{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION III
REGION III  
                                    2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                          LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                        September 13, 2017
Mr. Charles Arnone
September 13, 2017  
Vice President, Operations
Mr. Charles Arnone  
Entergy Nuclear Operations, Inc.
Vice President, Operations  
Palisades Nuclear Plant
Entergy Nuclear Operations, Inc.  
27780 Blue Star Memorial Highway
Palisades Nuclear Plant  
Covert, MI 49043-9530
27780 Blue Star Memorial Highway  
SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC
Covert, MI 49043-9530  
              TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):
SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC  
              INSPECTION REPORT 05000255/2017007.
TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):
Dear Mr. Arnone:
INSPECTION REPORT 05000255/2017007.  
On October 30, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Dear Mr. Arnone:  
Baseline Design Basis Assurance Inspection at the Palisades Nuclear Plant. This inspection
On October 30, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial  
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21M and
Baseline Design Basis Assurance Inspection at the Palisades Nuclear Plant. This inspection  
adjusted for the stations current plan to transition to decommissioning as allowed by Inspection
will be performed in accordance with NRC Baseline Inspection Procedure 71111.21M and  
Manual Chapter 2515. The inspection samples to be reviewed during this inspection are
adjusted for the stations current plan to transition to decommissioning as allowed by Inspection  
skewed toward decommissioning activities.
Manual Chapter 2515. The inspection samples to be reviewed during this inspection are  
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of
skewed toward decommissioning activities.  
risk significant components with low margin, or associated with an accident scenario, or a
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of  
specific system. The inspection also monitors the implementation of modifications to structures,
risk significant components with low margin, or associated with an accident scenario, or a  
systems, and components as modifications to one system may also affect the design bases and
specific system. The inspection also monitors the implementation of modifications to structures,  
functioning of interfacing systems as well as introduce the potential for common cause failures.
systems, and components as modifications to one system may also affect the design bases and  
The specific components and modifications to be reviewed during this baseline inspection will
functioning of interfacing systems as well as introduce the potential for common cause failures.
be identified as part of the preparation for the inspection and finalized during the in-office
The specific components and modifications to be reviewed during this baseline inspection will  
preparation week that occurs prior to the first onsite inspection week. In addition, operating
be identified as part of the preparation for the inspection and finalized during the in-office  
experience issues, associated with the component samples, will also be selected for review.
preparation week that occurs prior to the first onsite inspection week. In addition, operating  
The inspection team may request scenarios to be performed on the simulator. This request
experience issues, associated with the component samples, will also be selected for review.
would require support from your simulator staff to validate scenarios, simulator time, and a crew
The inspection team may request scenarios to be performed on the simulator. This request  
to perform the actions which would most likely occur during the second onsite week. The team
would require support from your simulator staff to validate scenarios, simulator time, and a crew  
will work closely with your staff early on during the inspection process to ensure this activity can
to perform the actions which would most likely occur during the second onsite week. The team  
be accomplished with minimal impact.
will work closely with your staff early on during the inspection process to ensure this activity can  
The inspection will include two weeks onsite. The inspection team will consist of four NRC
be accomplished with minimal impact.  
inspectors and two contractors. The current inspection schedule is as follows:
The inspection will include two weeks onsite. The inspection team will consist of four NRC  
            Offsite preparation:       October 23-27, 2017.
inspectors and two contractors. The current inspection schedule is as follows:  
            Onsite weeks:             October 30-November 3, 2017; and
                                        November 13-17, 2017.
Offsite preparation:  
October 23-27, 2017.  
Onsite weeks:  
October 30-November 3, 2017; and  
November 13-17, 2017.  


C. Arnone                                   -2-
C. Arnone  
Experience with previous baseline design/modification inspections of similar depth and length
-2-  
has shown that this type of inspection is extremely resource intensive, both for the NRC
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to
Experience with previous baseline design/modification inspections of similar depth and length  
ensure a productive inspection for both parties, we have enclosed a request for information
has shown that this type of inspection is extremely resource intensive, both for the NRC  
needed for the inspection.
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to  
It is important that all of these documents are up-to-date and complete in order to minimize the
ensure a productive inspection for both parties, we have enclosed a request for information  
number of additional documents requested during the preparation and/or the onsite portions of
needed for the inspection.  
the inspection. Insofar as possible, this information should be provided electronically to the lead
It is important that all of these documents are up-to-date and complete in order to minimize the  
inspector.
number of additional documents requested during the preparation and/or the onsite portions of  
The lead inspector for this inspection is Jamie Benjamin. If there are any questions about the
the inspection. Insofar as possible, this information should be provided electronically to the lead  
inspection or the material requested in the enclosure, please contact the lead inspector at
inspector.  
630-829-9747 or via e-mail at Jamie.Benjamin@nrc.gov.
The lead inspector for this inspection is Jamie Benjamin. If there are any questions about the  
This letter does not contain new or amended information collection requirements subject
inspection or the material requested in the enclosure, please contact the lead inspector at  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
630-829-9747 or via e-mail at Jamie.Benjamin@nrc.gov.  
collection requirements were approved by the Office of Management and Budget, Control
This letter does not contain new or amended information collection requirements subject  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
respond to, a request for information or an information collection requirement unless the
collection requirements were approved by the Office of Management and Budget, Control  
requesting document displays a currently valid Office of Management and Budget Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
Number.
respond to, a request for information or an information collection requirement unless the  
This letter and its enclosure will be made available for public inspection and copying at
requesting document displays a currently valid Office of Management and Budget Control  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
Number.  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter and its enclosure will be made available for public inspection and copying at  
                                              Sincerely,
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                              /RA/
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                              Jamie Benjamin, Senior Reactor Engineer
Sincerely,  
                                              Engineering Branch 2
                                              Division of Reactor Safety
/RA/  
Docket No. 50-255
License No. DPR-20
Enclosure:
Jamie Benjamin, Senior Reactor Engineer  
Design Bases Assurance Inspection
Engineering Branch 2  
   Document Request
Division of Reactor Safety
cc: Distribution via LISTSERV
Docket No. 50-255  
License No. DPR-20  
Enclosure:  
Design Bases Assurance Inspection  
   Document Request  
cc: Distribution via LISTSERV  


C. Arnone                               -3-
C. Arnone  
Letter to Charles Arnone from Jamie Benjamin dated September 13, 2017
-3-  
SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC
            TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):
Letter to Charles Arnone from Jamie Benjamin dated September 13, 2017  
            INSPECTION REPORT 05000255/2017007.
SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC  
DISTRIBUTION:
TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):
Jeremy Bowen
INSPECTION REPORT 05000255/2017007.  
RidsNrrPMPalisades Resource
DISTRIBUTION:  
RidsNrrDorlLpl3
Jeremy Bowen  
RidsNrrDirsIrib Resource
RidsNrrPMPalisades Resource  
Cynthia Pederson
RidsNrrDorlLpl3  
James Trapp
RidsNrrDirsIrib Resource  
Richard Skokowski
Cynthia Pederson  
Allan Barker
James Trapp  
Carole Ariano
Richard Skokowski  
Linda Linn
Allan Barker  
DRPIII
Carole Ariano  
DRSIII
Linda Linn  
ADAMS Accession Number ML17258A081
DRPIII  
  OFFICE RIII                   RIII               RIII             RIII
DRSIII  
  NAME       JBenjamin:cl
  DATE       09/13/17
                                OFFICIAL RECORD COPY
ADAMS Accession Number ML17258A081  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
JBenjamin:cl  
DATE  
09/13/17  
OFFICIAL RECORD COPY  


            DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
Inspection Report:             05000255/2017007
Enclosure
Inspection Dates:             October 30-November 3; and
Inspection Report:  
                              November 13-17.
05000255/2017007  
Inspection Procedure:         IP 71111.21M, Design Bases Assurance Inspection (Team)
Inspection Dates:  
Lead Inspector:               Jamie Benjamin, Senior Reactor Engineer, DRS
October 30-November 3; and  
                              630-829-9747
November 13-17.
                              Jamie.Benjamin@nrc.gov
Inspection Procedure:  
Selected components:
IP 71111.21M, Design Bases Assurance Inspection (Team)  
              Spent fuel pool
Lead Inspector:  
              Spent fuel pool leakage detection
Jamie Benjamin, Senior Reactor Engineer, DRS
              Spent fuel pool neutron absorber
630-829-9747  
              Spent fuel pool cooling water pumps
Jamie.Benjamin@nrc.gov  
              Spent fuel pool cooling water heat exchanger
Selected components:  
              Spent fuel pool cooling water component electrical supply
              Control room ventilation dampers
Spent fuel pool
              Control room ventilation fans
              Control room ventilation electrical supply
Spent fuel pool leakage detection  
              Main steam isolation valves (LERF sample)
I.     Information Requested (for the above selected components) to be available to the
Spent fuel pool neutron absorber  
      team lead by October 16, 2017:
      This information should be separated for each selected component or modification,
Spent fuel pool cooling water pumps  
      especially if provided electronically (e.g., folder with component or modification name
      that includes calculations, condition reports, maintenance history, etc.).
Spent fuel pool cooling water heat exchanger  
      1.     List of condition reports (corrective action documents) associated with each of
              the selected components for the last 6 years.
Spent fuel pool cooling water component electrical supply  
      2.     The maintenance history (corrective, preventive, and elective) associated with
              each of the selected components for the last 10 years. Identify frequency of
Control room ventilation dampers  
              preventive maintenance activities.
                                                                                        Enclosure
Control room ventilation fans  
Control room ventilation electrical supply  
Main steam isolation valves (LERF sample)  
I.  
Information Requested (for the above selected components) to be available to the  
team lead by October 16, 2017:  
This information should be separated for each selected component or modification,  
especially if provided electronically (e.g., folder with component or modification name  
that includes calculations, condition reports, maintenance history, etc.).  
1.  
List of condition reports (corrective action documents) associated with each of  
the selected components for the last 6 years.  
2.  
The maintenance history (corrective, preventive, and elective) associated with  
each of the selected components for the last 10 years. Identify frequency of  
preventive maintenance activities.  


    DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
3.   Copies of calculations associated with each of the selected components (if not
2
      previously provided), excluding data files. Please review the calculations and
3.  
      also provide copies of important referenced material (such as drawings,
Copies of calculations associated with each of the selected components (if not  
      engineering requests, and vendor letters).
previously provided), excluding data files. Please review the calculations and  
4.   System Health Reports, System Descriptions, Design Basis Documents, and/or
also provide copies of important referenced material (such as drawings,  
      Training Lesson Plans associated with each of the selected components.
engineering requests, and vendor letters).  
5.   A list of modifications, including equivalency evaluations and setpoint changes,
4.  
      associated with each of the selected components. This list should include a
System Health Reports, System Descriptions, Design Basis Documents, and/or  
      descriptive paragraph on the purpose of the modification. Please ensure this list
Training Lesson Plans associated with each of the selected components.  
      only includes design completed (not canceled) modifications.
5.  
6.   Copies of operability evaluations (open/closed for last 3 years) associated with
A list of modifications, including equivalency evaluations and setpoint changes,  
      each of the selected components and plans for restoring operability, if applicable.
associated with each of the selected components. This list should include a  
7.   Copies of selected operator work-around evaluations associated with each of the
descriptive paragraph on the purpose of the modification. Please ensure this list  
      selected components and plans for resolution, if applicable.
only includes design completed (not canceled) modifications.  
8.   Copies of any open temporary modifications associated with each of the selected
6.  
      components, if applicable.
Copies of operability evaluations (open/closed for last 3 years) associated with  
9.   Trend data on the selected electrical/mechanical components performance for
each of the selected components and plans for restoring operability, if applicable.  
      last 3 years (For example, pumps performance including in-service testing, other
7.  
      vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
Copies of selected operator work-around evaluations associated with each of the  
      results, diagnostic trend data, etc.).
selected components and plans for resolution, if applicable.  
10.   Provide copies of the normal and abnormal operating procedures associated with
8.  
      the selected components and selected scenarios.
Copies of any open temporary modifications associated with each of the selected  
11.   List of time critical or risk significant operator actions associated with
components, if applicable.  
      components. Identify those actions that do not have job performance measures.
9.  
12.   Copy of latest completed tests and surveillances for each component, for
Trend data on the selected electrical/mechanical components performance for  
      example:
last 3 years (For example, pumps performance including in-service testing, other  
      a. Pumps: comprehensive test, quarterly test, flow balance, etc.
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate  
      b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.
results, diagnostic trend data, etc.).  
      c. Heat Exchangers/Room Coolers: thermal performance, clean/inspect, fan
10.  
          flows, etc.
Provide copies of the normal and abnormal operating procedures associated with  
      d. Components: Technical Specification surveillances.
the selected components and selected scenarios.  
      e. Acceptance criteria basis calculations should also be included.
11.  
13.   A copy of any internal/external self-assessments and associated corrective
List of time critical or risk significant operator actions associated with  
      action documents generated in preparation for the inspection.
components. Identify those actions that do not have job performance measures.  
14.   A copy of engineering/operations related audits completed in the last 2 years.
12.  
                                            2
Copy of latest completed tests and surveillances for each component, for  
example:  
a. Pumps: comprehensive test, quarterly test, flow balance, etc.
b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.  
c. Heat Exchangers/Room Coolers: thermal performance, clean/inspect, fan  
flows, etc.  
d. Components: Technical Specification surveillances.  
e. Acceptance criteria basis calculations should also be included.  
13.  
A copy of any internal/external self-assessments and associated corrective  
action documents generated in preparation for the inspection.  
14.  
A copy of engineering/operations related audits completed in the last 2 years.  


          DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
    15.   List of permanent plant modifications to structures, systems, and components
3
            that are field work complete in the last 3 years. (For the purpose of this
15.  
            inspection, permanent plant modifications include permanent: plant changes,
List of permanent plant modifications to structures, systems, and components  
            design changes, set point changes, equivalency evaluations, suitability analyses,
that are field work complete in the last 3 years. (For the purpose of this  
            and commercial grade dedications.) The list should contain the number of each
inspection, permanent plant modifications include permanent: plant changes,  
            document, the title, the revision (or date), and the affected system.
design changes, set point changes, equivalency evaluations, suitability analyses,  
    16.   A list of calculation changes that have been issued for use in the last 3 years.
and commercial grade dedications.) The list should contain the number of each  
    17.   Copies of procedures addressing the following: modifications, design changes,
document, the title, the revision (or date), and the affected system.  
            set point changes, equivalency evaluations or suitability analyses, commercial
16.  
            grade dedications, and post-modification testing.
A list of calculation changes that have been issued for use in the last 3 years.  
    18.   A list of corrective action documents (open and closed) in the last 3 years that
17.  
            address permanent plant modifications issues, concerns, or processes. These
Copies of procedures addressing the following: modifications, design changes,  
            documents should also include the corrective action documents associated with
set point changes, equivalency evaluations or suitability analyses, commercial  
            the modification implementation.
grade dedications, and post-modification testing.  
    19.   Electronic copies of Updated Final Safety Analysis Report, Technical
18.  
            Specifications, Technical Specifications Bases, and Technical Requirements
A list of corrective action documents (open and closed) in the last 3 years that  
            Manual.
address permanent plant modifications issues, concerns, or processes. These  
    20.   Electronic copies of Updated Final Safety Analysis Report, Technical
documents should also include the corrective action documents associated with  
            Specifications, Technical Specifications Bases, and Technical Requirements
the modification implementation.  
            Manual.
19.  
    21.   Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
Electronic copies of Updated Final Safety Analysis Report, Technical  
    22.   Electronic copy of Piping and Instrumentation Drawings (if available).
Specifications, Technical Specifications Bases, and Technical Requirements  
    23.   Site top ten issues list.
Manual.  
    24.   Electronic copy of the site Individual Plant Examination of External Events, if
20.  
            available.
Electronic copies of Updated Final Safety Analysis Report, Technical  
    25.   Current management and engineering organizational chart.
Specifications, Technical Specifications Bases, and Technical Requirements  
II. Additional Information to be Provided on October 30, 2017, Onsite (for final
Manual.  
    selected components and modifications):
21.  
    1.     During the in-office preparation activities, the team will be making final selections
Major one line electrical drawings (ac and dc) and key diagrams (paper copies).  
            and may identify additional information needed to support the inspection. The
22.  
            lead inspector will provide a list of the additional information needed during the
Electronic copy of Piping and Instrumentation Drawings (if available).  
            week of October 23, 2017.
23.  
    2.     Schedule of any testing/maintenance activities to be conducted on the selected
Site top ten issues list.  
            components during the two onsite inspection weeks.
24.  
III. Information Requested to be Provided Throughout the Inspection
Electronic copy of the site Individual Plant Examination of External Events, if  
    1.     Copies of any corrective action documents generated as a result of the teams
available.  
            questions or queries during this inspection.
25.  
                                                3
Current management and engineering organizational chart.  
II.  
Additional Information to be Provided on October 30, 2017, Onsite (for final  
selected components and modifications):
1.  
During the in-office preparation activities, the team will be making final selections  
and may identify additional information needed to support the inspection. The  
lead inspector will provide a list of the additional information needed during the  
week of October 23, 2017.
2.  
Schedule of any testing/maintenance activities to be conducted on the selected  
components during the two onsite inspection weeks.  
III.  
Information Requested to be Provided Throughout the Inspection  
1.  
Copies of any corrective action documents generated as a result of the teams  
questions or queries during this inspection.  


            DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
        2.   Copies of the list of questions submitted by the team members and the
4
              status/resolution of the information requested (provide daily by 2:00 p.m.
2.  
              during the inspection to each team member).
Copies of the list of questions submitted by the team members and the  
        3.   One complete set of Piping and Instrumentation Drawings (paper copies).
status/resolution of the information requested (provide daily by 2:00 p.m.  
        4.   Reference materials. (make available if needed during all onsite weeks):
during the inspection to each team member).  
              a. Individual Plant Examination/Probabilistic Risk Assessment report;
3.  
              b. Procurement documents for components and modifications selected
One complete set of Piping and Instrumentation Drawings (paper copies).  
                  (verify retrievable);
4.  
              c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
Reference materials. (make available if needed during all onsite weeks):  
              d. Vendor manuals.
a. Individual Plant Examination/Probabilistic Risk Assessment report;  
b. Procurement documents for components and modifications selected  
(verify retrievable);  
c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
d. Vendor manuals.  
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                4
}}
}}

Latest revision as of 10:54, 8 January 2025

17 Palisades Nuclear Plant, Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000255/2017007
ML17258A081
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/13/2017
From: Jamie Benjamin
NRC/RGN-III/DRS/EB2
To: Arnone C
Entergy Nuclear Operations
References
IR 2017007
Download: ML17258A081 (7)


See also: IR 05000255/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

September 13, 2017

Mr. Charles Arnone

Vice President, Operations

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043-9530

SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC

TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):

INSPECTION REPORT 05000255/2017007.

Dear Mr. Arnone:

On October 30, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial

Baseline Design Basis Assurance Inspection at the Palisades Nuclear Plant. This inspection

will be performed in accordance with NRC Baseline Inspection Procedure 71111.21M and

adjusted for the stations current plan to transition to decommissioning as allowed by Inspection

Manual Chapter 2515. The inspection samples to be reviewed during this inspection are

skewed toward decommissioning activities.

The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of

risk significant components with low margin, or associated with an accident scenario, or a

specific system. The inspection also monitors the implementation of modifications to structures,

systems, and components as modifications to one system may also affect the design bases and

functioning of interfacing systems as well as introduce the potential for common cause failures.

The specific components and modifications to be reviewed during this baseline inspection will

be identified as part of the preparation for the inspection and finalized during the in-office

preparation week that occurs prior to the first onsite inspection week. In addition, operating

experience issues, associated with the component samples, will also be selected for review.

The inspection team may request scenarios to be performed on the simulator. This request

would require support from your simulator staff to validate scenarios, simulator time, and a crew

to perform the actions which would most likely occur during the second onsite week. The team

will work closely with your staff early on during the inspection process to ensure this activity can

be accomplished with minimal impact.

The inspection will include two weeks onsite. The inspection team will consist of four NRC

inspectors and two contractors. The current inspection schedule is as follows:

Offsite preparation:

October 23-27, 2017.

Onsite weeks:

October 30-November 3, 2017; and

November 13-17, 2017.

C. Arnone

-2-

Experience with previous baseline design/modification inspections of similar depth and length

has shown that this type of inspection is extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for information

needed for the inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector.

The lead inspector for this inspection is Jamie Benjamin. If there are any questions about the

inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9747 or via e-mail at Jamie.Benjamin@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jamie Benjamin, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

Enclosure:

Design Bases Assurance Inspection

Document Request

cc: Distribution via LISTSERV

C. Arnone

-3-

Letter to Charles Arnone from Jamie Benjamin dated September 13, 2017

SUBJECT: PALISADES NUCLEAR PLANT, REQUEST FOR INFORMATION FOR AN NRC

TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION (TEAM):

INSPECTION REPORT 05000255/2017007.

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPalisades Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Cynthia Pederson

James Trapp

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17258A081

OFFICE

RIII

RIII

RIII

RIII

NAME

JBenjamin:cl

DATE

09/13/17

OFFICIAL RECORD COPY

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000255/2017007

Inspection Dates:

October 30-November 3; and

November 13-17.

Inspection Procedure:

IP 71111.21M, Design Bases Assurance Inspection (Team)

Lead Inspector:

Jamie Benjamin, Senior Reactor Engineer, DRS

630-829-9747

Jamie.Benjamin@nrc.gov

Selected components:

Spent fuel pool

Spent fuel pool leakage detection

Spent fuel pool neutron absorber

Spent fuel pool cooling water pumps

Spent fuel pool cooling water heat exchanger

Spent fuel pool cooling water component electrical supply

Control room ventilation dampers

Control room ventilation fans

Control room ventilation electrical supply

Main steam isolation valves (LERF sample)

I.

Information Requested (for the above selected components) to be available to the

team lead by October 16, 2017:

This information should be separated for each selected component or modification,

especially if provided electronically (e.g., folder with component or modification name

that includes calculations, condition reports, maintenance history, etc.).

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

2.

The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

2

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters).

4.

System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5.

A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6.

Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if applicable.

7.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9.

Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, diagnostic trend data, etc.).

10.

Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11.

List of time critical or risk significant operator actions associated with

components. Identify those actions that do not have job performance measures.

12.

Copy of latest completed tests and surveillances for each component, for

example:

a. Pumps: comprehensive test, quarterly test, flow balance, etc.

b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.

c. Heat Exchangers/Room Coolers: thermal performance, clean/inspect, fan

flows, etc.

d. Components: Technical Specification surveillances.

e. Acceptance criteria basis calculations should also be included.

13.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

14.

A copy of engineering/operations related audits completed in the last 2 years.

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

3

15.

List of permanent plant modifications to structures, systems, and components

that are field work complete in the last 3 years. (For the purpose of this

inspection, permanent plant modifications include permanent: plant changes,

design changes, set point changes, equivalency evaluations, suitability analyses,

and commercial grade dedications.) The list should contain the number of each

document, the title, the revision (or date), and the affected system.

16.

A list of calculation changes that have been issued for use in the last 3 years.

17.

Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, and post-modification testing.

18.

A list of corrective action documents (open and closed) in the last 3 years that

address permanent plant modifications issues, concerns, or processes. These

documents should also include the corrective action documents associated with

the modification implementation.

19.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

20.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

21.

Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

22.

Electronic copy of Piping and Instrumentation Drawings (if available).

23.

Site top ten issues list.

24.

Electronic copy of the site Individual Plant Examination of External Events, if

available.

25.

Current management and engineering organizational chart.

II.

Additional Information to be Provided on October 30, 2017, Onsite (for final

selected components and modifications):

1.

During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of the additional information needed during the

week of October 23, 2017.

2.

Schedule of any testing/maintenance activities to be conducted on the selected

components during the two onsite inspection weeks.

III.

Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

4

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily by 2:00 p.m.

during the inspection to each team member).

3.

One complete set of Piping and Instrumentation Drawings (paper copies).

4.

Reference materials. (make available if needed during all onsite weeks):

a. Individual Plant Examination/Probabilistic Risk Assessment report;

b. Procurement documents for components and modifications selected

(verify retrievable);

c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

d. Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.