| issue date = 10/15/2002
| issue date = 10/15/2002
| title = Maine Yankee'S License Termination Plan
| title = Maine Yankee'S License Termination Plan
| author name = Williamson T L
| author name = Williamson T
| author affiliation = Maine Yankee Atomic Power Co
| author affiliation = Maine Yankee Atomic Power Co
| addressee name =  
| addressee name =  
Line 35: Line 35:
9 Added new tables MYAPC 053002 Table 2B-5 Revised Cs-137 numbers /  Added footnote:
9 Added new tables MYAPC 053002 Table 2B-5 Revised Cs-137 numbers /  Added footnote:
* Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.
* Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.
MYAPC 053002 Table 2B-6 Added discrete particle footnote RAI1-11c 082802 Table 2B-8 Revised to show the MDA values for each of the above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L). RAI1-10 042302 Table 2C-2 Added note to title, i.e., geometry corrected except as noted (1) Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data MYAPC 100602 Table 2C-2  Sample 10-3A: added a decimal point (21.5) Added footnote on geometry correction RAI1-14-3 053002 Table 2C-2 Added note (2) on net count rate RAI1-14.3 090302 Table 2C-3 Corrected Sb-125 = 0.4 RAI1-17 042302  Section 3 - Revision 3 Changes Section  Change / Topic Source Date 3.0 etc General updates to sections to reflect current state of decommissioning MYAPC 100702 3.1.2 Updated to include a description of the August 16th and November 19th application supplements. RAI1-19 042302 3.1.2 Updated to reflect completed construction of ISFSI and commencement of fuel movement MYAPC  091902 3.1.2 3.7.7 Updated: NRC approval of backlands license amendment. Added reference to NRC letter in Sect.  
MYAPC 053002 Table 2B-6 Added discrete particle footnote RAI1-11c 082802 Table 2B-8 Revised to show the MDA values for each of the above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L). RAI1-10 042302 Table 2C-2 Added note to title, i.e., geometry corrected except as noted (1) Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data MYAPC 100602 Table 2C-2  Sample 10-3A: added a decimal point (21.5) Added footnote on geometry correction RAI1-14-3 053002 Table 2C-2 Added note (2) on net count rate RAI1-14.3 090302 Table 2C-3 Corrected Sb-125 = 0.4 RAI1-17 042302  Section 3 - Revision 3 Changes Section  Change / Topic Source Date 3.0 etc General updates to sections to reflect current state of decommissioning MYAPC 100702 3.1.2 Updated to include a description of the August 16th and November 19th application supplements. RAI1-19 042302 3.1.2 Updated to reflect completed construction of ISFSI and commencement of fuel movement MYAPC  091902 3.1.2 3.7.7 Updated: NRC approval of backlands license amendment. Added reference to NRC letter in Sect.
 
3.7 MYAPC 091902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
===3.7 MYAPC===
091902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5 Section  Change / Topic Source Date 3.1.3 Revised to include the requirement to perform FSS prior to allowing a basement to be backfilled. RAI1-20 042302 3.1.3 Revised / Added ref to NRC Circular 81-07 SA / A3-1 091002 3.7.7 Deleted reference to Cumulative Risk letter MYAPC 042402  Section 4 - Revision 3 Changes Section  Change / Topic Source Date Attach 4A Created separate file to allow consistency in format / page numbering MYAPC 092202 Attach 4B Created separate file to allow consistency in format / page numbering MYAPC 092202  Section 5 - Revision 3 Changes Section  Change / Topic Source Date 5.1.3 Updated to reflect NRC license amendment on backlands MYAPC 092902 5.1.4 Reference to 1.4.2.c - made consistent with the current partial site release application package  RAI2-2 042302 5.1.4, 5.12 Updated NRC / EPA references RAI2-16 082602 5.10.1 Figure 5-6 Updated Organization - Corrected title of ISPRE - Radiochemist role per 5.14 of PMP 6.0 RAI2-15 092202 080102 5.11.3 Changed work order process to administrative controls MYAPC (QA) 071602 5.2.3 Changed the "may" to "will" to require FSS prior to backfilling excavated foundations. / replaced "RA" with "Industrial Area RAI2-3f 042302 5.2.3 Described survey unit design limitations RAI2-3d 053102 5.2.3 Added RAI response excerpt, rationale for classifying bldg footprint lower than foundation surface. RAI2-3e 060402 5.2.3 Added reference to Attachment 5A in text RAI2-3c 060402 5.2.4, 5.4.5.b, Attach 5A Updated forebay discussion (5.2.4); clarified ICS/CCS. RAI1-3/4  081902 5.3.1 Added rationale for survey unit size RAI2-4 042302 5.3.1.a Clarified: survey unit size for standing buildings is based on scenario pathways  RAI2-4 092102 5.4.2 Corrected typo: Appendix E of NUREG 1727 092402    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5 Section  Change / Topic Source Date 3.1.3 Revised to include the requirement to perform FSS prior to allowing a basement to be backfilled. RAI1-20 042302 3.1.3 Revised / Added ref to NRC Circular 81-07 SA / A3-1 091002 3.7.7 Deleted reference to Cumulative Risk letter MYAPC 042402  Section 4 - Revision 3 Changes Section  Change / Topic Source Date Attach 4A Created separate file to allow consistency in format / page numbering MYAPC 092202 Attach 4B Created separate file to allow consistency in format / page numbering MYAPC 092202  Section 5 - Revision 3 Changes Section  Change / Topic Source Date 5.1.3 Updated to reflect NRC license amendment on backlands MYAPC 092902 5.1.4 Reference to 1.4.2.c - made consistent with the current partial site release application package  RAI2-2 042302 5.1.4, 5.12 Updated NRC / EPA references RAI2-16 082602 5.10.1 Figure 5-6 Updated Organization - Corrected title of ISPRE - Radiochemist role per 5.14 of PMP 6.0 RAI2-15 092202 080102 5.11.3 Changed work order process to administrative controls MYAPC (QA) 071602 5.2.3 Changed the "may" to "will" to require FSS prior to backfilling excavated foundations. / replaced "RA" with "Industrial Area RAI2-3f 042302 5.2.3 Described survey unit design limitations RAI2-3d 053102 5.2.3 Added RAI response excerpt, rationale for classifying bldg footprint lower than foundation surface. RAI2-3e 060402 5.2.3 Added reference to Attachment 5A in text RAI2-3c 060402 5.2.4, 5.4.5.b, Attach 5A Updated forebay discussion (5.2.4); clarified ICS/CCS. RAI1-3/4  081902 5.3.1 Added rationale for survey unit size RAI2-4 042302 5.3.1.a Clarified: survey unit size for standing buildings is based on scenario pathways  RAI2-4 092102 5.4.2 Corrected typo: Appendix E of NUREG 1727 092402    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6 Section  Change / Topic Source Date 5.4.2.c 5.2.3 Added RAI excerpt on conservative use of sigma and discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 RAI2-3g 091902 5.4.3 Added SA Item B.3 SA / B.3 042402 5.4.3 Added statement re: how significant variations in background reference areas would be addressed. RAI2-6 060402 5.4.3 Added paragraph on background subtraction MYAPC 100702 5.4.4 Added recognition of triangular grid method RAI2-7b 042302 5.4.4  Clarified: if sole use of GPS , a more accurate system will be obtained RAI2-7a 042302 5.4.4.b Deleted FSSC MYAPC 071702 5.4.5 5.4.5.d, f 5.10.5.c  Added QC measures in SU design and FSS implementation. Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response RAI2-8 060302  5.4.5.b Clarified data list MYAPC 042402 5.4.5.f Changed "floppy disc: to appropriate storage media MYAPC 100702 5.5.1.a Expanded discussion on activated concrete State of Maine (Comment #73) 101002 5.5.1.a Added paragraph on removable contamination surveys (excerpt from RAI2-12a response) RAI2-12a 060402 5.5.1.a 5.5.2.d Corrected land scan speed to = 0.25m/sec deleted para on Land Area Scans MYAPC 100702 5.5.1.a,d Added T2-8 reference and add. paragraph on Vol. Conc. Meas. RAI2-9 060402 5.5.1.b Clarified last para under Stored Excavated Soil MYAPC 042402 5.5.1.b Clarified 2 nd para under Volumetric Samples MYAPC 042402 5.5.1.b Added RAI response excerpt, additional detail of actions taken to survey and handle stored soil for future re-use on site. RAI2-11 060302  5.5.1.d Updated forebay discussion MYAPC 053002 5.5.1.d Changed Section title to "specific" from "special" - to avoid confusion with Section 2 "Special Areas" MYAPC 092502 5.5.2.d Added reference to EC-009-01 (Ref 5.12.32) RAI2-12.c 092502 5.5.2.d Added ref to Section 6.7.2 RAI2-12.d 042402 5.5.2.d Reorganized; added discussion on Structure MDC RAI2-12.e.2 050102    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6 Section  Change / Topic Source Date 5.4.2.c 5.2.3 Added RAI excerpt on conservative use of sigma and discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 RAI2-3g 091902 5.4.3 Added SA Item B.3 SA / B.3 042402 5.4.3 Added statement re: how significant variations in background reference areas would be addressed. RAI2-6 060402 5.4.3 Added paragraph on background subtraction MYAPC 100702 5.4.4 Added recognition of triangular grid method RAI2-7b 042302 5.4.4  Clarified: if sole use of GPS , a more accurate system will be obtained RAI2-7a 042302 5.4.4.b Deleted FSSC MYAPC 071702 5.4.5 5.4.5.d, f 5.10.5.c  Added QC measures in SU design and FSS implementation. Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response RAI2-8 060302  5.4.5.b Clarified data list MYAPC 042402 5.4.5.f Changed "floppy disc: to appropriate storage media MYAPC 100702 5.5.1.a Expanded discussion on activated concrete State of Maine (Comment #73) 101002 5.5.1.a Added paragraph on removable contamination surveys (excerpt from RAI2-12a response) RAI2-12a 060402 5.5.1.a 5.5.2.d Corrected land scan speed to = 0.25m/sec deleted para on Land Area Scans MYAPC 100702 5.5.1.a,d Added T2-8 reference and add. paragraph on Vol. Conc. Meas. RAI2-9 060402 5.5.1.b Clarified last para under Stored Excavated Soil MYAPC 042402 5.5.1.b Clarified 2 nd para under Volumetric Samples MYAPC 042402 5.5.1.b Added RAI response excerpt, additional detail of actions taken to survey and handle stored soil for future re-use on site. RAI2-11 060302  5.5.1.d Updated forebay discussion MYAPC 053002 5.5.1.d Changed Section title to "specific" from "special" - to avoid confusion with Section 2 "Special Areas" MYAPC 092502 5.5.2.d Added reference to EC-009-01 (Ref 5.12.32) RAI2-12.c 092502 5.5.2.d Added ref to Section 6.7.2 RAI2-12.d 042402 5.5.2.d Reorganized; added discussion on Structure MDC RAI2-12.e.2 050102    Summary Listing of LTP Revision 3 Changes - by Section Source Key
Line 51: Line 49:
MYAPC EPA comments (various) 081202 8.2 8.6.4  Expanded discussion on forebay remediation / NRPA review process / MDEP conditional approval State of Maine (MDEP comment 10/8/02) 100902 8.3.2 Clarified the reference to Regulatory Guide 1.185 Section C.6 "Changes to the PSDAR" RAI1-28 030602 8.3.2 Added discussion: meeting RG 1.185 per RAI (bounded by FGEIS; no PSDAR revision needed) RAI1-28 073002 8.4.1 Updated to reflect the partial site release application submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies. RAI1-29 030602 8.4.1 Updated to reflect granting of license amendment. RAI1-29 072602 8.4.11 Added review by State re: historical and archeological resources RAI1-30 040302 8.6.13 8.1.2 8.2 Clarification on meaning of radiological "unrestricted use"; clarify potential for institutional controls.
MYAPC EPA comments (various) 081202 8.2 8.6.4  Expanded discussion on forebay remediation / NRPA review process / MDEP conditional approval State of Maine (MDEP comment 10/8/02) 100902 8.3.2 Clarified the reference to Regulatory Guide 1.185 Section C.6 "Changes to the PSDAR" RAI1-28 030602 8.3.2 Added discussion: meeting RG 1.185 per RAI (bounded by FGEIS; no PSDAR revision needed) RAI1-28 073002 8.4.1 Updated to reflect the partial site release application submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies. RAI1-29 030602 8.4.1 Updated to reflect granting of license amendment. RAI1-29 072602 8.4.11 Added review by State re: historical and archeological resources RAI1-30 040302 8.6.13 8.1.2 8.2 Clarification on meaning of radiological "unrestricted use"; clarify potential for institutional controls.
EPA#71 072602 8.6.2 RCRA update, per response to RAI Revised per 10/9/02 comments from MDEP; clarify conditional aspects of forebay NRPA permit. RAI1-33  State of Maine (MDEP comment 10/8/02) 072602 100902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
EPA#71 072602 8.6.2 RCRA update, per response to RAI Revised per 10/9/02 comments from MDEP; clarify conditional aspects of forebay NRPA permit. RAI1-33  State of Maine (MDEP comment 10/8/02) 072602 100902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12 Section  Change / Topic Source Date 8.6.4 8.4    -Relocated NRPA info to 8.6.4, added discussion on Circ Water Pump House NRPA -Added reference to Section 8.5 and 8.6 in 8.4 -Revised 8.6.4 to update for CWPH and Comp NRPA app and approvals  
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12 Section  Change / Topic Source Date 8.6.4 8.4    -Relocated NRPA info to 8.6.4, added discussion on Circ Water Pump House NRPA -Added reference to Section 8.5 and 8.6 in 8.4 -Revised 8.6.4 to update for CWPH and Comp NRPA app and approvals 8.6.4 Revised per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan. RAI1-31 RAI1-32 040202 053102 080502 100702  8.6.7 Discharges will be iaw requirements of the appropriate discharge permit.
 
====8.6.4 Revised====
per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan. RAI1-31 RAI1-32 040202 053102 080502 100702  8.6.7 Discharges will be iaw requirements of the appropriate discharge permit.
EPA#69 072602 8.6.9 Amended to reflect noise control provisions EPA#50.b 072602 8.9 Updated Reference listing and all ref cites in text.
EPA#69 072602 8.6.9 Amended to reflect noise control provisions EPA#50.b 072602 8.9 Updated Reference listing and all ref cites in text.
MYAPC 090302 080102}}
MYAPC 090302 080102}}

Revision as of 06:10, 14 July 2019

Maine Yankee'S License Termination Plan
ML022970058
Person / Time
Site: Maine Yankee
Issue date: 10/15/2002
From: Williamson T
Maine Yankee Atomic Power Co
To:
Document Control Desk, NRC/FSME
References
+sisprbs20060109, -RFPFR, MN-02-048, RA-02-124
Download: ML022970058 (18)


Text

Attachment 1 MAINE YANKEE LICENSE TERMINATION PLAN REVISION 3 (enclosed CD-ROM) 1 Maine Yankee to NRC Correspondence Supporting the LTP Review 5 Letter No Date Topic MN-01-034 August 16, 2001 Early Release of Backlands (Combined) MN-01-038 October 1, 2001 Submittal of Initial Characterization Survey Report and Historical Site Assessment MN-01-039 October 4, 2001 Maine Yankee LTP Related Calculations MN-01-041 October 16, 2001 Maine Yankee LTP Related Hydro-Geological Reports MN-01-040 October 17, 2001 Request for Expedited NRC Finding on the Status of the Intertidal Zone MN-01-044 November 19, 2001 Early Release of Backlands-Combined (Supplement to MN-01-034; addressed NRC Staff comments on the MY August 16, 2001 submittal) MN-02-002 January 16, 2002 Transmittal of Special Report: "Transuranic and Other Hard to Detect Radionuclides in Maine Yankee Sample Media" MN-02-009 February 14, 2002 Maine Yankee LTP Related Support Document - Resource Conservation Recovery Act (RCRA) Quality Assurance Project Plan (QAPP) MN-02-010 February 20, 2002 Maine Yankee Response to NRC RAI #16 (dated December 18, 2001) Addressing Site Hydrogeology MN-02-011 March 13, 2002 Response to NRC Request(s) for Additional Information for Maine Yankee Atomic Power Station License Termination Plan MN-02-012 March 13, 2002 Maine Yankee LTP Related Support Document -

Comprehensive Natural Resource Protection Act (NRPA)

Application MN-02-015 April 11, 2002 Revised Maine Yankee Response to NRC RAI #5 (dated December 18, 2001) - Supplementary Historical Site

Assessment (HSA) Data MN-02-017 April 23, 2002 Package 1 of RAI Related LTP Changes MN-02-030 June 26, 2002 Submittal of CWPH NRPA Application and Other Related NRPA Review Documentation MN-02-037 August 28, 2002 Maine Yankee Addendum Report Regarding Site Hydrogeology MN-02-119 October 3, 2002 Minor Corrections to Maine Yankee Reponses to NRC Requests for Additional Information

5 This table provides a listing of key Maine Yankee to NRC correspondence supporting the NRC's review of LTP Revision 2, i.e., letters filed after the submittal of LTP Revision 2. Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 1 Preface - Revision 3 Changes Section Change / Topic Source Date P.2 Revised DCGL from 17,000 to 18,000 MYAPC 100702 Section 1 - Revision 3 Changes Section Change / Topic Source Date 1.1, 1.2 Decommissioning updates MYAPC 100702 1.2 SA / TIRP / RAI - Added updated discussion MYAPC 042402 1.4.1 Revised to clearly reference the relevant license condition RAI1-1 042302 1.4.1 Revised to include an explanation of each of the change criteria in the license condition RAI1-23 042302 1.4.1 Revised to incorporate commitment (increase in a DCGL). RAI1-23-1 SA / A4-2, 3, 4 042302 1.4.1 Added commitment to provide prior notification to NRC re: survey unit classification downgrade. RAI1-23 072402 1.4.1 Clarified sentence re: MY's effort to "over perform" MYAPC 072602 1.4.1 Added additional clarification on less than 10 mrem release criteria / ref to Table 6-11 Revised 1.4.1 to be consistent with 5.6.4 regarding area classification downgrade to Class 2 or 3. Reference to 5.6.4 added Updated to reflect MY agreement to provide NRC prior notice (at least 2 weeks) re: intent to downgrade SU classification. NRC Letter 8/23/02 RAI2-13b 091602 092102 092602 092702 1.4.1 Corrected license condition from 2.B(9) to (10)

MYAPC 100702 1.4.2 1.7 NRC letter to Maine Yankee, dated July 30, 2002, Issuance of Amendment No. 167, license amendment approving partial release of site lands. (Reference added to 1.7) NRC Ltr 7/30/02 091602 1.4.2.c Updated to reflect the consolidated partial site release application dated August 16, 2001 and the acreage will be corrected RAI1-2 042302 1.5.2, 1.7 Revised titles used for GTS report to be consistent; corrected ref 1.7 (same as in Section 2 and 5) RAI1-3/4 081902 1.7 Add references to PSDAR, DSAR, LD2688-SP1084 MYAPC 090602 072602 Attach 1A Removed "Draft" from footer, numbered pages as a separate attachment MYAPC 092502 042402 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 2 Section 2 - Revision 3 Changes Section Change / Topic Source Date Various subsections Updated various references to attachments (adding "2" to Rev 0 attachment titles) NRC comment 10/8/02 100902 2.1, 2.2.5, 2.2.6, 2.3, 2.3.2a, 2.3.4b, Table 2-2, 2.3.5, 2.3.5a/b, 2.4.4, 2.4.7, 2.5, 2.5.2a, Various clarification updates re: ICS/CCS nomenclature in text. RAI1-3, 4 081902 2.1 thru 2.7 (Same as above entry) RAI1-4 053102 2.2.1 Added CSB spill events to HSA "key" items listing; updated total HSA items RAI1-5 042302 2.2.5 Updated refueling cavity water processing MYAPC 053102 2.2.5 Updated to reflect Backlands license amendment MYAPC 082902 2.2.5 Updated to reflect the August 13, 2001 and November 19, 2001 partial site release applications. The references to Attachment A will be deleted; Attachment 2A updated. RAI1-7 042302 2.2.5 Updated to reflect fuel transfer to ISFSI MYAPC 100602 2.3.4.d Clarified the exposure rate of soil for 5 pCi/g RAI1-8 042302 2.3.7 2.4.7.b Added footnotes to clarify survey packages numbering system (i.e., ICS to later CCS)

MYAPC 100902 2.4.7 Updated embedded piping footage MYAPC 092102 091002 090302 2.4.8 Clarified core population samples RAI1-9 080602 2.5.2.b Corrected MDAs of 0.01 pCi/g to 1.0 pCi/g RAI1-11b 082802 2.5.2.b & 2.5.3.c Added ref to new Attachment 2I RAI1-11a & 15a 090302 2.5.2.d Clarified buried pipe contribution (relationship) to annual dose (i.e., much less) RAI1-12 042302 2.5.2.f (g) Corrected typo - should be 2.5.2f MYAPC 090902 2.5.2.g, 2.5.3.e, Attach 2H Forebay characterization discussion. Added NEW Attachment 2H RAI1-17.1 091602 071202 2.5.3.a Table 2-7,8 (titles) Revised wording to provide ref. to Att 2F for core variability for BOP and Special Areas Expand discussion of O/A trench to include all "special areas" RAI1-14.4 092402 052202 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 3 Section Change / Topic Source Date 2.5.3.b Added:...an evaluation will be performed to determine if changes to the nuclide fraction are warranted. RAI1-14-1 042302 2.5.3.c Added footnote to 2.5.3c reflecting wording from RAI1-15a response about HPCI/LPCI lines. RAI1-15a 092002 2.5.3.d 2.5.2.f 2.7 Table 2C-3 Revised discussion on site hydrogeology, primarily reference to latest reports to NRC of 2/20/02 and 8/28/02 on groundwater.

2.5.3f revised to reference 2.5.3d. Also revised to reference Table 2C-3. And revised to explain why fire pond data is not in Table 2C-3 MY submittals to NRC (RAI1-16 response and Stratex reports) added to References in 2.7 Table 2C-3 revised; added note regarding Attachment 2H. RAI1- 16 092002 2.5.3.f Added new section title; "Future Sampling" RAI1-13.e RAI1-15 RAI1-17 042302 2.5.3.f Editorial changes to "Future Sampling" section; providing updated references to tables in text.

MYAPC 052102 2.7.11 Updated NRC ref RAI2-16 082602 2.7.16 Added reference to TIRP's TRU-HTD report RAI1-14.3 082802 2.7.18 Added EC-041-01 to references RAI1-17.1 091502 2.7.23 Added reference to supplemental HSA information RAI1-5 NRC comment 10/08/02 100902 Attach 2A Revised to be consistent with the consolidated partial site release application package RAI1-7 RAI1-18 042302 Attach 2F Revised to be consistent with Calculation EC 011 and per TIRP/LTP Team comments Numerous RAIs TIRP 073102 Attach 2G Added new Attachment 2G to describe processing (and other details) re: concrete cores RAI1-14.3 080502 Attach 2H New Attachment 2H added to provide detail on forebay/diffuser characterization.

Updated status of forebay dike boring effort; indicated schedule for providing NRC results RAI1-17.1 FOTC comment 100902 Attach 2I Added new Attachment 2I RAI1-11a & 15a 090302 Attachments All attachments created as separate files MYAPC 092002 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 4 Section Change / Topic Source Date Table 2-10 1.5 to 3.5 depth, Variance of act concrete ACTIVITY with depth / added ***note per JCD and corrected 0-0.5" sample activity.

Corrected entry (i.e., label on slice) to "1.5 to 4.0" RAI1-14.2 042302 100902 Table 2-12 Table 2-13 Corrected title: fractions vs concentrations RAI1-17 042302 Table 2-5 Added a row to segregate the exposure rate for the woodland and scrub areas RAI1-10 042302 Table 2-6 H-3 should be 400 (max) RAI1-10 042302 Table 2-8 Updated Special Area nuclide fractions RAI1-14-4 092402 Table 2A-3 1997 GTS: Eaton Farm = 0.45 vs 0.46, Merrymeeting = 0.42 vs 0.35 MYAPC 053002 Table 2A-7 Corrected Eaton Farm / Merrymeeting MYAPC 053002 Table 2A-8 &

9 Added new tables MYAPC 053002 Table 2B-5 Revised Cs-137 numbers / Added footnote:

  • Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.

MYAPC 053002 Table 2B-6 Added discrete particle footnote RAI1-11c 082802 Table 2B-8 Revised to show the MDA values for each of the above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L). RAI1-10 042302 Table 2C-2 Added note to title, i.e., geometry corrected except as noted (1) Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data MYAPC 100602 Table 2C-2 Sample 10-3A: added a decimal point (21.5) Added footnote on geometry correction RAI1-14-3 053002 Table 2C-2 Added note (2) on net count rate RAI1-14.3 090302 Table 2C-3 Corrected Sb-125 = 0.4 RAI1-17 042302 Section 3 - Revision 3 Changes Section Change / Topic Source Date 3.0 etc General updates to sections to reflect current state of decommissioning MYAPC 100702 3.1.2 Updated to include a description of the August 16th and November 19th application supplements. RAI1-19 042302 3.1.2 Updated to reflect completed construction of ISFSI and commencement of fuel movement MYAPC 091902 3.1.2 3.7.7 Updated: NRC approval of backlands license amendment. Added reference to NRC letter in Sect.

3.7 MYAPC 091902 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5 Section Change / Topic Source Date 3.1.3 Revised to include the requirement to perform FSS prior to allowing a basement to be backfilled. RAI1-20 042302 3.1.3 Revised / Added ref to NRC Circular 81-07 SA / A3-1 091002 3.7.7 Deleted reference to Cumulative Risk letter MYAPC 042402 Section 4 - Revision 3 Changes Section Change / Topic Source Date Attach 4A Created separate file to allow consistency in format / page numbering MYAPC 092202 Attach 4B Created separate file to allow consistency in format / page numbering MYAPC 092202 Section 5 - Revision 3 Changes Section Change / Topic Source Date 5.1.3 Updated to reflect NRC license amendment on backlands MYAPC 092902 5.1.4 Reference to 1.4.2.c - made consistent with the current partial site release application package RAI2-2 042302 5.1.4, 5.12 Updated NRC / EPA references RAI2-16 082602 5.10.1 Figure 5-6 Updated Organization - Corrected title of ISPRE - Radiochemist role per 5.14 of PMP 6.0 RAI2-15 092202 080102 5.11.3 Changed work order process to administrative controls MYAPC (QA) 071602 5.2.3 Changed the "may" to "will" to require FSS prior to backfilling excavated foundations. / replaced "RA" with "Industrial Area RAI2-3f 042302 5.2.3 Described survey unit design limitations RAI2-3d 053102 5.2.3 Added RAI response excerpt, rationale for classifying bldg footprint lower than foundation surface. RAI2-3e 060402 5.2.3 Added reference to Attachment 5A in text RAI2-3c 060402 5.2.4, 5.4.5.b, Attach 5A Updated forebay discussion (5.2.4); clarified ICS/CCS. RAI1-3/4 081902 5.3.1 Added rationale for survey unit size RAI2-4 042302 5.3.1.a Clarified: survey unit size for standing buildings is based on scenario pathways RAI2-4 092102 5.4.2 Corrected typo: Appendix E of NUREG 1727 092402 Summary Listing of LTP Revision 3 Changes - by Section Source Key
RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6 Section Change / Topic Source Date 5.4.2.c 5.2.3 Added RAI excerpt on conservative use of sigma and discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 RAI2-3g 091902 5.4.3 Added SA Item B.3 SA / B.3 042402 5.4.3 Added statement re: how significant variations in background reference areas would be addressed. RAI2-6 060402 5.4.3 Added paragraph on background subtraction MYAPC 100702 5.4.4 Added recognition of triangular grid method RAI2-7b 042302 5.4.4 Clarified: if sole use of GPS , a more accurate system will be obtained RAI2-7a 042302 5.4.4.b Deleted FSSC MYAPC 071702 5.4.5 5.4.5.d, f 5.10.5.c Added QC measures in SU design and FSS implementation. Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response RAI2-8 060302 5.4.5.b Clarified data list MYAPC 042402 5.4.5.f Changed "floppy disc: to appropriate storage media MYAPC 100702 5.5.1.a Expanded discussion on activated concrete State of Maine (Comment #73) 101002 5.5.1.a Added paragraph on removable contamination surveys (excerpt from RAI2-12a response) RAI2-12a 060402 5.5.1.a 5.5.2.d Corrected land scan speed to = 0.25m/sec deleted para on Land Area Scans MYAPC 100702 5.5.1.a,d Added T2-8 reference and add. paragraph on Vol. Conc. Meas. RAI2-9 060402 5.5.1.b Clarified last para under Stored Excavated Soil MYAPC 042402 5.5.1.b Clarified 2 nd para under Volumetric Samples MYAPC 042402 5.5.1.b Added RAI response excerpt, additional detail of actions taken to survey and handle stored soil for future re-use on site. RAI2-11 060302 5.5.1.d Updated forebay discussion MYAPC 053002 5.5.1.d Changed Section title to "specific" from "special" - to avoid confusion with Section 2 "Special Areas" MYAPC 092502 5.5.2.d Added reference to EC-009-01 (Ref 5.12.32) RAI2-12.c 092502 5.5.2.d Added ref to Section 6.7.2 RAI2-12.d 042402 5.5.2.d Reorganized; added discussion on Structure MDC RAI2-12.e.2 050102 Summary Listing of LTP Revision 3 Changes - by Section Source Key
RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 7 Section Change / Topic Source Date 5.5.2.d Expanded detail on land survey technique re: distance to surface, peak trap mode, etc. RAI2-12.e.3 091002 5.5.2.d Table5-6 Changed soil DCGL from 3.0 to 3.2 MYAPC 091002 5.5.2.e Added discussion on Co-60 discrete particle capability and confirms E600 operation in SCA mode. Added statement on Cs-137 (at 3 pCi/g) RAI2-12.e.3 RAI2-1.3 050102 5.5.2.f Added discussion on Es RA12-12g 053002 5.5.2.g Expanded Pipe crawler discussion RAI2-12h 092502 053002 5.6 Clarified: elevated measurement was the result of a discrete particle or a distributed source RAI2-3a 042302 5.6.2 E600 closure action. Added more detailed discussion on actions upon receiving confirmed indication of elevated area.. Added reference to 5.6.4 re: more discussion on reclassification. RAI2-12.f.3 050202 5.6.3 Added note from MARSSIM 8.5.2 (Rev 1 as published in FedReg, 6/01)

MYAPC 081202 5.6.3 5.8.1.d Added TIRP PS-4 Unity Rule changes, including NEW Section 5.8.1.d 5.8.1d revised to remove exact dose result of 7.52 MYAPC TIRP 091002 081702 093002 5.6.4 5.12 5.6.4: further revised to address downgrade from Class 1 or 2 to Class 3.

Further revisions to 5.6.4 to reference 8/23/02 NRC letter on downgrades and to clearly specify Class 1 to Class 2 downgrade considerations Expanded discussion on evaluation actions in an investigation RAI2-13.b 092102 091602 050102 5.8.1.b Corrected W r value criteria MYAPC 042402 5.8.1.b,c Corrected WRS Test and Sign Test equations to be consistent with MARSSIM RAI2-14 042302 5.8.1.b,c Corrected "N" nomenclature, added 40% or fewer "less than" values qualifier. RAI2-14 042302 5.9.4 Clarifications for consistency with FSS procedures MYAPC (QA) 071602 Attach 5A Updated piping data MYAPC 090402 Table 5-1A Revised survey area sizes MYAPC 060502 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 8 Section Change / Topic Source Date Table 5-1A to 5-1C Table 5-1E 5.4.5.i 5.5.1 5.1.2 5.6 5.6.1 5.6.3 5.7.2 5.8.1.c 5.9.1 5.10.2.d,f Section 5, QA/Licensing Compliance Review changes MYAPC 082102 Table 5-1B Inserted N/A for Information Center (B1400) exterior MYAPC 100702 Table 5-2 Revised by removing the reference to buried piping/conduit. Added footnote will be added to Table 5-2 indicating that the 180 m 2 includes floor and lower walls RAI2-4 042302 Table 5-3a Corrected typo for Sr-90 MYAPC 100702 Table 5-4 Added revised detector areas for 43-37 and 43-37-1 instruments; revised column header: "total detector area" RAI2-12.b 061902 Table 5-4 Added Ludlum window info. Corrected window data in response. RAI2-12b 042302 Table 5-4a Correct typo for land area scan MDC for Type 1=0.5 at 16 and 15 m 2 area MYAPC 061902 Table 5-4a New title (Land Area Scan MDC) since new Table 5-4b covers Structure Scan MDC Added reference in table to Section 6.7 (4.2 Ci/g DCGL explanation) RAI2-12.e.3 RAI2-12.c 050202 Table 5-4b New table on Structure Scan MDC RAI2-12.e.2 050102 Table 5-6 Updated liquid beta parameters MYAPC 042402 Table 5-6 Added TBD scan MDCs / corrected detector nomenclature RAI2-12f-1 042402 Table 5-7 Added footnote on scan MDC: Must be calculated a priori MYAPC 091002 Summary Listing of LTP Revision 3 Changes - by Section Source Key
RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 9 Section 6 - Revision 3 Changes Section Change / Topic Source Date 6.1 6.5.1 6.5.4 6.6.8 6.7.2 Table 6-1 Removed the word "conduit" associated with buried pipe MYAPC 092102 6.10.6 Added calculation EC 004-01 ref RAI1-17.1 082802 6.3 Deleted obsolete NRC ref to Regulatory Guide DG-4006 RAI2-16 082602 6.3 Reworded passage on 'contamination on basement surfaces' MYAPC 100702 6.6.1.a and d Added "flowable fill" to discussion MYAPC 100702 6.6.1.c Corrected soil depth from 5.8 to 2.8 m MYAPC 100702 6.6.2 Updated concrete / rebar dose MYAPC 092102 6.6.2.b Corrected inventory form 3.43 to 3.30E+08 MYAPC 100702 6.6.3 Updated to reflect Embedded Spray Pump piping MYAPC 092102 6.6.3 / 6.7.2 Updated embedded piping info 082602 6.6.5.a Corrected vol. source term = 28500 m3 MYAPC 100702 6.6.6 Updated groundwater discussion to reflect commitment for routine sampling of CFS and PAB test pit. Include reference back to 2.5.3d. RAI1-16 092002 6.6.9 Added new text RAI1-17.1 082802 6.7 Added explanation of 4.2 pCi/g RAI1-21.1 053002 6.7 Revised soil DCGL to 3.2 MYAPC 091002 6.7, 6.7.2 Revised OA trench text to "special areas" MYAPC 082802 6.7.16 Added EC 041-01 to Section 6 references MYAPC 091502 6.7.2 Added explanation of 4.2 pCi/g (DCGL outside RA) RAI2-12.c 060502 6.7.2 TIRP PS-4 Unity Rule changes Revised to replace exact dose value of 7.52 mrem/y for more general language RAI2-12d TIRP 093002 6.8.3 6.8.4 6.8.5 Added new sections to address AF for buried and embedded piping RAI1-25a & c 091602 Attach 6-13 Updated DCGLs / dose MYAPC 092002 Attach 6-17 Updated activated rebar table MYAPC 092002 Summary Listing of LTP Revision 3 Changes - by Section Source Key
RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 10 Section Change / Topic Source Date Attach 6-18 Updated / corrected title (special areas)

MYAPC 092002 Attach 6-19 Added: Special Areas Unitized Dose Factors MYAPC 092002 Attach 6-2, 6-6, 6-8, 6-9, 6-11, 6-12, 6-14, 6-15, 6-16 Updated per latest engineering calculations EC-041-01 092502 Attach 6-7 new version Updated per latest engineering calculations and/or technical basis document MYAPC 090302 Table 6-10 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-11 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-12 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-14 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-3 Updated per latest engineering calculations and/or technical basis document MYAPC 092102 Table 6-4 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-5 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-6a Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-6b Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-8 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-9 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Section 7 - Revision 3 Changes Section Change / Topic Source Date 7.0 Updated per Financial MYAPC 042302 7.1 Removed ref. To Appendix C RAI2-18 042302 Table 7-1 Added "TLG Site Specific Cost Estimate" to title RAI2-17 042302 Table 7-2 Added to title: "and Financial Planning Estimate and updated data" RAI2-17 042302 Table 7-3 Added new table RAI2-19 042302 Table 7-3 Added footnote re: FSS cost estimate. RAI2-19 073002 Table 7-3 Added "Notes" label to bottom of table MYAPC 091202 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 11 Section 8 - Revision 3 Changes Section Change / Topic Source Date 8.1.1 8.1.4 8.1.8 8.3 Identified specific document that bounds the env impact per RAI request RAI1-27 073002 8.1.1 Updated NRC ref for NUREG 1700 RAI2-16 082602 8.2 8.9 Updated: Comprehensive NRPA re: alternative analysis for demolition of forebay and diffuser. Numerous additions to Reference (8.9) as appropriate to support NRPA related changes. RAI1-32 060602 8.2, 8.4.6 8.6.3 8.6.13 8.8 Various updates/ larifications from MY RCRA specialist; included clarification of LTP use of unrestricted release under 50.82 vs. use of institutional controls re: to non-rad assessment. Updates, in part, address several related EPA comments as well.

MYAPC EPA comments (various) 081202 8.2 8.6.4 Expanded discussion on forebay remediation / NRPA review process / MDEP conditional approval State of Maine (MDEP comment 10/8/02) 100902 8.3.2 Clarified the reference to Regulatory Guide 1.185 Section C.6 "Changes to the PSDAR" RAI1-28 030602 8.3.2 Added discussion: meeting RG 1.185 per RAI (bounded by FGEIS; no PSDAR revision needed) RAI1-28 073002 8.4.1 Updated to reflect the partial site release application submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies. RAI1-29 030602 8.4.1 Updated to reflect granting of license amendment. RAI1-29 072602 8.4.11 Added review by State re: historical and archeological resources RAI1-30 040302 8.6.13 8.1.2 8.2 Clarification on meaning of radiological "unrestricted use"; clarify potential for institutional controls.

EPA#71 072602 8.6.2 RCRA update, per response to RAI Revised per 10/9/02 comments from MDEP; clarify conditional aspects of forebay NRPA permit. RAI1-33 State of Maine (MDEP comment 10/8/02) 072602 100902 Summary Listing of LTP Revision 3 Changes - by Section Source Key

RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12 Section Change / Topic Source Date 8.6.4 8.4 -Relocated NRPA info to 8.6.4, added discussion on Circ Water Pump House NRPA -Added reference to Section 8.5 and 8.6 in 8.4 -Revised 8.6.4 to update for CWPH and Comp NRPA app and approvals 8.6.4 Revised per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan. RAI1-31 RAI1-32 040202 053102 080502 100702 8.6.7 Discharges will be iaw requirements of the appropriate discharge permit.

EPA#69 072602 8.6.9 Amended to reflect noise control provisions EPA#50.b 072602 8.9 Updated Reference listing and all ref cites in text.

MYAPC 090302 080102