ML081830774: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML081830774
| number = ML081830774
| issue date = 07/02/2008
| issue date = 07/02/2008
| title = 07/24/2008 - Notice of Meeting with U.S. Department of Energy to Discuss the Dose Assessment Approach for the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, West Valley, Ny
| title = Notice of Meeting with U.S. Department of Energy to Discuss the Dose Assessment Approach for the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, West Valley, Ny
| author name = Glenn C
| author name = Glenn C
| author affiliation = NRC/FSME/DWMEP/DURLD/MDB
| author affiliation = NRC/FSME/DWMEP/DURLD/MDB

Latest revision as of 07:04, 7 December 2019

Notice of Meeting with U.S. Department of Energy to Discuss the Dose Assessment Approach for the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, West Valley, Ny
ML081830774
Person / Time
Site: West Valley Demonstration Project, P00M-032
Issue date: 07/02/2008
From: Glenn C
NRC/FSME/DWMEP/DURLD/MDB
To: Mcconnell K
NRC/FSME/DWMEP/DURLD
Glenn C, FSME/DWMEP, 415-6722
References
Download: ML081830774 (4)


Text

July 2, 2008 MEMORANDUM TO: Keith I. McConnell, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs FROM: Chad Glenn, Project Manager /RA/

Materials Decommissioning Branch Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

SUBJECT:

FORTHCOMING MEETING WITH U.S. DEPARTMENT OF ENERGY WEST VALLEY DEMONSTRATION PROJECT, WEST VALLEY, NY DATE & TIME: July 24, 2008 8:30 a.m. - 1:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North, Room O-3B4 11555 Rockville Pike Rockville, MD 20852 PURPOSE: Discuss the Dose Assessment Approach for the U.S. Department of Energy (DOE) Phase 1 Decommissioning Plan for the West Valley Demonstration Project CATEGORY: This is a Category 1 Meeting*. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

CONTACT: Chad Glenn, (301) 415-6722 Chad.glenn@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, 67 Federal Register 36920, May 28, 2002. For information regarding participating via teleconference, please contact Chad Glenn at (301) 415-6722 at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the meeting.

PARTICIPANTS: NRC Offices Outside Organizations FSME U.S. DOE OGC West Valley Demonstration Project Region I Stakeholders NRC Project No.: M-32

Enclosure:

Agenda

PARTICIPANTS: NRC Offices Outside Organizations FSME U.S. DOE OGC West Valley Demonstration Project Region I Stakeholders NRC Project No.: M-32

Enclosure:

Agenda DISTRIBUTION:

LCamper KMcConnell Region I CHolston NOrlando PMNS ML081830774 OFFICE DWMEP: PM DWMEP: LA DWMEP: BC DWMEP: DD NAME CGlenn SMichonski RTadesse KMcConnell DATE 07/01/2008 07/01/2008 07/02/2008 07/02/2008

AGENDA FOR DOE-NRC SCOPING MEETING WVDP PHASE 1 DECOMMISSIONING PLAN DOSE MODELING APPROACH Date: July 24, 2008 Location: U.S. Nuclear Regulatory Commission One White Flint North Building; Room O-3B4 Rockville, MD Objectives: (1) Describe the U.S. Department of Energys (DOE) proposed method for developing Derived Concentration Guideline Levels (DCGLs) and its Proposed Dose Modeling Approach for the West Valley Demonstration Project (WVDP)

Phase 1 Decommissioning Plan (DP).

(2) Discuss the U.S. Nuclear Regulatory Commissions (NRC) expectations for DCGL development and dose modeling in the WVDP Phase 1 DP.

(3) Discuss plans and schedule for subsequent DP meetings.

Agenda:

Times Topic Lead 8:30-8:35 NRC introductions and opening remarks. NRC 8:35-8:40 DOE introductions and opening remarks. Moira Maloney 8:40-8:50 Overview of NRCs Dose Modeling Expectations for the NRC WVDP Phase 1 DP 8:50-10:00 Proposed Dose Modeling Approach Presentation Jim McNeil

- Method for Developing Site Specific DCGLs 10:00-10:10 Break All 10:10-11:10 Proposed Dose Modeling Approach Presentation Jim McNeil

- Limited Site-Wide Dose Assessment 11:10-11:40 Comments from attending public/stakeholders Observers 11:40-11:50 Discuss need/schedule for subsequent DP meeting DOE, NRC 11:50-12:00 Closing remarks DOE, NRC Enclosure 1