IR 05000247/2008012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:INSPECTION COVER SHEET
{{#Wiki_filter:INSPECTION COVER SHEET INSPECTORS Lead: J. Richmond  FACILITY:  Indian Point Unit 2 Other: J. Lilliendahl  REPORT No:  50-247/2008-012 REPORT TYPE:  Feeder to DRS Team Type of Inspection: Mods & 50.59 INSP Dates:  June 2 to 6, 2008 (Station Blackout Diesel Generator) De-brief Date:  June 5, 2008 (one sample)
INSPECTION PLAN IS ATTACHED INSPECTION PROCEDURE DATA Procedure Nos IPE Code Title of Procedure  In RPS/IP 71111-17  BI Modifications & 50.59  YES PIMS ITEMS ASSIGNED FOR REVIEW Procedure Nos IPE Code IFS Number  Brief Description None.


INSPECTORS Lead: J. Richmond FACILITY: Indian Point Unit 2 Other: J. Lilliendahl REPORT No: 50-247/2008-012 REPORT TYPE: Feeder to DRS Team Type of Inspection: Mods & 50.59 INSP Dates: June 2 to 6, 2008 (Station Blackout Diesel Generator) De-brief Date: June 5, 2008 (one sample)
ALLEGATIONS ASSIGNED FOR REVIEW Procedure Nos IPE Code ALG Number  Brief Description None.


INSPECTION PLAN IS ATTACHED
PROJECTS COORDINATION: Date Discussed with DRP Section Chief:
 
COORDINATED: _________ ACKNOWLEDGED: APPROVED: __________
INSPECTION PROCEDURE DATA Procedure Nos IPE Code Title of Procedure In RPS/IP 71111-17 BI Modifications & 50.59 YES
  (E. Cobey, DRP) (R. Conte, DRS EB-1) (L. Doerflein, DRS EB-2)
 
PIMS ITEMS ASSIGNED FOR REVIEW Procedure Nos IPE Code IFS Number Brief Description Non ALLEGATIONS ASSIGNED FOR REVIEW Procedure Nos IPE Code ALG Number Brief Description Non PROJECTS COORDINATION: Date Discussed with DRP Section Chief:
 
COORDINATED: _________ ACKNOWLEDGED:
APPROVED: __________ (E. Cobey, DRP) (R. Conte, DRS EB-1) (L. Doerflein, DRS EB-2)
ARRANGEMENTS:
ARRANGEMENTS:
 
Hotel: Spring Hill Suites (Tarrytown, NY) Phone: (914) 336-4600 Contact: NRC Resident Office  Phone: (914) 739-9360 or Speed Dial xxx Mike Burney (Licensing) Phone: (914) 271-7073
Hotel: Spring Hill Suites (Tarrytown, NY) Phone: (914) 336-4600  
 
Contact: NRC Resident Office  Phone: (914)
739-9360 or Speed Di al xxx Mike Burney (Licensing) Phone: (914) 271-7073
}}
}}

Latest revision as of 09:03, 14 November 2019

Pre-Inspection Cover Sheet for Indian Point Unit 2, 50-247/2008-012 Inspection; Lead Inspector: J. Richmond
ML090410515
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/02/2008
From: Richmond J
Engineering Region 1 Branch 1
To:
John Richmond
References
IR-08-012
Download: ML090410515 (1)


Text

INSPECTION COVER SHEET INSPECTORS Lead: J. Richmond FACILITY: Indian Point Unit 2 Other: J. Lilliendahl REPORT No: 50-247/2008-012 REPORT TYPE: Feeder to DRS Team Type of Inspection: Mods & 50.59 INSP Dates: June 2 to 6, 2008 (Station Blackout Diesel Generator) De-brief Date: June 5, 2008 (one sample)

INSPECTION PLAN IS ATTACHED INSPECTION PROCEDURE DATA Procedure Nos IPE Code Title of Procedure In RPS/IP 71111-17 BI Modifications & 50.59 YES PIMS ITEMS ASSIGNED FOR REVIEW Procedure Nos IPE Code IFS Number Brief Description None.

ALLEGATIONS ASSIGNED FOR REVIEW Procedure Nos IPE Code ALG Number Brief Description None.

PROJECTS COORDINATION: Date Discussed with DRP Section Chief:

COORDINATED: _________ ACKNOWLEDGED: APPROVED: __________

(E. Cobey, DRP) (R. Conte, DRS EB-1) (L. Doerflein, DRS EB-2)

ARRANGEMENTS:

Hotel: Spring Hill Suites (Tarrytown, NY) Phone: (914) 336-4600 Contact: NRC Resident Office Phone: (914) 739-9360 or Speed Dial xxx Mike Burney (Licensing) Phone: (914) 271-7073