| title = Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
| title = Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PRIORITY(ACCELERATEDRIDSPROCESSING)REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9508100176DOC.DATE:95/08/02NOTARIZED:NODOCKETgFACIL:50-389St.LuciePlant,Unit2,FloridaPower&LightCo.05000389PAUTH.NAMEAUTHORAFFILIATIONSAGER,D.A.FloridaPower&.LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)
{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9508100176          DOC.DATE: 95/08/02      NOTARIZED: NO          DOCKET g FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                   05000389 P AUTH. NAME          AUTHOR AFFILIATION SAGER,D.A.           Florida  Power &. Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document          Control Desk)


==SUBJECT:==
==SUBJECT:==
ForwardssuppltoISIplansecondten-yrintervalrevisedstress&fracturemechanicsevaluationspressurizerinstrumentnozzles.DISTRIBUTIONCODE:A047DCOPIESRECEIVED:LTRjENCLjSIZE:2+~iTITLE:ORSubmittal:Inservice/Testing/RelieffromASMECode-GL-89-04NOTES:0RECIPIENTIDCODE/NAMEPD2-1LANORRIS,JINTERNAL:CZKECENERED0-MEBOGC/HDS3EXTERNAL:LITCOANDERSONNOACCOPIESLTTRENCL1111601111101111RECIPIENTIDCODE/NAMEPD2-1PDAEOD/SPD/RABNRR/DE/EMCBNUDOCS-ABSTRACTRES/DSIR/EIBLITCORANSOME,CNRCPDRCOPIESLTTRENCL11111"111111111D0,NNOTETOALL"RZDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5DB(415-2083)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEEDtTOTALNUMBEROFCOPIESREQUIRED:LTTR20ENCL13 1
Forwards suppl to ISI plan second ten-yr interval revised stress & fracture mechanics evaluations pressurizer TITLE:
0P.O.Box128,Ft.Pierce,FL34954-0120August2,1995L-95-22010CFR50.410CFR50.55aU.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555RE:St.LucieUnit2DocketNo.50-389In-Service-InspectionPlanSecondTen-YearIntervalRevisedStressandFractureMechanicsEvaluationsPressurizerInstrumentNozzles-SulementByletter(L-95-185)datedJuly7,1995,FloridaPowerandLightCompany(FPL)providedaresponsetoyourJune9,1995requestforadditionalinformation(RAI).TheinformationwassubmittedtosupporttheStaff'sreviewofthe'PLevaluationofflawindicationsandsubsequentin-serviceinspection(ISI)planssubmittedbyFPLletterL-95-74onMarch2,1995.FPLrequestedtheapprovalbyJuly1,1995,tosupportplanningfortheFall1995Unit2refuelingoutage.InaconferencecallonJuly25,1995,theNRCreviewerrequestedFPLtosubmitstressandfracturemechanicsevaluationsrevisedinresponsetotheRAI.AttachmentsAandBaretherevisedevaluationsyourequested.Pleasecontactusshouldyouneedanyadditionalclarifications.Verytrulyyours,D.A.ViceSt.LageresidentiePlantDAS/GRMcc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlant0800959508100i7b950802PDRADOCK050003899PDRanFPLGroupcompany NUCLEARENGINEERINGDEPAR7MEN7CoMPoNENTiSUPPoRTANDINsPEcTIoNsP.O.Box14000JUNoBEAcH,FioRIDA33408St.LucieNuclearPowerPlantUnit2ATTACHMENTAFRACTUREMECHANICSEVALUATIONOFST.LUCIEPRESSURIZERINSTRUMENTNOZZLESPreparedbyB&VYNUCLEARSERVICECOMPANYForSt.LucieNuclearPowerPlant10MilesSouthofFt.PierceonA1AFt.Pierce,Florida33034RevisionNumber:2Date:CommercialServiceDate:NRCDocketNumber:DocumentNumber:August8,198350-38932-1235128-02July11,199508/02/95....9508100176  
NOTES:
}}
OR instrument nozzles.
DISTRIBUTION CODE: A047D        COPIES RECEIVED: LTR Submittal: Inservice/Testing/Relief from    j    ENCL  j  SIZE:2+ ~ i ASME Code  GL-89-04 0
RECIPIENT          COPIES            RECIPIENT          COPIES ID CODE/NAME        LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD2-1 LA                  1    1      PD2-1 PD                1    1 NORRIS,J                  1    1 INTERNAL:   C                      6    0      AEOD/SPD/RAB            1    1 ZKE CEN ER    ED0-     1    1      NRR/DE/EMCB            1"    1 MEB            1    1      NUDOCS-ABSTRACT        1    1 OGC/HDS3                  1    0      RES/DSIR/EIB            1    1 EXTERNAL: LITCO ANDERSON            1    1      LITCO RANSOME,C        1    1 NOAC                      1    1      NRC PDR                1    1            D 0,
N NOTETO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR            20  ENCL    13
 
1 0
P.O. Box 128, Ft. Pierce, FL 34954-0120 August 2, 1995                        L-95-220 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 RE:     St. Lucie Unit      2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles  Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL) provided a response to your June 9, 1995 request for additional information (RAI). The information was submitted to support the Staff's review of the 'PL evaluation of flaw indications and subsequent in-service inspection (ISI) plans submitted by FPL letter L-95-74 on March 2, 1995. FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.
In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI.             Attachments A and B are the revised evaluations you requested. Please contact us should you need any additional clarifications.
Very    truly yours, D. A. ager Vice esident St. L ie Plant DAS/GRM cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II,  USNRC 080095 9508100i7b 95080205000389 PDR      ADOCK 9                  PDR an FPL Group company
 
NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O. Box 14000 JUNo BEAcH, FioRIDA 33408 St. Lucie Nuclear Power Plant Unit 2 ATTACHMENTA FRACTURE MECHANICS EVALUATION OF ST. LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VYNUCLEAR SERVICE COMPANY For St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on A1A Ft. Pierce, Florida 33034 Commercial Service Date:                     August  8, 1983 NRC Docket Number:                           50-389 Document Number:                             32-1235128-02 Revision Number:        2      Date:        July  11, 1995 08/02/95.... 9508100176}}

Latest revision as of 09:39, 29 October 2019

Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles
ML17309A794
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/02/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B236 List:
References
L-95-220, NUDOCS 9508100176
Download: ML17309A794 (4)


Text

PRIORITY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508100176 DOC.DATE: 95/08/02 NOTARIZED: NO DOCKET g FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 P AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl to ISI plan second ten-yr interval revised stress & fracture mechanics evaluations pressurizer TITLE:

NOTES:

OR instrument nozzles.

DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR Submittal: Inservice/Testing/Relief from j ENCL j SIZE:2+ ~ i ASME Code GL-89-04 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 NORRIS,J 1 1 INTERNAL: C 6 0 AEOD/SPD/RAB 1 1 ZKE CEN ER ED0- 1 1 NRR/DE/EMCB 1" 1 MEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 LITCO RANSOME,C 1 1 NOAC 1 1 NRC PDR 1 1 D 0,

N NOTETO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DB (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 13

1 0

P.O. Box 128, Ft. Pierce, FL 34954-0120 August 2, 1995 L-95-220 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 2 Docket No. 50-389 In-Service-Inspection Plan Second Ten-Year Interval Revised Stress and Fracture Mechanics Evaluations Pressurizer Instrument Nozzles Su lement By letter(L-95-185) dated July 7, 1995, Florida Power and Light Company (FPL) provided a response to your June 9, 1995 request for additional information (RAI). The information was submitted to support the Staff's review of the 'PL evaluation of flaw indications and subsequent in-service inspection (ISI) plans submitted by FPL letter L-95-74 on March 2, 1995. FPL requested the approval by July 1, 1995, to support planning for the Fall 1995 Unit 2 refueling outage.

In a conference call on July 25, 1995, the NRC reviewer requested FPL to submit stress and fracture mechanics evaluations revised in response to the RAI. Attachments A and B are the revised evaluations you requested. Please contact us should you need any additional clarifications.

Very truly yours, D. A. ager Vice esident St. L ie Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 080095 9508100i7b 95080205000389 PDR ADOCK 9 PDR an FPL Group company

NUCLEAR ENGINEERING DEPAR7MEN7 CoMPoNENTi SUPPoRT AND INsPEcTIoNs P.O. Box 14000 JUNo BEAcH, FioRIDA 33408 St. Lucie Nuclear Power Plant Unit 2 ATTACHMENTA FRACTURE MECHANICS EVALUATION OF ST. LUCIE PRESS URIZER INS TRUMENT NOZZLES Prepared by B&VYNUCLEAR SERVICE COMPANY For St. Lucie Nuclear Power Plant 10 Miles South of Ft. Pierce on A1A Ft. Pierce, Florida 33034 Commercial Service Date: August 8, 1983 NRC Docket Number: 50-389 Document Number: 32-1235128-02 Revision Number: 2 Date: July 11, 1995 08/02/95.... 9508100176