ML20199K943: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:-             _ -__-_ _ _ _______
{{#Wiki_filter:_
_        -        .
-
    *
.
  r   *
-
        In Reply Refer To:                       APR 0 41.986
_ -__-_ _ _ _______
        Dockets:     50-445/85-16
*
                    50-446/85-13
*
        Texas Utilities Generating Company
r
        ATTN: Mr. W. G. Counsil
In Reply Refer To:
                Executive Vice President
APR 0 41.986
        400 North Olive Street, Lock Box 81
Dockets:
        Dallas, Texas       75201
50-445/85-16
        Gentlemen:
50-446/85-13
        This refers to the inspection conducted by Mr. T. F. Westerman and other members
Texas Utilities Generating Company
        of the Region IV Comanche Peak Group during the period November 1-30, 1985, of
ATTN: Mr. W. G. Counsil
        activities covered by NRC Construction Permits CPPR-126 and CPPR-127 for the
Executive Vice President
        Comanche Peak Steam Electric Station, Units 1 &nd 2, and to the respective
400 North Olive Street, Lock Box 81
        discussion of our findings with Messrs. R. E. Camp and J. T. Merritt, and other
Dallas, Texas
        members of your staff at the conclusion of the inspection.
75201
        Areas examined during the inspection included construction and Comanche Peak
Gentlemen:
        Response Team activities.       Within these areas, the inspection consisted of
This refers to the inspection conducted by Mr. T. F. Westerman and other members
        selective examination of procedures and repre           'ative records, interviews with
of the Region IV Comanche Peak Group during the period November 1-30, 1985, of
        personnel, and observations by the inspectors. .hese findings are documented in
activities covered by NRC Construction Permits CPPR-126 and CPPR-127 for the
        the enclosed inspection report.
Comanche Peak Steam Electric Station, Units 1 &nd 2, and to the respective
        During this inspection, it was found that certain of your activities were in
discussion of our findings with Messrs. R. E. Camp and J. T. Merritt, and other
        violation of NRC requirements. Consequently, you are required to respond to
members of your staff at the conclusion of the inspection.
        these violations, in writing, in accordance with the provisions of Section 2.201
Areas examined during the inspection included construction and Comanche Peak
        of the NRC's " Rules of Practice," Part 2, Title'10, Code of Federal Regulations.
Response Team activities.
        Your response should be based on the specifics contained in the Notice of
Within these areas, the inspection consisted of
        Violation enclosed with this letter.
selective examination of procedures and repre
        During this inspection, it was found that certain of your activities appeared
'ative records, interviews with
        to deviate from commitments made to the NRC. These items and references to the
personnel, and observations by the inspectors.
        commitments are identified in the enclosed Notice of Deviation. You are
.hese findings are documented in
        requested to respond to these deviations in writing. Your response should be
the enclosed inspection report.
        based on the specifics contained in the Notice of Deviation enclosed with this
During this inspection, it was found that certain of your activities were in
        letter. With respect to item A.5 in the Notice of Deviation, out-of-scope
violation of NRC requirements. Consequently, you are required to respond to
        examples of incorrect tagging were also observed during the inspection as
these violations, in writing, in accordance with the provisions of Section 2.201
        discussed in paragraph 7.e.(2) of Appendix D of this report. You are
of the NRC's " Rules of Practice," Part 2, Title'10, Code of Federal Regulations.
        requested to include these inspection findings in your response to item A.5,
Your response should be based on the specifics contained in the Notice of
        taking into consideration that they pertain directly to the applicant and not
Violation enclosed with this letter.
        the reinspection effort.
During this inspection, it was found that certain of your activities appeared
        Six unresolved items are identified as follows in the enclosed inspection
to deviate from commitments made to the NRC. These items and references to the
        report: Apperdix C, paragraphs 3. 4.a. 4.b. and 6; Appendix D, paragraph 6.a.
commitments are identified in the enclosed Notice of Deviation. You are
                                                                  k                           kh
requested to respond to these deviations in writing.
        RIV: CPG / SRI / CON     SRI /0PSg     CPG         CPG             DRSP           NRR                       ,
Your response should be
        SHPhillips u             DLKelley       IBarnes   TFWesterman     EHJohnson     VSNoonan
based on the specifics contained in the Notice of Deviation enclosed with this
        4 /2./86 h l
letter. With respect to item A.5 in the Notice of Deviation, out-of-scope
                                                                                                                        '
examples of incorrect tagging were also observed during the inspection as
                                  j/3)/86     y /e /86
discussed in paragraph 7.e.(2) of Appendix D of this report. You are
                                                            it/ 9/86       A /4 /86       +/y /86 k
requested to include these inspection findings in your response to item A.5,
                                                  A
taking into consideration that they pertain directly to the applicant and not
            $4     $$El $Nh25                                                         /E0I                       I
the reinspection effort.
                                                                                                                    l
Six unresolved items are identified as follows in the enclosed inspection
            n
report: Apperdix C, paragraphs 3. 4.a. 4.b. and 6; Appendix D, paragraph 6.a.
k
kh
RIV: CPG / SRI / CON
SRI /0PSg
CPG
CPG
DRSP
NRR
,
SHPhillips u
DLKelley
IBarnes
TFWesterman
EHJohnson
VSNoonan
'
4 /2./86 h l
j/3)/86
y /e /86
it/ 9/86
A /4 /86
+/y /86 k
A
$4 $$El $Nh25
/E0I
I l
n


      _
_
r e
e
    Texas Utilities Generating Company       -2-
r
    We have also examined actions you have taken with regard to previously
Texas Utilities Generating Company
    identified inspection findings. The st eus of these items is identified in
-2-
    paragraph 2 of Appendix C, and paragraph 2 of Appendix D of the enclosed report.
We have also examined actions you have taken with regard to previously
    The responses directed by this letter and the accompanying Notices are not
identified inspection findings. The st eus of these items is identified in
    subject to the clearance procedures of the Office of Management and Budget as
paragraph 2 of Appendix C, and paragraph 2 of Appendix D of the enclosed report.
    required by the Paperwork Reduction Act of 1980, PL 96-511.
The responses directed by this letter and the accompanying Notices are not
    Should you have any question, concerning this inspection, we will be pleased to
subject to the clearance procedures of the Office of Management and Budget as
    discuss them with you.
required by the Paperwork Reduction Act of 1980, PL 96-511.
                                              Sincerely,
Should you have any question, concerning this inspection, we will be pleased to
                                                        at;y2 S'$1 W
discuss them with you.
                                                          E. H. J0WOU
Sincerely,
                                              E. H. Johnson, Director
at;y2 S'$1 W
                                              Division of Reactor Safety and
E. H. J0WOU
                                                Projects
E. H. Johnson, Director
    Enclosures:
Division of Reactor Safety and
    1.   Appendix A - Notice of Violation                                       .
Projects
    2.   Appendix B - Notice of Deviation
Enclosures:
    3.   Appendix C - NRC Construction Inspection Report
1.
            50-445/85-16
Appendix A - Notice of Violation
            50-446/85-13
.
    4.   Appendix D - NRC Comanche Peak Response
2.
            Team Activities Inspection Report
Appendix B - Notice of Deviation
            50-445/85-16
3.
            50-446/85-13
Appendix C - NRC Construction Inspection Report
    cc w/ enclosures:
50-445/85-16
    Texas Utilities Generating Company
50-446/85-13
    ATTN:   J. W. Beck, Vice President, Licensing
4.
            Quality Assurance and Nuclear Fuels
Appendix D - NRC Comanche Peak Response
    Skyway Tower
Team Activities Inspection Report
    400 North Olive Street
50-445/85-16
    Lock Box 81
50-446/85-13
    Dallas, Texas     75201
cc w/ enclosures:
    Juanita Ellis
Texas Utilities Generating Company
    President, CASE
ATTN:
    1426 South Polk Street
J. W. Beck, Vice President, Licensing
    Dallas, Texas     75224
Quality Assurance and Nuclear Fuels
    Renea Hicks
Skyway Tower
    Assistant Attorney General
400 North Olive Street
    Environmental Protection
Lock Box 81
      Division
Dallas, Texas
    P.O. Box 12548
75201
    Austin, Texas     76711
Juanita Ellis
    Texas Radiation Control Program Director
President, CASE
1426 South Polk Street
Dallas, Texas
75224
Renea Hicks
Assistant Attorney General
Environmental Protection
Division
P.O. Box 12548
Austin, Texas
76711
Texas Radiation Control Program Director


                                              . - .                                        .        ,
-- -
            -- -           . .__ .                     -
. .__ .
                    ,
. - .
          ,-
-
.
,
, -
,
j
j
                      ' Texas Utilities Generating Company                     -3-
' Texas Utilities Generating Company
-3-
4
4
                        bec to DMB (IE01)
bec to DMB (IE01)
                        bec distrib. by RIV:
bec distrib. by RIV:
                        *RPB                                             * MIS System
*RPB
                        *RRI-0PS                                         *RSTS Operator
* MIS System
                        *RRI-CONST                                       *R&SPB
*RRI-0PS
                        *T. F. Westerman, CPTG                               DRSP
*RSTS Operator
                                                                              R. Martin, RA
*RRI-CONST
*R&SPB
*T. F. Westerman, CPTG
DRSP
,
,
                        V. Noonan. NRR
V. Noonan. NRR
                        S. Treby, ELD                                 *RSB
R. Martin, RA
                        *RIV File                                           J. Taylor, IE
S. Treby, ELD
,                      *D. Weiss, LFMB (AR-2015)                           R. Heishman, IE
*RSB
j                       I. Barnes
*RIV File
t
J. Taylor, IE
                        *w/766
*D. Weiss, LFMB (AR-2015)
R. Heishman, IE
,
j
I. Barnes
t
*w/766
.
.
1
1
:
:
                                                      .
.
d
d
;
;
Line 160: Line 212:
l
l
,
,
  .7--m-         ,,         ,,p   4 - - , .,       q     r --. . - . -- - - , - - - - - ,   - , - -   .--gy --
.7--m-
                                                                                                                  w
,,
,,p
4 - - , .,
q
r --. . - .
-- - - ,
- - - - -
,
- , - -
.--gy
--
w
}}
}}

Latest revision as of 04:07, 8 December 2024

Forwards Insp Repts 50-445/85-16 & 50-446/85-13 on 851101-30 & Notices of Violation & Deviation.Six Unresolved Items Also Identified
ML20199K943
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/04/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20199K948 List:
References
NUDOCS 8604100259
Download: ML20199K943 (3)


See also: IR 05000445/1985016

Text

_

-

.

-

_ -__-_ _ _ _______

r

In Reply Refer To:

APR 0 41.986

Dockets:

50-445/85-16

50-446/85-13

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. T. F. Westerman and other members

of the Region IV Comanche Peak Group during the period November 1-30, 1985, of

activities covered by NRC Construction Permits CPPR-126 and CPPR-127 for the

Comanche Peak Steam Electric Station, Units 1 &nd 2, and to the respective

discussion of our findings with Messrs. R. E. Camp and J. T. Merritt, and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included construction and Comanche Peak

Response Team activities.

Within these areas, the inspection consisted of

selective examination of procedures and repre

'ative records, interviews with

personnel, and observations by the inspectors.

.hese findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title'10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

During this inspection, it was found that certain of your activities appeared

to deviate from commitments made to the NRC. These items and references to the

commitments are identified in the enclosed Notice of Deviation. You are

requested to respond to these deviations in writing.

Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter. With respect to item A.5 in the Notice of Deviation, out-of-scope

examples of incorrect tagging were also observed during the inspection as

discussed in paragraph 7.e.(2) of Appendix D of this report. You are

requested to include these inspection findings in your response to item A.5,

taking into consideration that they pertain directly to the applicant and not

the reinspection effort.

Six unresolved items are identified as follows in the enclosed inspection

report: Apperdix C, paragraphs 3. 4.a. 4.b. and 6; Appendix D, paragraph 6.a.

k

kh

RIV: CPG / SRI / CON

SRI /0PSg

CPG

CPG

DRSP

NRR

,

SHPhillips u

DLKelley

IBarnes

TFWesterman

EHJohnson

VSNoonan

'

4 /2./86 h l

j/3)/86

y /e /86

it/ 9/86

A /4 /86

+/y /86 k

A

$4 $$El $Nh25

/E0I

I l

n

_

e

r

Texas Utilities Generating Company

-2-

We have also examined actions you have taken with regard to previously

identified inspection findings. The st eus of these items is identified in

paragraph 2 of Appendix C, and paragraph 2 of Appendix D of the enclosed report.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any question, concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

at;y2 S'$1 W

E. H. J0WOU

E. H. Johnson, Director

Division of Reactor Safety and

Projects

Enclosures:

1.

Appendix A - Notice of Violation

.

2.

Appendix B - Notice of Deviation

3.

Appendix C - NRC Construction Inspection Report

50-445/85-16

50-446/85-13

4.

Appendix D - NRC Comanche Peak Response

Team Activities Inspection Report

50-445/85-16

50-446/85-13

cc w/ enclosures:

Texas Utilities Generating Company

ATTN:

J. W. Beck, Vice President, Licensing

Quality Assurance and Nuclear Fuels

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas

75201

Juanita Ellis

President, CASE

1426 South Polk Street

Dallas, Texas

75224

Renea Hicks

Assistant Attorney General

Environmental Protection

Division

P.O. Box 12548

Austin, Texas

76711

Texas Radiation Control Program Director

-- -

. .__ .

. - .

-

.

,

, -

,

j

' Texas Utilities Generating Company

-3-

4

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB
  • MIS System
  • RRI-0PS
  • RSTS Operator
  • RRI-CONST
  • R&SPB
  • T. F. Westerman, CPTG

DRSP

,

V. Noonan. NRR

R. Martin, RA

S. Treby, ELD

  • RSB
  • RIV File

J. Taylor, IE

  • D. Weiss, LFMB (AR-2015)

R. Heishman, IE

,

j

I. Barnes

t

  • w/766

.

1

.

d

i

l

.

J

l

4

i

l

l

,

.7--m-

,,

,,p

4 - - , .,

q

r --. . - .

-- - - ,

- - - - -

,

- , - -

.--gy

--

w