| Q | CCA | Title |
---|
05000250/FIN-2009003-01 | 2009Q2 | H.11 H.12 | Failure to Implement Procedures for Conducting a Valve Alignment Causes Spill of Reactor Coolant And Contamination Of a Plant Employee |
05000250/FIN-2009003-06 | 2009Q2 | H.2 | Inadequate Evaluation of Damaged Rod Control Extension Results in High Risk Condition and Condition Yellow |
05000250/FIN-2009003-07 | 2009Q2 | H.14 | Failure to Implement TS Requirements Regarding Structural Integrity of Code Class 2 Main Steam Isolation Components |
05000250/FIN-2009003-02 | 2009Q2 | H.11 H.12 | Failure to Implement TS Requirements Resulting From Loss of Configuration Control of the 3C Main Steam Isolation Valve |
05000250/FIN-2009003-03 | 2009Q2 | P.3 | Failrue to Maintain Lighting Impedes Compensatory Measure For Failed Fire Detection |
05000250/FIN-2009003-04 | 2009Q2 | H.8 | Failure to Assure That Design Controls Were Maintained During Maintenance On The 3B Main Steam Isolation Valve (MSIV) |
05000250/FIN-2009003-05 | 2009Q2 | H.2 | Failure to Implement Design Controls When Modifying Safety Equipment During Painting Activities |
05000250/FIN-2009005-03 | 2009Q4 | | Violation of Technical Specification 5.5.1.1 regarding Unit 3 spent fuel storage with degrading Boraflex poison |
05000250/FIN-2009005-02 | 2009Q4 | | Evaluate Inappropriate Characterization of Reactor Coolant System (RCS) Filters for Transportation and Disposal |
05000250/FIN-2009403-01 | 2009Q4 | | Security |
05000250/FIN-2009005-01 | 2009Q4 | H.14 | Failure to Implement Required TS Controls for a High Radiation Area with Dose Rates in Excess of 1000 mrem/hr |