05000250/FIN-2010008-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 9: | Line 9: | ||
| significance = Severity level III | | significance = Severity level III | ||
| cornerstone = Initiating Events | | cornerstone = Initiating Events | ||
| violation of = | | violation of = | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71152 | | Inspection procedure = IP 71152 | ||
| Inspector = | | Inspector = J Stewart, M Barillas, M Sykes, P Higgins, S Ninhc, Evans C, Scott L, Wert M, Sykes R, Taylor R, Zimmerman V, Mccre | ||
| CCA = P.3 | | CCA = P.3 | ||
| INPO aspect = PI.3 | | INPO aspect = PI.3 |
Revision as of 19:48, 20 February 2018
Site: | Turkey Point |
---|---|
Report | IR 05000250/2010008 Section 4OA2 |
Date counted | Mar 31, 2010 (2010Q1) |
Type: | TEV: Severity level III |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Stewart M Barillas M Sykes P Higgins S Ninhc Evans C Scott L Wert M Sykes R Taylor R Zimmerman V Mccre |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |