ML071130024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML071130024
| number = ML071130024
| issue date = 05/03/2007
| issue date = 05/03/2007
| title = NRC Receipt of South Texas Project, Units 1 & 2 Response to Generic Letter 2006-03 Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (TAC Nos. MD1634 and MD1635)
| title = NRC Receipt of South Texas Project, Units 1 & 2 Response to Generic Letter 2006-03 Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
| author name = Thadani M
| author name = Thadani M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Latest revision as of 19:40, 22 March 2020

NRC Receipt of South Texas Project, Units 1 & 2 Response to Generic Letter 2006-03 Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML071130024
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/03/2007
From: Thadani M
NRC/NRR/ADRO/DORL/LPLIV
To: Sheppard J
South Texas
Thadani, M C, NRR/DORL/LP4, 415-1476
References
GL-06-003, TAC MD1634, TAC MD1635
Download: ML071130024 (4)


Text

May 3, 2007 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483

SUBJECT:

NRC RECEIPT OF STP NUCLEAR OPERATING COMPANY RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1634 AND MD1635)

Dear Mr. Sheppard:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response dated May 25, 2006, to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-1476.

Sincerely,

/RA/

Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page

May 3, 2007 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483

SUBJECT:

NRC RECEIPT OF STP NUCLEAR OPERATING COMPANY RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1634 AND MD1635)

Dear Mr. Sheppard:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response dated May 25, 2006, to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-1476.

Sincerely,

/RA/

Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrPMMThadani LPLIV Reading RidsNrrLALFeizollahi RidsAcrsAcnwMailCenter RidsOgcRp RidsNrrDorlLpl4 RidsRgn4MailCenter JEargle, NRR RidsNrrDraAfpb RidsNrrDraAfpb (SWeerakody) DFrumkin, DRA ACCESSION NO: ML071130024 OFFICE NRR/LPL4/PM NRR/LPL4/PM NRR/LPL4/LA NRR/AFPB/BC NRR/LPL4/BC NAME MThadani JEargle LFeizollahi SWeerakody THiltz DATE 4/27/07 4/27/07 & 5/1/07 4/27/07 5/2/07 5/3/07 OFFICIAL RECORD COPY

South Texas Project, Units 1 & 2 cc:

Senior Resident Inspector E. D. Halpin U.S. Nuclear Regulatory Commission Site Vice President P.O. Box 289 STP Nuclear Operating Company Wadsworth, TX 77483 South Texas Project Electric Generating Station C. M. Canady P.O. Box 289 City of Austin Wadsworth, TX 77483 Electric Utility Department 721 Barton Springs Road S. M. Head, Manager, Licensing Austin, TX 78704 STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 J. J. Nesrsta/R. K. Temple Wadsworth, TX 77483 E. Alercon/Kevin Pollo City Public Service Board C. T. Bowman P.O. Box 1771 General Manager, Oversight San Antonio, TX 78296 STP Nuclear Operating Company P.O Box 389 INPO Wadsworth, TX 77483 Records Center 700 Galleria Parkway Marilyn Kistler Atlanta, GA 30339-3064 Sr. Staff Specialist, Licensing STP Nuclear Operating Company Regional Administrator, Region IV P.O. Box 289, Mail Code 5014 U.S. Nuclear Regulatory Commission Wadsworth, TX 77483 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Environmental and Natural Resources Policy Director Steve Winn/Christie Jacobs P.O. Box 12428 Eddy Daniels/Marty Ryan Austin, TX 78711-3189 NRC Energy, Inc.

211 Carnegie Center Jon C. Wood Princeton, NJ 08540 Cox, Smith, & Matthews 112 East Pecan, Suite 1800 Judge, Matagorda County San Antonio, TX 78205 Matagorda County Courthouse 1700 Seventh Street Director Bay City, TX 77414 Division of Compliance & Inspection Bureau of Radiation Control A. H. Gutterman, Esq. Texas Department of State Health Services Morgan, Lewis & Bockius 1100 West 49th Street 1111 Pennsylvania Avenue, NW Austin, TX 78756 Washington, DC 20004 South Texas Project, Units 1 & 2 March 2007

cc:

Mr. Ted Enos Ken Coates 4200 South Hulen Plant General Manager Suite 422 STP Nuclear Operating Company Ft. Worth, TX 76109 South Texas Project Electric Generating Station Brian Almon P.O. Box 289 Public Utility Commission Wadsworth, TX 77483 William B. Travis Building P.O. Box 13326 Mr. Terry Parks, Chief Inspector 1701 North Congress Avenue Texas Department of Licensing Austin, TX 78701-3326 and Regulation Boiler Division Susan M. Jablonski P.O. Box 12157 Office of Permitting, Remediation Austin, TX 78711 and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 March 2007