ENS 51611: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 10: Line 10:
| utype =  
| utype =  
| cfr = 10 CFR 21.21(d)(3)(i)
| cfr = 10 CFR 21.21(d)(3)(i)
| emergency class =  Non Emergency
| emergency class =  Non Emergency  
| notification date = 12/18/2015 15:50
| notification date = 12/18/2015 15:50
| notification by = Margie Hover
| notification by = Margie Hover
| NRC officer = Dong Hwa Park
| NRC officer = Dong Hwa Park
| event date = 10/06/2015 EST
| event date = 10/06/2015 00:00 EST
| last update date = 12/18/2015
| last update date = 02/08/2019
| title = Potential Part 21 Involving A200 Series Starters
| title = En Revision Imported Date  2/11/2019
| event text = The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
| event text = EN Revision Text: POTENTIAL PART 21 INVOLVING A200 SERIES STARTERS
The following is excerpted from a report submitted by QualTech NP, Nuclear Division, Curtiss-Wright Corporation:
Pacific Gas and Electric (PG&E) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.  
Pacific Gas and Electric (PG&E) reported to QTNP [QualTech NP] that they have had eight Cutler Hammer A200 series starter failures since September 15, 2008. The failures would remain in the operated/energized contact state with power removed for some period of time. All starters impacted with this failure were continuously energized. The concern was that if tripped, that the main contacts would not open to protect the motor.  
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PG&E. The test report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
Testing was performed by Eaton Industrial Controls Division after receiving defective samples from PG&E. The test report from Eaton was received by QTNP for further review and evaluation. On October 6, 2015 QTNP determined that the Cutler Hammer A200 series starter failures may be reportable and an extent of condition review needed to be done.
Line 24: Line 25:
Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
Thus any starters/contactors of the CH A200 series manufactured between May 2008 & December 31 , 2012 could have this concern. This failure has only been reported for continuously energized applications. The end user should evaluate their applications for this potential failure mechanism.
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
QTNP has notified North Anna, H. B. Robinson, Diablo Canyon, and Hatch.
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2015/20151221en.html#en51611
* * * UPDATE ON 2/8/19 AT 1831 EST FROM AZZ NUCLEAR GROUP TO BRIAN P. SMITH * * *
PDMS material has been identified in the Eaton A200 series starters/contactors with date code T4115 (41st week of 2015) which is outside the range of May 2008 to December 2012 that were originally identified in NRC Event Number 51611 from 2015.  This resulted in a few instances where the starter did not immediately open when the power was removed.
Notified R2DO (Masters), R4DO (Werner), and PART 21/50.55 REACTORS via email
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190211en.html#en51611
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 08:30, 11 February 2019

ENS 51611 +/-
Where
Qualtech Np
Cincinnati, Ohio (NRC Region 3)
Organization: Qualtech Np
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+1761.83 h73.41 days <br />10.487 weeks <br />2.413 months <br />)
Opened: Margie Hover
15:50 Dec 18, 2015
NRC Officer: Dong Park
Last Updated: Feb 8, 2019
51611 - NRC Website