| number = ML12283A087
| number = ML12283A087
| issue date = 10/03/2012
| issue date = 10/03/2012
| title = Catawba Nuclear Power Plant - Operating Licensing Written Examination Approval 05000413-12-301 and 05000414-12-301
| title = Operating Licensing Written Examination Approval 05000413-12-301 and 05000414-12-301
| author name = Widmann M T
| author name = Widmann M
| author affiliation = NRC/RGN-II/DRS/OLHPB
| author affiliation = NRC/RGN-II/DRS/OLHPB
| addressee name = Phillips K
| addressee name = Phillips K
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:October 3, 2012
[[Issue date::October 3, 2012]]


Duke Energy Corporation, LLC ATTN: Mr. Kevin Phillips Training Manager Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
==SUBJECT:==
CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301


SUBJECT: CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301
==Dear Mr. Phillips:==
October 1, 2012
 
==SUBJECT:==
CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301


==Dear Mr. Phillips:==
==Dear Mr. Phillips:==
Line 31: Line 35:
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff administered the operating tests to individuals, as applicable, from September 4-12, 2012. Note that any examination waivers and application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff administered the operating tests to individuals, as applicable, from September 4-12, 2012. Note that any examination waivers and application denials have been addressed in separate correspondence.


The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," the week of October 1, 2012.
The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, the week of October 1, 2012.
 
This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4550.
 
Please contact the Chief Examiner, Mr. Phillip Capehart, at (404) 997-4483 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant on the list of approved applicants.


This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4550. Please contact the Chief Examiner, Mr. Phillip Capehart, at (404) 997-4483 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant on the list of approved applicants.
Sincerely,
/RA by Mark E. Franke for/  


Sincerely,/RA by Mark E. Franke for/ Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 October 3, 2012 Duke Energy Corporation, LLC ATTN: Mr. Kevin Phillips Training Manager Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
Malcolm T. Widmann, Chief  


SUBJECT: CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301
Operations Branch 1


==Dear Mr. Phillips:==
Division of Reactor Safety
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examination at Catawba Nuclear Power Plant.
 
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
 
X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML12283A087 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS


The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff administered the operating tests to individuals, as applicable, from September 4-12, 2012. Note that any examination waivers and application denials have been addressed in separate correspondence.
SIGNATURE PEC & EL MEF FOR


The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," the week of October 1, 2012. This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4550.
NAME PCAPEHART MWIDMANN


Please contact the Chief Examiner, Mr. Phillip Capehart, at (404) 997-4483 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant on the list of approved applicants.
DATE 10/3 / 2012 10/ 3 /2012


Sincerely,/RA by Mark E. Franke for/ Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML12283A087  X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE PEC & EL MEF FOR NAME PCAPEHART MWIDMANN DATE 10/3 / 2012 10/ 3 /2012 10/ /2012 10/ /2012 10/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
10/ /2012 10/ /2012 10/ /2012 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 22:07, 11 January 2025

Operating Licensing Written Examination Approval 05000413-12-301 and 05000414-12-301
ML12283A087
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/03/2012
From: Widmann M
Operator Licensing and Human Performance Branch
To: Phillips K
Duke Energy Carolinas
References
50-413/12-301, 50-414/12-301 IR-12-301
Download: ML12283A087 (2)


Text

October 3, 2012

SUBJECT:

CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301

Dear Mr. Phillips:

October 1, 2012

SUBJECT:

CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000413/2012301 AND 05000414/2012301

Dear Mr. Phillips:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examination at Catawba Nuclear Power Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC staff administered the operating tests to individuals, as applicable, from September 4-12, 2012. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, the week of October 1, 2012.

This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4550.

Please contact the Chief Examiner, Mr. Phillip Capehart, at (404) 997-4483 if you have any questions or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant on the list of approved applicants.

Sincerely,

/RA by Mark E. Franke for/

Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML12283A087 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS