Letter Sequence Request |
---|
|
|
MONTHYEARSBK-L-11245, License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage2012-01-30030 January 2012 License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage Project stage: Request SBK-L-12099, Supplement to LAR 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage2012-05-10010 May 2012 Supplement to LAR 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage Project stage: Supplement ML12192A2322012-07-24024 July 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-12199, Response to Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage2012-09-20020 September 2012 Response to Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Response to RAI ML12270A4312012-10-0202 October 2012 Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Other ML12270A4232012-12-0505 December 2012 Non-Proprietary - Request for Additional Information Regarding License Amendment Request 11-04. Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-13061, Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage2013-03-27027 March 2013 Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Request ML13095A1222013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13095A0262013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13095A1012013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13094A4092013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts Project stage: Request ML13268A4682014-01-0808 January 2014 Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-14018, Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for Spent Fuel Storage2014-01-29029 January 2014 Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for Spent Fuel Storage Project stage: Response to RAI ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes Project stage: Approval SBK-L-15036, Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault2015-02-25025 February 2015 Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault Project stage: Response to RAI 2013-12-20
[Table View] |
|
---|
Category:Letter type:SBK
MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic SBK-L-20077, Core Operating Limits Report for Cycle 212020-06-0101 June 2020 Core Operating Limits Report for Cycle 21 2024-04-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements2022-12-0909 December 2022 License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating ML20120A0472020-04-29029 April 2020 Correction to Amendment No. 162 Issued November 18, 2019, Revisions to Technical Specifications Associated with Movable Control Rods SBK-L-20001, License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint2020-01-24024 January 2020 License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint SBK-L-18089, License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-153762019-11-0101 November 2019 License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-15376 SBK-L-19104, License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements2019-10-0303 October 2019 License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements SBK-L-19049, License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators2019-06-0404 June 2019 License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators SBK-L-18151, Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application2018-08-29029 August 2018 Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18075, Eighth Annual Update to License Renewal Application2018-05-0101 May 2018 Eighth Annual Update to License Renewal Application SBK-L-18013, Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program2018-03-16016 March 2018 Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program SBK-L-18006, Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application2018-01-23023 January 2018 Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-17185, License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications2017-12-0101 December 2017 License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications SBK-L-17163, Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program2017-10-0606 October 2017 Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program SBK-L-17081, License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries2017-07-28028 July 2017 License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries SBK-L-17108, Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience2017-07-20020 July 2017 Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency SBK-L-16181, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-12-23023 December 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program SBK-L-16146, Sixth Annual Update to the Renewal Application2016-10-0707 October 2016 Sixth Annual Update to the Renewal Application SBK-L-16013, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-08-0909 August 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 ML15310A1022015-11-19019 November 2015 License Renewal Application Online Reference Portal SBK-L-15187, Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 242015-10-0909 October 2015 Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 24 SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14155, License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15)2014-09-24024 September 2014 License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15) SBK-L-14126, Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement2014-07-24024 July 2014 Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement SBK-L-14080, Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations2014-07-24024 July 2014 Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations ML14167A4302014-06-12012 June 2014 Supplement to License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-14086, Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program2014-05-15015 May 2014 Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-13121, License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology2013-09-10010 September 2013 License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-13030, LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-03-27027 March 2013 LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process SBK-L-13028, License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications2013-03-0101 March 2013 License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications SBK-L-12235, License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2012-12-20020 December 2012 License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process SBK-L-12186, Second Annual Update to the NextEra Energy Seabrook License Renewal Application2012-09-18018 September 2012 Second Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-12105, License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change2012-06-20020 June 2012 License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change 2024-09-25
[Table view] Category:Technical Specification
MONTHYEARL-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-19129, Submittal of Changes to the Seabrook Station Technical Specification Bases2019-12-31031 December 2019 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18195, Submittal of Changes to the Seabrook Station Technical Specification Bases2018-12-18018 December 2018 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-17208, Submittal of Changes to the Seabrook Station Technical Specification Bases2017-12-14014 December 2017 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process SBK-L-16206, Submittal of Changes to Technical Specification Bases Dated 12/21/20162016-12-21021 December 2016 Submittal of Changes to Technical Specification Bases Dated 12/21/2016 SBK-L-15228, Submittal of Changes to the Technical Specification Bases2016-01-0505 January 2016 Submittal of Changes to the Technical Specification Bases SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14231, Submittal of Changes to Technical Specification Bases2014-12-18018 December 2014 Submittal of Changes to Technical Specification Bases ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-12265, Submittal of Changes to the Technical Specification Bases2012-12-19019 December 2012 Submittal of Changes to the Technical Specification Bases SBK-L-12052, Submittal of Changes to Technical Specification Bases2012-02-16016 February 2012 Submittal of Changes to Technical Specification Bases SBK-L-11066, License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation2011-04-21021 April 2011 License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation SBK-L-10236, Submittal of Changes to the Technical Specification Bases2010-12-30030 December 2010 Submittal of Changes to the Technical Specification Bases SBK-L-09269, Submittal of Changes to Technical Specification Bases2009-12-30030 December 2009 Submittal of Changes to Technical Specification Bases SBK-L-09211, Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria2009-09-25025 September 2009 Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 262009-02-18018 February 2009 License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26 SBK-L-08216, Submittal of Changes to Technical Specification Bases2008-12-16016 December 2008 Submittal of Changes to Technical Specification Bases SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat2008-02-19019 February 2008 Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated. SBK-L-06244, Submittal of Changes to Seabrook Station Technical Specification Bases2007-01-0303 January 2007 Submittal of Changes to Seabrook Station Technical Specification Bases SBK-L-06214, Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process.2006-11-28028 November 2006 Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process. SBK-L-06171, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time.2006-10-0101 October 2006 Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time. ML0605302202006-02-17017 February 2006 Technical Specification Pages Re Removal of Requirement to Perform End-of-Life Moderator Temperature Coefficient Measurement ML0512900672005-05-0606 May 2005 Technical Specifications, Containment Systems, Bases. Amendment No. BC 04-12 ML0511500472005-04-21021 April 2005 Technical Specifications, Containment Building Penetrations Surveillance Requirements (Tac. MC3753) ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term ML0430102922004-10-25025 October 2004 Technical Specification Pages, Change to Emergency Diesel Generator Technical Specification Surveillance Requirement 4.8.1.1.2A5 Footnote ML0428902812004-10-12012 October 2004 Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate ML0426700362004-09-21021 September 2004 License Amendment, Issuance of Amendment Re Change to Emergency Power Systems SBK-L-04050, Submittal of Changes to the Plant Technical Specification Bases2004-09-0202 September 2004 Submittal of Changes to the Plant Technical Specification Bases ML0408603072004-03-17017 March 2004 License Amendment Request 04-03, Application for Stretch Power Uprate ML0407106782004-03-0303 March 2004 Submittal of Changes to the Technical Specification Bases ML0404404322004-02-0404 February 2004 License Amendment Request 03-03, Miscellaneous Changes to the Technical Specifications. ML0404204042004-02-0303 February 2004 License Amendment Request 03-04, Change to Technical Specification SR 4.8.1.1.2a.5. ML0229400242002-10-11011 October 2002 License Amendment Request 02-04, Revision to TS Associated with Pressure/Temperature Curves & Low Temperature Overpressure Protection Limits ML0225301992002-09-0505 September 2002 Technical Specifications Re Index - Limiting Conditions for Operation and Surveillance Requirements ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 2024-08-12
[Table view] Category:Bases Change
MONTHYEARL-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-19129, Submittal of Changes to the Seabrook Station Technical Specification Bases2019-12-31031 December 2019 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-18195, Submittal of Changes to the Seabrook Station Technical Specification Bases2018-12-18018 December 2018 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-17208, Submittal of Changes to the Seabrook Station Technical Specification Bases2017-12-14014 December 2017 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process SBK-L-16206, Submittal of Changes to Technical Specification Bases Dated 12/21/20162016-12-21021 December 2016 Submittal of Changes to Technical Specification Bases Dated 12/21/2016 SBK-L-15228, Submittal of Changes to the Technical Specification Bases2016-01-0505 January 2016 Submittal of Changes to the Technical Specification Bases SBK-L-14231, Submittal of Changes to Technical Specification Bases2014-12-18018 December 2014 Submittal of Changes to Technical Specification Bases SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-12265, Submittal of Changes to the Technical Specification Bases2012-12-19019 December 2012 Submittal of Changes to the Technical Specification Bases SBK-L-12052, Submittal of Changes to Technical Specification Bases2012-02-16016 February 2012 Submittal of Changes to Technical Specification Bases SBK-L-11066, License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation2011-04-21021 April 2011 License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation SBK-L-10236, Submittal of Changes to the Technical Specification Bases2010-12-30030 December 2010 Submittal of Changes to the Technical Specification Bases SBK-L-09269, Submittal of Changes to Technical Specification Bases2009-12-30030 December 2009 Submittal of Changes to Technical Specification Bases SBK-L-08216, Submittal of Changes to Technical Specification Bases2008-12-16016 December 2008 Submittal of Changes to Technical Specification Bases SBK-L-06244, Submittal of Changes to Seabrook Station Technical Specification Bases2007-01-0303 January 2007 Submittal of Changes to Seabrook Station Technical Specification Bases SBK-L-06214, Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process.2006-11-28028 November 2006 Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process. SBK-L-06171, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time.2006-10-0101 October 2006 Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time. SBK-L-04050, Submittal of Changes to the Plant Technical Specification Bases2004-09-0202 September 2004 Submittal of Changes to the Plant Technical Specification Bases ML0407106782004-03-0303 March 2004 Submittal of Changes to the Technical Specification Bases ML0404404322004-02-0404 February 2004 License Amendment Request 03-03, Miscellaneous Changes to the Technical Specifications. 2023-12-13
[Table view] |
Text
{{#Wiki_filter:NEXTera ENERY" I December 20, 2013 SBK-L-13224 Docket No. 50-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts
References:
- 1. NextEra Energy Seabrook, LLC letter SBK-L-1 1245, "License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage,"
January 30, 2012
- 2. NRC letter "Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage (TAC No. ME7946)," March 30, 2012
- 3. NextEra Energy Seabrook, LLC letter SBK-L-12099, "Supplement to LAR 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage," May 10, 2012
- 4. NRC Letter "Seabrook Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage (TAC No. ME8688)," July 24, 2012
- 5. NextEra Energy Seabrook, LLC letter SBK-L-12199, "Response to Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage," September 20, 2012
- 6. NRC Letter "Seabrook Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage (TAC No. ME8688)," December 5, 2012
- 7. NextEra Energy Seabrook, LLC letter SBK-L-1 3061, "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage," March 27, 2013 NextEra Energy Seabrook, LLC.
626 Lafayette Rd, Seabrook, NH 03874 A ba
United States Nuclear Regulatory Commission SBK-L-13224 / Page 2 In Reference 1 and supplemented by References 3, 5, and 7, NextEra Energy Seabrook, LLC (NextEra) submitted a request for an amendment to the Technical Specifications (TS) for Seabrook Station. The proposed change would revise the TS for new and spent fuel storage as the result of new criticality analyses for the new fuel vault and the spent fuel pool.
As discussed in a conference call with the NRC on December 4, 2013, the staff has completed its review of the criticality analysis related to the spent fuel pool storage portion of the LAR; however, review of the analysis related to the new fuel vault storage will continue well into 2014. As a result, NextEra proposes that the NRC review and approve the proposed changes in LAR 11-04 in two segments. The first segment would include approval and issuance of an amendment with the TS changes involving only spent fuel pool storage.
Review of the criticality analysis and associated TS changes related to new fuel vault storage would continue, and a separate amendment for the changes related to new fuel vault storage would be issued following the NRC staff's review and approval of the proposed changes. The suggested approach would allow the NRC staff to close its review of the spent fuel pool storage portion of the LAR and provide NextEra with updated TS for spent fuel pool storage.
To support separating the LAR review and approval into two parts, Attachments 1 and 2 provide separate markups of the proposed TS changes for each segment. Attachment 1 provides markups of the TS for proposed changes related only to the spent fuel pool storage portion of the LAR. Attachment 2 contains markups for TS changes related to new fuel vault storage. The Attachments only separate the proposed changes into two parts and do not materially alter the proposed changes from those originally submitted in References 1, 3, 5, and 7. This proposed change does not alter the conclusion in Reference 1 that the proposed change does not involve a significant hazards consideration pursuant to 10 CFR 50.92. Provided for information only in Attachments 3 and 4 are markups of the proposed TS Bases changes for the spent fuel pool storage portion and the new fuel vault storage portion of the LAR, respectively.
Reference 1 included a markup of changes to the TS index. However, on June 17, 2013, the NRC issued Amendment 137, which removed the index from the TS. Therefore, a TS index is not included in the TS markups in Attachments 1 and 2 to this letter.
Should you have any questions regarding this letter, please contact Mr. Michael Ossing, Licensing Manager, at (603) 773-7512.
Sincerely, Kevin T. Walsh Site Vice President NextEra Energy Seabrook, LLC
United States Nuclear Regulatory Commission SBK-L-1 3224 / Page 3 - Markup of the TS for Spent Fuel Storage Portion of LAR 11-04 - Markup of the TS for New Fuel Storage Portion of LAR 11-04 - Markup of the TS Bases for Spent Fuel Storage Portion of LAR 11-04 - Markup of the TS Bases for New Fuel Storage Portion of LAR 11-04 cc: NRC Region I Administrator J. G. Lamb, NRC Project Manager NRC Senior Resident Inspector
ATTACHMENT 1 Markup of the TS for Spent Fuel Storage Portion of LAR 11-04
REFUELING OPERATIONS 3/4,913 SPENT FUEL ASSEMBLY STORAGEQ LIMITING CONDITION FOR OPERATION 3.9J3 Fuel assemblies stored In the Spent Fuel Ishall beplaced Inthe spent fuel storage racks .according to the criteria shown in I-rt'
APPLICASILI'rY. Whenever fuel Is In the Spent Fuel Pool.
ACTION:-
- a. With the requirements of the above speplffbailon not. lsIed, suspend all other fuel movement within the Spent Fuel Pool and ove tile non-complying. "
fuelI to allow ns Inthe Spent Fuel Pool Inaccordance
- b. The provisions of Specification 3.0.3 are not applicable.
I .
SURVEILLANCE REQUIREMENTS .
.913.1 Týhe burnup of each fuel assembly to bestored In the Spent Fuel Pool shall be determined from U'!s measured burnup history prior to storage as longIn.
asthethat fuel Puel Spent Pool. IsA assembly A complete record of each assembly shall be maintained Fuel Pool, the -{
movementinto or within theSpent 4,.0.3.2 "After fuel asseblxby(ies) moved shall *e checked and"
[position of the fuel assembly(les) that was (were) 3/4 9-16 Amendment No. 6 SEABROOI(- UNIT "I
'1can be stored anywhere .* ,1 2 must not be stored next11 Io3 3 must be stored next to I of amply locations TypelI
*.. 5,-- " //---1 ~ i-"
2.6 2.76 3.0 3,26 3.6 3.75 4,0 4.26 4.5 . 41.75 6.0 Inltlal Enrichment w U235)
Figure 3,9..1 Fuel Assembly Burnup vs. InItlal Enric ont
.or Spent Fuel Assembty Storage SEABROOK- UNIT 1 3/4 9-17 mendment No. 6
X..':~ *Jr.fl~tAl.*.~.%t~t~* *1* *..-..,... -
REFUELING OPERATIONS a.
13/4,,15 SPENT FUEL POOL BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.15 The boron concentration In the Spent Fuel Pool shall be greater than or equal to 2000 ppm.
APPLICABILITY: Whenever fuel Is In the Spent Fuel Pool ACTION
- a. With boron concentration In the Spent Fuel Pool, less than 2000 ppm, immediately suspend movement of fuel In the Spent Fuel Pool and Immediately initiate actlon to rostore boron concentratlon to 2000 ppm or greater.
- b. The provisions of Specification 3,0.3 are not applicable.
GURVEILLANCE REgQUiREMENTS 4.9.15.1 The boron concentrallon of the Spent Fuel Pool shall be verified to be 2000 ppm or greater at least once per 7 days, SEABROOK-1 MIT I 9-17 13/4 SBBOOKtINT Amendm~jit No.
.... I.......
DESIGN FEATURES 5.6 FUEL STORAGE CRITIOALIT.Y 6.6.1.1 e spent fuel storage racks are designed and shall be maintained with:
- a. Ak R-eval-ent to less than or equal to an flooded with unborat
,--Water, which Includes margin for i. eegilnty In calculation methodr mechanical tolerances with 6%probabillty at a 95 CO ldnce level.
- b. A nominal 10.356 center-to-center distance ] een fuel assemblles placed in the storage racks.
5.6.1.2 The new fuel storage racks are designed and shall be maintained with:
- a. A k.11 equivalent to less than or equal to 0.95 when flooded with unborated water, which Includes margin for uncertainty Incalculational methods and mechanical tolerances with a 95% probability at a 95% confidence level.
- b. A ke11 equivalent to less than or equal t( 0.98 when aqueous foam moderat ton is assumed, which Includes margin for uncertainty In calculational methods and mechanical tolerances with a 95% probability at a 95% confidence leW C. A nominal 21 inch center-to-center distance between fuel assemblies place din the storage racks.
PRAINA~g 56A2 The spent fuiel storage pool Isdesigned and shall be maintained to prevent Inadvertent draining of the pool below elevation 14 feet 6 Inches.
CAPACITY 6,6.3 The spent fuel storage pool Isdesigned and shall be maintained with a storage capacity limited to no more than 1236fuel assemblies.
5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components Identified InTable 6.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 6.7-1.
SEABROOK - UNIT 1I1 Amendment N0o.-6----
I
INSERT 5.6.1.1 The spent fuel storage racks are designed and shall be maintained with:
- a. A keff less than 1.0 when flooded with unborated water, which includes an allowance for biases and uncertainties as described in UFSAR Chapter 9.
- b. A ket less than or equal to 0.95 when flooded with water borated to 500 ppm, which includes an allowance for biases and uncertainties as described in UFSAR Chapter 9.
- c. A nominal 10.35 inch center-to-center distance between fuel assemblies placed in the storage racks.
INSERT 5.6.1.3 5.6.1.3 Fresh or irradiated fuel assemblies shall be stored in the spent fuel pool in compliance with the following:
- a. Any 2x2 array of Region 1 storage cells containing fuel shall comply with the storage pattern in Figure 5.6-1 and the requirements of Table 5.6-1. The reactivity ranks of fuel assemblies in the 2x2 array (rank determined using.
Table 5.6-1) shall be equal to or less than defined for the 2x2 array.
- b. Any 2x2 array of Region 2 storage cells containing fuel shall comply with the storage requirements defined in Figure 5.6-2 and the requirements of Table 5.6-1 or with the allowable exception of evaluated assemblies stored on the periphery of Region 2 as defined in 5.6.1.3.c. The evaluated assemblies are listed in Table 5.6-2.
- c. 2x2 arrays fully within the first two rows closest to the West Wall composed only of fuel assemblies documented in Table 5-6.2 or empty locations, are allowed without having to meet the storage requirements defined in Figure 5.6-2 and the requirements of Table 5.6-1.
- d. In addition to meeting the requirements defined in 5.6.1.3.a, fuel assemblies placed in Region I in the row adjacent to Region 2 shall continue the Region 2 patterns as defined in Figure 5.6-2 and shall meet the associated Region 2 reactivity class requirements.
- e. Any fuel assembly (with or without an RCCA) may be replaced by an empty water cell, non-fuel hardware or a fuel rod storage basket.
Table 5.6-1 BURNUP REQUIREMENTS FOR EACH REACTIVITY CLASS Bounding Polynomial Fits for Minimum Burnup Requirements See Notes 1,2 and 3 for use of Table 5.6-1 Reactivity Cooling Class (1) Time Coefficient A() Coefficient B Coefficient C RC 1(3) N/A N/A N/A N/A RC 2 N/A -23.9486 7.4857 0.0000 Enrichment <3.6 w/o Enrichment > 3.6 w/o Coefficients Coefficients A B C A B C 0 years -46.4893 24.2342 -1.4689 -46.9639 23.9883 -1.4535) 2.5 years -45.3671 23.6083 -1.4430 -44.6422 22.7925 -1.3592 RC 3 5 years -43.3626 22.3467 -1.2912 -42.8691 21.5892 -1.2031 10 years -41.2729 21.3176 -1.2238 -40.4786 20.4229 -1.1214 15 years -37.5450 19.2208 -0.9792 -36.5543 18.2164 -0.8607 20 years -37.1511 19.1067 -0.9965 -35.8945 17.9317 -0.8518 0 years -39.4986 24.8329 -1.4714 -35.5129 22.5425 -1.2508 2.5 years -42.0614 26.2021 -1.7536 -31.0986 20.3032 -1.0635 5 years -43.5036 26.7220 -1.8423 -28.4171 18.8863 -0.9270 10 years -40.2450 24.8908 -1.6792 -32.5900 20.6289 -1.1778 15 years -39.4193 24.3389 -1.6482 -35.7271 22.0541 -1.3825 20 years -38.0193 23.4289 -1.5482 -33.6429 20.7970 -1.2397 0 years -18.6729 17.1776 -0.3238 15.4943 0.4484 1.5317 2.5 years -22.0079 18.6718 -0.6196 27.0014 -5.0979 2.0587 RC 5 5 years -24.5664 19.9913 -0.8744 20.9571 -2.1108 1.6159 10 years -25.9493 20.7089 -1.0982 -0.9900 8.4067 0.2667 15 years -26.8021 21.1"165 -1.2220 -13.6314 14.4202 -0.5032 20 years -26.3500 20.8067 -1.2333 -20.7757 17.7162 -0.9238 SEABROOK - UNIT I 5-11 Amrendment No.
Table 5.6-1 (continued)
BURNUP REQUIREMENTS FOR EACH REACTIVITY CLASS Bounding Polynomial Fits for Minimumn Burnup Requirements See Notes 1, 2 and 3 for use of Table 5.6-1 Notes
- 1. Reactivity Classes are presented from High to Low, e.g., RC 1 is most reactive fuiel, RC 5 is least reactive fuel.
- 2. The specific minimum burnup (Bu) required for each fuel assembly for Reactivity Classes 2-5 are calculated from the following equation:
Bu = A + BxEn +Cx En 2 where the coefficients A, B and C are defined above for each Reactivity Class and cooling time (if applicable) and En is defined as the nominal initial central zone enrichment. Actual cooling time is rounded down to the nearest value, e.g., an assembly with an actual cooling time of 12 years would utilize the10 year coefficients. No uncertainties should be applied when determining the minimum burmup requirement; all appropriate uncertainties have been included during the coefficient generation.
- 3. Fresh or irradiated fuel with an initial enrichment of_< 5.0 w/o U-235.
SEABROOK - UNIT 1 5-12 Amendment No
Table 5.6-2 !
EVALUATED ASSEMBLIES ON PERIPHERY OF REGION 2 i
i.
coal 01733 049 C02 c03 C04
-18 Ci1 C20 034 c38 037 cs0 051 C52 I.
C05 C21 038 C63 COo C22 039 066 C07 C23 C40 C56 c09 C24 C41 C7 C10 C26 042 c08 c1 . C27 C43 059 012 c28 C44 c60 C18 029 C45 0ol C14 030 C46 C62 15 _C31 04- c63
" 0 cC32 c48 C64 SEABROOK -UNIT I 5-13 Amendment No.
ALLOWABLE STORAGE PATTERN REGION I (See Notes 1 and 2)
Pattern "A" See Definition I DEFINITIONS:
- 1. Allowable pattern is fuel assemblies that meet Reactivity Class (RC) 1, 2, 3, 4, or 5 checkerboarded with fuel assemblies that meet RC 2, 3, 4, 5. Requirements for all RC are defined in Table 5.6-1. Diagram is for illustration only.
NOTES
- 1. There are no interface limitations within Region 1 between rack modules or within racks. Each cell is a part of up to four 2x2 arrays, and each cell must simultaneously meet the requirements of all those arrays of which it is a part.
- 2. Replacement of any fuel assembly by an empty water hole, non-fuel hardware or fuel rod storage basket is acceptable.
Figure 5.6-1 SEABROOK - UNIT 1 5-14 Amendnient No.
ALLOWABLE STORAGE PATTERNS REGION 2 (See Notes 1, 2)
Pattern "B" Pattern "C" Pattern "D" RC3 RCCA LuCi
[Cfin RC 5 3 R3 RC3 See Definition I See Definition 2 Lieeoefijjton 3 DEFINITIONS
- 1. Allowable pattern is fuel assemblies that meet Reactivity Class (RC) 3 4, or 5 in each of the 2x2 array locations combined with two RCCAs placed in any two locations within the 2x2 array. Requirements for all RC are defined in Table 5.6-1. Replacement of any fuel assembly (with or without an RCCA) by an empty water hole, non-fuel hardware or fuel rod storage basket is acceptable. Diagram is for illustration only.
- 2. Allowable pattern is fuel assemblies that meet Reactivity Class (RC) 4 or 5 in each of the 2x2 array locations with one RCCA placed anywhere in the 2x2 array. Requirements for all RC are defined in Table 5.6-1.
Replacement of any fuel assembly (with or without an RCCA) by an empty water hole, non-fuel hardware or fuel rod storage basket is acceptable. Diagram is for illustration only.
- 3. Allowable pattern is Reactivity Class (RC) 5 in each of the 2x2 array locations. Minimum bumup for RC 5 is defined in Table 5.6-1 as a function of nominal initial central zone enrichment and cooling time. Replacement of any fuel assembly by an empty water hole, non-fuel hardware or fuel rod storage basket is acceptable.
Diagram is for illustration only.
NOTES
- 1. The storage arrangements of fuel within a rack module may contain more than one pattern. There are no interface limitations within Region 2 between rack modules or within racks. Each cell is a part of up to four 2x2 arrays, and each cell must simultaneously meet the requirements of all those arrays of which it is a part.
- 2. All permanent and transient configurations for fuel placed within Region 2 must meet the requirements of Figure 5.6-2 and Table 5.6-1.
Figure 5.6-2 SEABROOK - UNIT 1 5-15 Amendmnent No.
.1 TABLE 5.7-1 COMPONENT CYCUC.OR TRANSIENT U?MATS DESIGN CYCLE CYCUIC OR COMPONENT TRANSIENT UMIT OR TRANSIN-T Reactor Coolant System 200 heatup cycles at -100*F/I, Heatup cycle - Tavs from _<200OF to 2 5500 F.
and 200 coofdown cycles at
_<I00F/h Cooldown cycle - Ta,, fromn __5502F to
<2000F.
200 pressurizer cooldown cycles Pressu rizer cooldown cycle temperatures at : 2001nh. from Z6501F to ýg 200=F.
80 loss of load cycles, wi tnout > 15% of RATED THERMAL POWER to immediate Reactor trip,. 0% of RATED THERMAL POWER.
40 cycles of loss-of-offsite Loss-of-offsite A.C. electrical ESF Electrical A.C. electrical power. System.
80 cycles of loss of flow in one Loss of only one reactor coolant pumpL reactor coolant .cop.
400 Resactor trip cycles. 100% to 0% of RATED THERMAL POWER.
Spray water temperature differential 10 auxiliary spray actuation cycles. > 320 0F.
200 leek tests. Pressuized to' 2250 psig.
10 hydrostatc pressure tests. Pressurized to k 3106 psig.
Secondary Coolant System I steam line break. Break in a > 6-inch steam line.
10 hydrostatic pressure tests. Pressurized to '_ 1481 psig.
.'*7 SEABROOK - UNIT I
ATTACHMENT 2 Markup of the TS for New Fuel Storage Portion of LAR 11-04
REFUELING OPERA-TIONS 314.9.14 EW FUELA SEM3Y S-0GEr
....I Fo -okl ULIMITING CONDITION FOR OPERATIO/-Y`
3.9.14 The New Fuel6 Storage Vault may be maintained with a full loading of 90 assemblies with fuel enrIchment Up to 3.676 0/o 235U. The loading must be reduced to 81 assemblies for enrichments from 3.675 to 5.0 w/o 2U by limiting the fuel assernbly placement In the central column of the New Fuel Storage Vault to every other location.
APPLICABILITY; Whenever fuel Is In the New Fuel Storage Vaull.
ACTION
- a. With the requirements of the above specification not satisfied, suspend all other fuel. movement wIthin the New Fuel Storage Vault and move ihe nonn-complying fuel assemblies to allowable locations In the New Fuel Storage Vault In accordance with Ihe requIrements of the above upeclilcation.
- b. The provislons of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.14.1 After fuel aesemnbly(Ies) movement Into or within fthNew Fuel Storage Vault, the position of the new fuel assemnbly(les) that was (wore) moved shall bý checked and Independently verified to be in accordance with the requirements of the above specification.
SEABROOJ - UNIT i 3/4 9-18 Amendment NO
DESIGN FEATURES 5.6 FUEL STORAGE CRITICALIT 5.6.1.1 The spent fuel storage racks are desIgned and shall be mainlained with:'
- a. A ken equivalent to less than or equal to 0.95 when flooded with unborated water, which Includes margin for uncertainty in calculation methods and mechanical tolerances with a 95% probability at a 95% confidence level.
- b. A nominal 10.35 Inch center-to-center distance between fuel assemblies placed In the storage racks.
5.6.1.2 The new fuel storage racks are designed and shall be maintalned wth:
- a. A ken equivalent to.lAesa-than or equal to 0.96 when ooded with unborated water, which I 0aes margin for uncertaintyy.J alculational methods and mecha olerances with a 96% pro lty at a 95% confiden Vel
- b. ken equivalent to less than o qual to 0.98 when aque foam moderation
," Is assumed, whoich Include .. argln for uncertainty I.e.rolulational methods l .,
- c. A nominal 21inch centeo-center distance beteen fuel assemblie aced in D)RAINAGE 5.6.2 The spent fuel storage pool Is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 14 feet 6 Inches.
CAPACITY 5.6.3 The spent fuel storage pool Is designed and shall be maintained with a storage capacity limited to no more than '1236 fuel assemblies.
5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT 6.7.1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7--1.
SEABROOK - UNIT 1 56-10 AAmendmdnt No.4
INSERT 5.6.1.2
- a. A keff equivalent to less than or equal to 0.95 when fully flooded with unborated water, which includes an allowance for biases and uncertainties as described in UFSAR Chapter 9.
- b. A keff equivalent to less than or equal to 0.98 if moderated by aqueous foam, which includes an allowance for biases and uncertainties as described in USFAR Chapter 9.
- c. At least a nominal 21 inch center-to-center distance between fuel assemblies placed in the storage racks with a nominal 33 inches center-to-center distance (east to west) between fuel assemblies in the center column and adjacent columns.
ATTACHMENT 3 Markup of the TS Bases for Spent Fuel Storage Portion of LAR 11-04
3/4.9 REFUELING OPERATIONS (Continued)
BASES 3/4.9.9 (THIS SPECIFICATION NUMBER IS NOT USED.)
3/4.9.10 and 3/4.9.11 WATER LEVEL - REACTOR VESSEL and STORAGE POOL The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly. The minimum water depth is consistent with the assumptions of the safety analysis. Suspending fuel movement or crane operation does not preclude moving a component to a safe location.
3/4.9.12 FUEL STORAGE BUILDING EMERGENCY AIR CLEANING SYSTEM The limitations on the Fuel Storage Building Emergency Air Cleaning System ensure that all radioactive material released from an irradiated fuel assembly will be filtered through the HEPA filters and charcoal adsorber prior to discharge to the atmosphere. Operation of the system with the heaters operating for at least 10 continuous hours in a 31-day period is sufficient to reduce the buildup of moisture on the adsorbers and HEPA filters. The OPERABILITY of this system and the resulting iodine removal capacity are consistent with the assumptions of the safety analyses. ANSI N510-1980 will be used as a procedural guide for surveillance testing. Suspending fuel movement or crane operation does not preclude moving a component to a safe location.
One train of the Fuel Storage Building Emergency Air Cleaning System must be in operation during fuel movement. This requirement, however, does not apply to movement of a spent fuel cask containing irradiated fuel in preparation for transfer to dry storage.
Movement of fuel after it has been inserted into a spent fuel cask and unlatched from the lifting tool is no longer a consideration with regard to this specification.
3/4.9.13 SPENT FUEL ASSEMBLY STORAGE Restrictions I Poolison pla dicat~ t of fuel igue 3.9-.
assemblies of s.atn Thes red enrichments within the Spent nsurethat the Io*:*.pn Fuel Pool ways remain less than 0_ ssuming the pool to be floo* -- ith unborated wa he restrictions delineate igure 3.9-1 and the action s ment are consistent ith the criticality safety a 'sis performed for the Spent Fule ool as documented in the
- FSAR, SEABROOK - UNIT 1 B 3/4 9-4 AmRe 6, 85, BC 0, -0, 08-10
3/4.9 REFUELING OPERATIONS (Continued')
3/4.9 REFUELING OPERATIONS (Continued)
BASES 3/4.9.14 NEW FUEL ASSEMBLY STORAGE Restrictions on placement of fuel assemblies of certain enrichments within the New Fuel Storage Vault is dictated by Specification 3/4.9.14. These restrictions ensure that the Ke, of the New Fuel Storage Vault will always remain less than 0.95 assuming the area to be flooded with unborated water. In addition, these restrictions ensure that the Kef of the New Fuel Storage Vault will always remain less than 0.98 when aqueous foam moderation is assumed. The restrictions delineated in Specification 3/4.9.14 and the action statement are consistent with the criticality safety analysis performed for the New Fuel Storage Vault as documented in the FSAR.
SEABROOK - UNIT 1 B 3/4 9-5 BC 08-10 1
INSERT 1 Restrictions on placement of fuel assemblies of certain enrichments within the Spent Fuel Pool is dictated by Specification 5.6.1.3. These restrictions ensure that the keff of the Spent Fuel Pool will always remain less than 1.0 assuming the pool to be flooded with unborated water and less than or equal to 0.95 when flooded with water borated to 500 ppm.
The restrictions delineated in Specification 5.6.1.3 and the action statement are consistent with the criticality safety analysis performed for the Spent Fuel Pool as documented in the FSAR.
INSERT 2 3'/4.9.15 SPENT FUEL POOL BORON CONCENTRATION The limitation on the Spent Fuel Pool boron concentration ensures that sufficient boron is present to maintain criticality margin during any potential spent fuel pool accident. The required boron concentration is also sufficient to ensure that no boron dilution event could reduce the spent fuel concentration below 500 ppm. The action statement requires immediately suspending movement of fuel until the boron concentration has been restored. This does not preclude movement of a fuel assembly to a safe position.
ATTACHMENT 4 Markup of the TS Bases for New Fuel Storage Portion of LAR 11-04
3/4.9 REFUELING OPERATIONS (Continued'*
3/4.9 REFUELIN OPERATIONS (Continued)
Restrictions ollacement of fuel asseý-. s of certain enrichments within the New Fuel Sto-ra-ult is dictated by Spec ion 3/4.9.14. These restrictio nsure that the e
K0 odedwithuborated e New Fuel Storage Va er. In
-iiaddition, always remain less than these restric " 0. ssuming the area to ensure that the K of the New Fuel Storage Vill always remain less tha when aqueous foam motoa n is assumed. Thrstrictions delineated in S iation 3/4.9.14 and the act s'rtatement are consist, with the criticality safety yfsis performed for the New Storage Vault/
s documented in the FSAR.
SEABROOK- UNIT I B 3/4 9-5 BC 08-10 1}}