ML17331B043: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT'OCKET NO.50-316 DATE 02/Nov/93 ,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 2 2.Reporting Period December 92 3.Licensed Thermal Power (MWt)3411 4.Name Plate Rating (Gross MWe)1133 5.Design Electrical Rating (Net MWe)1090 6.Maximum Dependable Capacity (GROSS MWe)1100 7.Maximum Dependable Capacity (Net MWe)1060 notes Rev.1 Corrected UCFs to use MDC=1060 MWe Net year round.02/Nov/93 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons See notes above.No longer using seasonall ad'usted values.9.Power Level To Which Restricted.
{{#Wiki_filter:N.R.C. OPERATING DATA REPORT'OCKET NO.     50-316 DATE     02/Nov/93
If Any (Net MWe)10.Reasons For Restrictions.
                                      ,COMPLETED BY         DG Turner TELEPHONE     616-465-5901 OPERATING STATUS
If Any: ll.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit.Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Ge'n.(MWH)18.Net Elect:.Energy Gen.(MWH)19;Unit Service Factor 20.Unit Availability Factor 21.Unit.Capacity Factor (MDC Net)22.Unit Capacity Factor'(DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six This Mo.Yr.744.0 744.0 0.0 300.7 0.0.862331 256060 245846 40.4 40.4 31 2 30.3 59'Months (Type, to Date 8785.0 3169.4 0.0 1716.3 0'4893139 1485880 1427300 19'19'15.3 14'69.7 Date,'and Cumm e 131497.0 863'57.5 0.0 83316.4 0.0 257587772 83754030 80672172 64'64'58.9 57'"16.4 Duration):
: l. Unit Name                 D. C. Cook   Unit 2
25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
: 2. Reporting Period                     December 92 notes
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved 931118O~>~
: 3. Licensed Thermal Power (MWt)                 3411       Rev. 1      Corrected
93 PDR'DOC, ,PDR R 0 h'>~'E}}
: 4. Name Plate Rating (Gross MWe)               1133       UCFs to use MDC=1060
: 5. Design Electrical Rating (Net MWe)           1090       MWe Net year round.
: 6. Maximum Dependable Capacity (GROSS MWe) 1100           02/Nov/93 DG Turner
: 7. Maximum Dependable Capacity (Net MWe)       1060
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons     See notes above. No longer using seasonall ad'usted values.
: 9. Power Level To Which Restricted.
: 10. Reasons For Restrictions. If    If Any Any:
(Net    MWe)
This  Mo.      Yr. to Date ll. Hours in Reporting Period
: 12. No. of Hrs. Reactor Was Critical 744.0          8785.0 Cumm e 131497.0 863'57.5 744.0          3169.4
: 13. Reactor Reserve Shutdown Hours               0.0            0.0            0.0
: 14. Hours Generator on Line                   300.7          1716.3      83316.4
: 15. Unit .Reserve Shutdown Hours                 0.0  .          0'            0.0
: 16. Gross Therm. Energy Gen. (MWH)           862331          4893139    257587772
: 17. Gross Elect. Energy Ge'n. (MWH)         256060          1485880    83754030
: 18. Net Elect:. Energy Gen. (MWH)           245846          1427300    80672172 19; Unit Service Factor                         40.4            19 '          64 '
: 20. Unit Availability Factor                   40.4            19 '          64 '
: 21. Unit. Capacity Factor (MDC Net)             31 2            15.3          58.9
: 22. Unit Capacity Factor '(DER Net)             30.3            14 '          57 '
: 23. Unit Forced Outage Rate                     59 '            69.7        "16.4
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration):
: 25. If Shut   Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forcast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC,       ,PDR R
 
0   h '>
          ~
  'E}}

Revision as of 13:06, 22 October 2019

Rev 1 to Monthly Operating Rept for Dec 1992 for DC Cook Unit 2
ML17331B043
Person / Time
Site: Cook 
Issue date: 12/31/1992
From: Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B040 List:
References
NUDOCS 9311150322
Download: ML17331B043 (2)


Text

N.R.C. OPERATING DATA REPORT'OCKET NO. 50-316 DATE 02/Nov/93

,COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D. C. Cook Unit 2
2. Reporting Period December 92 notes
3. Licensed Thermal Power (MWt) 3411 Rev. 1 Corrected
4. Name Plate Rating (Gross MWe) 1133 UCFs to use MDC=1060
5. Design Electrical Rating (Net MWe) 1090 MWe Net year round.
6. Maximum Dependable Capacity (GROSS MWe) 1100 02/Nov/93 DG Turner
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons See notes above. No longer using seasonall ad'usted values.
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any Any:

(Net MWe)

This Mo. Yr. to Date ll. Hours in Reporting Period

12. No. of Hrs. Reactor Was Critical 744.0 8785.0 Cumm e 131497.0 863'57.5 744.0 3169.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 300.7 1716.3 83316.4
15. Unit .Reserve Shutdown Hours 0.0 . 0' 0.0
16. Gross Therm. Energy Gen. (MWH) 862331 4893139 257587772
17. Gross Elect. Energy Ge'n. (MWH) 256060 1485880 83754030
18. Net Elect:. Energy Gen. (MWH) 245846 1427300 80672172 19; Unit Service Factor 40.4 19 ' 64 '
20. Unit Availability Factor 40.4 19 ' 64 '
21. Unit. Capacity Factor (MDC Net) 31 2 15.3 58.9
22. Unit Capacity Factor '(DER Net) 30.3 14 ' 57 '
23. Unit Forced Outage Rate 59 ' 69.7 "16.4
24. Shutdowns Scheduled over Next Six Months (Type, Date,'and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 931118O~>~ 93 PDR'DOC, ,PDR R

0 h '>

~

'E