ML17331B043: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N.R.C. OPERATING DATA REPORT'OCKET NO.     50-316 DATE     02/Nov/93
{{#Wiki_filter:N.R.C.
                                      ,COMPLETED BY         DG Turner TELEPHONE     616-465-5901 OPERATING STATUS
OPERATING DATA REPORT'OCKET NO.
: l. Unit Name                 D. C. Cook   Unit 2
50-316 DATE 02/Nov/93
: 2. Reporting Period                     December 92 notes
,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS
: 3. Licensed Thermal Power (MWt)                 3411       Rev. 1      Corrected
: l. Unit Name D.
: 4. Name Plate Rating (Gross MWe)               1133       UCFs to use MDC=1060
C.
: 5. Design Electrical Rating (Net MWe)           1090       MWe Net year round.
Cook Unit 2
: 6. Maximum Dependable Capacity (GROSS MWe) 1100           02/Nov/93 DG Turner
: 2. Reporting Period December 92
: 7. Maximum Dependable Capacity (Net MWe)       1060
: 3. Licensed Thermal Power (MWt) 3411 4.
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons     See notes above. No longer using seasonall ad'usted values.
Name Plate Rating (Gross MWe) 1133
: 9. Power Level To Which Restricted.
: 5. Design Electrical Rating (Net MWe) 1090 6.
: 10. Reasons For Restrictions. If   If Any Any:
Maximum Dependable Capacity (GROSS MWe) 1100 7.
(Net    MWe)
Maximum Dependable Capacity (Net MWe) 1060 notes Rev.
This  Mo.      Yr. to Date ll. Hours in Reporting Period
1 Corrected UCFs to use MDC=1060 MWe Net year round.
: 12. No. of Hrs. Reactor Was Critical 744.0          8785.0 Cumm e 131497.0 863'57.5 744.0          3169.4
02/Nov/93 DG Turner
: 13. Reactor Reserve Shutdown Hours               0.0            0.0            0.0
: 8. If Changes Occur in Capacity Ratings (Items no.
: 14. Hours Generator on Line                   300.7          1716.3      83316.4
3 through 7) Since Last Report Give Reasons See notes above.
: 15. Unit .Reserve Shutdown Hours                 0.0  .          0'            0.0
No longer using seasonall ad'usted values.
: 16. Gross Therm. Energy Gen. (MWH)           862331          4893139    257587772
9.
: 17. Gross Elect. Energy Ge'n. (MWH)         256060          1485880    83754030
Power Level To Which Restricted. If Any (Net MWe) 10.
: 18. Net Elect:. Energy Gen. (MWH)           245846          1427300    80672172 19; Unit Service Factor                         40.4            19 '          64 '
Reasons For Restrictions. If Any:
: 20. Unit Availability Factor                   40.4            19 '          64 '
ll. Hours in Reporting Period 12.
: 21. Unit. Capacity Factor (MDC Net)             31 2            15.3          58.9
No. of Hrs. Reactor Was Critical
: 22. Unit Capacity Factor '(DER Net)             30.3            14 '          57 '
: 13. Reactor Reserve Shutdown Hours
: 23. Unit Forced Outage Rate                     59 '            69.7        "16.4
: 14. Hours Generator on Line
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration):
: 15. Unit.Reserve Shutdown Hours
: 25. If Shut   Down At End of Report Period, Estimated Date of Startup:
: 16. Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Ge'n.
(MWH)
: 18. Net Elect:. Energy Gen.
(MWH) 19; Unit Service Factor
: 20. Unit Availability Factor
: 21. Unit. Capacity Factor (MDC Net)
: 22. Unit Capacity Factor
'(DER Net)
: 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six This Mo.
Yr.
744.0 744.0 0.0 300.7 0.0 862331 256060 245846 40.4 40.4 31 2
30.3 59 '
Months (Type, to Date 8785.0 3169.4 0.0 1716.3 0 '
4893139 1485880 1427300 19 '
19 '
15.3 14 '
69.7 Date,'and Cumm e 131497.0 863'57.5 0.0 83316.4 0.0 257587772 83754030 80672172 64 '
64 '
58.9 57 '
"16.4 Duration):
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forcast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC,       ,PDR R
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 931118O~>~ 93 PDR'DOC,
,PDR R


0   h '>
0 h
          ~
~
  'E}}
'E}}

Latest revision as of 14:19, 7 January 2025

Rev 1 to Monthly Operating Rept for Dec 1992 for DC Cook Unit 2
ML17331B043
Person / Time
Site: Cook 
Issue date: 12/31/1992
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150322
Download: ML17331B043 (2)


Text

N.R.C.

OPERATING DATA REPORT'OCKET NO.

50-316 DATE 02/Nov/93

,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 2

2. Reporting Period December 92
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes Rev.

1 Corrected UCFs to use MDC=1060 MWe Net year round.

02/Nov/93 DG Turner

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons See notes above.

No longer using seasonall ad'usted values.

9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit.Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Ge'n.

(MWH)

18. Net Elect:. Energy Gen.

(MWH) 19; Unit Service Factor

20. Unit Availability Factor
21. Unit. Capacity Factor (MDC Net)
22. Unit Capacity Factor

'(DER Net)

23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr.

744.0 744.0 0.0 300.7 0.0 862331 256060 245846 40.4 40.4 31 2

30.3 59 '

Months (Type, to Date 8785.0 3169.4 0.0 1716.3 0 '

4893139 1485880 1427300 19 '

19 '

15.3 14 '

69.7 Date,'and Cumm e 131497.0 863'57.5 0.0 83316.4 0.0 257587772 83754030 80672172 64 '

64 '

58.9 57 '

"16.4 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 931118O~>~ 93 PDR'DOC,

,PDR R

0 h

~

'E