Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.. _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000 | |||
- Ext. 251 OPERATING STATUS Not'5 Davis-Besse Unit 1 | |||
: 1. Unit Name: | : 1. Unit Name: | ||
May, 1080 | |||
: 2. Reporting Period: | : 2. Reporting Period: | ||
2772 | |||
: 3. Licensed Thermal Power (MWt): | : 3. Licensed Thermal Power (MWt): | ||
: 4. Nameptare Rating (Gross MWe): | 925 | ||
: 4. Nameptare Rating (Gross MWe): | |||
906 | |||
: 5. Design Electrical Rating (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
934 | |||
: 6. Maximum Dependable Capacity (Gross MWep: | : 6. Maximum Dependable Capacity (Gross MWep: | ||
890 | |||
* 7. Maximum Dependable Capacity (Net MWe): | * 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons: | : 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons: | ||
: 9. Power Level To Which Restricted,If Any (Net MWe): | : 9. Power Level To Which Restricted,If Any (Net MWe): | ||
: 10. Reasons For Restrictions,If Any: | : 10. Reasons For Restrictions,If Any: | ||
This Month | This Month Yr.-to-Date Cumulative 744 3,647 | ||
: 11. Hours in Reporting Period | : 12. Number Of flours Reactor Was Critical 0 | ||
2,078 | |||
: 13. Reactor Reserve Shutdown Hours 0 | _ 24,172 | ||
: 15. Unit Resene Shutdown Hours 0 | : 11. Hours in Reporting Period 13,042 0 | ||
: 16. Gross Thermal Energy Generated (MWH) | 0 2,875.8 | ||
: 17. Gross Electrical Energy Generated (MWil) | : 13. Reactor Reserve Shutdown Hours 1l 0 | ||
2,008.7 11.881.0 | |||
: 18. Net Electrical Energy Generated (MWH) | : 14. Hours Generator On-Line 0 | ||
: 19. Unit Service Factor 0 | 0 | ||
: 20. Unit Availability Factor | : 1..'' 2 8 | ||
: 21. Unit Capacity Factor (Using MDC Net) 0 | : 15. Unit Resene Shutdown Hours 0 | ||
: 22. Unit Capacity Factor (Using DER Net) | 4,687,305 24.886.812 | ||
: 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 8.307.070 | |||
: 17. Gross Electrical Energy Generated (MWil) 0 1,483,787 7,654,365 | |||
: 18. Net Electrical Energy Generated (MWH) 0 55.1 50.4 | |||
: 19. Unit Service Factor 0 | |||
55.1 58.2 | |||
: 20. Unit Availability Factor 0 | |||
45.7 38.3 | |||
: 21. Unit Capacity Factor (Using MDC Net) 0 44.9 37.6 | |||
: 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6 | |||
: 23. Unit Forced Outage Rate | : 23. Unit Forced Outage Rate | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): | ||
August 1, 1980 | August 1, 1980 | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status tPrior to Commercial Operation): | : 26. Units in Test Status tPrior to Commercial Operation): | ||
Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION | Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION (9/77) 810 203 054j | ||
(9/77) 810 203 054j | . -}} | ||
Latest revision as of 15:04, 23 December 2024
| ML20003A356 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/22/1981 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20003A329 | List: |
| References | |
| NUDOCS 8102030549 | |
| Download: ML20003A356 (1) | |
Text
.
l i
Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.. _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000
- Ext. 251 OPERATING STATUS Not'5 Davis-Besse Unit 1
- 1. Unit Name:
May, 1080
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power (MWt):
925
- 4. Nameptare Rating (Gross MWe):
906
- 5. Design Electrical Rating (Net MWe):
934
- 6. Maximum Dependable Capacity (Gross MWep:
890
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr.-to-Date Cumulative 744 3,647
- 12. Number Of flours Reactor Was Critical 0
2,078
_ 24,172
- 11. Hours in Reporting Period 13,042 0
0 2,875.8
- 13. Reactor Reserve Shutdown Hours 1l 0
2,008.7 11.881.0
- 14. Hours Generator On-Line 0
0
- 1.. 2 8
- 15. Unit Resene Shutdown Hours 0
4,687,305 24.886.812
- 16. Gross Thermal Energy Generated (MWH) 0 1.583.559 8.307.070
- 17. Gross Electrical Energy Generated (MWil) 0 1,483,787 7,654,365
- 18. Net Electrical Energy Generated (MWH) 0 55.1 50.4
- 19. Unit Service Factor 0
55.1 58.2
- 20. Unit Availability Factor 0
45.7 38.3
- 21. Unit Capacity Factor (Using MDC Net) 0 44.9 37.6
- 22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
August 1, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION (9/77) 810 203 054j
. -