ML102730788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML102730788
| number = ML102730788
| issue date = 09/21/2010
| issue date = 09/21/2010
| title = 2010/09/21-Pilgrim Watch'S Reply to Entergy'S Response to Pilgrim Watch'S Memo Regarding Proposed Schedule
| title = Pilgrim Watch'S Reply to Entergy'S Response to Pilgrim Watch'S Memo Regarding Proposed Schedule
| author name = Lampert M
| author name = Lampert M
| author affiliation = Pilgrim Watch
| author affiliation = Pilgrim Watch
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:kks j -.;k- -) /DOCKETED USNRC September 22, 2010 (8:00a.m.)
{{#Wiki_filter:kks j -. ;k- -) /
OFFICE OF SECRETARY UNITED STATES OF AMERICA RULEMAKINGS AND ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application Docket # 50-293 September 21, 2010 Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule The statement in Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule saying that "Pilgrim Watch was previously able to prepare its testimony in six weeks,[and] there is no good reason why is now needs more than three months" is misleading and totally disingenuous.
DOCKETED USNRC September 22, 2010 (8:00a.m.)
The Board's May 5, 2010 Order provided for a five (5) month preparatory period prior to submitting pre-trial filings. The time period prior to filing is not simply for what experts are required to do, but also what Pilgrim Watch is required to do, absent a plethora of other supports-lawyers, paralegals, secretaries, copy room staff, and mail clerks.Thanking you for your consideration, I am sirely, Mary Lampert \........Pilgrim Watch, pro se 148 Washington Street Duxbury, MA 02332 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application September 21, 2010 CERTIFICATE OF SERVICE I hereby certify that Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule was served September 21, 2010 in the above captioned proceeding to the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class.Secretary of the Commission Attn: Rulemakings and Adjudications Staff Mail Stop 0-16 C I United States Nuclear Regulatory Commission  
OFFICE OF SECRETARY                 UNITED STATES OF AMERICA RULEMAKINGS AND ADJUDICATIONS     STAFF       NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                             Docket # 50-293 Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application September 21, 2010 Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule The statement in Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule saying that "Pilgrim Watch was previously able to prepare its testimony in six weeks,
[2 copies]Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Mail Stop -T-3 F23 US NRC Washington, DC 20555-0001 Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Mail Stop T-3 F23 US NRC Washington, DC 20555-0001 Administrative Judge Richard F. Cole Atomic Safety and Licensing Board Mail Stop -T-3-F23 US NRC Washington, DC 20555-0001 Office of Commission Appellate Adjudication Mail Stop 0-16 C1 United States Nuclear Regulatory Commission Washington, DC 20555-0001 Atomic Safety and Licensing Board Mail Stop T-3 F23 United States Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: 0-16C1 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Office of General Counsel Mail Stop: 0-15 D21 Washington DC 20555-0001 Susan L. Uttal, Esq.Andrea Jones, Esq.Brian Harris, Esq.Michael Dreher, Esq.Brian Newell, Paralegal U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: 01 -Fl Washington, DC 20555-0001 Lisa Regner, Project Mgr. Plant Lic.Branch 1-1, Operator Reactor Licensing Washington, DC 20555-0001 Paul A. Gaukler, Esq.David R. Lewis, Esq.Jason B. Parker, Esq.Pillsbury, Winthrop, Shaw, Pittman, LLP -2300 N Street, N.W.Washington, DC 20037-1128 Katherine Tucker ASLB, Law Clerk U.S. Nuclear Regulatory Commission Mail Stop T-3-E2a Washington, DC 20555-0001 Martha Coakley, Attorney General Matthew Brock, Assistant Attorney General Commonwealth of Massachusetts Office of Attorney General One Ashburton Place Boston, MA 02108 Mark Stankiewicz Town Manager, Town of Plymouth 11 Lincoln Street Plymouth MA 02360 Sheila Slocum Hollis, Esq.Town of Plymouth MA Duane Morris, LLP 505 9th Street, N.W. 1000 Washington D.C. 20004-2166 Richard R. MacDonald Town Manager, Town of Duxbury 878 Tremont Street Duxbury, MA 02332 Fire Chief & Director DEMA, Town of Duxbury 688 Tremont Street P.O. Box 2824 Duxbury, MA 02331 Terence A. Burke, Esq.Entergy Nuclear Mail Stop M-ECH-62 Jackson, MS 39213 Mary Lampert Pilgrim Watch, pro se 148 Washington St.Duxbury, MA 023332 September 21, 2010 2}}
[and] there is no good reason why is now needs more than three months" is misleading and totally disingenuous.
The Board's May 5, 2010 Order provided for a five (5) month preparatory period prior to submitting pre-trial filings. The time period prior to filing is not simply for what experts are required to do, but also what Pilgrim Watch is required to do, absent a plethora of other supports
      - lawyers, paralegals, secretaries, copy room staff, and mail clerks.
Thanking you for your consideration, I am sirely, Mary Lampert           \........
Pilgrim Watch, pro se 148 Washington Street Duxbury, MA 02332
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                                   Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application                                       September 21, 2010 CERTIFICATE OF SERVICE I hereby certify that Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule was served September 21, 2010 in the above captioned proceeding to the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class.
Secretary of the Commission                   Administrative Judge Attn: Rulemakings and Adjudications           Richard F. Cole Staff                                         Atomic Safety and Licensing Board Mail Stop 0-16 C I                             Mail Stop -T-3-F23 United States Nuclear Regulatory               US NRC Commission [2 copies]                         Washington, DC 20555-0001 Administrative Judge                           Office of Commission Appellate Ann Marshall Young, Chair                     Adjudication Atomic Safety and Licensing Board             Mail Stop 0-16 C1 Mail Stop - T-3 F23                           United States Nuclear Regulatory US NRC                                         Commission Washington, DC 20555-0001                      Washington, DC 20555-0001 Administrative Judge                           Atomic Safety and Licensing Board Paul B. Abramson                              Mail Stop T-3 F23 Atomic Safety and Licensing Board             United States Nuclear Regulatory Mail Stop T-3 F23                             Commission US NRC                                         Washington, DC 20555-0001 Washington, DC 20555-0001
 
U.S. Nuclear Regulatory Commission       Martha Coakley, Attorney General Office of Commission Appellate           Matthew Brock, Assistant Attorney Adjudication                             General Commonwealth of Mail Stop: 0-16C1                       Massachusetts Washington, DC 20555-0001               Office of Attorney General One Ashburton Place U.S. Nuclear Regulatory Commission       Boston, MA 02108 Office of General Counsel Mail Stop: 0-15 D21                     Mark Stankiewicz Washington DC 20555-0001                 Town Manager, Town of Plymouth Susan L. Uttal, Esq.                     11 Lincoln Street Andrea Jones, Esq.                       Plymouth MA 02360 Brian Harris, Esq.
Michael Dreher, Esq.                     Sheila Slocum Hollis, Esq.
Brian Newell, Paralegal                 Town of Plymouth MA Duane Morris, LLP U.S. Nuclear Regulatory Commission       505 9th Street, N.W. 1000 Office of Nuclear Reactor Regulation     Washington D.C. 20004-2166 Mail Stop: 01 -Fl Washington, DC 20555-0001               Richard R. MacDonald Town Manager, Town of Duxbury Lisa Regner, Project Mgr. Plant Lic. 878 Tremont Street Branch 1-1, Operator Reactor Licensing   Duxbury, MA 02332 Washington, DC 20555-0001 Fire Chief & Director DEMA, Paul A. Gaukler, Esq.                   Town of Duxbury David R. Lewis, Esq.                     688 Tremont Street Jason B. Parker, Esq.                   P.O. Box 2824 Pillsbury, Winthrop, Shaw, Pittman,     Duxbury, MA 02331 LLP - 2300 N Street, N.W.
Washington, DC 20037-1128               Terence A. Burke, Esq.
Entergy Nuclear Katherine Tucker                         Mail Stop M-ECH-62 ASLB, Law Clerk                         Jackson, MS 39213 U.S. Nuclear Regulatory Commission Mail Stop T-3-E2a Washington, DC 20555-0001 Mary Lampert Pilgrim Watch, pro se 148 Washington St.
Duxbury, MA 023332 September 21, 2010 2}}

Latest revision as of 16:31, 6 December 2019

Pilgrim Watch'S Reply to Entergy'S Response to Pilgrim Watch'S Memo Regarding Proposed Schedule
ML102730788
Person / Time
Site: Pilgrim
Issue date: 09/21/2010
From: Lampert M
Pilgrim Watch
To:
NRC/SECY/RAS, Atomic Safety and Licensing Board Panel
References
RAS J-271
Download: ML102730788 (3)


Text

kks j -. ;k- -) /

DOCKETED USNRC September 22, 2010 (8:00a.m.)

OFFICE OF SECRETARY UNITED STATES OF AMERICA RULEMAKINGS AND ADJUDICATIONS STAFF NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket # 50-293 Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application September 21, 2010 Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule The statement in Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule saying that "Pilgrim Watch was previously able to prepare its testimony in six weeks,

[and] there is no good reason why is now needs more than three months" is misleading and totally disingenuous.

The Board's May 5, 2010 Order provided for a five (5) month preparatory period prior to submitting pre-trial filings. The time period prior to filing is not simply for what experts are required to do, but also what Pilgrim Watch is required to do, absent a plethora of other supports

- lawyers, paralegals, secretaries, copy room staff, and mail clerks.

Thanking you for your consideration, I am sirely, Mary Lampert \........

Pilgrim Watch, pro se 148 Washington Street Duxbury, MA 02332

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket # 50-293-LR Entergy Corporation Pilgrim Nuclear Power Station License Renewal Application September 21, 2010 CERTIFICATE OF SERVICE I hereby certify that Pilgrim Watch's Reply to Entergy's Response to Pilgrim Watch's Memo Regarding Proposed Schedule was served September 21, 2010 in the above captioned proceeding to the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class.

Secretary of the Commission Administrative Judge Attn: Rulemakings and Adjudications Richard F. Cole Staff Atomic Safety and Licensing Board Mail Stop 0-16 C I Mail Stop -T-3-F23 United States Nuclear Regulatory US NRC Commission [2 copies] Washington, DC 20555-0001 Administrative Judge Office of Commission Appellate Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Mail Stop 0-16 C1 Mail Stop - T-3 F23 United States Nuclear Regulatory US NRC Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Atomic Safety and Licensing Board Paul B. Abramson Mail Stop T-3 F23 Atomic Safety and Licensing Board United States Nuclear Regulatory Mail Stop T-3 F23 Commission US NRC Washington, DC 20555-0001 Washington, DC 20555-0001

U.S. Nuclear Regulatory Commission Martha Coakley, Attorney General Office of Commission Appellate Matthew Brock, Assistant Attorney Adjudication General Commonwealth of Mail Stop: 0-16C1 Massachusetts Washington, DC 20555-0001 Office of Attorney General One Ashburton Place U.S. Nuclear Regulatory Commission Boston, MA 02108 Office of General Counsel Mail Stop: 0-15 D21 Mark Stankiewicz Washington DC 20555-0001 Town Manager, Town of Plymouth Susan L. Uttal, Esq. 11 Lincoln Street Andrea Jones, Esq. Plymouth MA 02360 Brian Harris, Esq.

Michael Dreher, Esq. Sheila Slocum Hollis, Esq.

Brian Newell, Paralegal Town of Plymouth MA Duane Morris, LLP U.S. Nuclear Regulatory Commission 505 9th Street, N.W. 1000 Office of Nuclear Reactor Regulation Washington D.C. 20004-2166 Mail Stop: 01 -Fl Washington, DC 20555-0001 Richard R. MacDonald Town Manager, Town of Duxbury Lisa Regner, Project Mgr. Plant Lic. 878 Tremont Street Branch 1-1, Operator Reactor Licensing Duxbury, MA 02332 Washington, DC 20555-0001 Fire Chief & Director DEMA, Paul A. Gaukler, Esq. Town of Duxbury David R. Lewis, Esq. 688 Tremont Street Jason B. Parker, Esq. P.O. Box 2824 Pillsbury, Winthrop, Shaw, Pittman, Duxbury, MA 02331 LLP - 2300 N Street, N.W.

Washington, DC 20037-1128 Terence A. Burke, Esq.

Entergy Nuclear Katherine Tucker Mail Stop M-ECH-62 ASLB, Law Clerk Jackson, MS 39213 U.S. Nuclear Regulatory Commission Mail Stop T-3-E2a Washington, DC 20555-0001 Mary Lampert Pilgrim Watch, pro se 148 Washington St.

Duxbury, MA 023332 September 21, 2010 2