{{#Wiki_filter:!"!UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
          ) In the Matter of  
                                                )
      )        ) Docket Nos. 50
In the Matter of                               )
-250-SLR & 50-251-SLR FLORIDA POWER & LIGHT COMPANY
                                                )     Docket Nos. 50-250-SLR & 50-251-SLR FLORIDA POWER & LIGHT COMPANY                   )
)    (Turkey Point Units 3 and 4
(Turkey Point Units 3 and 4)             )
)   )         ) INTERVENORS INITIAL MANDATORY DISCLOSURE REPORT UNDER 10 C
                                                )
.F.R. 2.336 Pursuant to 10 C.F.R. 2.336, and the Licensing Boards Initial Scheduling Order dated March 21, 2019 and Order dated April 2, 2019 , Intervenors Friends of the Earth, Inc., Natural Resources Defense Council, Inc., and Miami Waterkeeper, Inc. (collectively, Intervenors), by and through counsel, make the following disclosures with respect to the admitted contentions:
INTERVENORS INITIAL MANDATORY DISCLOSURE REPORT UNDER 10 C.F.R. § 2.336 Pursuant to 10 C.F.R. § 2.336, and the Licensing Boards Initial Scheduling Order dated March 21, 2019 and Order dated April 2, 2019, Intervenors Friends of the Earth, Inc., Natural Resources Defense Council, Inc., and Miami Waterkeeper, Inc. (collectively, Intervenors), by and through counsel, make the following disclosures with respect to the admitted contentions:
1.!Testifying Witnesses. Intervenors have not yet identified the persons whom they propose to have testify as witnesses with respect to the admitted contentions. As required by 10 C.F.R. 2.336, Intervenors will supplement this disclosure once testifying witnesses are identified.
: 1. Testifying Witnesses. Intervenors have not yet identified the persons whom they propose to have testify as witnesses with respect to the admitted contentions. As required by 10 C.F.R. § 2.336, Intervenors will supplement this disclosure once testifying witnesses are identified.
2.!Documents and Data Collections. Please see the attached table of documents, Attachment 1, disclosing documents relied upon by Intervenors in support of the contentions.
: 2. Documents and Data Collections. Please see the attached table of documents, Attachment 1, disclosing documents relied upon by Intervenors in support of the contentions.
3.!Tangible Things. Intervenors do not have any tangible things to disclose.
: 3. Tangible Things. Intervenors do not have any tangible things to disclose.
1
: 4. Privileged Documents. At this time, Intervenors are not aware of any documents in their possession, relevant to the contentions, that would otherwise be required to be disclosed for which a claim of privilege or protected status is being made.
: 5. Certification under 2.336(c). Pursuant to Section 2.336(c), the foregoing disclosures constitute all relevant materials required by such section to have been disclosed, and the disclosures are accurate and complete as of this date.
Respectfully submitted,
/s/ Richard Ayres                          /s/ Geoffrey H. Fettus Richard E. Ayres                            Geoffrey Fettus Ayres Law Group                            /s/ Caroline Reiser 2923 Foxhall Road, N.W.                    Caroline Reiser Washington, D.C. 20016                      Natural Resources Defense Council 202-722-6930                                1152 15th Street, NW, Suite 300 ayresr@ayreslawgroup.com                    Washington, DC 20005 Counsel for Friends of the Earth            202-289-2371 gfettus@nrdc.org creiser@nrdc.org Counsel for Natural Resources Defense Council
/s/ Ken Rumelt                              /s/ Kelly Cox Kenneth J. Rumelt                          Kelly Cox Environmental & Natural Resources          Miami Waterkeeper Law Clinic                                  2103 Coral Way 2nd Floor Vermont Law School                          Miami, FL 33145 164 Chelsea Street, PO Box 96              305-905-0856 South Royalton, VT 05068                    kelly@miamiwaterkeeper.org 802-831-1031                                Counsel for Miami Waterkeeper krumelt@vermontlaw.edu Counsel for Friends of the Earth May 10, 2019 2


!#!4.!Privileged Documents. At this time, Intervenors are not aware of any documents in their possession, relevant to the contentions, that would otherwise be required to be disclosed for which a claim of privilege or protected status is being made.
Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title                                Author and/or Document Public Domain Location Organization Date for Which Produced JP-    Technical Development Document for the         EPA              4/9/02      https://tinyurl.com/y3t2umvs 0001  Proposed Section 316(b) Phase II Existing Facilities Rule JP-    Generic Environmental Impact Statement on      NRC              11/30/02    ML023500395 0002  Decommissioning of Nuclear Facilities, NUREG-0586, Supp. 1, Vol. 1 JP-    Flow Velocity, Water Temperature, And          Ami L. Riscassi 1/31/03      https://pubs.usgs.gov/of/2003/ofr03348/pdf/OFR0334 0003  Conductivity In Shark River Slough,           and Raymond                  8report.pdf Everglades National Park, Florida: July 1999  W. Schaffranek,
5.!Certification under 2.336(c). Pursuant to Section 2.336(c), the foregoing disclosures constitute all relevant materials required by such section to have been disclosed, and the disclosures are accurate and complete as of this date.
      - August 2001                                  USGS JP-   Generic Environmental Impact Statement for     NRC              1/31/07    ML070100234 0004  License Renewal of Nuclear Plants, Supplement 28 Regarding Oyster Creek Nuclear Generating Station, NUREG-1437, Vol. 1 Supp. 28 JP-   Generic Environmental Impact Statement for    NRC              12/31/10    ML103350405 0005  License Renewal of Nuclear Plants, Supplement 38 Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, NUREG-1437, Supp. 38, Vol. 1 JP-   Conductivity                                  EPA              3/6/12      https://archive.epa.gov/water/archive/web/html/vms59.
Respectfully submitted, /s/ Richard Ayres Richard E. Ayres Ayres Law Group 2923 Foxhall Road, N.W.
0006                                                                                html 1
Washington, D.C. 20016 202-722-6930 ayresr@ayreslawgroup.com Counsel for Friends of the Earth
/s/ Geoffrey H. Fettus Geoffrey Fettus
/s/ Caroline Reiser Caroline Reise r Natural Resources Defense Council 1152 15 th Street, NW, Suite 300 Washington, DC 20005 202-289-2371 gfettus@nrdc.org creiser@nrdc.org Counsel for Natural Resources Defense Council  /s/ Ken Rumelt Kenneth J. Rumelt Environmental & Natural Resources Law Clinic Vermont Law School 164 Chelsea Street, PO Box 96 South Royalton, VT 05068 802-831-1031 krumelt@vermontlaw.edu Counsel for Friends of the Earth
     /s/ Kelly Cox Kelly Cox Miami Waterkeeper 2103 Coral Way 2nd Floor Miami, FL 33145 305-905-0856 kelly@miamiwaterkeeper.org Counsel for Miami Waterkeeper May 10, 2019


!""#$%&'(")*)+),'"-"-.('/01)2(3'4).5)6.$7&'("02(-"-#8)6-0$8.07/'0)+)9#:)*;<)=;*>
Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title                                  Author and/or Document Public Domain Location Organization Date for Which Produced JP-   License Amendment To Increase the               NRC              4/3/12    77 Fed. Reg. 20,059 0007  Maximum Reactor Power Level, Florida Power & Light Company, Turkey Point, Units 3 and 4, Final Environmental Assessment and Finding of No Significant Impact JP-   Regulatory Guide 4.2, Preparation of           NRC              6/31/2013  ML13067A354 0008  Environmental Reports for Nuclear Power Plant License Renewal Applications, Rev. 1, Supp. 1 JP-   NUREG-1437, Generic Environmental Impact       NRC              6/31/2013  https://www.nrc.gov/reading-rm/doc-0009  Statement for License Renewal of Nuclear                                    collections/nuregs/staff/sr1437/r1/
*ID No.Document TitleAuthor and/or Organization for Which ProducedDocument DatePublic Domain Location JP-0001Technical Development Document for the Proposed Section 316(b) Phase II Existing Facilities RuleEPA4/9/02https://tinyurl.com/y3t2umvs JP-0002Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, NUREG-0586, Supp. 1, Vol. 1NRC11/30/02ML023500395 JP-0003Flow Velocity, Water Temperature, And Conductivity In Shark River Slough, Everglades National Park, Florida: July 1999  August 2001Ami L. Riscassi and Raymond W. Schaffranek, USGS1/31/03https://pubs.usgs.gov/of/2003/ofr03348/pdf/OFR03348report.pdf JP-0004Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 28 Regarding Oyster Creek Nuclear Generating Station, NUREG-1437, Vol. 1 Supp. 28NRC1/31/07ML070100234 JP-0005Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38 Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, NUREG-1437, Supp. 38, Vol. 1NRC12/31/10ML103350405 JP-0006ConductivityEPA3/6/12https://archive.epa.gov/water/archive/web/html/vms59.html
Plants JP-   Final Aquatic Life Ambient Water Quality       EPA              8/22/13    78 Fed. Reg. 52,192 0010  Criteria for Ammonia - Freshwater JP-   Letter, License Amendment Request No. 231,     FP&L              7/10/14    ML14196A006 0011  Application to Revise Technical Specification to Revise Ultimate Heat Sink Temperature Limit JP-   The Cooling System at the FPL Turkey Point     David A. Chin, 1/1/15        ML18213A434 0012  Power Station                                  Ph.D.
!""#$%&'(")*)+),'"-"-.('/01)2(3'4).5)6.$7&'("02(-"-#8)6-0$8.07/'0)+)9#:)*;<)=;*>
JP-   Consent Agreement, Miami Dade County-          MDC-DERM 10/1/15            https://www.fpl.com/landing/pdf/Miami-Dade-County-0013  DERM v. FP&L                                                                Consent-Agreement.pdf JP-   Potential Impacts of Accelerated Climate       Pacific          5/1/16    ML16208A282 0014  Change, Annual Report of Work for NRC           Northwest Agreement Number NRC-HQ-60-14-D-0025            National Laboratory 2
=ID No.Document TitleAuthor and/or Organization for Which ProducedDocument DatePublic Domain Location JP-0007License Amendment To Increase the Maximum Reactor Power Level, Florida Power & Light Company, Turkey Point, Units 3 and 4, Final Environmental Assessment and Finding of No Significant ImpactNRC4/3/1277 Fed. Reg. 20,059 JP-0008Regulatory Guide 4.2, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, Rev. 1, Supp. 1NRC6/31/2013ML13067A354 JP-0009NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear PlantsNRC6/31/2013https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1437/r1/
 
JP-0010Final Aquatic Life Ambient Water Quality Criteria for Ammonia  FreshwaterEPA8/22/1378 Fed. Reg. 52,192 JP-0011Letter, License Amendment Request No. 231, Application to Revise Technical Specification to Revise Ultimate Heat Sink Temperature LimitFP&L7/10/14ML14196A006 JP-0012The Cooling System at the FPL Turkey Point Power StationDavid A. Chin, Ph.D.1/1/15ML18213A434 JP-0013Consent Agreement, Miami Dade County-DERM v. FP&LMDC-DERM10/1/15https://www.fpl.com/landing/pdf/Miami-Dade-County-Consent-Agreement.pdf JP-0014Potential Impacts of Accelerated Climate Change, Annual Report of Work for NRC Agreement Number NRC-HQ-60-14-D-0025Pacific Northwest National Laboratory5/1/16ML16208A282
Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title                                Author and/or Document Public Domain Location Organization Date for Which Produced JP-   Consent Order, State of Florida Dept of       FDEP              6/20/16    ML16216A216 0015  Environmental Protection v. Florida Power &
!""#$%&'(")*)+),'"-"-.('/01)2(3'4).5)6.$7&'("02(-"-#8)6-0$8.07/'0)+)9#:)*;<)=;*>
Light Co., OGC File No. 16-0241 JP-   NRC Final Report, Environmental Impact         NRC              10/31/16  ML16300A104; ML16300A137; ML16301A018; 0016  Statement for Combined Licenses for Turkey                                 ML16300A312; ML16337A147 Point Nuclear Plant Units 6 and 7 JP-   Letter, NEI 12-06, Revision 2, Appendix G,   FP&L              12/20/16  ML17012A065 0017  G.4.2, Mitigating Strategies Assessment (MSA) for FLEX Strategies report for the New Flood Hazard Information JP-   Sea Level Rise, in Climate Science Special   William V.       1/31/17    https://science2017.globalchange.gov/downloads/CSS 0018  Report: Fourth National Climate Assessment,    Sweet et al.,                R2017_FullReport.pdf Vol. 1 JP-   Global and Regional Sea Level Rise Scenarios   NOAA              1/31/17    https://tinyurl.com/zvn25ua 0019  for the United States, NOAA Technical Report NOS CO-OPS 083 JP-   Biological Opinion for Combined License for   FWS              6/23/17    ML17177A673 0021  Turkey Point Nuclear Plant, Units 6 and 7 JP-   Generic Aging Lessons Learned for             NRC              7/31/17    ML17187A204 0022  Subsequent License Renewal (GALL-SLR)
?ID No.Document TitleAuthor and/or Organization for Which ProducedDocument DatePublic Domain Location JP-0015Consent Order, State of Florida Dept of Environmental Protection v. Florida Power & Light Co., OGC File No. 16-0241FDEP6/20/16ML16216A216 JP-0016NRC Final Report, Environmental Impact Statement for Combined Licenses for Turkey Point Nuclear Plant Units 6 and 7NRC10/31/16ML16300A104; ML16300A137; ML16301A018; ML16300A312; ML16337A147 JP-0017Letter, NEI 12-06, Revision 2, Appendix G, G.4.2, Mitigating Strategies Assessment (MSA) for FLEX Strategies report for the New Flood Hazard InformationFP&L12/20/16ML17012A065 JP-0018Sea Level Rise, in Climate Science Special Report: Fourth National Climate Assessment, Vol. 1William V. Sweet et al.,1/31/17https://science2017.globalchange.gov/downloads/CSSR2017_FullReport.pdf JP-0019Global and Regional Sea Level Rise Scenarios for the United States, NOAA Technical Report NOS CO-OPS 083 NOAA1/31/17https://tinyurl.com/zvn25ua JP-0021Biological Opinion for Combined License for Turkey Point Nuclear Plant, Units 6 and 7FWS6/23/17ML17177A673 JP-0022Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, NUREG-2191, Vol. 2NRC7/31/17ML17187A204 JP-0023Direct Testimony and Exhibits of Sorab Panday, Docket No. 20170007-EIFlorida Office of Public Counsel8/23/17ML18213A430 JP-0024Turkey Point Nuclear Power Plant, Units 3 and 4, Applicants Environmental Report Subsequent Operating License Renewal StageFP&L1/31/18ML18037A836
Report, NUREG-2191, Vol. 2 JP-   Direct Testimony and Exhibits of Sorab         Florida Office    8/23/17    ML18213A430 0023  Panday, Docket No. 20170007-EI                of Public Counsel JP-   Turkey Point Nuclear Power Plant, Units 3     FP&L              1/31/18    ML18037A836 0024  and 4, Applicants Environmental Report Subsequent Operating License Renewal Stage 3
!""#$%&'(")*)+),'"-"-.('/01)2(3'4).5)6.$7&'("02(-"-#8)6-0$8.07/'0)+)9#:)*;<)=;*>
 
@ID No.Document TitleAuthor and/or Organization for Which ProducedDocument DatePublic Domain Location JP-0025Turkey Point Units 3 and 4 Subsequent License Renewal Application, Appendix E Environmental Report Supplemental InformationFP&L4/10/18ML18102A521 JP-0026Declaration of Bill Powers, P.E.Bill Powers5/14/18ML18213A429 JP-0027Letter from Wilbur Mayorga (Miami-Dade County, Division of Environmental Resources Management) to Matthew J. Raffenberg (FPL)MDC-DERM7/10/18ML18213A435 JP-0028Biological Assessment for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Proposed Subsequent License RenewalNRC12/31/18ML18353A835 JP-0029Backgrounder on Tritium, Radiation Protection Limits, and Drinking Water StandardsNRC4/31/2019ML062020079
Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title                                Author and/or Document Public Domain Location Organization Date for Which Produced JP-   Turkey Point Units 3 and 4 Subsequent         FP&L              4/10/18    ML18102A521 0025  License Renewal Application, Appendix E Environmental Report Supplemental Information JP-   Declaration of Bill Powers, P.E.             Bill Powers      5/14/18    ML18213A429 0026 JP-   Letter from Wilbur Mayorga (Miami-Dade       MDC-DERM          7/10/18    ML18213A435 0027  County, Division of Environmental Resources Management) to Matthew J. Raffenberg (FPL)
!CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Initial Mandatory Disclosure Report in the above captioned proceeding were served via the Electronic Information Exchange (EIE) on the 10th day of May 2019, which to the best of my knowledge resulted in transmittal of same to those on the EIE Service List for the captioned proceeding.
JP-   Biological Assessment for the Turkey Point   NRC              12/31/18    ML18353A835 0028  Nuclear Generating Unit Nos. 3 and 4 Proposed Subsequent License Renewal JP-   Backgrounder on Tritium, Radiation           NRC              4/31/2019  ML062020079 0029  Protection Limits, and Drinking Water Standards 4
  /s/ Kenneth Rumelt Kenneth Rumelt May 10, 2019}}
 
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Initial Mandatory Disclosure Report in the above captioned proceeding were served via the Electronic Information Exchange (EIE) on the 10th day of May 2019, which to the best of my knowledge resulted in transmittal of same to those on the EIE Service List for the captioned proceeding.
      /s/ Kenneth Rumelt Kenneth Rumelt May 10, 2019}}

Latest revision as of 19:07, 19 October 2019

Intervenors' Initial Mandatory Disclosure Report Under 10 C.F.R. 2.336
ML19130A163
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/10/2019
From: Ayres R, Cox K, Fettus G, Reiser C, Rumelt K
Ayres Law Group, Friends of the Earth, Miami Waterkeeper, Natural Resources Defense Council, Vermont Law School
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-SLR, 50-251-SLR, ASLBP 18-957-01-SLR-BD01, RAS 54973
Download: ML19130A163 (7)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket Nos. 50-250-SLR & 50-251-SLR FLORIDA POWER & LIGHT COMPANY )

(Turkey Point Units 3 and 4) )

)

INTERVENORS INITIAL MANDATORY DISCLOSURE REPORT UNDER 10 C.F.R. § 2.336 Pursuant to 10 C.F.R. § 2.336, and the Licensing Boards Initial Scheduling Order dated March 21, 2019 and Order dated April 2, 2019, Intervenors Friends of the Earth, Inc., Natural Resources Defense Council, Inc., and Miami Waterkeeper, Inc. (collectively, Intervenors), by and through counsel, make the following disclosures with respect to the admitted contentions:

1. Testifying Witnesses. Intervenors have not yet identified the persons whom they propose to have testify as witnesses with respect to the admitted contentions. As required by 10 C.F.R. § 2.336, Intervenors will supplement this disclosure once testifying witnesses are identified.
2. Documents and Data Collections. Please see the attached table of documents, Attachment 1, disclosing documents relied upon by Intervenors in support of the contentions.
3. Tangible Things. Intervenors do not have any tangible things to disclose.

1

4. Privileged Documents. At this time, Intervenors are not aware of any documents in their possession, relevant to the contentions, that would otherwise be required to be disclosed for which a claim of privilege or protected status is being made.
5. Certification under 2.336(c). Pursuant to Section 2.336(c), the foregoing disclosures constitute all relevant materials required by such section to have been disclosed, and the disclosures are accurate and complete as of this date.

Respectfully submitted,

/s/ Richard Ayres /s/ Geoffrey H. Fettus Richard E. Ayres Geoffrey Fettus Ayres Law Group /s/ Caroline Reiser 2923 Foxhall Road, N.W. Caroline Reiser Washington, D.C. 20016 Natural Resources Defense Council 202-722-6930 1152 15th Street, NW, Suite 300 ayresr@ayreslawgroup.com Washington, DC 20005 Counsel for Friends of the Earth 202-289-2371 gfettus@nrdc.org creiser@nrdc.org Counsel for Natural Resources Defense Council

/s/ Ken Rumelt /s/ Kelly Cox Kenneth J. Rumelt Kelly Cox Environmental & Natural Resources Miami Waterkeeper Law Clinic 2103 Coral Way 2nd Floor Vermont Law School Miami, FL 33145 164 Chelsea Street, PO Box 96 305-905-0856 South Royalton, VT 05068 kelly@miamiwaterkeeper.org 802-831-1031 Counsel for Miami Waterkeeper krumelt@vermontlaw.edu Counsel for Friends of the Earth May 10, 2019 2

Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title Author and/or Document Public Domain Location Organization Date for Which Produced JP- Technical Development Document for the EPA 4/9/02 https://tinyurl.com/y3t2umvs 0001 Proposed Section 316(b) Phase II Existing Facilities Rule JP- Generic Environmental Impact Statement on NRC 11/30/02 ML023500395 0002 Decommissioning of Nuclear Facilities, NUREG-0586, Supp. 1, Vol. 1 JP- Flow Velocity, Water Temperature, And Ami L. Riscassi 1/31/03 https://pubs.usgs.gov/of/2003/ofr03348/pdf/OFR0334 0003 Conductivity In Shark River Slough, and Raymond 8report.pdf Everglades National Park, Florida: July 1999 W. Schaffranek,

- August 2001 USGS JP- Generic Environmental Impact Statement for NRC 1/31/07 ML070100234 0004 License Renewal of Nuclear Plants, Supplement 28 Regarding Oyster Creek Nuclear Generating Station, NUREG-1437, Vol. 1 Supp. 28 JP- Generic Environmental Impact Statement for NRC 12/31/10 ML103350405 0005 License Renewal of Nuclear Plants, Supplement 38 Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, NUREG-1437, Supp. 38, Vol. 1 JP- Conductivity EPA 3/6/12 https://archive.epa.gov/water/archive/web/html/vms59.

0006 html 1

Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title Author and/or Document Public Domain Location Organization Date for Which Produced JP- License Amendment To Increase the NRC 4/3/12 77 Fed. Reg. 20,059 0007 Maximum Reactor Power Level, Florida Power & Light Company, Turkey Point, Units 3 and 4, Final Environmental Assessment and Finding of No Significant Impact JP- Regulatory Guide 4.2, Preparation of NRC 6/31/2013 ML13067A354 0008 Environmental Reports for Nuclear Power Plant License Renewal Applications, Rev. 1, Supp. 1 JP- NUREG-1437, Generic Environmental Impact NRC 6/31/2013 https://www.nrc.gov/reading-rm/doc-0009 Statement for License Renewal of Nuclear collections/nuregs/staff/sr1437/r1/

Plants JP- Final Aquatic Life Ambient Water Quality EPA 8/22/13 78 Fed. Reg. 52,192 0010 Criteria for Ammonia - Freshwater JP- Letter, License Amendment Request No. 231, FP&L 7/10/14 ML14196A006 0011 Application to Revise Technical Specification to Revise Ultimate Heat Sink Temperature Limit JP- The Cooling System at the FPL Turkey Point David A. Chin, 1/1/15 ML18213A434 0012 Power Station Ph.D.

JP- Consent Agreement, Miami Dade County- MDC-DERM 10/1/15 https://www.fpl.com/landing/pdf/Miami-Dade-County-0013 DERM v. FP&L Consent-Agreement.pdf JP- Potential Impacts of Accelerated Climate Pacific 5/1/16 ML16208A282 0014 Change, Annual Report of Work for NRC Northwest Agreement Number NRC-HQ-60-14-D-0025 National Laboratory 2

Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title Author and/or Document Public Domain Location Organization Date for Which Produced JP- Consent Order, State of Florida Dept of FDEP 6/20/16 ML16216A216 0015 Environmental Protection v. Florida Power &

Light Co., OGC File No. 16-0241 JP- NRC Final Report, Environmental Impact NRC 10/31/16 ML16300A104; ML16300A137; ML16301A018; 0016 Statement for Combined Licenses for Turkey ML16300A312; ML16337A147 Point Nuclear Plant Units 6 and 7 JP- Letter, NEI 12-06, Revision 2, Appendix G, FP&L 12/20/16 ML17012A065 0017 G.4.2, Mitigating Strategies Assessment (MSA) for FLEX Strategies report for the New Flood Hazard Information JP- Sea Level Rise, in Climate Science Special William V. 1/31/17 https://science2017.globalchange.gov/downloads/CSS 0018 Report: Fourth National Climate Assessment, Sweet et al., R2017_FullReport.pdf Vol. 1 JP- Global and Regional Sea Level Rise Scenarios NOAA 1/31/17 https://tinyurl.com/zvn25ua 0019 for the United States, NOAA Technical Report NOS CO-OPS 083 JP- Biological Opinion for Combined License for FWS 6/23/17 ML17177A673 0021 Turkey Point Nuclear Plant, Units 6 and 7 JP- Generic Aging Lessons Learned for NRC 7/31/17 ML17187A204 0022 Subsequent License Renewal (GALL-SLR)

Report, NUREG-2191, Vol. 2 JP- Direct Testimony and Exhibits of Sorab Florida Office 8/23/17 ML18213A430 0023 Panday, Docket No. 20170007-EI of Public Counsel JP- Turkey Point Nuclear Power Plant, Units 3 FP&L 1/31/18 ML18037A836 0024 and 4, Applicants Environmental Report Subsequent Operating License Renewal Stage 3

Attachment 1 - Petitioners' Index of Documents Initial Disclosures - May 10, 2019 ID No. Document Title Author and/or Document Public Domain Location Organization Date for Which Produced JP- Turkey Point Units 3 and 4 Subsequent FP&L 4/10/18 ML18102A521 0025 License Renewal Application, Appendix E Environmental Report Supplemental Information JP- Declaration of Bill Powers, P.E. Bill Powers 5/14/18 ML18213A429 0026 JP- Letter from Wilbur Mayorga (Miami-Dade MDC-DERM 7/10/18 ML18213A435 0027 County, Division of Environmental Resources Management) to Matthew J. Raffenberg (FPL)

JP- Biological Assessment for the Turkey Point NRC 12/31/18 ML18353A835 0028 Nuclear Generating Unit Nos. 3 and 4 Proposed Subsequent License Renewal JP- Backgrounder on Tritium, Radiation NRC 4/31/2019 ML062020079 0029 Protection Limits, and Drinking Water Standards 4

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Initial Mandatory Disclosure Report in the above captioned proceeding were served via the Electronic Information Exchange (EIE) on the 10th day of May 2019, which to the best of my knowledge resulted in transmittal of same to those on the EIE Service List for the captioned proceeding.

/s/ Kenneth Rumelt Kenneth Rumelt May 10, 2019