ML11276A070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/29/2011
| issue date = 09/29/2011
| title = Mip - University of Illinois Nuclear Reactor FY2012
| title = Mip - University of Illinois Nuclear Reactor FY2012
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS/MCID
| author affiliation = NRC/RGN-III/DNMS/MCID
| addressee name = Holm R L
| addressee name = Holm R
| addressee affiliation = Univ of Illinois - Urbana - Champaign
| addressee affiliation = Univ of Illinois - Urbana - Champaign
| docket = 05000151
| docket = 05000151
Line 13: Line 13:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:September 29, 2011 Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801
==SUBJECT:==
UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN  FISCAL YEAR 2012
==Dear Dr. Holm:==
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.
Because this MIP is based, in part, on your proposed schedule of decommissioning activities for fiscal year (FY) 2012; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor inspection schedule.
We currently project the region will conduct approximately five inspections at the reactor through December 2012, if work begins as planned. You have indicated that a decommissioning contractor has been selected and will begin work in the fall of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.
R. Holm                                          The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure            Title IP 69013                        Research and Test Reactor Decommissioning IP 83801                        Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
                                                  /RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc:      J. Klinger, Illinois Emergency Management Agency (IEMA)
C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois
R. Holm                                                                    The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure                            Title IP 69013                                        Research and Test Reactor Decommissioning IP 83801                                        Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
                                                                            /RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc:          J. Klinger, Illinois Emergency Management Agency (IEMA)
C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois DISTRIBUTION:
Bruce Watson                                                  Allan Barker John Hickman                                                  Harral Logaras Dominick Orlando                                              Viktoria Mitlyng Cynthia Pederson                                              Prema Chandrathil Anne Boland                                                    MCID Patrick Louden
*See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - University of Illinois Nuclear Reactor FY2012.docx Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE            RIII DNMS                      E      RIII DNMS                E      RIII                                RIII NAME              JETapp:jm JET                        CALipa CAL DATE            09/29/11                              09/29/11 OFFICIAL RECORD COPY}}

Latest revision as of 13:54, 12 November 2019

Mip - University of Illinois Nuclear Reactor FY2012
ML11276A070
Person / Time
Site: University of Illinois
Issue date: 09/29/2011
From: Christine Lipa
NRC/RGN-III/DNMS/MCID
To: Holm R
University of Illinois
References
Download: ML11276A070 (3)


Text

September 29, 2011 Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801

SUBJECT:

UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN FISCAL YEAR 2012

Dear Dr. Holm:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of decommissioning activities for fiscal year (FY) 2012; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor inspection schedule.

We currently project the region will conduct approximately five inspections at the reactor through December 2012, if work begins as planned. You have indicated that a decommissioning contractor has been selected and will begin work in the fall of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.

R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc: J. Klinger, Illinois Emergency Management Agency (IEMA)

C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois

R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc: J. Klinger, Illinois Emergency Management Agency (IEMA)

C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois DISTRIBUTION:

Bruce Watson Allan Barker John Hickman Harral Logaras Dominick Orlando Viktoria Mitlyng Cynthia Pederson Prema Chandrathil Anne Boland MCID Patrick Louden

  • See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - University of Illinois Nuclear Reactor FY2012.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII RIII NAME JETapp:jm JET CALipa CAL DATE 09/29/11 09/29/11 OFFICIAL RECORD COPY