{{#Wiki_filter:January 10, 2006Mr. Bradley J. Erbes Manager, Technical Services GE Energy, Nuclear 3901 Castle Hayne Road Wilmington, NC 28401
{{#Wiki_filter:January 10, 2006 Mr. Bradley J. Erbes Manager, Technical Services GE Energy, Nuclear 3901 Castle Hayne Road Wilmington, NC 28401


==SUBJECT:==
==SUBJECT:==
PSEG NUCLEAR LLC, REQUEST FOR WITHHOLDING INFORMATION FROMPUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MC8839)
PSEG NUCLEAR LLC, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MC8839)


==Dear Mr. Erbes:==
==Dear Mr. Erbes:==


By letter dated November 7, 2005, PSEG Nuclear LLC submitted an affidavit executed by you,dated April 25, 2005, requesting that the information contained in the following document bewithheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations(10 CFR) Part 2, Section 2.390:NEDC-33158P, Fuel Transition Report for Hope Creek Generating Station,Supplement 1, Revision 1, Class IIIA nonproprietary copy of this document has been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide DocumentsAccess and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons:(4)a.Information that discloses a process, method, or apparatus, includingsupporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;(4)b.Information which, if used by a competitor, would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
By letter dated November 7, 2005, PSEG Nuclear LLC submitted an affidavit executed by you, dated April 25, 2005, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Section 2.390:
B. Erbes- 2 -Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1321.Sincerely,/RA/Stewart N. Bailey, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-354 cc:  See next page Hope Creek cc:
NEDC-33158P, Fuel Transition Report for Hope Creek Generating Station, Supplement 1, Revision 1, Class III A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
Mr. Michael P. GallagherVice President - Eng/Tech Support PSEG Nuclear
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electrics competitors without license from General Electric constitutes a competitive economic advantage over other companies; (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.


P.O. Box 236 Hancocks Bridge, NJ  08038Mr. Michael BrothersVice President - Nuclear Assessments PSEG Nuclear
B. Erbes                                        Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1321.
Sincerely,
                                              /RA/
Stewart N. Bailey, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: See next page


P.O. Box 236 Hancocks Bridge, NJ 08038Mr. George P. BarnesSite Vice President - Hope Creek PSEG Nuclear  
Hope Creek cc:
Mr. Michael P. Gallagher            Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support    PSEG Nuclear - N21 PSEG Nuclear                        P.O. Box 236 P.O. Box 236                        Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers                Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear                        Nuclear Group Headquarters KSA1-E P.O. Box 236                        200 Exelon Way Hancocks Bridge, NJ 08038            Kennett Square, PA 19348 Mr. George P. Barnes                Lower Alloways Creek Township Site Vice President - Hope Creek     c/o Mary O. Henderson, Clerk PSEG Nuclear                         Municipal Building, P.O. Box 157 P.O. Box 236                        Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich              Radiation Protection Programs Plant Support Manager                NJ Department of Environmental PSEG Nuclear                          Protection and Energy P.O. Box 236                        CN 415 Hancocks Bridge, NJ 08038            Trenton, NJ 08625-0415 Mr. Michael J. Massaro              Brian Beam Plant Manager - Hope Creek          Board of Public Utilities PSEG Nuclear                        2 Gateway Center, Tenth Floor P.O. Box 236                        Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino              U.S. Nuclear Regulatory Commission Director - Regulatory Assurance      475 Allendale Road PSEG Nuclear - N21                  King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038            Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038


P.O. Box 236 Hancocks Bridge, NJ 08038Mr. George H. GellrichPlant Support Manager PSEG Nuclear
ML060040164 OFFICE    NRR/LPLI-2/PM        NRR/LPLI-2/PM        NRR/LPLI-2/LA      SBWB/BC      NRR/LPLI-2/BC NAME      FSaba: CM            SBailey              CRaynor            LLois        DRoberts DATE      1/09/06              1/09/06              1/06/06            1/09/06       1/10/06}}
 
P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Michael J. MassaroPlant Manager - Hope Creek PSEG Nuclear
 
P.O. Box 236 Hancocks Bridge, NJ 08038Ms. Christina L. PerinoDirector - Regulatory Assurance PSEG Nuclear - N21
 
P.O. Box 236 Hancocks Bridge, NJ  08038Jeffrie J. Keenan, EsquirePSEG Nuclear - N21
 
P.O. Box 236 Hancocks Bridge, NJ  08038Ms. R. A. KankusJoint Owner Affairs Exelon Generation Company, LLC Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA  19348Lower Alloways Creek Townshipc/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ  08038Dr. Jill Lipoti, Asst. DirectorRadiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ  08625-0415Brian BeamBoard of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ  07102Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406Senior Resident InspectorHope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ  08038
 
ML060040164OFFICENRR/LPLI-2/PMNRR/LPLI-2/PMNRR/LPLI-2/LASBWB/BCNRR/LPLI-2/BCNAMEFSaba: CMSBaileyCRaynorLLoisDRoberts DATE1/09/061/09/061/06/061/09/06 1/10/06}}

Latest revision as of 00:26, 24 November 2019

Withholding from Public Disclosure, NEDC-33158P, Fuel Transition Report for Hope Creek Generating Station, Supplement 1, Revision 1, Class III
ML060040164
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/10/2006
From: Stewart Bailey
Plant Licensing Branch III-2
To: Erbes B
General Electric Co
Bailey S N
References
NEDC-33158P, TAC MC8839
Download: ML060040164 (4)


Text

January 10, 2006 Mr. Bradley J. Erbes Manager, Technical Services GE Energy, Nuclear 3901 Castle Hayne Road Wilmington, NC 28401

SUBJECT:

PSEG NUCLEAR LLC, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MC8839)

Dear Mr. Erbes:

By letter dated November 7, 2005, PSEG Nuclear LLC submitted an affidavit executed by you, dated April 25, 2005, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Section 2.390:

NEDC-33158P, Fuel Transition Report for Hope Creek Generating Station, Supplement 1, Revision 1, Class III A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electrics competitors without license from General Electric constitutes a competitive economic advantage over other companies; (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

B. Erbes Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1321.

Sincerely,

/RA/

Stewart N. Bailey, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: See next page

Hope Creek cc:

Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038

ML060040164 OFFICE NRR/LPLI-2/PM NRR/LPLI-2/PM NRR/LPLI-2/LA SBWB/BC NRR/LPLI-2/BC NAME FSaba: CM SBailey CRaynor LLois DRoberts DATE 1/09/06 1/09/06 1/06/06 1/09/06 1/10/06