| issue date = 08/21/2015
| issue date = 08/21/2015
| title = 2015 Clinton Power Station Initial License Examination CPS Request for Initial Operator Licensing Re-examination
| title = 2015 Clinton Power Station Initial License Examination CPS Request for Initial Operator Licensing Re-examination
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon
{{#Wiki_filter:Exelon Generation ~
Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461


==Subject:==
==Subject:==
 
Clinton Power Station Request for Initial Operator Licensing Re-examination
Clinton Power Station Request for Initial Operator Licensing Re-examination  


==Reference:==
==Reference:==
Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training Manager, Exelon Generation Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination.
This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015.
EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination. This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document. EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original ILT exam given at CPS starting March 16, 2015.
The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination.
There are no regulatory commitments contained within this letter.
Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training Director, at (217) 937-4000.
Respectfully, 7.-&____-,=~,...._..-
*/Wk          J/aJC:.cY>7<,/
Mark M. Newcomer Site Vice President Clinton Power Station


Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training
U-604232 Page2 jlp/cas Attachment - Documentation Regarding Mr. James Nelson's Remediation Plan cc:       (All without attachment]
: Manager, Exelon Generation
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Document Control Desk}}
: Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination.
This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015. EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination.
This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document.
EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original IL T exam given at CPS starting March 16, 2015. The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination.
There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training
: Director, at (217) 937-4000.
Respectfully, 7.-&____-,=
*/Wk J/aJC:.cY>7<,/
Mark M. Newcomer Site Vice President Clinton Power Station jlp/cas Attachment  
-Documentation Regarding Mr. James Nelson's Remediation Plan cc: (All without attachment]
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector  
-Clinton Power Station NRC Document Control Desk U-604232 Page2}}

Latest revision as of 07:14, 31 October 2019

2015 Clinton Power Station Initial License Examination CPS Request for Initial Operator Licensing Re-examination
ML15272A077
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/21/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A597 List:
References
Download: ML15272A077 (2)


Text

Exelon Generation ~

Clinton Power Station 8401 Power Road Cinlon,IL 61727 U-604232 July 2, 2015 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Clinton Power Station Request for Initial Operator Licensing Re-examination

Reference:

Lette'r from Hironori Peterson (U.S. NRC) to James R. Nelson (EGC) dated June 9, 2015 This letter is a follow up to a telephone conversation between Mr. Daniel Snook, Clinton Power Station (CPS) Operations Training Manager, Exelon Generation Company, LLC (EGC), and Mr. Dell McNeil, U.S. NRC Region 3 (NRC). The referenced letter above states the license application for Mr. James Nelson is now a final denial. The referenced letter also states Mr. Nelson is required to retake the administrative/systems/simulator operating test and may request a waiver from the written examination portion of the ILT NRC examination.

This letter documents a tentative agreement reached to re-administer Mr. Nelson's Job Performance Measure (JPM) portions of operating test for the week of August 17, 2015.

EGC requests a waiver of the written examination portion of the retake examination as stated in the reference letter. Additionally, EGC requests Mr. Nelson be excused from taking the simulator portion of the operating examination. This request is based on Mr. Nelson's solid performance on the simulator portion of the original operating examination as well as the information in the attached document. EGC requests the attached document be held from public release for two years based on the information included in the letter contains information of the contents for the original ILT exam given at CPS starting March 16, 2015.

The NRC excusing Mr. Nelson from the written examination portion and the simulator operating examination portion will result in Mr. Nelson needing to successfully pass the 15 administrative/systems JPMs portion of the retake examination.

There are no regulatory commitments contained within this letter.

Should you have any questions concerning this letter, please contact Mr. Christopher Dunn, Clinton Training Director, at (217) 937-4000.

Respectfully, 7.-&____-,=~,...._..-

  • /Wk J/aJC:.cY>7<,/

Mark M. Newcomer Site Vice President Clinton Power Station

U-604232 Page2 jlp/cas Attachment - Documentation Regarding Mr. James Nelson's Remediation Plan cc: (All without attachment]

Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Document Control Desk