| | issue date = 03/08/2012 | | | issue date = 03/08/2012 |
| | title = Request for Additional Information | | | title = Request for Additional Information |
| | author name = Martin R E | | | author name = Martin R |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Ajluni M J | | | addressee name = Ajluni M |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000348, 05000364 | | | docket = 05000348, 05000364 |
| | license number = NPF-002, NPF-008 | | | license number = NPF-002, NPF-008 |
| | contact person = Martin R E | | | contact person = Martin R |
| | case reference number = TAC ME7094, TAC ME7095 | | | case reference number = TAC ME7094, TAC ME7095 |
| | document type = Letter | | | document type = Letter |
Line 21: |
Line 21: |
|
| |
|
| ==Dear Mr. Ajluni:== | | ==Dear Mr. Ajluni:== |
| By letter dated September 9, 2011 (Agencywide Documents Access and Management System Accession No. ML 112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. | | By letter dated September 9, 2011 (Agencywide Documents Access and Management System Accession No. ML112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. |
| WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware. | | WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware. |
| Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function. | | Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function. |
Line 28: |
Line 28: |
|
| |
|
| ==Dear Mr. Ajluni:== | | ==Dear Mr. Ajluni:== |
| By letter dated September 9,2011 (Agencywide Documents Access and Management System Accession No. ML 112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. | | By letter dated September 9,2011 (Agencywide Documents Access and Management System Accession No. ML112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. |
| WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware. | | WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware. |
| Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function. | | Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function. |
|
---|
Category:Letter
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 8, 2012 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295, Bin -038 Birmingham, AL 35201-1295 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME7094 AND ME7095 )
Dear Mr. Ajluni:
By letter dated September 9, 2011 (Agencywide Documents Access and Management System Accession No. ML112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function.
WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware.
Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function.
Please indicate whether that is SNC's practice in this regard. If a different practice or approach is used to derive the allocation time, please include a specific explanation in your response.
Please provide your response to the RAI within thirty (30) days of the date of this letter. Sincerely, Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc w/encl: Distribution via Listserv March 8, 2012 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295, Bin -038 Birmingham, AL 35201-1295 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME7094 AND ME7095 )
Dear Mr. Ajluni:
By letter dated September 9,2011 (Agencywide Documents Access and Management System Accession No. ML112521438), Southern Nuclear Operating Company, Inc. (SNC or the licensee), submitted a license amendment request regarding FNP to add Surveillance Requirement 3.3.1.14 to Technical Specification Table 3.3.1-1, "Reactor Trip System Instrumentation," Function 3, "Power Range Neutron Flux High Positive Rate." By letter dated February 3, 2012, SNC responded to a request for additional information (RAI). With respect to the response to RAI No.2, please provide the allocation time for processing the Power Range Neutron Flux High Positive Rate Trip (PFRT) function.
WCAP-13632-P-A, Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements," identifies a bounding generic rack response time allocation applicable to the protection functions in accordance with the protection function hardware.
Accordingly, the staff is requesting information about the bounding allocation time for the PFRT function for Farley, Units 1 and 2. Note that the WCAP allows users to estimate response time allocation times, using the specific channel card string for the protective function.
Please indicate whether that is SNC's practice in this regard. If a different practice or approach is used to derive the allocation time, please include a specific explanation in your response.
Please provide your response to the RAI within thirty (30) days of the date of this letter. Sincerely, IRA! Robert E. Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: Distribution via Listserv DISTRIBUTION PUBLIC LPL2-1 RlF RidsNrrDorlLpl2-1 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsRgn2MailCenter Resource RidsNrrLASFigueroa Resource RidsOgcRp Resource MSingletary, NRR RidsNrrDssStsb Resource RidsNrrPMFarley Resource RidsNrrDeEicb Resource RAlvarado, NRR a e ADAMS A ccesslon N 0.: ML
- B jY memo d t d OFFICE NAME DATE DORULPL2-1/PM RMartin 03/0/712 DORULPL2-1/LA SFigueroa 03/08/12 NRR/DE/EICB/BC JThorp* 03/07/12 DORULPL2-1/BC NSalgado 03/08/12 DORULPL2-1/PM RMartin 03/08/12 OFFICIAL RECORD COpy