(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/21/2015 | | | issue date = 08/21/2015 |
| | title = 2015 Clinton Power Station Initial License Examination CPS Request for Initial Operator Licensing Re-examination | | | title = 2015 Clinton Power Station Initial License Examination CPS Request for Initial Operator Licensing Re-examination |
| | author name = McNeil D R | | | author name = Mcneil D |
| | author affiliation = NRC/RGN-III/DRS/OLB | | | author affiliation = NRC/RGN-III/DRS/OLB |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon | | {{#Wiki_filter:Exelon Generation ~ |
| | Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| | | Clinton Power Station Request for Initial Operator Licensing Re-examination |
| Clinton Power Station Request for Initial Operator Licensing Re-examination | |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training Manager, Exelon Generation Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination. |
| | This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015. |
| | EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination. This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document. EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original ILT exam given at CPS starting March 16, 2015. |
| | The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination. |
| | There are no regulatory commitments contained within this letter. |
| | Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training Director, at (217) 937-4000. |
| | Respectfully, 7.-&____-,=~,...._..- |
| | */Wk J/aJC:.cY>7<,/ |
| | Mark M. Newcomer Site Vice President Clinton Power Station |
|
| |
|
| Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training
| | U-604232 Page2 jlp/cas Attachment - Documentation Regarding Mr. James Nelson's Remediation Plan cc: (All without attachment] |
| : Manager, Exelon Generation
| | Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Document Control Desk}} |
| : Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination.
| |
| This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015. EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination.
| |
| This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document.
| |
| EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original IL T exam given at CPS starting March 16, 2015. The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination.
| |
| There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training
| |
| : Director, at (217) 937-4000.
| |
| Respectfully, 7.-&____-,=
| |
| */Wk J/aJC:.cY>7<,/
| |
| Mark M. Newcomer Site Vice President Clinton Power Station jlp/cas Attachment
| |
| -Documentation Regarding Mr. James Nelson's Remediation Plan cc: (All without attachment] | |
| Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector | |
| -Clinton Power Station NRC Document Control Desk U-604232 Page2}} | |
|
---|
Category:License-Operator
MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4682022-01-28028 January 2022 ES-301-4 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A3032021-04-13013 April 2021 Administered RO Written Exam ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2682021-04-13013 April 2021 SRO Admin JPM 2023-09-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2102021-04-13013 April 2021 Ile Outline Review Comments ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21145A0442021-04-13013 April 2021 Operating Test Outline Submittal Letter ML21145A0362021-04-13013 April 2021 ES-201-2 ML21145A0402021-04-13013 April 2021 ES-301-5 2023-09-15
[Table view] |
Text
Exelon Generation ~
Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Clinton Power Station Request for Initial Operator Licensing Re-examination
Reference:
Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training Manager, Exelon Generation Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination.
This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015.
EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination. This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document. EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original ILT exam given at CPS starting March 16, 2015.
The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination.
There are no regulatory commitments contained within this letter.
Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training Director, at (217) 937-4000.
Respectfully, 7.-&____-,=~,...._..-
Mark M. Newcomer Site Vice President Clinton Power Station
U-604232 Page2 jlp/cas Attachment - Documentation Regarding Mr. James Nelson's Remediation Plan cc: (All without attachment]
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Document Control Desk