ML17339A179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17339A179
| number = ML17339A179
| issue date = 12/05/2017
| issue date = 12/05/2017
| title = LaSalle TS 3.8.1 Cscs LAR Markup
| title = TS 3.8.1 CSCS LAR Markup
| author name = Green K M
| author name = Green K
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name =  
| addressee name =  
Line 13: Line 13:
| document type = Meeting Agenda
| document type = Meeting Agenda
| page count = 3
| page count = 3
| project =
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:ACTIONS CONDITION                REQUIRED ACTION          COMPLETION TIME C.  --------NOTES--------  C.1      Perform SR 3.8.1.1      1 hour
: 1. Not applicable              for OPERABLE required during installation          offsite circuit(s). AND of the Unit 2 Division 2 CSCS                                      Once per isolation valve                                      8 hours during Unit 2                                        thereafter Refueling 17 while Unit 2 is in        AND MODE 4, 5, or defueled.          C.2      Declare required        4 hours from feature(s), supported  discovery of
: 2. Not applicable              by the inoperable      Condition C during installation          DG(s), inoperable      concurrent with of the Unit 1                when the redundant      inoperability Division 2 CSCS              required feature(s)    of redundant isolation valve              are inoperable.        required during Unit 1                                        feature(s)
Refueling 19 while Unit 1 is in        AND MODE 4, 5, or defueled.          C.3.1    Determine OPERABLE      24 hours
    ---------------------          DG(s) are not inoperable due to Required Division 3 DG          common cause failure.
inoperable.
OR OR C.3.2    Perform SR 3.8.1.2      24 hours One required Division          for OPERABLE DG(s).
1, 2, or 3 DG inoperable and the    AND required opposite unit Division 2 DG          C.4      Restore required        72 hours inoperable.                    DG(s) to OPERABLE status.                AND 17 days from discovery of failure to meet LCO 3.8.1.a or b (continued)
LaSalle 1 and 2                    3.8.1-4              Amendment No. 194/181
ACTIONS CONDITION              REQUIRED ACTION          COMPLETION TIME F.  --------NOTES--------  F.1  Restore one required  2 hours
: 1. Not applicable            DG to OPERABLE during installation      status.                OR of the Unit 2 Division 2 CSCS                                  72 hours if isolation valve                                  Division 3 DG during Unit 2                                    is inoperable Refueling 17 while Unit 2 is in MODE 4, 5, or defueled.
: 2. Not applicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4, 5, or defueled.
Two required Division 1, 2, or 3 DGs inoperable.
OR Division 2 DG and the required opposite unit Division 2 DG inoperable.
(continued)
LaSalle 1 and 2                3.8.1-6              Amendment No. 200/187
ACTIONS CONDITION              REQUIRED ACTION        COMPLETION TIME G.  --------NOTES--------- G.1  Restore required    7 days
: 1. Only applicable            Division 2 DG to during installation        OPERABLE status.
of the Unit 2 Division 2 CSCS isolation valve during Unit 2 Refueling 17 while Unit 2 is in MODE 4,5, or defueled.
: 2. Only applicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4,5, or defueled.
Division 2 DG and the required opposite unit Division 2 DG inoperable.
H. Required Action and    H.1  Be in MODE 3.        12 hours associated Completion Time of Condition A, B, C, D, E, F or G not met.
I. Three or more required I.1  Enter LCO 3.0.3. Immediately AC sources inoperable.
LaSalle 1 and 2                  3.8.1-7            Amendment No. 200/187}}

Latest revision as of 23:18, 3 February 2020

TS 3.8.1 CSCS LAR Markup
ML17339A179
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/05/2017
From: Kimberly Green
Plant Licensing Branch III
To:
Green K, NRR/DORL/LPLIII
Shared Package
ML17339A178 List:
References
Download: ML17339A179 (3)


Text

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. --------NOTES-------- C.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

1. Not applicable for OPERABLE required during installation offsite circuit(s). AND of the Unit 2 Division 2 CSCS Once per isolation valve 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during Unit 2 thereafter Refueling 17 while Unit 2 is in AND MODE 4, 5, or defueled. C.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of
2. Not applicable by the inoperable Condition C during installation DG(s), inoperable concurrent with of the Unit 1 when the redundant inoperability Division 2 CSCS required feature(s) of redundant isolation valve are inoperable. required during Unit 1 feature(s)

Refueling 19 while Unit 1 is in AND MODE 4, 5, or defueled. C.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />


DG(s) are not inoperable due to Required Division 3 DG common cause failure.

inoperable.

OR OR C.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> One required Division for OPERABLE DG(s).

1, 2, or 3 DG inoperable and the AND required opposite unit Division 2 DG C.4 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. DG(s) to OPERABLE status. AND 17 days from discovery of failure to meet LCO 3.8.1.a or b (continued)

LaSalle 1 and 2 3.8.1-4 Amendment No. 194/181

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. --------NOTES-------- F.1 Restore one required 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

1. Not applicable DG to OPERABLE during installation status. OR of the Unit 2 Division 2 CSCS 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if isolation valve Division 3 DG during Unit 2 is inoperable Refueling 17 while Unit 2 is in MODE 4, 5, or defueled.
2. Not applicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4, 5, or defueled.

Two required Division 1, 2, or 3 DGs inoperable.

OR Division 2 DG and the required opposite unit Division 2 DG inoperable.

(continued)

LaSalle 1 and 2 3.8.1-6 Amendment No. 200/187

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. --------NOTES--------- G.1 Restore required 7 days

1. Only applicable Division 2 DG to during installation OPERABLE status.

of the Unit 2 Division 2 CSCS isolation valve during Unit 2 Refueling 17 while Unit 2 is in MODE 4,5, or defueled.

2. Only applicable during installation of the Unit 1 Division 2 CSCS isolation valve during Unit 1 Refueling 19 while Unit 1 is in MODE 4,5, or defueled.

Division 2 DG and the required opposite unit Division 2 DG inoperable.

H. Required Action and H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, C, D, E, F or G not met.

I. Three or more required I.1 Enter LCO 3.0.3. Immediately AC sources inoperable.

LaSalle 1 and 2 3.8.1-7 Amendment No. 200/187