{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Kevin Walsh, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 January 8, 2014
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 8, 2014 Mr. Kevin Walsh, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR SPENT FUEL STORAGE (TAC NO. ME8688)  
SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR SPENT FUEL STORAGE (TAC NO. ME8688)


==Dear Mr. Walsh:==
==Dear Mr. Walsh:==
By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).
By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).
The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.68(b)(4);
The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).
and (3) revise the requirements for fuel storage within the NFV. By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LAR will be reviewed under TAC No. ME8688, and the NFV LARwill be reviewed under TAC No. MF3283. Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.
The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.
K. Walsh The NRC staff has determined that additional information is required to complete its review under TAC No. MF3283. The NRC staff's request for additional information (RAI) is contained in the enclosed RAI. A draft of these questions was previously sent to Mr. Gary Kilby of your staff on September 25, 2013, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LAR will be reviewed under TAC No. ME8688, and the NFV LARwill be reviewed under TAC No. MF3283.
Conference calls were held on October 24, 2013, and on January 6, 2014, and Mr. Kilby agreed that NextEra would respond to the RAI by January 31, 2014. Please note that if you do not respond to the RAI by March 31, 2014, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of 10 CFR, Section 2.1 08, "Denial of application for failure to supply information." If you have questions, you can contact me at 301-415-3100 or by e-mail at John.Lamb@nrc.gov.
Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.
Docket No. 50-443  
 
K. Walsh                                   The NRC staff has determined that additional information is required to complete its review under TAC No. MF3283. The NRC staff's request for additional information (RAI) is contained in the enclosed RAI. A draft of these questions was previously sent to Mr. Gary Kilby of your staff on September 25, 2013, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed. Conference calls were held on October 24, 2013, and on January 6, 2014, and Mr. Kilby agreed that NextEra would respond to the RAI by January 31, 2014. Please note that if you do not respond to the RAI by March 31, 2014, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of 10 CFR, Section 2.1 08, "Denial of application for failure to supply information."
If you have questions, you can contact me at 301-415-3100 or by e-mail at John.Lamb@nrc.gov.
G. Lamb, Acting Chief nt Licensing Branch 1-2 vision of Operating Reactor Licensing ffice of Nuclear Reactor Regulation Docket No. 50-443


==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Distribution via Listserv G. Lamb, Acting Chief nt Licensing Branch 1-2 vision of Operating Reactor Licensing ffice of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 11-04 NEXTERA ENERGY SEABROOK, LLC. SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).
Request for Additional Information cc w/encl: Distribution via Listserv
The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations, Section 50.68(b)(4);
and (3) revise the requirements for fuel storage within the NFV. By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LARwill be reviewed under TAC No. ME8688 and the NFV LARwill be reviewed under TAC No. MF3283. Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.
The NRC staff has determined that additional information is necessary to complete its review under TAC No. ME8688. REQUEST FOR ADDITIONAL INFORMATION (RAI) 1. Several of the initial RAis requested information that affected loading curve generation.
Following resolution of these issues, it is noted that unexpected trends are still present in the RC5 (Loading pattern D) loading curves. In particular, the loading curves for lower cooling times and enrichments above 3.6 weight percent appear to bend up. This is inconsistent with the other loading curves documented in this analysis and with trends seen in other SFP analyses.
Please explain the unexpected trends and verify that the fuel composition and kett calculations for the RC5 loading curves were performed correctly.
Enclosure K. Walsh The NRC staff has determined that additional information is required to complete its review under TAC No. MF3283. The NRC staff's request for additional information (RAI) is contained in the enclosed RAI. A draft of these questions was previously sent to Mr. Gary Kilby of your staff on September 25, 2013, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
Conference calls were held on October 24, 2013, and on January 6, 2014, and Mr. Kilby agreed that NextEra would respond to the RAI by January 31, 2014. Please note that if you do not respond to the RAI by March 31, 2014, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of 10 CFR, Section 2.1 08, "Denial of application for failure to supply information." If you have questions, you can contact me at 301-415-3100 or by e-mail at John. Lamb@nrc.gov.
Docket No. 50-443


==Enclosure:==
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 11-04 NEXTERA ENERGY SEABROOK, LLC.
SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).
The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).
The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations, Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.
By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LARwill be reviewed under TAC No. ME8688 and the NFV LARwill be reviewed under TAC No. MF3283.
Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.
The NRC staff has determined that additional information is necessary to complete its review under TAC No. ME8688.
REQUEST FOR ADDITIONAL INFORMATION (RAI)
: 1.      Several of the initial RAis requested information that affected loading curve generation.
Following resolution of these issues, it is noted that unexpected trends are still present in the RC5 (Loading pattern D) loading curves. In particular, the loading curves for lower cooling times and enrichments above 3.6 weight percent appear to bend up. This is inconsistent with the other loading curves documented in this analysis and with trends seen in other SFP analyses. Please explain the unexpected trends and verify that the fuel composition and kett calculations for the RC5 loading curves were performed correctly.
Enclosure


Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
ML13268A468                                     *via email OFFICE     LPL 1-2/PM               LPL 1-2/LA           SRXB/BC       LPL 1-2/BC (A)
PUBLIC RidsNRRDorllpl1-2 Resource RidsAcrsAcnw_MaiiCTR Resource Sincerely, Ira/ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPLI-2 R/F RidsNrrPMSeabrook Resource RidsNrrDoriDpr Resource RidsNrrLAABaxter Resource RidsRgn1 MaiiCenter Resource ADAMS Accession No: ML13268A468  
NAME       REnnis for JLamb         ABaxter               CJackson*     Jlamb DATE       1/7/14                   1/8/14               09/24/13       1/8/14}}
*via email OFFICE LPL 1-2/PM LPL 1-2/LA SRXB/BC LPL 1-2/BC (A) NAME REnnis for JLamb ABaxter CJackson*
Jlamb DATE 1/7/14 1/8/14 09/24/13 1/8/14 OFFICIAL RECORD COPY}}

Latest revision as of 13:10, 4 November 2019

Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
ML13268A468
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/08/2014
From: John Lamb
Plant Licensing Branch 1
To: Walsh K
NextEra Energy Seabrook
Lamb J
References
TAC ME8688
Download: ML13268A468 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 8, 2014 Mr. Kevin Walsh, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR SPENT FUEL STORAGE (TAC NO. ME8688)

Dear Mr. Walsh:

By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).

The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).

The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.

By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LAR will be reviewed under TAC No. ME8688, and the NFV LARwill be reviewed under TAC No. MF3283.

Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.

K. Walsh The NRC staff has determined that additional information is required to complete its review under TAC No. MF3283. The NRC staff's request for additional information (RAI) is contained in the enclosed RAI. A draft of these questions was previously sent to Mr. Gary Kilby of your staff on September 25, 2013, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed. Conference calls were held on October 24, 2013, and on January 6, 2014, and Mr. Kilby agreed that NextEra would respond to the RAI by January 31, 2014. Please note that if you do not respond to the RAI by March 31, 2014, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of 10 CFR, Section 2.1 08, "Denial of application for failure to supply information."

If you have questions, you can contact me at 301-415-3100 or by e-mail at John.Lamb@nrc.gov.

G. Lamb, Acting Chief nt Licensing Branch 1-2 vision of Operating Reactor Licensing ffice of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 11-04 NEXTERA ENERGY SEABROOK, LLC.

SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012, September 20, 2012, and March 27, 2013 (ADAMS Accession Nos. ML12136A126, ML12271A276, and ML13099A022, respectively), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit No. 1 (Seabrook).

The proposed change revises the technical specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).

The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kett) limits of Title 10 of the Code of Federal Regulations, Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.

By letter dated December 20, 2013 (ADAMS Accession No. ML13360A045), NextEra requested that the SFP and NFV be separated into two separate LARs. The SFP LARwill be reviewed under TAC No. ME8688 and the NFV LARwill be reviewed under TAC No. MF3283.

Please note the application dated January 30, 2012, included a mark-up of changes to the TS index. The TS index page mark-up was omitted from the supplement dated December 30, 2013, since Amendment No. 137, issued on June 17, 2013, removed the TS index from the Seabrook TSs, making any future TS index changes obsolete.

The NRC staff has determined that additional information is necessary to complete its review under TAC No. ME8688.

REQUEST FOR ADDITIONAL INFORMATION (RAI)

1. Several of the initial RAis requested information that affected loading curve generation.

Following resolution of these issues, it is noted that unexpected trends are still present in the RC5 (Loading pattern D) loading curves. In particular, the loading curves for lower cooling times and enrichments above 3.6 weight percent appear to bend up. This is inconsistent with the other loading curves documented in this analysis and with trends seen in other SFP analyses. Please explain the unexpected trends and verify that the fuel composition and kett calculations for the RC5 loading curves were performed correctly.

Enclosure

ML13268A468 *via email OFFICE LPL 1-2/PM LPL 1-2/LA SRXB/BC LPL 1-2/BC (A)

NAME REnnis for JLamb ABaxter CJackson* Jlamb DATE 1/7/14 1/8/14 09/24/13 1/8/14