ML11269A193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11269A193
| number = ML11269A193
| issue date = 09/08/2011
| issue date = 09/08/2011
| title = Calvert Cliffs, Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 5, Figure 5.1-2, ISFSI Retrieval Operations Flowchart
| title = Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 5, Figure 5.1-2, ISFSI Retrieval Operations Flowchart
| author name =  
| author name =  
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY                          HSM SITE 0)
REMOVE RAM AND POSITION CASK                PULL CASK WITH HSM                    OUT OF HSMOPENING 2          ,Ir              CD        .
REMOVEHSM              SECURE CASK ON DOORANDDSC                  TRAILER AND SEISMIC                  INSTALL TOP RESTRAINT                COVER PLATE 3
* CD        I ALIGN AND DOCK                REPLACE CASK WITH                    DOOR HSMOPENING                    ONHSM 4        ,                @        ,.
MOVE CASK INSTALL CASK TO NEXT RESTRAINT LOCATION SYSTEM ON SITE 5        ,.              @        I ALIGN AND              REMOVE CASK EXTEND RAM            INNER AND OUTER THROUGH CASK                    PLUG INTOHSM                  ASSEMBLIES 6
PULL DSCOUT              INSTALL CASK OFHSM INTO        --        BOTTOM CASK WITH RAM                COVER BGE-A92.01M Figure 5.1-2 ISFSI Retrieval Operations Flowchart Page 1 of 3
[See Reference 5.2]
Rev. 1
 
CASK DECON PIT    FUEL POOL        AUX. BLDG. TRUCK BAY HSMSITE PLACE CASK REMOVE
                  -                    CASK IN DECON PIT                        TRUNNION RESTRAINTS REMOVE LIFT CASKIDSC CASK TOP COVER PLATE                    FROM TRAILER BGE-A92.01M REMOVEDSC TOP COVER PLATE
          +
DRILL OUT VENT AND SIPHON PORT PLUGS FILLDSC WITH BORATED WATER FILLDSC AND CASK ANNULUS WITH WATER REMOVE SEAL WELD FROM DSC TOP COVER PLATE REMOVE DSC TOP COVER PLATE REMOVE SEAL WELD FROM TOP PLUG ASSEMBLY Fig ure 5.1-2 ISFSI Retrieval Operations Flowchart Page 2 of 3
[See Reference 5.2]
Rev. 1
 
CASK DECON PIT                                        FUEL POOL
@1-------.. .
MOVE CASK                                                                  MOVE CASK
                    -        REMOVE WATER              LOWER CASK TO SPENT                                                            ~    TO CASK
                          ~      FROM                  INTO POOL FUEL POOL                                                                  DECON PIT DSC CAVIlY SEAL WELD TOP EXTERIOR            -
DECONTAMINATE J - - -....
SHIELD PLUG          REMOVE DSC TOP SURFACE                    AND COVER            SHIELD PLUG OF CASK                  PLATETO DSC PROCESSOR              REMOVE FUEL STORE DSCAS              ASSEMBLIES LOW LEVEL                FROM DSC WASTE PLACE TOP SHIELD PLUG      ~
ONTO DSC BGE-A92.01M          ,.
Figure 5.1-2 ISFSI Retrieval Operations Flowchart Page 3 of 3
[See Reference 5.2]
Rev. 1}}

Latest revision as of 23:12, 6 February 2020

Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 5, Figure 5.1-2, ISFSI Retrieval Operations Flowchart
ML11269A193
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/08/2011
From:
Calvert Cliffs
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML11269A193 (3)


Text

AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE 0)

REMOVE RAM AND POSITION CASK PULL CASK WITH HSM OUT OF HSMOPENING 2 ,Ir CD .

REMOVEHSM SECURE CASK ON DOORANDDSC TRAILER AND SEISMIC INSTALL TOP RESTRAINT COVER PLATE 3

  • CD I ALIGN AND DOCK REPLACE CASK WITH DOOR HSMOPENING ONHSM 4 , @ ,.

MOVE CASK INSTALL CASK TO NEXT RESTRAINT LOCATION SYSTEM ON SITE 5 ,. @ I ALIGN AND REMOVE CASK EXTEND RAM INNER AND OUTER THROUGH CASK PLUG INTOHSM ASSEMBLIES 6

PULL DSCOUT INSTALL CASK OFHSM INTO -- BOTTOM CASK WITH RAM COVER BGE-A92.01M Figure 5.1-2 ISFSI Retrieval Operations Flowchart Page 1 of 3

[See Reference 5.2]

Rev. 1

CASK DECON PIT FUEL POOL AUX. BLDG. TRUCK BAY HSMSITE PLACE CASK REMOVE

- CASK IN DECON PIT TRUNNION RESTRAINTS REMOVE LIFT CASKIDSC CASK TOP COVER PLATE FROM TRAILER BGE-A92.01M REMOVEDSC TOP COVER PLATE

+

DRILL OUT VENT AND SIPHON PORT PLUGS FILLDSC WITH BORATED WATER FILLDSC AND CASK ANNULUS WITH WATER REMOVE SEAL WELD FROM DSC TOP COVER PLATE REMOVE DSC TOP COVER PLATE REMOVE SEAL WELD FROM TOP PLUG ASSEMBLY Fig ure 5.1-2 ISFSI Retrieval Operations Flowchart Page 2 of 3

[See Reference 5.2]

Rev. 1

CASK DECON PIT FUEL POOL

@1-------.. .

MOVE CASK MOVE CASK

- REMOVE WATER LOWER CASK TO SPENT ~ TO CASK

~ FROM INTO POOL FUEL POOL DECON PIT DSC CAVIlY SEAL WELD TOP EXTERIOR -

DECONTAMINATE J - - -....

SHIELD PLUG REMOVE DSC TOP SURFACE AND COVER SHIELD PLUG OF CASK PLATETO DSC PROCESSOR REMOVE FUEL STORE DSCAS ASSEMBLIES LOW LEVEL FROM DSC WASTE PLACE TOP SHIELD PLUG ~

ONTO DSC BGE-A92.01M ,.

Figure 5.1-2 ISFSI Retrieval Operations Flowchart Page 3 of 3

[See Reference 5.2]

Rev. 1