ML103270445: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/21/2010 | | issue date = 12/21/2010 | ||
| title = Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum | | title = Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum | ||
| author name = David M | | author name = David M | ||
| author affiliation = NRC/NRR/DORL/LPLIII-2 | | author affiliation = NRC/NRR/DORL/LPLIII-2 | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Nuclear | | addressee affiliation = Exelon Nuclear | ||
| docket = 05000454, 05000455, 05000456, 05000457 | | docket = 05000454, 05000455, 05000456, 05000457 | ||
Line 15: | Line 15: | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:ME2941, TAC:ME2942, TAC:ME2943, TAC:ME2944 | | project = TAC:ME2941, TAC:ME2942, TAC:ME2943, TAC:ME2944 | ||
| stage = | | stage = Other | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued) | ||
: 5. ComEd letter from D. Saccomando to the Office of Nuclear Reactor Regulation dated December 21, 1994, transmitting an attachment that documents applicable sections of WCAP-11992/11993 and ComEd application of the UET methodology addressed in "Additional Information Regarding Application for Amendment to Facility Operating Licenses-Reactivity Control Systems." | |||
: 6. WCAP-16009-P-A, Revision 0, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005. | |||
: 7. WCAP-10079-P-A, "NOTRUMP, A Nodal Transient Small Break and General Network Code," August 1985. | |||
: 8. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model using NOTRUMP Code," August 1985. | |||
: 9. WCAP-10216-P-A, Revision 1, "Relaxation of Constant Axial Offset Control - FQ Surveillance Technical Specification," February 1994. | |||
: 10. WCAP-8745-P-A, "Design Bases for the Thermal Overpower T and Thermal Overtemperature T Trip Functions," | |||
September 1986; | |||
: c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met; and | |||
: d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC. | |||
BYRON UNITS 1 & 2 5.6 4 Amendment}} |
Latest revision as of 05:50, 13 November 2019
ML103270445 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood |
Issue date: | 12/21/2010 |
From: | David M Plant Licensing Branch III |
To: | Pacilio M Exelon Nuclear |
David Marshall NRR/DORL/LPL3-2 415-154 | |
Shared Package | |
ml103270423 | List: |
References | |
TAC ME2941, TAC ME2942, TAC ME2943, TAC ME2944 | |
Download: ML103270445 (1) | |
Text
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 5. ComEd letter from D. Saccomando to the Office of Nuclear Reactor Regulation dated December 21, 1994, transmitting an attachment that documents applicable sections of WCAP-11992/11993 and ComEd application of the UET methodology addressed in "Additional Information Regarding Application for Amendment to Facility Operating Licenses-Reactivity Control Systems."
- 6. WCAP-16009-P-A, Revision 0, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
- 7. WCAP-10079-P-A, "NOTRUMP, A Nodal Transient Small Break and General Network Code," August 1985.
- 8. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model using NOTRUMP Code," August 1985.
- 9. WCAP-10216-P-A, Revision 1, "Relaxation of Constant Axial Offset Control - FQ Surveillance Technical Specification," February 1994.
- 10. WCAP-8745-P-A, "Design Bases for the Thermal Overpower T and Thermal Overtemperature T Trip Functions,"
September 1986;
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met; and
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
BYRON UNITS 1 & 2 5.6 4 Amendment