Line 15: Line 15:
| NRC officer = Robert A. Thompson
| NRC officer = Robert A. Thompson
| event date = 05/19/2025 10:45 CDT
| event date = 05/19/2025 10:45 CDT
| last update date = 05/19/2025
| last update date = 05/22/2025
| title = Manual Reactor Scram Due to Loss of Feedwater
| title = Manual Reactor Scram Due to Loss of Feedwater
| event text = The following information was provided by the licensee via phone and email:
| event text = The following information was provided by the licensee via phone and email:
Line 25: Line 25:
On Unit 1, all control rods fully inserted on the scram and outboard main steam isolation valves closed on a loss of power.
On Unit 1, all control rods fully inserted on the scram and outboard main steam isolation valves closed on a loss of power.
The initial bus trip was caused by control power perturbations due to a ground on the associated battery system.
The initial bus trip was caused by control power perturbations due to a ground on the associated battery system.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250520en.html#en57718
* * * UPDATE ON 5/20/2025 AT 1200 EDT FROM MATTHEW FRITCH TO SAMUEL COLVARD * * *
Based on additional investigation, it has not been confirmed that the initial bus trip was caused by a ground on the associated battery system.  The cause remains under investigation.
Notified R3DO (Szwarc)
* * * UPDATE ON 5/22/2025 AT 1532 EDT FROM CONNER BEALER TO TENISHA MEADOWS * * *
The scram was initially reported as manual; however, further investigation determined that it was automatically initiated.
Notified R3DO (Szwarc)
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250523en.html#en57718
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1
| type = GE-3
| type = GE-3
| Scram code = N
| Scram code = M/R
| Reactor critical = Y
| Reactor critical = Y
| Initial power = 100
| Initial power = 100

Latest revision as of 06:20, 23 May 2025

ENS 57718 +/-
Where
Quad Cities Constellation icon.png
Illinois (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.6 h-0.025 days <br />-0.00357 weeks <br />-8.2188e-4 months <br />)
Opened: Jason Cooper
15:09 May 19, 2025
NRC Officer: Robert A. Thompson
Last Updated: May 22, 2025
57718 - NRC Website