(3 intermediate revisions by the same user not shown) |
(No difference)
|
Latest revision as of 18:36, 18 January 2022
Letter Sequence Other |
---|
|
Results
Other: ML21208A367, ML21208A409, ML21208A418, ML21208A424, ML21208A429, ML21210A125, ML21210A126, ML21210A127, ML21210A128, ML21210A129, ML21210A133, ML21210A134, ML21210A135, ML21210A136, ML21210A137, ML21210A138, ML21210A139, ML21210A140, ML21231A013
|
MONTHYEARML21210A1272020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Frontmatter (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1382020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21231A0132020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (EPID L-2020-LRO-0076)- Redacted Project stage: Other ML21208A3672020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21208A4092020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21208A4182020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21208A4242020-09-30030 September 2020 ML20308A515_003 SPS UFSAR Chapter 3 - Redacted Project stage: Other ML21208A4292020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Epids L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1262020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (Epids L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1252020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1402020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Technical Requirements (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1282020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1292020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1332020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1342020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations(Epid L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1352020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1362020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1372020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 5, Containment System (EPID L-2020-LRO-0076) - Redacted Project stage: Other ML21210A1392020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (EPID L-2020-LRO-0076) - Redacted Project stage: Other 2020-09-30
[Table View] |
Similar Documents at Surry |
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML21210A1332020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations (EPID L-2020-LRO-0076) - Redacted ML21210A1382020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards (EPID L-2020-LRO-0076) - Redacted ML21231A0132020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (EPID L-2020-LRO-0076)- Redacted ML21208A3672020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (EPID L-2020-LRO-0076) - Redacted ML21208A4092020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (EPID L-2020-LRO-0076) - Redacted ML21208A4182020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - (EPID L-2020-LRO-0076) - Redacted ML21208A4242020-09-30030 September 2020 ML20308A515_003 SPS UFSAR Chapter 3 - Redacted ML21208A4292020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (Epids L-2020-LRO-0076) - Redacted ML21210A1262020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (Epids L-2020-LRO-0076) - Redacted ML21210A1252020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging (EPID L-2020-LRO-0076) - Redacted ML21210A1272020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Frontmatter (EPID L-2020-LRO-0076) - Redacted ML21210A1282020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (EPID L-2020-LRO-0076) - Redacted ML21210A1292020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted ML21210A1342020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations(Epid L-2020-LRO-0076) - Redacted ML21210A1352020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted ML21210A1362020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (EPID L-2020-LRO-0076) - Redacted ML21210A1372020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 5, Containment System (EPID L-2020-LRO-0076) - Redacted ML21210A1392020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (EPID L-2020-LRO-0076) - Redacted ML21210A1402020-09-30030 September 2020 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Technical Requirements (EPID L-2020-LRO-0076) - Redacted ML19058A4422018-09-27027 September 2018 Updated Final Safety Analysis Report, Chapter 9 ML19058A5832018-09-27027 September 2018 UFSAR Chapter 14-18 ML14233A5142014-06-30030 June 2014 Redacted - Surry Power Station Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 20 ML19094A1341970-02-13013 February 1970 Final Safety Analysis Report ML19094A1321970-01-21021 January 1970 Surry Station Units 1 & 2, Final Safety Analysis Report ML19094A1331970-01-21021 January 1970 Final Safety Analysis Report 2020-09-30
[Table view] |
Text
Surry Power Station Updated Final Safety Analysis Report Chapter 16
Intentionally Blank Revision 52Updated Online 09/30/20 SPS UFSAR 16-i Chapter 16: Technical Specifications and Technical Requirements Table of Contents Section Title Page 16.1 TECHNICAL SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16.1-1 16.2 TECHNICAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16.2-1
Revision 52Updated Online 09/30/20 SPS UFSAR 16-ii Intentionally Blank
Revision 52Updated Online 09/30/20 SPS UFSAR 16.1-1 CHAPTER 16 TECHNICAL SPECIFICATIONS AND TECHNICAL REQUIREMENTS 16.1 TECHNICAL SPECIFICATIONS Technical Specifications were proposed in accordance with 10 CFR 50.36 during the initial licensing of the plant. The Technical Specifications now reside in Appendix A of the Operating License for each unit.
Technical Specifications define plant variables, operating conditions, surveillance requirements, and administrative controls that are considered necessary to ensure the health and safety of the public.
Revision 52Updated Online 09/30/20 SPS UFSAR 16.1-2 Intentionally Blank
Revision 52Updated Online 09/30/20 SPS UFSAR 16.2-1 16.2 TECHNICAL REQUIREMENTS The Technical Requirements Manual (TRM) contains requirements for plant operation and surveillance of systems formerly contained in the Technical Specifications, along with other selected items. Some requirements were removed from the Technical Specifications as part of NRC and industry efforts to simplify Technical Specifications.
The TRM is controlled by station procedure, and a 10 CFR 50.59 review is required to change the TRM. Changes to the TRM may be made without prior NRC approval, provided that the changes do not involve a license amendment as defined in 10 CFR 50.59. Changes to the TRM that are implemented without prior NRC approval are reported to the NRC in accordance with 10 CFR 50.59. Proposed changes that involve a license amendment are reviewed and approved by the NRC prior to implementation.
Revision 52Updated Online 09/30/20 SPS UFSAR 16.2-2 Intentionally Blank