| issue date = 08/01/2014
| issue date = 08/01/2014
| title = 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
| title = 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix D Required Operator Actions Form ES-D-2   Facility: __D C Cook______ Scenario No.: ____
{{#Wiki_filter:Appendix D                                 Required Operator Actions                     Form ES-D-2 Facility: __D C Cook______ Scenario No.: ____1____                              Op-Test No.: 2014301 Examiners: ____________________________ Operators:                   _____________________________
1____  Op-Test No.: 2014301 Examiners: ____________________________   Operators:
Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power.
_____________________________
Even        Malf. No.      Event                                      Event t No.                      Type*                                  Description C(ATC) 1        U1_RCR16                        Pressurizer Safety Valve Leak (SV45B 2gpm)
____________________________
TS 2                              R        Power Reduction 3                              N        Turbine Power Reduction U1_ECP          C(ATC) 4                                        East CCP fails on overcurrent Stator Short          TS 5        U1_RX33B          I(BOP)        Feedwater flow controller fails U1_QTC302 6        175 over 5        I(ATC)      Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7                          M(ALL)        Large break LOCA 60%
_____________________________
U1_ED05E 8                          M(ALL)        Vital bus T11A Fails (On RX Trip)
____________________________
(Trg 1)
_____________________________
U1_RP10A 9        U1_RP11A          C(ATC)        Auto/Manual SI Train A does not occur U1_RP11C
*        (N)ormal,  (R)eactivity,  (I)nstrument,  (C)omponent, (M)ajor


Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power. Event No. Malf. No.
Appendix D                                      Scenario Outline                              Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____                                  Op-Test No.: 2014301 Examiners: ____________________________ Operators:                      _____________________________
Event Type* Event Description 1 U1_RCR16 C(ATC) TS Pressurizer Safety Valve Leak (SV45B 2gpm) R Power Reduction 3  N Turbine Power Reduction 4 U1_ECP Stator Short C(ATC) TS East CCP fails on overcurrent 5 U1_RX33B I(BOP) Feedwater flow controller fails 6 U1_QTC302 175 over 5 Minutes I(ATC) Charging Letdown Header Temperature QTC
Initial Conditions: ___ EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.
-302 fails high 7 U1_RC01A 60% M(ALL) Large break LOCA 8 U1_ED05E (Trg 1) M(ALL) Vital bus T11A Fails (On RX Trip) 9 U1_RP10A U1_RP11A U1_RP11C C(ATC) Auto/Manual SI Train A does not occur
Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.
                    * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
Event                          Event                                      Event Malf. No.
No.                          Type*                                   Description 1                               N        Secure the CD D/G U1_NI10B          I(ATC) 2        200 over 1                      Power range detector (NI-42) fails high min                TS 3                              R         Power increase to restore power U1_FW40A 4                         C(BOP)        Condenser Level Control failure (100%)
100 U1_BLP131          I(ATC) 5                                        Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec            TS U1_MS02C 6                             Major      Steam line #3 break inside containment 50%
U1_RP01A                        Reactor trip failure (ATWS), Rods Drop when MG sets de-7                           C(ATC)
U1_RP01B                        energized U1_RP09A 8                         C(BOP)         Feedwater isolation does not occur in automatic U1_RP09B 9       U1_FW48C          C(BOP)         TDAFW pump does not start in auto
*         (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,     (M)ajor Page 1 of 1


Appendix D Scenario Outline Form ES-D-1 Page 1 of 1  Facility: __D C Cook______ Scenario No.: ____
Appendix D                                 Scenario Outline                         Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____                      Op-Test No.: 2014301 Examiners: ____________________________ Operators:               _____________________________
3____  Op-Test No.: 2014301 Examiners: ____________________________   Operators:
Initial Conditions: 12% power, main generator has just been paralleled.
_____________________________
Turnover: The unit is at 12% power with the generator has just been paralleled to the grid.
____________________________
The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power.
_____________________________
Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%.
____________________________
Event                     Event                                  Event Malf. No.
_____________________________
No.                      Type*                               Description 1                         N     Control Feed Flow In Manual 2                         R    Raise Power U1_MPC253 3                      I(ATC)   Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4                     C(BOP)   MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5     A to 1 over 2    I(BOP)  Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (150 gpm with a 5 min 6       10% over 5      Major Min                  ramp)
Initial Conditions: ___
U1_RP10A 7                       I(ATC)  Auto SI fails U1_RP10B U1_TC02 8                      C(BOP)   Main turbine fails to trip U1_TC03 U1_RD0435 9                      C(ATC)   Two rods fail to Drop (H4 & H6)
EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.
U1_RD0441 U1_ECP 10      Stator Short C(ATC)   East CCP trips on overcurrent 3 minutes after the RXtrip
Turnover:
*       (N)ormal,     (R)eactivity, (I)nstrument,   (C)omponent,     (M)ajor Page 1 of 1
1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.
Event No. Malf. No.
Event Type* Event Description 1 N Secure the CD D/G 2 U1_NI10B 200 over 1 min I(ATC) TS Power range detector (NI
-42) fails high 3  R Power increase to restore power 4 U1_FW40A 100 C(BOP) Condenser Level Control failure (100%)
5 U1_BLP131 0 over 30sec I(ATC) TS Steam generator #3 BLP131 controlling level channel fails low 6 U1_MS02C 50% Major Steam line #3 break inside containment 7 U1_RP01A U1_RP01B C(ATC) Reactor trip failure (ATWS), Rods Drop when MG sets de
-energized 8 U1_RP09A U1_RP09B C(BOP) Feedwater isolation does not occur in automatic 9 U1_FW48C C(BOP) TDAFW pump does not start in auto
                        * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor


Appendix D Scenario Outline Form ES-D-1 Page 1 of 1  Facility: __D C Cook______ Scenario No.: ___
Appendix D                               Scenario Outline                         Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____                  Op-Test No.: 2014301 Examiners: ____________________________ Operators:           _____________________________
4_____ Op-Test No.:
2014301 Examiners: ____________________________   Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: 12% power, main generator has just been paralleled.
Turnover:  The unit is at 12% power with the generator has just been paralleled to the grid. The unit was down powered to fix leak on the weld for FTR
-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. Procedure 1
-OHP-4021-001-006, Power Escalation is complete up to step 4.2
: 8. Raise Power at 10%/hour to ~29%. Event No. Malf. No.
Event Type* Event Description 1  N Control Feed Flow In Manual 2  R Raise Power 3 U1_MPC253 to 740 I(ATC) Turbine impulse pressure instrument (MPC
-253) fails HIGH 4 U1_MPP222 1500 C(BOP) MPP 222 SG #2 PORV Pressure Channel 5 U1_FPC_250 A to 1 over 2 min I(BOP) Main Feedwater discharge pressure (FPC
-250A) fails Low 6 U1_RC10D 10% over 5 Min Major Small break LOCA in containment (150 gpm with a 5 min ramp) 7 U1_RP10A U1_RP10B I(ATC) Auto SI fails 8 U1_TC02 U1_TC03 C(BOP) Main turbine fails to trip 9 U1_RD0435 U1_RD0441 C(ATC) Two rods fail to Drop (H4 & H6) 10 U1_ECP Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip  * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor Appendix D Scenario Outline Form ES-D-1    Page 1 of 1  Facility: __D C Cook______  Scenario No.: ___
5_____  Op-Test No.:
2014301  Examiners:  ____________________________  Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: 79% power, Power reduction in progress.
Initial Conditions: 79% power, Power reduction in progress.
Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02
Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - was run for engineering data collection.
-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service  
Event                     Event                              Event Malf. No.
- was run for engineering data collection.
No.                      Type*                           Description 1                         N     Remove North Condensate Booster from service U1_QLC451       I(ATC) 2                                VCT level instrument (QLC-451) fails low To 0%        TS 3                         R     Power reduction U1_MFC140       I(BOP) 4                                Steam flow channel (MFC-140) fails low (Controlling) to 0        TS Pressurizer PORV (NRC-153) leaking (requires isolation) -
Event No. Malf. No.
U1_RCR20                5% open NOTE: Time compression may be used as the 5                      C(ATC) to 5                procedure requires a 15 minute wait time after unisolating each PORV.
Event Type* Event Description 1 N Remove North Condensate Booster from service 2 U1_QLC451 To 0% I(ATC) TS VCT level instrument (QLC
U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%)
-451) fails low 3 R Power reduction 4 U1_MFC140 to 0 I(BOP) TS Steam flow channel (MFC
6      to 30 over 10    Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7                     C(BOP)     Steam generator safety valve (SV3-4) opens - 80%
-140) fails low (Controlling) 5 U1_RCR20 to 5 C(ATC) Pressurizer PORV (NRC
to 80%
-153) leaking (requires isolation)  
*       (N)ormal,    (R)eactivity, (I)nstrument,   (C)omponent,    (M)ajor Page 1 of 1}}
- 5% open NOTE: Time compression may be used as the procedure requires a 15 minute wait time after unisolating each PORV.
6 U1_RC23D to 30 over 10 min Major Reactor Trip with S/G
#4 tube rupture (600 gpm (60%) ramp to 30% over 10 minutes  
- raise to 60% on trip
) 7 U1_MS06D to 80% C(BOP) Steam generator safety valve (SV 3-4) opens  
- 80%             * (N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor}}

Latest revision as of 17:17, 5 February 2020

2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
ML14274A256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14274A256 (4)


Text

Appendix D Required Operator Actions Form ES-D-2 Facility: __D C Cook______ Scenario No.: ____1____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power.

Even Malf. No. Event Event t No. Type* Description C(ATC) 1 U1_RCR16 Pressurizer Safety Valve Leak (SV45B 2gpm)

TS 2 R Power Reduction 3 N Turbine Power Reduction U1_ECP C(ATC) 4 East CCP fails on overcurrent Stator Short TS 5 U1_RX33B I(BOP) Feedwater flow controller fails U1_QTC302 6 175 over 5 I(ATC) Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7 M(ALL) Large break LOCA 60%

U1_ED05E 8 M(ALL) Vital bus T11A Fails (On RX Trip)

(Trg 1)

U1_RP10A 9 U1_RP11A C(ATC) Auto/Manual SI Train A does not occur U1_RP11C

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: ___ EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.

Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.

Event Event Event Malf. No.

No. Type* Description 1 N Secure the CD D/G U1_NI10B I(ATC) 2 200 over 1 Power range detector (NI-42) fails high min TS 3 R Power increase to restore power U1_FW40A 4 C(BOP) Condenser Level Control failure (100%)

100 U1_BLP131 I(ATC) 5 Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec TS U1_MS02C 6 Major Steam line #3 break inside containment 50%

U1_RP01A Reactor trip failure (ATWS), Rods Drop when MG sets de-7 C(ATC)

U1_RP01B energized U1_RP09A 8 C(BOP) Feedwater isolation does not occur in automatic U1_RP09B 9 U1_FW48C C(BOP) TDAFW pump does not start in auto

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 12% power, main generator has just been paralleled.

Turnover: The unit is at 12% power with the generator has just been paralleled to the grid.

The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power.

Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%.

Event Event Event Malf. No.

No. Type* Description 1 N Control Feed Flow In Manual 2 R Raise Power U1_MPC253 3 I(ATC) Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4 C(BOP) MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5 A to 1 over 2 I(BOP) Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (150 gpm with a 5 min 6 10% over 5 Major Min ramp)

U1_RP10A 7 I(ATC) Auto SI fails U1_RP10B U1_TC02 8 C(BOP) Main turbine fails to trip U1_TC03 U1_RD0435 9 C(ATC) Two rods fail to Drop (H4 & H6)

U1_RD0441 U1_ECP 10 Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 79% power, Power reduction in progress.

Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - was run for engineering data collection.

Event Event Event Malf. No.

No. Type* Description 1 N Remove North Condensate Booster from service U1_QLC451 I(ATC) 2 VCT level instrument (QLC-451) fails low To 0% TS 3 R Power reduction U1_MFC140 I(BOP) 4 Steam flow channel (MFC-140) fails low (Controlling) to 0 TS Pressurizer PORV (NRC-153) leaking (requires isolation) -

U1_RCR20 5% open NOTE: Time compression may be used as the 5 C(ATC) to 5 procedure requires a 15 minute wait time after unisolating each PORV.

U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%)

6 to 30 over 10 Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7 C(BOP) Steam generator safety valve (SV3-4) opens - 80%

to 80%

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1