| {{#Wiki_filter:NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa. | | {{#Wiki_filter:NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa. |
| www.nrc.gov No. I-06-031 May 4, 2006 Contact: Diane Screnci, 610/337-5330 E-mail: opa1@nrc.gov Neil Sheehan, 610/337-5331 NRC PROPOSES $16,250 FINE FOR MARCUS HOOK, PA., COMPANY FOR VIOLATIONS INVOLVING RADIATION EXPOSURES The Nuclear Regulatory Commission staff has proposed a $16,250 civil penalty for a Marcus Hook (Delaware County), Pa., company for several violations of agency requirements. The most significant violation by Epsilon Products Co. involved exposures exceeding regulatory limits to five employees and contractors of the firm who are not radiation workers and are therefore considered members of the public. | | www.nrc.gov No. I-06-031 May 4, 2006 |
| | |
| | ==Contact:== |
| | Diane Screnci, 610/337-5330 E-mail: opa1@nrc.gov Neil Sheehan, 610/337-5331 NRC PROPOSES $16,250 FINE FOR MARCUS HOOK, PA., COMPANY FOR VIOLATIONS INVOLVING RADIATION EXPOSURES The Nuclear Regulatory Commission staff has proposed a $16,250 civil penalty for a Marcus Hook (Delaware County), Pa., company for several violations of agency requirements. The most significant violation by Epsilon Products Co. involved exposures exceeding regulatory limits to five employees and contractors of the firm who are not radiation workers and are therefore considered members of the public. |
| Last Aug. 27th, Epsilon notified the NRC that a gauge containing radioactive material (cesium-137) had malfunctioned at its Marcus Hook site, with its radioactive source failing to retract to the shielded position. The gauge was located outside of a chemical process tank in order to monitor the buildup of polymerized material within the vessel. Initially, the unshielded source was not detected due to an inadequate radiological survey conducted by a company technician. | | Last Aug. 27th, Epsilon notified the NRC that a gauge containing radioactive material (cesium-137) had malfunctioned at its Marcus Hook site, with its radioactive source failing to retract to the shielded position. The gauge was located outside of a chemical process tank in order to monitor the buildup of polymerized material within the vessel. Initially, the unshielded source was not detected due to an inadequate radiological survey conducted by a company technician. |
| Subsequent radiological surveys and interviews determined that five workers who cleaned the interior of the tank between Aug. 23 and 27 received a radiation dose in excess of the regulatory limit of 100 millirems because the source was unshielded at the time. The doses ranged from 103 to 197 millirems. The highest estimated dose is approximately 4 percent of the annual allowable level for radiation workers. It is not expected that these exposures will result in adverse health effects for the exposed individuals. | | Subsequent radiological surveys and interviews determined that five workers who cleaned the interior of the tank between Aug. 23 and 27 received a radiation dose in excess of the regulatory limit of 100 millirems because the source was unshielded at the time. The doses ranged from 103 to 197 millirems. The highest estimated dose is approximately 4 percent of the annual allowable level for radiation workers. It is not expected that these exposures will result in adverse health effects for the exposed individuals. |
Latest revision as of 20:08, 7 December 2019
|
---|
Category:Press Release
MONTHYEARML23166A0212023-03-10010 March 2023 News Release-I-23-002: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant 2022 Performance ML22346A0552022-11-23023 November 2022 News Release-I-22-016: NRC Schedules Decommissioning Webinar for Nuclear Power Plant Emergency Preparedness and Security Requirements ML22346A0562022-11-21021 November 2022 News Release-I-22-015: NRC Names New Resident Inspector at Salem Nuclear Power Plant ML22346A0572022-11-10010 November 2022 News Release-I-22-014: West Virginia Hospital to Take Corrective Actions Under Settlement Agreement with NRC ML22305A5512022-10-14014 October 2022 News Release-I-22-013: NRC Imposes Civil Penalty to Pennsylvania Company ML22270A0832022-09-14014 September 2022 News Release-I-22-012: NRC Names New Resident Inspector at Peach Bottom Nuclear Power Plant ML22255A0872022-09-0909 September 2022 News Release-I-22-011: NRC to Conduct Pre-Decisional Enforcement Conference with a Connecticut Medical Facility ML22217A0572022-08-0505 August 2022 News Release-I-22-010: New NRC Senior Resident Inspector Assigned to Calvert Cliffs Nuclear Power Plant ML22215A2132022-07-28028 July 2022 News Release-I-22-009: NRC Names New Resident Inspector at Ginna Nuclear Power Plant Press Release-I-22-008, NRC Names New Resident Inspector at Limerick Nuclear Power Plant2022-06-22022 June 2022 Press Release-I-22-008: NRC Names New Resident Inspector at Limerick Nuclear Power Plant ML22153A1262022-05-26026 May 2022 News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants ML22131A1432022-05-0606 May 2022 News Release-I-22-006: NRC to Hold Public Meeting to Discuss Seabrook Station 2021 Safety Performance ML22131A1422022-05-0202 May 2022 News Release-I-22-005: NRC Proposes $3,500 Defense Health Agency Fine for Loss of Medical Purpose Radioactive Material ML22083A0522022-03-18018 March 2022 News Release-I-22-004: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant 2021 Performance ML22063A4642022-03-0202 March 2022 News Release-I-22-003: NRC Proposes $25,600 Fine for Pennsylvania Company ML22028A0502022-01-26026 January 2022 News Release-I-22-002: NRC Issues Confirmatory Order, $50,000 Civil Penalty to HDI Over Security-Related Violations at Oyster Creek Nuclear Power Plant Press Release-I-22-001, NRC Names New Senior Resident Inspector at Salem Nuclear Power Plant2022-01-10010 January 2022 Press Release-I-22-001: NRC Names New Senior Resident Inspector at Salem Nuclear Power Plant Press Release-I-21-010, NRC Proposes $150,000 Civil Penalty for Violations at New Jersey Nuclear Power Plant Undergoing Decommissioning2021-12-22022 December 2021 Press Release-I-21-010: NRC Proposes $150,000 Civil Penalty for Violations at New Jersey Nuclear Power Plant Undergoing Decommissioning Press Release-I-21-009, NRC Issues Confirmatory Action Letter to West Virginia Hospital2021-11-19019 November 2021 Press Release-I-21-009: NRC Issues Confirmatory Action Letter to West Virginia Hospital Press Release-I-21-007, NRC to Hold Public Meeting to Receive Comments on Indian Point Nuclear Power Plant Decommissioning Activities Report2021-07-19019 July 2021 Press Release-I-21-007: NRC to Hold Public Meeting to Receive Comments on Indian Point Nuclear Power Plant Decommissioning Activities Report Press Release-I-21-006, NRC Proposes $3,750 Fine for Connecticut Hospital Violations2021-06-0202 June 2021 Press Release-I-21-006: NRC Proposes $3,750 Fine for Connecticut Hospital Violations Press Release-I-21-005, NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants2021-06-0101 June 2021 Press Release-I-21-005: NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants Press Release-I-21-004, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant2021-05-24024 May 2021 Press Release-I-21-004: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant Press Release-I-21-003, NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance2021-03-11011 March 2021 Press Release-I-21-003: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance Press Release-I-21-002, NRC Names New Senior Resident Inspector at Indian Point Unit 3 Nuclear Power Plant2021-02-17017 February 2021 Press Release-I-21-002: NRC Names New Senior Resident Inspector at Indian Point Unit 3 Nuclear Power Plant Press Release-I-21-001, NRC Proposes $8,500 Civil Penalty to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges2021-01-14014 January 2021 Press Release-I-21-001: NRC Proposes $8,500 Civil Penalty to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges Press Release-I-21-011, NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant2020-12-28028 December 2020 Press Release-I-21-011: NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant Press Release-I-20-023, NRC Names New Resident Inspector at Millstone Station2020-12-0707 December 2020 Press Release-I-20-023: NRC Names New Resident Inspector at Millstone Station Press Release-I-20-022, NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant2020-11-12012 November 2020 Press Release-I-20-022: NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant Press Release-I-20-021, NRC Names New Senior Resident Inspector at Seabrook Station2020-10-20020 October 2020 Press Release-I-20-021: NRC Names New Senior Resident Inspector at Seabrook Station Press Release-I-20-020, NRC Names New Resident Inspector at Beaver Valley Nuclear Power Plant2020-10-14014 October 2020 Press Release-I-20-020: NRC Names New Resident Inspector at Beaver Valley Nuclear Power Plant Press Release-I-20-019, NRC Names New Senior Resident Inspector at Susquehanna Nuclear Power Plant2020-09-28028 September 2020 Press Release-I-20-019: NRC Names New Senior Resident Inspector at Susquehanna Nuclear Power Plant Press Release-I-20-018, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Indian Point Nuclear Power Plant2020-09-0101 September 2020 Press Release-I-20-018: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Indian Point Nuclear Power Plant Press Release-I-20-017, NRC Names New Senior Resident Inspector at Beaver Valley Nuclear Power Plant2020-08-18018 August 2020 Press Release-I-20-017: NRC Names New Senior Resident Inspector at Beaver Valley Nuclear Power Plant Press Release-I-20-016, New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Power Plant2020-07-0909 July 2020 Press Release-I-20-016: New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Power Plant Press Release-I-20-015, NRC Senior Resident Inspector Newly Assigned to Limerick Nuclear Power Plant2020-07-0606 July 2020 Press Release-I-20-015: NRC Senior Resident Inspector Newly Assigned to Limerick Nuclear Power Plant Press Release-I-20-014, NRC Proposes $7,500 Fine to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges2020-06-25025 June 2020 Press Release-I-20-014: NRC Proposes $7,500 Fine to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges Press Release-I-20-013, NRC Names Resident Inspector at FitzPatrick Nuclear Power Plant2020-06-24024 June 2020 Press Release-I-20-013: NRC Names Resident Inspector at FitzPatrick Nuclear Power Plant Press Release-I-20-012, NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants2020-06-15015 June 2020 Press Release-I-20-012: NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants Press Release-I-20-011, NRC Names New Senior Resident Inspector at Indian Point Nuclear Power Plant2020-06-0505 June 2020 Press Release-I-20-011: NRC Names New Senior Resident Inspector at Indian Point Nuclear Power Plant Press Release-I-20-010, NRC Names New Resident Inspector at Hope Creek Nuclear Power Plant2020-06-0404 June 2020 Press Release-I-20-010: NRC Names New Resident Inspector at Hope Creek Nuclear Power Plant ML20149K5522020-05-28028 May 2020 Press Release I-20-009: NRC Names New Senior Resident Inspector at Peach Bottom Nuclear Power Plant Press Release-I-20-008, NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants2020-05-27027 May 2020 Press Release-I-20-008: NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants Press Release-I-20-007, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Salem and Hope Creek Nuclear Power Plants2020-05-21021 May 2020 Press Release-I-20-007: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Salem and Hope Creek Nuclear Power Plants Press Release-I-20-006, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant2020-05-20020 May 2020 Press Release-I-20-006: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant Press Release-I-20-005, NRC Proposes $7,500 Fine for West Virginia Engineering Firm2020-04-27027 April 2020 Press Release-I-20-005: NRC Proposes $7,500 Fine for West Virginia Engineering Firm Press Release-I-20-004, NRC Proposes $7,500 Civil Penalty for Company Violations at Puerto Rico Facility2020-04-24024 April 2020 Press Release-I-20-004: NRC Proposes $7,500 Civil Penalty for Company Violations at Puerto Rico Facility Press Release-I-20-003, NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance2020-04-0808 April 2020 Press Release-I-20-003: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance Press Release-I-20-002, NRC to Conduct Public Webinar on April 21 to Discuss Indian Point Nuclear Power Plant Decommissioning Topics2020-04-0707 April 2020 Press Release-I-20-002: NRC to Conduct Public Webinar on April 21 to Discuss Indian Point Nuclear Power Plant Decommissioning Topics Press Release-I-20-001, NRC Names New Resident Inspector at R.E. Ginna Nuclear Power Plant2020-01-0909 January 2020 Press Release-I-20-001: NRC Names New Resident Inspector at R.E. Ginna Nuclear Power Plant 2023-03-10
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa.
www.nrc.gov No. I-06-031 May 4, 2006
Contact:
Diane Screnci, 610/337-5330 E-mail: opa1@nrc.gov Neil Sheehan, 610/337-5331 NRC PROPOSES $16,250 FINE FOR MARCUS HOOK, PA., COMPANY FOR VIOLATIONS INVOLVING RADIATION EXPOSURES The Nuclear Regulatory Commission staff has proposed a $16,250 civil penalty for a Marcus Hook (Delaware County), Pa., company for several violations of agency requirements. The most significant violation by Epsilon Products Co. involved exposures exceeding regulatory limits to five employees and contractors of the firm who are not radiation workers and are therefore considered members of the public.
Last Aug. 27th, Epsilon notified the NRC that a gauge containing radioactive material (cesium-137) had malfunctioned at its Marcus Hook site, with its radioactive source failing to retract to the shielded position. The gauge was located outside of a chemical process tank in order to monitor the buildup of polymerized material within the vessel. Initially, the unshielded source was not detected due to an inadequate radiological survey conducted by a company technician.
Subsequent radiological surveys and interviews determined that five workers who cleaned the interior of the tank between Aug. 23 and 27 received a radiation dose in excess of the regulatory limit of 100 millirems because the source was unshielded at the time. The doses ranged from 103 to 197 millirems. The highest estimated dose is approximately 4 percent of the annual allowable level for radiation workers. It is not expected that these exposures will result in adverse health effects for the exposed individuals.
A millirem is a measure of exposure to radiation. The average American is exposed to about 360 millirems of radiation exposure each year from natural and manmade sources.
In response to the event, the NRC performed a Special Inspection at the facility between last Aug. 30 and Dec. 16, 2005, with the inspectors identifying six apparent violations. Besides the violation for radiation exposures experienced by the employees and contractors, the other violations include: 1) failure to maintain dose rates in unrestricted areas below 2 millirems in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; 2) failure to perform appropriate radiological surveys in unrestricted and uncontrolled areas;
- 3) failure to provide appropriate training to an authorized user of radioactive materials; 4) failure to conduct adequate physical inspections of the fixed gauge at the required 6-month interval; and 5)
failure to develop and implement operating and emergency operating procedures that included instructions for testing each gauge for proper operation.
While none of the employees received a radiation exposure that is considered harmful, the NRC considers the failure to control radiation doses within regulatory limits to any individuals who are considered members of the public a serious matter, Region I Administrator Samuel J. Collins wrote in a letter to Epsilon regarding the enforcement action.
The company has taken steps to prevent a recurrence that include removing the gauge involved from service; conducting a review of its entire radiation safety program and recommending the revision and/or development of radiation safety procedures; and taking steps to ensure that only appropriately trained staff members are permitted to use gauges containing radioactive material.
Epsilon is required to provide the NRC with a written reply to the violations within 30 days.