ML16113A218: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
| docket = 05000295, 05000304 | | docket = 05000295, 05000304 | ||
| license number = | | license number = | ||
| contact person = Edwards R | | contact person = Edwards R | ||
| document type = Slides and Viewgraphs | | document type = Slides and Viewgraphs | ||
| page count = 16 | | page count = 16 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Decommissioning Power Reactors: | ||
Zion Decommissioning Project CRCPD - May 18, 2016 | |||
Safely remove a facility from service and reduce residual radioactivity to a level that permits: | |||
(a) release of the property for unrestricted use, and terminate the license; or (b) release of the property under restricted conditions, and terminate the license 1 | |||
2 3 | |||
Financial Safe Storage of Spent Equipment Fuel Community 4 | |||
5 Personnel Safety Radiological Safe Decommissioning Storage of Spent Fuel Environment Site Restoration 6 | |||
Decommissioning | |||
* Fuel removed from Inspections | |||
* License termination core | |||
* Transition from | |||
* Inspection Manual Reactor Oversight Chapter 2561 Process | |||
* Flexible | |||
* Inspection reports publicly available in ADAMS Enter Program End Program 8 | |||
Zion Nuclear Power Station | |||
* Two unit Westinghouse Pressurized Water Reactor | |||
* ~40 miles North of Chicago in Zion, IL | |||
* Permanently Shutdown February 13, 1998 | |||
* License transfer to ZionSolutions on September 1, 2010 9 | |||
Zion Radiological Decommissioning Status Completed: | |||
* Spent fuel transfer to Independent Spent Fuel Storage Installation | |||
* Greater Than Class C (GTCC) waste removed | |||
* Class B and C waste removed | |||
* Demolition of Crib house and South Guardhouse 10 | |||
Zion Survey Units 11 | |||
* Final Status Surveys (FSS): | |||
* Performed by licensee | |||
* Demonstrate compliance with the release criteria | |||
* Communication between regulator, licensee, and state | |||
* Inspections during FSS: | |||
* Evaluate compliance with License Termination Plan | |||
* Independent confirmatory surveys | |||
* NRC contract with Oak Ridge Associated Universities | |||
* What happens after License Termination? | |||
12 | |||
13 14 Safe Storage Questions? | |||
of Spent Fuel 15 | |||
Decommissioning Power Reactors: | |||
Zion Decommissioning Project CRCPD - May 18, 2016 | |||
Safely remove a facility from service and reduce residual radioactivity to a level that permits: | |||
(a) release of the property for unrestricted use, and terminate the license; or (b) release of the property under restricted conditions, and terminate the license 1 | |||
2 3 | |||
Financial Safe Storage of Spent Equipment Fuel Community 4 | |||
5 Personnel Safety Radiological Safe Decommissioning Storage of Spent Fuel Environment Site Restoration 6 | |||
Decommissioning | |||
* Fuel removed from Inspections | |||
* License termination core | |||
* Transition from | |||
* Inspection Manual Reactor Oversight Chapter 2561 Process | |||
* Flexible | |||
* Inspection reports publicly available in ADAMS Enter Program End Program 8 | |||
Zion Nuclear Power Station | |||
* Two unit Westinghouse Pressurized Water Reactor | |||
* ~40 miles North of Chicago in Zion, IL | |||
* Permanently Shutdown February 13, 1998 | |||
* License transfer to ZionSolutions on September 1, 2010 9 | |||
Zion Radiological Decommissioning Status Completed: | |||
* Spent fuel transfer to Independent Spent Fuel Storage Installation | |||
* Greater Than Class C (GTCC) waste removed | |||
* Class B and C waste removed | |||
* Demolition of Crib house and South Guardhouse 10 | |||
Zion Survey Units 11 | |||
* Final Status Surveys (FSS): | |||
* Performed by licensee | |||
* Demonstrate compliance with the release criteria | |||
* Communication between regulator, licensee, and state | |||
* Inspections during FSS: | |||
* Evaluate compliance with License Termination Plan | |||
* Independent confirmatory surveys | |||
* NRC contract with Oak Ridge Associated Universities | |||
* What happens after License Termination? | |||
12 | |||
13 14 Safe Storage Questions? | |||
of Spent Fuel 15}} |
Latest revision as of 20:43, 30 October 2019
ML16113A218 | |
Person / Time | |
---|---|
Site: | Zion File:ZionSolutions icon.png |
Issue date: | 05/18/2016 |
From: | NRC/RGN-III |
To: | |
Edwards R | |
References | |
Download: ML16113A218 (16) | |
Text
Decommissioning Power Reactors:
Zion Decommissioning Project CRCPD - May 18, 2016
Safely remove a facility from service and reduce residual radioactivity to a level that permits:
(a) release of the property for unrestricted use, and terminate the license; or (b) release of the property under restricted conditions, and terminate the license 1
2 3
Financial Safe Storage of Spent Equipment Fuel Community 4
5 Personnel Safety Radiological Safe Decommissioning Storage of Spent Fuel Environment Site Restoration 6
Decommissioning
- Fuel removed from Inspections
- License termination core
- Transition from
- Inspection Manual Reactor Oversight Chapter 2561 Process
- Flexible
- Inspection reports publicly available in ADAMS Enter Program End Program 8
Zion Nuclear Power Station
- Two unit Westinghouse Pressurized Water Reactor
- ~40 miles North of Chicago in Zion, IL
- Permanently Shutdown February 13, 1998
- License transfer to ZionSolutions on September 1, 2010 9
Zion Radiological Decommissioning Status Completed:
- Spent fuel transfer to Independent Spent Fuel Storage Installation
- Greater Than Class C (GTCC) waste removed
- Class B and C waste removed
- Demolition of Crib house and South Guardhouse 10
Zion Survey Units 11
- Final Status Surveys (FSS):
- Performed by licensee
- Demonstrate compliance with the release criteria
- Communication between regulator, licensee, and state
- Inspections during FSS:
- Evaluate compliance with License Termination Plan
- Independent confirmatory surveys
- NRC contract with Oak Ridge Associated Universities
- What happens after License Termination?
12
13 14 Safe Storage Questions?
of Spent Fuel 15
Decommissioning Power Reactors:
Zion Decommissioning Project CRCPD - May 18, 2016
Safely remove a facility from service and reduce residual radioactivity to a level that permits:
(a) release of the property for unrestricted use, and terminate the license; or (b) release of the property under restricted conditions, and terminate the license 1
2 3
Financial Safe Storage of Spent Equipment Fuel Community 4
5 Personnel Safety Radiological Safe Decommissioning Storage of Spent Fuel Environment Site Restoration 6
Decommissioning
- Fuel removed from Inspections
- License termination core
- Transition from
- Inspection Manual Reactor Oversight Chapter 2561 Process
- Flexible
- Inspection reports publicly available in ADAMS Enter Program End Program 8
Zion Nuclear Power Station
- Two unit Westinghouse Pressurized Water Reactor
- ~40 miles North of Chicago in Zion, IL
- Permanently Shutdown February 13, 1998
- License transfer to ZionSolutions on September 1, 2010 9
Zion Radiological Decommissioning Status Completed:
- Spent fuel transfer to Independent Spent Fuel Storage Installation
- Greater Than Class C (GTCC) waste removed
- Class B and C waste removed
- Demolition of Crib house and South Guardhouse 10
Zion Survey Units 11
- Final Status Surveys (FSS):
- Performed by licensee
- Demonstrate compliance with the release criteria
- Communication between regulator, licensee, and state
- Inspections during FSS:
- Evaluate compliance with License Termination Plan
- Independent confirmatory surveys
- NRC contract with Oak Ridge Associated Universities
- What happens after License Termination?
12
13 14 Safe Storage Questions?
of Spent Fuel 15