ML17252B565: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/09/1977 | | issue date = 12/09/1977 | ||
| title = LER 77-061/03L-0 for Dresden, Unit 2 Re Reactor Protection System Instrument Settings Found to Be Less Conservative than Those Established by the Technical Specifications Which Do Not Prevent the Fulfillment of the Functional Requirements o | | title = LER 77-061/03L-0 for Dresden, Unit 2 Re Reactor Protection System Instrument Settings Found to Be Less Conservative than Those Established by the Technical Specifications Which Do Not Prevent the Fulfillment of the Functional Requirements o | ||
| author name = Stephenson | | author name = Stephenson B | ||
| author affiliation = Commonwealth Edison Co | | author affiliation = Commonwealth Edison Co | ||
| addressee name = Keppler J | | addressee name = Keppler J | ||
| addressee affiliation = NRC/RGN-III | | addressee affiliation = NRC/RGN-III | ||
| docket = 05000237 | | docket = 05000237 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:.: | ||
e Commonwealth 9son | |||
:~*. - | |||
* Dresden Nuclear Power Station R.R. #.1 Morris; Illinois 60450 Telephone 815/942-2920 December 9, BBS LTR #1136-77 James G. Keppler, Regional Director Directorate of Regulatory Operations - Region U.S. Nuclear Regulatory COililllission 799 Roosevelt R_oad Glen Ellyn, IL 60137 Reportable Occurrence Report #77-061/03L-0,Docket #050-237 is hereby submitted to your office in accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(a), reactor protection system instrument settings which are found to be less conservative than those established by the technical specifications but which do not prevent the fulfillment of the functional requirements of affected systems. | |||
Steplienson S.tation Superintendent Dresden Nuclear Power Station BBS:dlz | |||
==Enclosure:== | ==Enclosure:== | ||
}} | cc: Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC. | ||
DEC 12 1977'}} |
Latest revision as of 20:04, 29 October 2019
ML17252B565 | |
Person / Time | |
---|---|
Site: | Dresden ![]() |
Issue date: | 12/09/1977 |
From: | Stephenson B Commonwealth Edison Co |
To: | James Keppler NRC/RGN-III |
References | |
BBS LTR 1136-77 LER 77-061/03L-0 | |
Download: ML17252B565 (1) | |
Text
.:
e Commonwealth 9son
- ~*. -
- Dresden Nuclear Power Station R.R. #.1 Morris; Illinois 60450 Telephone 815/942-2920 December 9, BBS LTR #1136-77 James G. Keppler, Regional Director Directorate of Regulatory Operations - Region U.S. Nuclear Regulatory COililllission 799 Roosevelt R_oad Glen Ellyn, IL 60137 Reportable Occurrence Report #77-061/03L-0,Docket #050-237 is hereby submitted to your office in accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(a), reactor protection system instrument settings which are found to be less conservative than those established by the technical specifications but which do not prevent the fulfillment of the functional requirements of affected systems.
Steplienson S.tation Superintendent Dresden Nuclear Power Station BBS:dlz
Enclosure:
cc: Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC.
DEC 12 1977'