ML17228B045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/02/1995
| issue date = 03/02/1995
| title = Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
| title = Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PRIC)RIZY(ACCELERATEDRIDSPROCESSliREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)PNOTES:ACCESSIONNBR:9503070355DOC.DATE:95/03/02NOTARIZED:NODOCKETNFACIL:50-389St.LuciePlant,Unit2,FloridaPower6LightCo.05000389AUTH.NAME'UTHORAFFILIATIONSAGER,D.A.FloridaPower6LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)R
{{#Wiki_filter:PRIC)RI ZY (ACCELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9503070355                DOC.DATE:     95/03/02    NOTARIZED: NO          DOCKET  N FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power                      6  Light  Co. 05000389 AUTH. NAME     'UTHOR AFFILIATION SAGER,D.A.           Florida      Power 6 Light Co.
P RECIP.NAME            RECIPIENT AFFILIATION Document Control Branch (Document                Control Desk)
R


==SUBJECT:==
==SUBJECT:==
ForwardsRev1to"FractureMechanicsEvaluation...,"Rev1to"Stressesfor...PressurizerLEFM"&Rev0to"SubsequentInserviceExamPlanforPressurizerinstrumentNozzles."IDISTRIBUTIONCODE:R047DCOPIESRECEIVED:LTRJENCLgSIZE:++pTITLE:ORSubmittal:Inservice/Testing/RelieffromASM'ode-G-89-04RECIPIENTIDCODE/NAMEPD2.-2LANORRIS,JINTERNAL:ACRSFILECENTR01RR/DE/EMEBOGC/HDS3EXTERNAL:LITCOBROWN,BNOACCOPIESLTTRENCL1111661111101111RECIPIENTIDCODE/NAMEPD2-2PDAEOD/SPD/RABNRR/DE/EMCBNUDOCS-ABSTRACTRES/DSIR/EIBLITCORANSOME,CNRCPDRCOPIESLTTRENCL11DUNNOTETOALL"RIDSRECIPIENTS:PLEASEHELPUSTOREDUCEiVASTE!CONTACTTIIEDOCU."v!ENTCONTROLDESK,ROOMP]-37(EXT.504-2083)TOELIXIINATEYOURNAMEPROD!DISTRI!3UTIONLISTSI'ORDOCUMENTSYOUDON"I'EED!TOTALNUMBEROFCOPIESREQUIRED:LTTR20ENCL19 PPMarch2,1995L-95-7210CFR50.55aFloridaPower5LightCompany,P.O,Box128,FortPierce,FL34954-0128U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555RE:St.LucieUnit2DocketNo.50-389FractureMechanicsAnalysisofPressurizerInstrumentNozzleFlawsPursuantto10CFR50.55a(a)(3),FloridaPowerandLightCompany(FPL)requestsapprovaloftheenclosedfracturemechanicsevaluationwiththesupportingstressanalysisandthesubsequentISIexaminationplanfortheUnit~2pressurizerinstrumentnozzlewelds.The1989editionoftheASMEBoilerandPressureVesselCodeSectionXI,IWB-3134(b)requiresthelicenseetosubmitanalyticalevaluationexaminationresultstotheregulatoryauthorityhavingjurisdiction.TheNRChaspreviouslygrantedapprovaloftheinitialevaluationforonefuelcyclebyNRClettersdatedApril1,1994,andApril5,1994.ApprovaloftheFractureMechanicsEvaluationandtheIn-ServiceExaminationPlanisrequestedbyJuly1,1995,tosupportthenextUnit.2RefuelingOutagewhichisscheduledtostartonSeptember25,1995.FPLperformedtheevaluationofthepressurizerinstrumentnozzleflawsasdescribedinIWB-3600.Basedontheresultsoftheevaluation,FPLhasdeterminedthatthenozzlesmeettheacceptancecriteriaforcontinuedservicewithouttheflawsbeingremoved.AttachmentsAandBconcludethatthenozzlesareacceptableforanadditional30yearsofplantlife.TheareacontainingtheflawwillbeperiodicallyexaminedasdescribedinAttachmentC.Pleasecontactusifthereareanyquestionsaboutthissubmittal.Verytrulyyours,4(AD.A.gerVicePsidentSt.Lu'ePlantDAS/GRMEnclosures(3)cc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlant9503070355950302PDRADOCK05000389pPDRanFPLGroupcompany070047
Forwards Rev        1  to "Fracture Mechanics Evaluation...," Rev 1 to "Stresses for...Pressurizer LEFM" & Rev 0 to "Subsequent Inservice Exam Plan for Pressurizer instrument Nozzles."
~~lf}}
Submittal: Inservice/Testing/Relief Jfrom ASM'ode G 04 DISTRIBUTION CODE: R047D TITLE:  OR COPIES RECEIVED:LTR            ENCL  g  SIZE: +  +        p I
NOTES:
RECIPIENT                COPIES                RECIPIENT          COPIES ID  CODE/NAME              LTTR ENCL          ID  CODE/NAME        LTTR ENCL PD2.-2 LA                      1      1      PD2-2 PD                1    1 NORRIS,J                        1      1 INTERNAL: ACRS                            6      6      AEOD/SPD/RAB FILE  CENT R      01          1      1      NRR/DE/EMCB RR/DE/EMEB                    1      1      NUDOCS-ABSTRACT OGC/HDS3                        1      0      RES/DSIR/EIB EXTERNAL: LITCO BROWN,B                    1      1      LITCO RANSOME,C NOAC                            1      1      NRC PDR D
U N
NOTE TO ALL"RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT TI IE DOCU."v!ENT CONTROL DESK, ROOM P]-37 (EXT. 504-2083 ) TO ELI XIINATE YOUR NAME PROD!
DISTRI!3UTION LISTS I'OR DOCUMENTS YOU DON "I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                    20  ENCL    19
 
Florida Power 5 Light Company, P.O, Box 128, Fort Pierce, FL 34954-0128 PP                                  March 2, 1995                            L-95-72 10 CFR        50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:     St. Lucie Unit      2 Docket No. 50-389 Fracture Mechanics Analysis of Pressurizer Instrument Nozzle Flaws Pursuant to 10          CFR  50.55a(a)(3), Florida            Power and          Light        Company (FPL) requests            approval of the enclosed fracture mechanics evaluation with the supporting stress analysis and the subsequent ISI examination plan for the Unit~ 2 pressurizer instrument nozzle welds. The 1989 edition of the ASME Boiler and Pressure Vessel Code Section XI, IWB-3134(b) requires the licensee to submit analytical evaluation examination results to the regulatory authority having jurisdiction. The NRC has previously granted approval of the initial evaluation for one fuel cycle by NRC letters dated April 1, 1994, and April 5, 1994. Approval of the Fracture Mechanics Evaluation and the In-Service Examination Plan is requested by July 1, 1995, to support the next Unit.2 Refueling Outage which is scheduled to start on September 25, 1995.
FPL performed the evaluation of the pressurizer instrument nozzle flaws as described in IWB-3600. Based on the results of the evaluation, FPL has determined that the nozzles meet the acceptance criteria for continued service without the flaws being removed.
Attachments A and B conclude that the nozzles are acceptable for an additional 30 years of plant life. The area containing the flaw will be periodically examined as described in Attachment C.
Please contact us          if there are any questions about                  this submittal.
Very    truly    yours, 4(A D. A.         ger Vice P sident St. Lu 'e Plant DAS/GRM Enclosures          (3) cc:     Stewart D. Ebneter, Regional Administrator, Region                                II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9503070355 950302 PDR      ADOCK 05000389 p                  PDR an FPL Group company            070047
 
  ~ ~
lf}}

Latest revision as of 22:06, 29 October 2019

Forwards Rev 1 to Fracture Mechanics Evaluation..., Rev 1 to Stresses For...Pressurizer LEFM & Rev 0 to Subsequent Inservice Exam Plan for Pressurizer Instrument Nozzles.
ML17228B045
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B046 List:
References
L-95-72, NUDOCS 9503070355
Download: ML17228B045 (3)


Text

PRIC)RI ZY (ACCELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9503070355 DOC.DATE: 95/03/02 NOTARIZED: NO DOCKET N FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME 'UTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co.

P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Forwards Rev 1 to "Fracture Mechanics Evaluation...," Rev 1 to "Stresses for...Pressurizer LEFM" & Rev 0 to "Subsequent Inservice Exam Plan for Pressurizer instrument Nozzles."

Submittal: Inservice/Testing/Relief Jfrom ASM'ode G 04 DISTRIBUTION CODE: R047D TITLE: OR COPIES RECEIVED:LTR ENCL g SIZE: + + p I

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2.-2 LA 1 1 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 6 6 AEOD/SPD/RAB FILE CENT R 01 1 1 NRR/DE/EMCB RR/DE/EMEB 1 1 NUDOCS-ABSTRACT OGC/HDS3 1 0 RES/DSIR/EIB EXTERNAL: LITCO BROWN,B 1 1 LITCO RANSOME,C NOAC 1 1 NRC PDR D

U N

NOTE TO ALL"RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT TI IE DOCU."v!ENT CONTROL DESK, ROOM P]-37 (EXT. 504-2083 ) TO ELI XIINATE YOUR NAME PROD!

DISTRI!3UTION LISTS I'OR DOCUMENTS YOU DON "I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 19

Florida Power 5 Light Company, P.O, Box 128, Fort Pierce, FL 34954-0128 PP March 2, 1995 L-95-72 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 2 Docket No. 50-389 Fracture Mechanics Analysis of Pressurizer Instrument Nozzle Flaws Pursuant to 10 CFR 50.55a(a)(3), Florida Power and Light Company (FPL) requests approval of the enclosed fracture mechanics evaluation with the supporting stress analysis and the subsequent ISI examination plan for the Unit~ 2 pressurizer instrument nozzle welds. The 1989 edition of the ASME Boiler and Pressure Vessel Code Section XI, IWB-3134(b) requires the licensee to submit analytical evaluation examination results to the regulatory authority having jurisdiction. The NRC has previously granted approval of the initial evaluation for one fuel cycle by NRC letters dated April 1, 1994, and April 5, 1994. Approval of the Fracture Mechanics Evaluation and the In-Service Examination Plan is requested by July 1, 1995, to support the next Unit.2 Refueling Outage which is scheduled to start on September 25, 1995.

FPL performed the evaluation of the pressurizer instrument nozzle flaws as described in IWB-3600. Based on the results of the evaluation, FPL has determined that the nozzles meet the acceptance criteria for continued service without the flaws being removed.

Attachments A and B conclude that the nozzles are acceptable for an additional 30 years of plant life. The area containing the flaw will be periodically examined as described in Attachment C.

Please contact us if there are any questions about this submittal.