| | number = ML101050203 | | | number = ML101050203 |
| | issue date = 04/08/2010 | | | issue date = 04/08/2010 |
| | title = Watts Bar, Unit 2 - Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents | | | title = Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents |
| | author name = Bajestani M | | | author name = Bajestani M |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
Line 12: |
Line 12: |
| | document type = Letter | | | document type = Letter |
| | page count = 2 | | | page count = 2 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:--a Withhold from Public Disclosure Under 10 CFR 2.390 Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 April 8, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391 | | {{#Wiki_filter:-- a Withhold from Public Disclosure Under 10 CFR 2.390 Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 April 8, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 -ADDITIONAL INFORMATION REGARDING FINAL SAFETY ANALYSIS REPORT (FSAR), CHAPTER 7, "INSTRUMENTATION AND CONTROLS" REVIEW -REQUESTED COMMON Q PROPRIETARY DOCUMENTS | | WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - ADDITIONAL INFORMATION REGARDING FINAL SAFETY ANALYSIS REPORT (FSAR), |
| | CHAPTER 7, "INSTRUMENTATION AND CONTROLS" REVIEW - |
| | REQUESTED COMMON Q PROPRIETARY DOCUMENTS |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | TVA letter dated March 12, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - |
| | Additional Information Regarding Final Safety Analysis Report (FSAR) |
| | Chapter 7, 'Instrumentation and Controls Review"' |
| | The purpose of this letter is to provide documents that TVA committed in the referenced letter to submit by April 9, 2009. Specifically, in response to Question 4, NRC requested TVA to identify the documentation that will be submitted for each un-reviewed digital instrumentation and control system and component and the associated docketing schedule. In response, TVA committed in part to provide proprietary versions of the WBN Unit 2 Post Accident Monitoring System (PAMS) Licensing Technical Report (Document Number WNA-LI-00058-WBT, Revision 0) and the Software Requirements Specification for PAMS (Document Number WNA-SD-00239-WBT, Revision 1). |
| | The Enclosure contains these two documents, as well as their affidavits for withholding. |
| | Additionally, the affidavits for withholding for two of the other three proprietary documents referenced in TVA's response to Question 4 that were provided with the referenced letter are also enclosed. Specifically, enclosed is the affidavit for the following proprietary documents: |
| | System Design Specification (Document Number WNA-DS-01667-WBT, Revision 1) and System Requirements Specification (Document Number WNA-DS-01617-WBT, Revision 1). |
| | Printedon recycledpaper |
|
| |
|
| TVA letter dated March 12, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -Additional Information Regarding Final Safety Analysis Report (FSAR)Chapter 7, 'Instrumentation and Controls Review"'The purpose of this letter is to provide documents that TVA committed in the referenced letter to submit by April 9, 2009. Specifically, in response to Question 4, NRC requested TVA to identify the documentation that will be submitted for each un-reviewed digital instrumentation and control system and component and the associated docketing schedule.
| | U.S. Nuclear Regulatory Commission Page 2 April 8, 2010 The enclosed documents contain information proprietary to Westinghouse. TVA requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR § 2.390. |
| In response, TVA committed in part to provide proprietary versions of the WBN Unit 2 Post Accident Monitoring System (PAMS) Licensing Technical Report (Document Number WNA-LI-00058-WBT, Revision 0) and the Software Requirements Specification for PAMS (Document Number WNA-SD-00239-WBT, Revision 1).The Enclosure contains these two documents, as well as their affidavits for withholding.
| | This letter does not contain any commitments. If you have any questions, please contact me at (423) 365-2351. |
| Additionally, the affidavits for withholding for two of the other three proprietary documents referenced in TVA's response to Question 4 that were provided with the referenced letter are also enclosed.
| | Sincerely, Masoud jestani Watts a Unit 2 Vice President cc (Enclosure): |
| Specifically, enclosed is the affidavit for the following proprietary documents:
| |
| System Design Specification (Document Number WNA-DS-01667-WBT, Revision 1) and System Requirements Specification (Document Number WNA-DS-01617-WBT, Revision 1).Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 April 8, 2010 The enclosed documents contain information proprietary to Westinghouse.
| |
| TVA requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR § 2.390.This letter does not contain any commitments. | |
| If you have any questions, please contact me at (423) 365-2351.Sincerely, Masoud jestani Watts a Unit 2 Vice President cc (Enclosure): | |
| U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381}} | | U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381}} |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05
[Table view] |
Text
-- a Withhold from Public Disclosure Under 10 CFR 2.390 Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 April 8, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391
Subject:
WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - ADDITIONAL INFORMATION REGARDING FINAL SAFETY ANALYSIS REPORT (FSAR),
CHAPTER 7, "INSTRUMENTATION AND CONTROLS" REVIEW -
REQUESTED COMMON Q PROPRIETARY DOCUMENTS
Reference:
TVA letter dated March 12, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
Additional Information Regarding Final Safety Analysis Report (FSAR)
Chapter 7, 'Instrumentation and Controls Review"'
The purpose of this letter is to provide documents that TVA committed in the referenced letter to submit by April 9, 2009. Specifically, in response to Question 4, NRC requested TVA to identify the documentation that will be submitted for each un-reviewed digital instrumentation and control system and component and the associated docketing schedule. In response, TVA committed in part to provide proprietary versions of the WBN Unit 2 Post Accident Monitoring System (PAMS) Licensing Technical Report (Document Number WNA-LI-00058-WBT, Revision 0) and the Software Requirements Specification for PAMS (Document Number WNA-SD-00239-WBT, Revision 1).
The Enclosure contains these two documents, as well as their affidavits for withholding.
Additionally, the affidavits for withholding for two of the other three proprietary documents referenced in TVA's response to Question 4 that were provided with the referenced letter are also enclosed. Specifically, enclosed is the affidavit for the following proprietary documents:
System Design Specification (Document Number WNA-DS-01667-WBT, Revision 1) and System Requirements Specification (Document Number WNA-DS-01617-WBT, Revision 1).
Printedon recycledpaper
U.S. Nuclear Regulatory Commission Page 2 April 8, 2010 The enclosed documents contain information proprietary to Westinghouse. TVA requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR § 2.390.
This letter does not contain any commitments. If you have any questions, please contact me at (423) 365-2351.
Sincerely, Masoud jestani Watts a Unit 2 Vice President cc (Enclosure):
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381