05000334/FIN-2009005-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure to Properly Verify Valve Line-up Results in an Overpressurization of the Isolated CIS" Reactor Coolant Loop. | | title = Failure to Properly Verify Valve Line-up Results in an Overpressurization of the Isolated CIS\" Reactor Coolant Loop. | ||
| docket = 05000334, 05000413 | | docket = 05000334, 05000413 | ||
Line 13: | Line 13: | ||
| identified by = Self-Revealing | | identified by = Self-Revealing | ||
| Inspection procedure = IP 71153 | | Inspection procedure = IP 71153 | ||
| Inspector = J D,' | | Inspector = J D, 'Antonioj Tomlinson, P Kaufman, R Bellamy, T Moslak, T O, 'Harad Spindler, D Werkheiser, E Burket | ||
| CCA = H.8 | | CCA = H.8 | ||
| INPO aspect = WP.4 | | INPO aspect = WP.4 |
Revision as of 20:38, 20 February 2018
Site: | Beaver Valley |
---|---|
Report | IR 05000334/2009005 Section 4OA3 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | J D 'Antonioj Tomlinson P Kaufman R Bellamy T Moslak T O 'Harad Spindler D Werkheiser E Burket |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |