ML12157A084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Stabenow D
| author name = Stabenow D
| author affiliation = US SEN (Senate), US Congress
| author affiliation = US SEN (Senate), US Congress
| addressee name = Apostolakis G E, Jaczko G B, Magwood W D, Ostendorff W C, Svinicki K L
| addressee name = Apostolakis G, Jaczko G, Magwood W, Ostendorff W, Svinicki K
| addressee affiliation = NRC/Chairman, NRC/OCM
| addressee affiliation = NRC/Chairman, NRC/OCM
| docket = 05000255
| docket = 05000255
| license number =  
| license number =  
| contact person = Rihm R S
| contact person = Rihm R
| case reference number = G20120377, LTR-12-0221, SECY-2012-0279, CORR-12-0057
| case reference number = G20120377, LTR-12-0221, SECY-2012-0279, CORR-12-0057
| package number = ML12157A408
| package number = ML12157A408
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:EDO Principal Correspondence  Control FROM:                  DUE:  06/20/12              EDO CONTROL: G20120377 DOC DT: 05/17/12 FINAL REPLY:
Senator Debbie Stabenow TO:
Commission FOR SIGNATURE OF :                **  PRI **              CRC NO:  12-0221 Chairman Jaczko DESC:                                                    ROUTING:
Safety Issues with Palisades Nuclear Power Plant        Borchardt (EDATS: SECY-2012-0279)                                Weber Johnson Ash Mamish OGC/GC DATE:    06/04/12                                          Leeds, NRR Pederson, RIII ASSIGNED TO:              CONTACT:                          Zobler, OGC Schmidt, OCA EDO              Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).      NRR and Region III  to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
5~C~1-tDV1                                          L ~i&S'.
EDATS Number: SECY-2012-0279                                                                    Source: SECY Genera Inorato Assigned To: OEDO                                                          OEDO Due Date: 6/20/2012 11:00 PM Other Assignees:                                                            SECY Due Date: 6/22/2012 11:00 PM
==Subject:==
Safety Issues with Palisades Nuclear Power Plant
==
Description:==
CC Routing: NRR; RegionIII; OGC; OCA ADAMS Accession Numbers - Incoming: NONE                                                Response/Package: NONE Ote    nomto Cross Reference Number: G20120377, LTR- 12-0221                                                Staff Initiated: NO Related Task:                                                                                Recurring Item: NO File Routing: EDATS                                                                  Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes    Infraio Action Type: Letter                                                                              Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko                                                                      Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region II to provide input to Roger Rihm,,OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
Docmen Inoraio Originator Name: Senator Debbie Stabenow                                              Date of Incoming: 5/17/2012 Originating Organization: Congress                                    Document Received by SECY Date: 6/1/2012 Addressee: Commission                                              Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 01, 2012 11:23 PAPER NUMBER:    LTR- 12-0221                              LOGGING DATE:  05/18/2012 ACTION OFFICE:
AUTHOR:          SEN Debbie Stabenow AFFILIATION:      CONG ADDRESSEE:        CHRM Gregory Jaczko
==SUBJECT:==
Concerns the Palisades nuclear power plant ACTION:          Signature of Chairman DISTRIBUTION:    RF, OCA to Ack LETTER DATE:      05/17/2012 ACKNOWLEDGED      No SPECIAL HANDLING: Commission Correspondence NOTES:
FILE LOCATION:    ADAMS DATE DUE:        06/22/2012                      DATE SIGNED:
EDO -- G20120377
DEBBIE STABENOW                                                                                            COMMITTEES:
MICHIGAN -                                                                              AGRICULTURE, NUTRITION, AND FORESTRY BUDGET ENERGY AND NATURAL RESOURCES
                                                            'Unied            16cateFINANCE
                                                                                ýtatc 133 HART SENATE OFFICE BUILDING WASHINGTON, DC 20510-2204 May 17, 2012 The Honorable Gregory Jaczko, Chairman The Honorable Kristine Svinicki, Commissioner The Honorable George Apostolakis, Commissioner The Honorable William Magwood, Commissioner The Honorable William Ostendorff, Commissioner United States Nuclear Regulatory Commission Mail Stop O- 16G4 Washington, DC 20555
==Dear Chairman Jaczko and Honorable Commissioners,==
I am writing to express concerns regarding the Palisades nuclear power plant located in Covert, Michigan and related Nuclear Regulatory Commission actions.
As you know, on September 25, 2011, the Palisades Nuclear Power Plant was shut down for a week due to electrical errors. There was also a component coupling failure at the plant in August 2011 and a water pump failure in May 2011. Due to continuing issues, the Nuclear Regulatory Commission has downgraded this plant to the "Regulatory Response Column" with the possibility of being downgraded further to the "Degraded Cornerstone Column."
The safety of the Palisades plant is of the utmost importance to me and the residents of Michigan. Palisades is an important job creator, providing more than 650 jobs in the area, and it must be capable of operating safely and effectively to continue powering Michigan businesses and homes. In the wake of multiple shutdowns and equipment issues, I am very concerned about the impact of these safety issues on the community and our state.
Therefore, I respectfully request a detailed report of all the actions taken by the Nuclear Regulatory Commission to address the recent safety issues at the Palisades plant, as well as a detailed report of the history of incidents at Palisades that led to the downgrading of the plant's safety status.
Sincerely, United States Senator PRINTED ON RECYCLED PAPER}}

Latest revision as of 15:58, 6 February 2020

G20120377/LTR-12-0221/EDATS: SECY-2012-0279 - Ltr. Senator Debbie Stabenow Safety Issues with Palisades Nuclear Power Plant
ML12157A084
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/17/2012
From: Stabenow D
US SEN (Senate), US Congress
To: Apostolakis G, Jaczko G, Magwood W, Ostendorff W, Kristine Svinicki
NRC/Chairman, NRC/OCM
Rihm R
Shared Package
ML12157A408 List:
References
G20120377, LTR-12-0221, SECY-2012-0279, CORR-12-0057
Download: ML12157A084 (4)


Text

EDO Principal Correspondence Control FROM: DUE: 06/20/12 EDO CONTROL: G20120377 DOC DT: 05/17/12 FINAL REPLY:

Senator Debbie Stabenow TO:

Commission FOR SIGNATURE OF : ** PRI ** CRC NO: 12-0221 Chairman Jaczko DESC: ROUTING:

Safety Issues with Palisades Nuclear Power Plant Borchardt (EDATS: SECY-2012-0279) Weber Johnson Ash Mamish OGC/GC DATE: 06/04/12 Leeds, NRR Pederson, RIII ASSIGNED TO: CONTACT: Zobler, OGC Schmidt, OCA EDO Rihm SPECIAL INSTRUCTIONS OR REMARKS:

Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region III to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.

5~C~1-tDV1 L ~i&S'.

EDATS Number: SECY-2012-0279 Source: SECY Genera Inorato Assigned To: OEDO OEDO Due Date: 6/20/2012 11:00 PM Other Assignees: SECY Due Date: 6/22/2012 11:00 PM

Subject:

Safety Issues with Palisades Nuclear Power Plant

==

Description:==

CC Routing: NRR; RegionIII; OGC; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Ote nomto Cross Reference Number: G20120377, LTR- 12-0221 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes Infraio Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region II to provide input to Roger Rihm,,OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.

Docmen Inoraio Originator Name: Senator Debbie Stabenow Date of Incoming: 5/17/2012 Originating Organization: Congress Document Received by SECY Date: 6/1/2012 Addressee: Commission Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 01, 2012 11:23 PAPER NUMBER: LTR- 12-0221 LOGGING DATE: 05/18/2012 ACTION OFFICE:

AUTHOR: SEN Debbie Stabenow AFFILIATION: CONG ADDRESSEE: CHRM Gregory Jaczko

SUBJECT:

Concerns the Palisades nuclear power plant ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 05/17/2012 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES:

FILE LOCATION: ADAMS DATE DUE: 06/22/2012 DATE SIGNED:

EDO -- G20120377

DEBBIE STABENOW COMMITTEES:

MICHIGAN - AGRICULTURE, NUTRITION, AND FORESTRY BUDGET ENERGY AND NATURAL RESOURCES

'Unied 16cateFINANCE

ýtatc 133 HART SENATE OFFICE BUILDING WASHINGTON, DC 20510-2204 May 17, 2012 The Honorable Gregory Jaczko, Chairman The Honorable Kristine Svinicki, Commissioner The Honorable George Apostolakis, Commissioner The Honorable William Magwood, Commissioner The Honorable William Ostendorff, Commissioner United States Nuclear Regulatory Commission Mail Stop O- 16G4 Washington, DC 20555

Dear Chairman Jaczko and Honorable Commissioners,

I am writing to express concerns regarding the Palisades nuclear power plant located in Covert, Michigan and related Nuclear Regulatory Commission actions.

As you know, on September 25, 2011, the Palisades Nuclear Power Plant was shut down for a week due to electrical errors. There was also a component coupling failure at the plant in August 2011 and a water pump failure in May 2011. Due to continuing issues, the Nuclear Regulatory Commission has downgraded this plant to the "Regulatory Response Column" with the possibility of being downgraded further to the "Degraded Cornerstone Column."

The safety of the Palisades plant is of the utmost importance to me and the residents of Michigan. Palisades is an important job creator, providing more than 650 jobs in the area, and it must be capable of operating safely and effectively to continue powering Michigan businesses and homes. In the wake of multiple shutdowns and equipment issues, I am very concerned about the impact of these safety issues on the community and our state.

Therefore, I respectfully request a detailed report of all the actions taken by the Nuclear Regulatory Commission to address the recent safety issues at the Palisades plant, as well as a detailed report of the history of incidents at Palisades that led to the downgrading of the plant's safety status.

Sincerely, United States Senator PRINTED ON RECYCLED PAPER