ML17221A527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)ACCESSION NBR: 8712030027 DOC.DATE: 87/11/27 NOTARIZED:
{{#Wiki_filter:I REGULA     Y INFORMATION   DISTRIBUTI       YSTEM (RIDS)
NO FACIL: 50-389 St.Lucie Plante Unit 2e Florida Pacer h Light Co.AUTH.N*ME AUTHOR*FFILI ATION WOODY>C.O.Florida Power 5 Light Co.REC IP.NAME RECIPIENT AFFILIATION Document Control Branch<Document Control Desk>
ACCESSION NBR: 8712030027         DOC. DATE: 87/11/27     NOTARIZED: NO         DOCKET  I FACIL: 50-389 St. Lucie Plante       Unit 2e Florida Pacer h Light Co.         05000389 AUTH. N*ME             AUTHOR *FFILIATION WOODY> C. O.         Florida Power 5 Light Co.
REC IP. NAME           RECIPIENT AFFILIATION Document Control Branch <Document Control Desk>


==SUBJECT:==
==SUBJECT:==
Application for amend to License NPF-16e incorporating revised pressure/temp limits and results of recent low temp overpressure protection analMsis.NRC approval requested prior to plant reaching 32 EFPYs.Fee paid.DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal:
Application for amend to License NPF-16e incorporating revised pressure/temp limits and results of recent low temp overpressure protection analMsis. NRC approval requested prior to plant reaching 32 EFPYs. Fee paid.
General Distribution DOCKET I 05000389 NOTES: RECIPIENT ID.CODE/NAME PD2-2 L*TOURIGNYe E COPIES LTTR ENCL 0 1 1 REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5 5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB NR ILRB 01 EXTERNAL: LPDR NSIC 1 0 1 1 1 1 1 1 1 1 1 1 1 NRR/DEST/ADS NRR/DEST/MTB NRR/DOE*/TSB OGC/HDS2 RES/DE/EIB NRC PDR 1 1 1 1 1 0 1 1 1 1 0(30 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17 t
DISTRIBUTION CODE: A001D         COPIES RECEIVED: LTR       ENCL     SIZE:
P OX 14000, JUNO BEACH, FL 33408-0420
TITLE:   OR Submittal: General Distribution NOTES:
@I,lb'-I~/he~NoyEMgER 2 7 1987 L-87-482 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT           COPIES            REC IP IENT        COPIES ID .CODE/NAME       LTTR ENCL      ID CODE/NAME        LTTR ENCL PD2-2 L*                       0     PD2-2 PD               5     5 TOURIGNYe E              1    1 INTERNAL: ARM/DAF/LFMB               1    0      NRR/DEST/ADS            1    1 NRR/DEST/CEB            1     1     NRR/DEST/MTB NRR/DEST/RSB            1    1      NRR/DOE*/TSB           1    1 NR        ILRB          1    1      OGC/HDS2               1    0 01      1    1      RES/DE/EIB             1     1 EXTERNAL: LPDR                      1           NRC PDR                1     1 NSIC                    1     1 0( 30 TOTAL NUMBER OF COPIES REQUIRED: LTTR           20   ENCL     17
Re: St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment P/T Limits and LTOP Anal sis In accordance with IO CFR 50.90, Florida Power 6.Light Company (FPL)submits herewith a request to amend Facility Operating License NPF-I6.The purpose of the amendment is to incorporate revised Pressure/Temperature (P/T)limits and the results of a recent Low Temperature Overpressure Protection (LTOP)analysis into the Technical Specifications for St.Lucie Unit 2.New P/T limit curves have been generated for six operating periods starting at 4 Effective Full Power Years (EFPY)out to 32 EFPY (in intervals of 4-IO, IO-I5, l5-20, 20-25, 25-30 and 30-32 EFPY).Your approval of the proposed amendment is requested prior to the plant reaching 4.0 EFPY (currently projected to occur no earlier than May l3, l988), since the existing P/T curves expire at that time.We are prepared to meet with your staff as necessary to expedite the review process.Revised Technical Specification pages are provided in Attachment I.Attachment 2 is a Safety Evaluation of the proposed amendment.
 
Attachment 3 is a determination of"No Significant Hazards Consideration." Attachment 4 is a detailed report of the methodology used to calculate the new P/T curves and proposed OMS system alignment configurations and Attachment 5 describes the methodology used for adjusted reference temperature calculation.
t P   OX 14000, JUNO BEACH, FL 33408-0420
OS89 PDR ADOCK 05000389 P I 0 d(<6~(, E JW I/033/I an FPL Group company 4I Ir 0, U.S.Nuclear Regulatory Commission L-87-482 Page two ln accordance with 10 CFR 170.21, FPL Check No.6776 is attached as remittance of the license amendment application fee.Very truly yours, C.O.Wood Group Vic resident Nuclear Energy COW/E JW/gp At tachments (5)cc: Dr.J.Nelson Grace, USNRC, Region ll Senior Resident inspector, USNRC, St.Lucie Plant Mr.Lyle Jerrett, Florida Dept.of Health and Rehabilitative Services E JW I/033/2 a e~i'a lA d STATE OF FLORIDA))ss.COUNTY OF PALM BEACH)~COW i fi dl,d d That he is a Grou Vice President of Florida Power 8 Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.C.O.Woody Subscribed and sworn to before me this~day of , l9 P7.1 do~,.~)"0'..'" C~.+'gg C-NOTARY PQBLlC, in and for the County'f Palm Beach, State of Florida tfOYARY PUBLIC SYA'fE OF IjY COLAISSIOM E h'xpjres.  
                                                                                                      @I,lb' I
,I~II I+II''H-'I I II I., II<'4 I~II Ill I I N'I 4 P)~I>~',i~II I,}}
                                                                                                      ~/he~
NoyEMgER   2 7 1987 L-87-482 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Re:   St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment P/T Limits and LTOP Anal sis In accordance with IO CFR 50.90, Florida Power 6. Light Company (FPL) submits herewith a request to amend Facility Operating License NPF-I6.
The purpose of the amendment is to incorporate revised Pressure/Temperature (P/T) limits and the results of a recent Low Temperature Overpressure Protection (LTOP) analysis into the Technical Specifications for St. Lucie Unit 2. New P/T limit curves have been generated for six operating periods starting at 4 Effective Full Power Years (EFPY) out to 32 EFPY (in intervals of 4-IO, IO-I5, l5-20, 20-25, 25-30 and 30-32 EFPY).         Your approval of the proposed amendment is requested prior to the plant reaching 4.0 EFPY (currently projected to occur no earlier than May l3, l988), since the existing P/T curves expire at that time. We are prepared to meet with your staff as necessary to expedite the review process.
Revised Technical Specification pages are provided in Attachment I. Attachment 2   is a Safety Evaluation of the proposed amendment.         Attachment 3 is a determination of "No Significant Hazards Consideration." Attachment 4 is a detailed report of the methodology used to calculate the new P/T curves and proposed OMS system alignment configurations and Attachment 5 describes the methodology used for adjusted reference temperature calculation.
I PDR   ADOCK   05000389 OS89 0
P                                                                   d(<6~(,
E JW I /033/ I                                                                   an FPL Group company
 
4I Ir 0,
 
U.S. Nuclear Regulatory Commission L-87-482 Page two ln accordance with 10 CFR 170.21, FPL Check No. 6776 is attached     as remittance of the license amendment application fee.
Very truly yours, C. O. Wood Group Vic resident Nuclear Energy COW/E JW/gp Attachments (5) cc:   Dr. J. Nelson Grace, USNRC, Region ll Senior Resident inspector, USNRC, St. Lucie Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services E JW I /033/2
 
a
    ~ i
        'a e
lA d
 
STATE OF FLORIDA                         )
                                            )     ss.
COUNTY OF PALM BEACH )
    ~COW                     i   fi     dl,d                       d That he is           a Grou     Vice President         of Florida Power 8 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
C. O. Woody Subscribed and sworn to before me this
  ~day             of                           , l9 P7.
1 do~,
            .~) "0'..'"
C~. +'gg
  'f C
  -
NOTARY PQBLlC, in and for the County Palm Beach, State of Florida tfOYARY PUBLIC SYA'fE OF IjY COLAISSIOM E
h' xpjres.
 
            ,I
                ~   II     I
                                          +II       ''     H - 'I I
I II                 ., II<'4 I
                  ~           II Ill I               I N
      'I P ) ~   I>
4
                                              ~ ',i   ~     II I,}}

Revision as of 22:16, 29 October 2019

Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Recent Low Temp Overpressure Protection Analysis.Nrc Approval Requested Prior to Plant Reaching 32 Efpys.Fee Paid
ML17221A527
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/27/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17221A528 List:
References
L-87-482, NUDOCS 8712030027
Download: ML17221A527 (8)


Text

I REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)

ACCESSION NBR: 8712030027 DOC. DATE: 87/11/27 NOTARIZED: NO DOCKET I FACIL: 50-389 St. Lucie Plante Unit 2e Florida Pacer h Light Co. 05000389 AUTH. N*ME AUTHOR *FFILIATION WOODY> C. O. Florida Power 5 Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch <Document Control Desk>

SUBJECT:

Application for amend to License NPF-16e incorporating revised pressure/temp limits and results of recent low temp overpressure protection analMsis. NRC approval requested prior to plant reaching 32 EFPYs. Fee paid.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID .CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 L* 0 PD2-2 PD 5 5 TOURIGNYe E 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB 1 1 NRR/DEST/MTB NRR/DEST/RSB 1 1 NRR/DOE*/TSB 1 1 NR ILRB 1 1 OGC/HDS2 1 0 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 NRC PDR 1 1 NSIC 1 1 0( 30 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17

t P OX 14000, JUNO BEACH, FL 33408-0420

@I,lb' I

~/he~

NoyEMgER 2 7 1987 L-87-482 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment P/T Limits and LTOP Anal sis In accordance with IO CFR 50.90, Florida Power 6. Light Company (FPL) submits herewith a request to amend Facility Operating License NPF-I6.

The purpose of the amendment is to incorporate revised Pressure/Temperature (P/T) limits and the results of a recent Low Temperature Overpressure Protection (LTOP) analysis into the Technical Specifications for St. Lucie Unit 2. New P/T limit curves have been generated for six operating periods starting at 4 Effective Full Power Years (EFPY) out to 32 EFPY (in intervals of 4-IO, IO-I5, l5-20, 20-25, 25-30 and 30-32 EFPY). Your approval of the proposed amendment is requested prior to the plant reaching 4.0 EFPY (currently projected to occur no earlier than May l3, l988), since the existing P/T curves expire at that time. We are prepared to meet with your staff as necessary to expedite the review process.

Revised Technical Specification pages are provided in Attachment I. Attachment 2 is a Safety Evaluation of the proposed amendment. Attachment 3 is a determination of "No Significant Hazards Consideration." Attachment 4 is a detailed report of the methodology used to calculate the new P/T curves and proposed OMS system alignment configurations and Attachment 5 describes the methodology used for adjusted reference temperature calculation.

I PDR ADOCK 05000389 OS89 0

P d(<6~(,

E JW I /033/ I an FPL Group company

4I Ir 0,

U.S. Nuclear Regulatory Commission L-87-482 Page two ln accordance with 10 CFR 170.21, FPL Check No. 6776 is attached as remittance of the license amendment application fee.

Very truly yours, C. O. Wood Group Vic resident Nuclear Energy COW/E JW/gp Attachments (5) cc: Dr. J. Nelson Grace, USNRC, Region ll Senior Resident inspector, USNRC, St. Lucie Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services E JW I /033/2

a

~ i

'a e

lA d

STATE OF FLORIDA )

) ss.

COUNTY OF PALM BEACH )

~COW i fi dl,d d That he is a Grou Vice President of Florida Power 8 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

C. O. Woody Subscribed and sworn to before me this

~day of , l9 P7.

1 do~,

.~) "0'..'"

C~. +'gg

'f C

-

NOTARY PQBLlC, in and for the County Palm Beach, State of Florida tfOYARY PUBLIC SYA'fE OF IjY COLAISSIOM E

h' xpjres.

,I

~ II I

+II H - 'I I

I II ., II<'4 I

~ II Ill I I N

'I P ) ~ I>

4

~ ',i ~ II I,