ML19095A472: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 158 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO. 52-026   Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. Facility Combined License No. NPF-92 REMOVE INSERT 7 7     Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-459 C-459 (7)       Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with     10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, for Changes and SNC shall report the change to the Director of NRO, or the designee, in accordance with 10 CFR 50.59(d). (b) SNC shall report any violation of a requirement in Section 2.D.(3), Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73. (8)       Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 158, are hereby incorporated into this license. (9)       Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g). (10)   Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones: (a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program 1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 158 C-459 Amendment No. 158  E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 Verified on VEGP Unit 3   850 Not used. 851 E.3.9.05.01.03 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.1] 5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities. 5.1.3 The plant parameters listed in UFSAR Table 7.5-1, Post-Accident Monitoring System, can be retrieved and displayed in the TSC. 852 E.3.9.05.01.04 5.1 The licensee has established a technical support center (TSC) and on onsite operations support center (OSC). [H.1] 5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities. 5.1.4 The TSC is located within the protected area, and no major security barriers exist between the TSC and the control room. 853 Verified on VEGP Unit 3   854 Verified on VEGP Unit 3   855 Verified on VEGP Unit 3   856 Verified on VEGP Unit 3   857 Not used. 858 E.3.9.05.02.02 5.2 The licensee has established an emergency operations facility (EOF). [H.2] 5.2 An inspection of the EOF will be performed, including a test of the capabilities. 5.2.2 The plant parameters listed in UFSAR Table 7.5-1, Post-Accident Monitoring System, can be retrieved and displayed in the EOF.}}
{{#Wiki_filter:ATTACHMENT TO LICENSE AMENDMENT NO. 158 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO. 52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE                               INSERT 7                                   7 Appendix C to Facility Combined License No. NPF-92 REMOVE                               INSERT C-459                               C-459
 
(7)   Reporting Requirements (a)   Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)   SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8)   Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 158, are hereby incorporated into this license.
(9)   Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)     Environmental Qualification Program implemented before initial fuel load; (b)     Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)     Preservice Testing Program implemented before initial fuel load; (d)     Containment Leakage Rate Testing Program implemented before initial fuel load; (e)     Fire Protection Program
: 1.       The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7                               Amendment No. 158
 
E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No.         Program Commitment                 Inspections, Tests, Analyses         Acceptance Criteria 849                 Verified on VEGP Unit 3 850   Not used.
851 E.3.9.05.01.03 5.1 The licensee has established a   5.1 An inspection of the as-built 5.1.3 The plant parameters technical support center (TSC)        TSC and OSC will be performed,    listed in UFSAR Table 7.5-1, and an onsite operations support      including a test of the          Post-Accident Monitoring center (OSC). [H.1]                  capabilities.                    System, can be retrieved and displayed in the TSC.
852 E.3.9.05.01.04 5.1 The licensee has established a   5.1 An inspection of the as-built 5.1.4 The TSC is located within technical support center (TSC)        TSC and OSC will be performed,    the protected area, and no major and on onsite operations support      including a test of the          security barriers exist between center (OSC). [H.1]                  capabilities.                    the TSC and the control room.
853                 Verified on VEGP Unit 3 854                 Verified on VEGP Unit 3 855                 Verified on VEGP Unit 3 856                 Verified on VEGP Unit 3 857   Not used.
858 E.3.9.05.02.02 5.2 The licensee has established     5.2 An inspection of the EOF     5.2.2 The plant parameters an emergency operations facility      will be performed, including a    listed in UFSAR Table 7.5-1, (EOF). [H.2]                          test of the capabilities.        Post-Accident Monitoring System, can be retrieved and displayed in the EOF.
C-459                              Amendment No. 158}}

Revision as of 22:56, 19 October 2019

Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 158 (LAR-18-008)
ML19095A472
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/30/2019
From:
Office of New Reactors
To:
Southern Nuclear Operating Co
References
EPID L-2018-LLA-0262, LAR 18-008
Download: ML19095A472 (3)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 158 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-92 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-459 C-459

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 158, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 158

E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 Verified on VEGP Unit 3 850 Not used.

851 E.3.9.05.01.03 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.3 The plant parameters technical support center (TSC) TSC and OSC will be performed, listed in UFSAR Table 7.5-1, and an onsite operations support including a test of the Post-Accident Monitoring center (OSC). [H.1] capabilities. System, can be retrieved and displayed in the TSC.

852 E.3.9.05.01.04 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.4 The TSC is located within technical support center (TSC) TSC and OSC will be performed, the protected area, and no major and on onsite operations support including a test of the security barriers exist between center (OSC). [H.1] capabilities. the TSC and the control room.

853 Verified on VEGP Unit 3 854 Verified on VEGP Unit 3 855 Verified on VEGP Unit 3 856 Verified on VEGP Unit 3 857 Not used.

858 E.3.9.05.02.02 5.2 The licensee has established 5.2 An inspection of the EOF 5.2.2 The plant parameters an emergency operations facility will be performed, including a listed in UFSAR Table 7.5-1, (EOF). [H.2] test of the capabilities. Post-Accident Monitoring System, can be retrieved and displayed in the EOF.

C-459 Amendment No. 158