ML11314A128: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11314A128
| number = ML11314A128
| issue date = 09/01/2011
| issue date = 09/01/2011
| title = Crystal River, Unit 3, Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections
| title = Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections
| author name =  
| author name =  
| author affiliation = Progress Energy Carolinas, Inc
| author affiliation = Progress Energy Carolinas, Inc
Line 14: Line 14:
| document type = Drawing
| document type = Drawing
| page count = 1
| page count = 1
| project = TAC:ME5208
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:PCHG-DESG Engineering Change 0000070139R0 Z50R0                          Page 1 of 1}}

Latest revision as of 13:01, 12 November 2019

Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections
ML11314A128
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2011
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
3F0911-01, TAC ME5208 522-041-008
Download: ML11314A128 (1)


Text

PCHG-DESG Engineering Change 0000070139R0 Z50R0 Page 1 of 1