ML17227A751: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/04/1993
| issue date = 03/04/1993
| title = Application for Amend to License DPR-67,excluding Penetrations Inside Containment from 31-day Surveillance Requirement of TS 4.6.1.1.a.1 Per NUREG-1432 (STS for C-E Plants)
| title = Application for Amend to License DPR-67,excluding Penetrations Inside Containment from 31-day Surveillance Requirement of TS 4.6.1.1.a.1 Per NUREG-1432 (STS for C-E Plants)
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 15: Line 15:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 7
| page count = 7
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ACCEI ERAT                  DOCUMENT DIST                    UTION 'SYSTEM REGULAT        INFORMATION DISTRIBUTION
                                    'I STEM (RIDS)
ACCESSION NBR:9303080002              DOC.DATE: 93/03/04      NOTARIZED: YES        DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.                      05000335 AUTH. NAME            AUTHOR AFFILIATION SAGER,D.A.            Florida    Power 6 Light Co.
RECIP.NAME            RECIPIENT AFFILIATION Document Control Branch (Document            Control Desk)
 
==SUBJECT:==
Application for amend to License DPR-67,excluding penetrations inside containment from 31-day surveillance requirement of TS 4.6.l.l.a.l per NUREG-1432 (STS for C-E plants).
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL TITLE: OR Submittal: General Distribution j  SIZE: $ + /0 NOTES:
RECIPIENT              COPIES              RECIPIENT          COPIES ID CODE/NAME            LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD2-2 LA                    1      1    PD2-2 PD                1    1 NORRIS,J                    2      2 INTERNAL: ACRS                          6      6    NRR/DE/EELB            1    1 NRR/DORS/OTSB              1      1    NRR/DRCH/HICB          1    1 NRR/DSSA/SCSB              1      1    NRR/DSSA/SPLB          1    1 NRR/DSSA/SRXB              1      1    NUDOCS-ABSTRACT        1    1 O~C+FgB                    1      0    OGC/HDS3                1    0 REG  FIR        Ol        1      1 EXTERNAL: NRC PDR                      1      1    NSIC                    1    1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                22  ENCL    20
 
/g p
    '0 0 ~ 1
 
P.O. Box 128, Ft. Pierce, FL 34954-0128 March 4, 1993                    L-93-055 10 CFR 50-90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:  St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance Re uirement Pursuant to 10 CFR 50.90, Florida Power & Light. Company (FPL) requests to amend Facility Operating License DPR-67 for St. Lucie Unit 1.          The proposed amendment excludes penetrations                              inside containment from the 31 day surveillance requirement of Technical Specification (TS) 4.6.1.1.a.l. and is consistent with similar provisions            contained        in NUREG-1432,        Standard                Technical Specifications for Combustion Engineering Plants.
It is further requested that the proposed amendment be issued in time for Unit 1, Cycle 12 startup which is scheduled for May 23, 1993. Circumstances surrounding the prompt nature of this request are documented in USNRC letter to FPL dated February 16, 1993,
 
==Subject:==
St. Lucie Unit 1  Temporary Waiver of Compliance. contains a copy of the appropriate TS page marked-up to show the proposed change. Attachment 2 is a Safety Analysis in support of the proposed amendment.                          Attachment 3 is the "Determination of No Significant Hazards Consideration."
The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board.        In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.
Please contact us              if there  are any questions about          this submittal.
Very  truly      yours, 05007$
D. A. S    er ident Vice St.
P Lu    'lanti 9303080002 PDR, 930304 F'
ADQCK  05000335 PDR an FPL Group companY
 
W F
 
St. Lucie Unit                  1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance                      Re uirement STATE OF FLORIDA                          )
                                                )
COUNTY OF                ST. LUCIE        )
D. A. Sager                being      first duly sworn, deposes  and says:
That he              is Vice President, St. Lucie Plant for the Nuclear Division of Florida                Power    &  Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made        in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
<- >-aA.a  c a~a ~ ~. p                                      D. A. ger STATE OF FLORIDA COUNTY OF The      foregoing instrument was acknowledged before me.;thist, +l  day of                                    ., IS@
by.D.A."Sjge'rrr who is personally known to me ankd19ho did~take an oath.
O i.
  '    '; ~~'44RFN WFs&
    ',,~P,,        ~,-~Na'me    of Notary Public
          >>sr N lit tt t tt Yiy  Commission expires                      /f  19' Commission No.                      Cg.OO '3 KW f KAREN WEST Notate PuMo-Stats of Rorlda My Commlasfon Exptrss APR 18,1994
                            &#xb9; COMM CC 003229
 
V Y
f4 WZ u    ~i~~ ~ ir*3~~%
 
St. Lucie Unit  1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance  Re  uirement DAS/RLD/kw DAS/PSL 8874-93 Attachments cc:  Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant.
Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.}}

Latest revision as of 13:42, 4 February 2020

Application for Amend to License DPR-67,excluding Penetrations Inside Containment from 31-day Surveillance Requirement of TS 4.6.1.1.a.1 Per NUREG-1432 (STS for C-E Plants)
ML17227A751
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/04/1993
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17227A752 List:
References
RTR-NUREG-1432 L-93-055, L-93-55, NUDOCS 9303080002
Download: ML17227A751 (7)


Text

ACCEI ERAT DOCUMENT DIST UTION 'SYSTEM REGULAT INFORMATION DISTRIBUTION

'I STEM (RIDS)

ACCESSION NBR:9303080002 DOC.DATE: 93/03/04 NOTARIZED: YES DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License DPR-67,excluding penetrations inside containment from 31-day surveillance requirement of TS 4.6.l.l.a.l per NUREG-1432 (STS for C-E plants).

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL TITLE: OR Submittal: General Distribution j SIZE: $ + /0 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 NORRIS,J 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 NRR/DORS/OTSB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SCSB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 O~C+FgB 1 0 OGC/HDS3 1 0 REG FIR Ol 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

/g p

'0 0 ~ 1

P.O. Box 128, Ft. Pierce, FL 34954-0128 March 4, 1993 L-93-055 10 CFR 50-90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance Re uirement Pursuant to 10 CFR 50.90, Florida Power & Light. Company (FPL) requests to amend Facility Operating License DPR-67 for St. Lucie Unit 1. The proposed amendment excludes penetrations inside containment from the 31 day surveillance requirement of Technical Specification (TS) 4.6.1.1.a.l. and is consistent with similar provisions contained in NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.

It is further requested that the proposed amendment be issued in time for Unit 1, Cycle 12 startup which is scheduled for May 23, 1993. Circumstances surrounding the prompt nature of this request are documented in USNRC letter to FPL dated February 16, 1993,

Subject:

St. Lucie Unit 1 Temporary Waiver of Compliance. contains a copy of the appropriate TS page marked-up to show the proposed change. Attachment 2 is a Safety Analysis in support of the proposed amendment. Attachment 3 is the "Determination of No Significant Hazards Consideration."

The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board. In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.

Please contact us if there are any questions about this submittal.

Very truly yours, 05007$

D. A. S er ident Vice St.

P Lu 'lanti 9303080002 PDR, 930304 F'

ADQCK 05000335 PDR an FPL Group companY

W F

St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance Re uirement STATE OF FLORIDA )

)

COUNTY OF ST. LUCIE )

D. A. Sager being first duly sworn, deposes and says:

That he is Vice President, St. Lucie Plant for the Nuclear Division of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

<- >-aA.a c a~a ~ ~. p D. A. ger STATE OF FLORIDA COUNTY OF The foregoing instrument was acknowledged before me.;thist, +l day of ., IS@

by.D.A."Sjge'rrr who is personally known to me ankd19ho did~take an oath.

O i.

' '; ~~'44RFN WFs&

',,~P,, ~,-~Na'me of Notary Public

>>sr N lit tt t tt Yiy Commission expires /f 19' Commission No. Cg.OO '3 KW f KAREN WEST Notate PuMo-Stats of Rorlda My Commlasfon Exptrss APR 18,1994

¹ COMM CC 003229

V Y

f4 WZ u ~i~~ ~ ir*3~~%

St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment St. Lucie Unit 1 Containment Penetrations Surveillance Re uirement DAS/RLD/kw DAS/PSL 8874-93 Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant.

Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.