Letter Sequence Other |
---|
|
|
MONTHYEARML0704401972007-03-0202 March 2007 G20070094/LTR-07-0097 - Ltr. Representative John Kline, Incident at the Monticello Nuclear Generating Plant and Its Applicability to the Prairie Island Nuclear Generation Plant Project stage: Other 2007-03-02
[Table View] |
|
---|
Category:Congressional Correspondence
MONTHYEARML15287A0162015-10-13013 October 2015 10-13-15 Ack Ltr to Senator Debbie Stabenow - Palisades ML15173A2872015-06-22022 June 2015 06-22-15 Acknowledge Ltr to Senator Stabenow - Palisades ML13183A2262013-07-0303 July 2013 G20130462/LTR-13-0528 - Letter to Senator Debbie Stabenow, from: R. W. Borchardt, Constituent Concerns Regarding Repairs at Palisades ML13169A2322013-06-18018 June 2013 G20130462/LTR-13-0528-Ticket - Senator Debbie Stabenow Ltr. Constituent Concerns Regarding Repairs at Palisades ML13169A2292013-06-18018 June 2013 G20130462/LTR-13-0528 - Senator Debbie Stabenow Ltr. Constituent Concerns Regarding Repairs at Palisades ML12198A1712012-08-22022 August 2012 Enclosuresponse to Information Requests from Rep. E. J. Markey Letter of June 22, 2012 ML12198A1732012-08-15015 August 2012 Attachment to Enclosuexecutive Summary ML12191A4022012-08-15015 August 2012 G20120453/LTR-12-0298/EDATS: SECY-2012-0330 - Letter to Rep. Edward J. Markey from Chairman Macfarlane Shutdown of Palisades Nuclear Power Plant - Leak in Water Storage Tank ML12166A4562012-08-15015 August 2012 G20120377/LTR-12-0221/SECY-2012-0279 - Letter to Senator Debbie Stabenow from Chairman Macfarlane Re Safety Issues with Palisades Nuclear Power Plant ML12178A4462012-06-22022 June 2012 G20120453/LTR-12-0298/EDATS: SECY-2012-0330 - Ltr. Rep. Edward J. Markey Re Shutdown of Palisades Nuclear Power Plant - Leak in Water Storage Tank ML12157A0842012-05-17017 May 2012 G20120377/LTR-12-0221/EDATS: SECY-2012-0279 - Ltr. Senator Debbie Stabenow Safety Issues with Palisades Nuclear Power Plant ML11336A3712011-12-0101 December 2011 G20110839/LTR-11-0638/EDATS: SECY-2011-0639 - Ltr. Rep. Edward J. Markey Recent Results of Nuclear Regulatory Commission Investigation of Palisades Shutdown (Due to Congress: 1/6/12) CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 ML1017204532010-03-17017 March 2010 E-mail from Mcdonough, Alexander (Reid) to Amy Powell Board Issues Order to Filings in Response to Naruc and Prairie Island ML1017204522010-03-17017 March 2010 E-mail from Cristinzio, Dayle (Reid) to Amy Powell Board Issues Order to Filings in Response to Naruc and Prairie Island ML1017204512010-03-17017 March 2010 E-mail from Amy Powell to Cristinzio, Dayle (Reid) Board Issues Order to Filings in Response to Naruc and Prairie Island ML0704401972007-03-0202 March 2007 G20070094/LTR-07-0097 - Ltr. Representative John Kline, Incident at the Monticello Nuclear Generating Plant and Its Applicability to the Prairie Island Nuclear Generation Plant ML0703900442007-02-0101 February 2007 G20070094/LTR-0097 - Ltr. John Kline Monticello and Prairie Island Facilities ML0535301372005-04-26026 April 2005 Letter from Congressman Fred Upton to Chairman Nils Diaz Pertaining to Palisades Nuclear Power Plant ML18347A7471979-06-15015 June 1979 Replacement of the Steam Generator 2015-06-22
[Table view] Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection 2024-02-01
[Table view] |
Text
March 2, 2007 The Honorable John Kline United States House of Representatives Washington, D.C. 20515
Dear Congressman Kline:
On behalf of the Nuclear Regulatory Commission (NRC), I am responding to your letter of February 1, 2007, addressed to Ms. Rebecca Schmidt, Director, Office of Congressional Affairs. In your letter, you request background information about an incident at the Monticello Nuclear Generating Plant (Monticello) and its applicability to the Prairie Island Nuclear Generating Plant (Prairie Island). Specifically, you asked for background information about an automatic reactor trip, which occurred after the failure of a structural support, as well as the response taken to address the problems. You further asked if any of the problems at Monticello were applicable to Prairie Island and requested NRC to outline the precautions that would be taken to assure the same incident does not occur at that facility.
An automatic shutdown occurred at Monticello, a boiling-water reactor with a General Electric turbine, on January 10, 2007, when the main steamline pressure decreased to the automatic reactor shutdown setpoint. Four turbine control valves regulate the supply of steam to the main turbine generator. The pressure decreased because the control mechanism for the valves was damaged and all four valves opened more than was actually needed. These valves are operated by a mechanism housed in the turbine control valve actuator box (actuator box). The support structure for the actuator box failed, causing it to shift downward by 6 inches. This downward shift of the actuator box damaged the control mechanism for the valves. However, the main steamlines and other adjacent structures were not damaged.
Through its assessment of the cause, the licensee for Monticello found that it had inadequately designed the actuator box support structure during original plant construction and that some of the original welds were of poor quality. It should be noted that the valves and the actuator box are not part of the reactor safety systems at Monticello. Onsite NRC resident inspectors observed the plant operators actions during the shutdown. The operators followed plant operating procedures, all shutdown systems operated properly, and the plant was safely shut down. The event did not pose a risk to the public.
NRC inspectors examined the welds on the failed support structure and reviewed the metallurgical report which documented the results of sampling and testing some of the failed welds. The licensee subsequently redesigned and modified the actuator box support structure.
NRC inspectors also reviewed the licensees redesign and modification to the actuator box support structure, associated engineering design calculations, stress analysis of the steamlines, and a sample of the licensees corrective actions related to its evaluation for possible other inadequate supports.
J. Kline NRC shared the original Monticello actuator box design information with the NRC inspection staff at other potentially susceptible boiling-water reactors such as Vermont Yankee, Oyster Creek, Pilgrim, and Nine Mile Point. None of these plants had similar actuator box support structures.
NRC also shared this information with the NRC resident inspectors at the Prairie Island plant, a pressurized-water reactor with a Westinghouse turbine. Monticello uses a single mechanical system (cam and linkages) to operate the control valves. All of the controls are enclosed within a box that is attached to a top mounted support. Prairie Island uses an electro-hydraulic system, whereby each turbine control valve is operated by a separate control called an actuator which has its own supply of hydraulic fluid. Each actuator is mounted onto the turbine control valve that it controls and the turbine control valves are welded to a pedestal that supports underneath the valve. Since the four valves at Prairie Island are controlled independently of each other and are supported from below, Prairie Island can not experience a failure similar to the incident at Monticello. Furthermore, the NRC resident inspectors visually inspected the turbine control valve and actuator supports and found them satisfactory.
I hope that you find this information helpful.
Sincerely,
/RA William F. Kane Acting for/
Luis A. Reyes Executive Director for Operations
J. Kline NRC shared the original Monticello actuator box design information with the NRC inspection staff at other potentially susceptible boiling-water reactors such as Vermont Yankee, Oyster Creek, Pilgrim, and Nine Mile Point. None of these plants had similar actuator box support structures.
NRC also shared this information with the NRC resident inspectors at the Prairie Island plant, a pressurized-water reactor with a Westinghouse turbine. Monticello uses a single mechanical system (cam and linkages) to operate the control valves. All of the controls are enclosed within a box that is attached to a top mounted support. Prairie Island uses an electro-hydraulic system, whereby each turbine control valve is operated by a separate control called an actuator which has its own supply of hydraulic fluid. Each actuator is mounted onto the turbine control valve that it controls and the turbine control valves are welded to a pedestal that supports underneath the valve. Since the four valves at Prairie Island are controlled independently of each other and are supported from below, Prairie Island can not experience a failure similar to the incident at Monticello. Furthermore, the NRC resident inspectors visually inspected the turbine control valve and actuator supports and found them satisfactory.
I hope that you find this information helpful.
Sincerely,
/RA William F. Kane Acting for/
Luis A. Reyes Executive Director for Operations DISTRIBUTION: G20070094/LTR-07-0097 PUBLIC EDO Reading File LPL3-1 Reading File RidsEdoMailCenter RidsOcaMailCenter RidsOpaMail RidsNrrOd RidsNrrRgn3MailCenter RidsNrrWpcMail RidsNrrAdro RidsNrrDorl RidsNrrDorlLpl3-1 RidsNrrPMPTam RidsNrrLATHarris B. Burgess, R-III RidsOgcRp ML070470428 OFFICE LPL3-1\PM LPL3-1\LA TechEd LPL3-1\(A)BC R-III\DRP NAME PTam THarris HChang (via email) PMilano MSatorios (via email)
DATE 2/27/07 2/16/07 2/14/07 2/27/07 2/16/07 OFFICE DORL\D NRR\D OCA EDO NAME CHaney (TMcGinty for) JDyer (TQuay for) BKeeling LReyes DATE 2/20/07 2/22/07 3/02/07 3/02/07 OFFICIAL RECORD COPY