| {{#Wiki_filter:-V.7-EDO Principal Correspondence Control FROM: DUE: 11/18/05 EDO CONTROL: G20050706 DOC DT: 10/11/05 FINAL REPLY: Jonathan M. Block Putney, Vermont Reyes, EDO FOR SIGNATURE OF :** GRN **CRC NO: Dyer, NRR DESC: ROUTING: 2.206 -Vermont Yankee/Emergency Evacuations DATE: 10/14/05 Reyes Virgilio Kane Silber Dean Burns Collins, RI Cyr, OGC Williams, NRR Goldberg, OGC ASSIGNED TO: NRR CONTACT: Dyer SPECIAL INSTRUCTIONS OR REMARKS: 1TAk{ I a~ Ei> O I IE -I)--j: e, bb -6 | | {{#Wiki_filter:- |
| --JONATHAN M. BLOcK ATrORNEY AT LAW 94 Main Street P.O. Box 566 Putney, VT. 05346-0566 802-387-2646 (vox)-2667 (fax)jonb(ilsover.nct October 11, 2005 Mr. Luis A. Reyes Executive Director for Operations United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 RE: Request for initiation of an emergency 10 CFR 2.206 for temporary closure or de-rating of the Vermont Yankee Nuclear Power Station [IVYNPS, Docket 50-271] due to impossibility of emergency evacuations in the wake of recent storm damage to the city of Keene, town of Hinsdale in New Hampshire, and other portions of New Hampshire that are part of existing evacuation routes for VYNPS or within the effluent pathway in an emergency event. | | V.7-EDO Principal Correspondence Control FROM: DUE: 11/18/05 EDO CONTROL: G20050706 DOC DT: 10/11/05 FINAL REPLY: |
| | Jonathan M. Block Putney, Vermont Reyes, EDO FOR SIGNATURE OF : ** GRN ** CRC NO: |
| | Dyer, NRR DESC: ROUTING: |
| | 2.206 - Vermont Yankee/Emergency Evacuations Reyes Virgilio Kane Silber Dean Burns DATE: 10/14/05 Collins, RI Cyr, OGC ASSIGNED TO: CONTACT: Williams, NRR Goldberg, OGC NRR Dyer SPECIAL INSTRUCTIONS OR REMARKS: |
| | 1TAk{ I a~ Ei> OI -1 I)--j: e,bb -6 IE |
| | |
| | - - |
| | JONATHAN M. BLOcK ATrORNEY AT LAW 94 Main Street P.O. Box 566 Putney, VT. 05346-0566 802-387-2646 (vox) |
| | -2667 (fax) jonb(ilsover.nct October 11, 2005 Mr. Luis A. Reyes Executive Director for Operations United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 RE: Request for initiation of an emergency 10 CFR 2.206 for temporary closure or de-rating of the Vermont Yankee Nuclear Power Station [IVYNPS, Docket 50-271] due to impossibility of emergency evacuations in the wake of recent storm damage to the city of Keene, town of Hinsdale in New Hampshire, and other portions of New Hampshire that are part of existing evacuation routes for VYNPS or within the effluent pathway in an emergency event. |
|
| |
|
| ==Dear Mr. Reycs:== | | ==Dear Mr. Reycs:== |
| By this letter I am initiating the above referenced request. If an emergency at VYNPS necessitated use of any or all of the major means of egress under the Vermont and New Hampshire emergency evacuation plans, people living in the storm damaged areas would be trapped, people fleeing from other areas would not be able to safely get to the major evacuation centers. Many persons living in the areas that are within the effluent pathway of VYNPS, which persons are located in areas that received the greatest impact from the storm rains and flooding, would be unable to safely evacuate. | | |
| Please see photographic evidence of just some of the damage to main evacuation routes and local cities and towns at http://wNvwv.nhoem.state.nh.us/10_05._storm/storm video.asp http://w-zvw.nhoem.state.nh.us/1 0j)5Lstorm/cheshire..photos.asp Thank you for your assistance in this matter.Sincerely, Jonathan M. Block EDO --G20050706}} | | By this letter I am initiating the above referenced request. If an emergency at VYNPS necessitated use of any or all of the major means of egress under the Vermont and New Hampshire emergency evacuation plans, people living in the storm damaged areas would be trapped, people fleeing from other areas would not be able to safely get to the major evacuation centers. Many persons living in the areas that are within the effluent pathway of VYNPS, which persons are located in areas that received the greatest impact from the storm rains and flooding, would be unable to safely evacuate. Please see photographic evidence of just some of the damage to main evacuation routes and local cities and towns at http://wNvwv.nhoem.state.nh.us/10_05._storm/storm video.asp http://w-zvw.nhoem.state.nh.us/1 0j)5Lstorm/cheshire..photos.asp Thank you for your assistance in this matter. |
| | Sincerely, Jonathan M. Block EDO -- G20050706}} |
Letter Sequence Request |
---|
|
|
MONTHYEARML0529101722005-10-11011 October 2005 G20050706 - Jonathan M. Block Ltr Re 2.206 - Vermont Yankee/Emergency Evacuations Project stage: Request ML0531402162005-12-0707 December 2005 Proposed Director'S Decision Jonathan M. Block 2.206 Petition - Vermont Yankee Project stage: Other ML0532504052005-12-0707 December 2005 Michael R. Kansler, Ltr Jonathan M. Blocke 2.206 Proposed Director'S Decision - Vermont Yankee Project stage: Other ML0531402072005-12-0707 December 2005 Federal Register Notice Jonathan M. Block 2.206 - Vermont Yankee Project stage: Other ML0531401972005-12-0707 December 2005 G20050706 - Jonathan M. Block Ltr 2.206 Acknowledgement Letter - Vermont Yankee Emergency Evacuations Project stage: Other ML0603403262006-03-0404 March 2006 G20050706 - Jonathan M. Block Director'S Decision October 11, 2005 Petition Filed with the Executive Director of Operations Pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) Project stage: Other ML0603402462006-03-0404 March 2006 G20050706 - Federal Register Notice Jonathan M. Block, 2.206 Petition Project stage: Other ML0603401312006-03-0404 March 2006 G20050706 - Jonathan M. Block Ltr. October 11, 2005 Petition Filed with the Executive Director of Operations Pursuant to Section 2.206 of Title 10 of the Code of Federal Regulations (10 CFR 2.206) Project stage: Other 2005-12-07
[Table View] |
|
---|
Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] |
Text
-
V.7-EDO Principal Correspondence Control FROM: DUE: 11/18/05 EDO CONTROL: G20050706 DOC DT: 10/11/05 FINAL REPLY:
Jonathan M. Block Putney, Vermont Reyes, EDO FOR SIGNATURE OF : ** GRN ** CRC NO:
Dyer, NRR DESC: ROUTING:
2.206 - Vermont Yankee/Emergency Evacuations Reyes Virgilio Kane Silber Dean Burns DATE: 10/14/05 Collins, RI Cyr, OGC ASSIGNED TO: CONTACT: Williams, NRR Goldberg, OGC NRR Dyer SPECIAL INSTRUCTIONS OR REMARKS:
1TAk{ I a~ Ei> OI -1 I)--j: e,bb -6 IE
- -
JONATHAN M. BLOcK ATrORNEY AT LAW 94 Main Street P.O. Box 566 Putney, VT. 05346-0566 802-387-2646 (vox)
-2667 (fax) jonb(ilsover.nct October 11, 2005 Mr. Luis A. Reyes Executive Director for Operations United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 RE: Request for initiation of an emergency 10 CFR 2.206 for temporary closure or de-rating of the Vermont Yankee Nuclear Power Station [IVYNPS, Docket 50-271] due to impossibility of emergency evacuations in the wake of recent storm damage to the city of Keene, town of Hinsdale in New Hampshire, and other portions of New Hampshire that are part of existing evacuation routes for VYNPS or within the effluent pathway in an emergency event.
Dear Mr. Reycs:
By this letter I am initiating the above referenced request. If an emergency at VYNPS necessitated use of any or all of the major means of egress under the Vermont and New Hampshire emergency evacuation plans, people living in the storm damaged areas would be trapped, people fleeing from other areas would not be able to safely get to the major evacuation centers. Many persons living in the areas that are within the effluent pathway of VYNPS, which persons are located in areas that received the greatest impact from the storm rains and flooding, would be unable to safely evacuate. Please see photographic evidence of just some of the damage to main evacuation routes and local cities and towns at http://wNvwv.nhoem.state.nh.us/10_05._storm/storm video.asp http://w-zvw.nhoem.state.nh.us/1 0j)5Lstorm/cheshire..photos.asp Thank you for your assistance in this matter.
Sincerely, Jonathan M. Block EDO -- G20050706