)                                                                             ,
: 14. Hours Generator On-Line 0
: 19. Unit Service Factor 0                     55.1               50.4        ,
0
: 20. Unit Availability Factor                         0                     55.1                58.2
: 1..'' 2 8
: 21. Unit Capacity Factor (Using MDC Net) 0                     45.7                38.3
: 15. Unit Resene Shutdown Hours 0
: 22. Unit Capacity Factor (Using DER Net)             0                    44.9                37.6 0                     14.3               25.6
4,687,305 24.886.812
: 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 8.307.070
: 17. Gross Electrical Energy Generated (MWil) 0 1,483,787 7,654,365
: 18. Net Electrical Energy Generated (MWH) 0 55.1 50.4
: 19. Unit Service Factor 0
55.1 58.2
: 20. Unit Availability Factor 0
45.7 38.3
: 21. Unit Capacity Factor (Using MDC Net) 0 44.9 37.6
: 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):                           .
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
August 1, 1980
August 1, 1980
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status tPrior to Commercial Operation):                       Forecast       .
: 26. Units in Test Status tPrior to Commercial Operation):
Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION                 ,
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION (9/77) 810 203 054j
(9/77) 810 203 054j                                                       .
. -}}
_ - _ - _ . -}}

Latest revision as of 15:04, 23 December 2024

Revised Monthly Operating Rept for May 1981
ML20003A356
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030549
Download: ML20003A356 (1)


Text

.

l i

Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.. _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000

- Ext. 251 OPERATING STATUS Not'5 Davis-Besse Unit 1

1. Unit Name:

May, 1080

2. Reporting Period:

2772

3. Licensed Thermal Power (MWt):

925

4. Nameptare Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

934

6. Maximum Dependable Capacity (Gross MWep:

890

  • 7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr.-to-Date Cumulative 744 3,647

12. Number Of flours Reactor Was Critical 0

2,078

_ 24,172

11. Hours in Reporting Period 13,042 0

0 2,875.8

13. Reactor Reserve Shutdown Hours 1l 0

2,008.7 11.881.0

14. Hours Generator On-Line 0

0

1.. 2 8
15. Unit Resene Shutdown Hours 0

4,687,305 24.886.812

16. Gross Thermal Energy Generated (MWH) 0 1.583.559 8.307.070
17. Gross Electrical Energy Generated (MWil) 0 1,483,787 7,654,365
18. Net Electrical Energy Generated (MWH) 0 55.1 50.4
19. Unit Service Factor 0

55.1 58.2

20. Unit Availability Factor 0

45.7 38.3

21. Unit Capacity Factor (Using MDC Net) 0 44.9 37.6
22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

August 1, 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION (9/77) 810 203 054j

. -