IR 05000277/2002010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML022590702
| number = ML022700571
| issue date = 09/16/2002
| issue date = 09/27/2002
| title = Summary of Publically Observed IR 05000277-02-010 Exit Meeting on August 15, 2002
| title = IR 05000277-02-010, 05000278-02-010, July 8 - August 15, 2002; Peach Bottom Atomic Power Station, Units 2 & 3. License Renewal Application, Aging Management Inspection Report
| author name = Lew D
| author name = Lanning W
| author affiliation = NRC/RGN-I/DRS/PEB
| author affiliation = NRC/RGN-I/DRS
| addressee name =  
| addressee name = Skolds J
| addressee affiliation = NRC/RGN-I
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000277
| docket = 05000277, 05000278
| license number = DPR-044
| license number = DPR-044, DPR-056
| contact person =  
| contact person =  
| document report number = IR-02-010
| document report number = IR-02-010
| document type = Memoranda
| document type = Inspection Report, Letter
| page count = 1
| page count = 32
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 16, 2002 MEMORANDUM TO:  File FROM:  David C. Lew, Chief /RA by J. T. Yerokun Acting for/
{{#Wiki_filter:September 27, 2002
Performance Evaluation Branch Division of Reactor Safety Region I SUBJECT:  EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION SUMMARY OF PUBLICALLY OBSERVED INSPECTION 50-277/02-10 EXIT MEETING ON AUGUST 15, 2002 On August 15, 2002 at 7:00 p.m., an exit meeting was conducted at the Peach Bottom Inn, Restaurant and Lounge, between the Nuclear Regulatory Commission (NRC) staff and Exelon Generation Company, LLC. The purpose of the meeting was for the NRC staff to convey the results of the NRC team inspections conducted as part of the review of Exelons application for license renewal for Peach Bottom Atomic Power Statio The meeting was opened by Michael Modes, Senior Reactor Inspector, Division of Reactor Safety and leader of the team inspection. The meeting was attended by Wayne Lanning, Division Director, Division of Reactor Safety. The NRC briefly summarized the findings of the inspection. Approximately 6 people, other than the NRC and Exelon, attended the meetin At the end of the meeting between Exelon and the NRC public attendees were offered the opportunity to ask questions of NRC officials. Numerous questions were asked over a two hour period. The following issues were discussed: dry cask storage, fuel pool integrity, financial liability and license renewal. These questions and comments were addressed by NRC management.


DOCUMENT NAME: G:\PEB\MMODES\PB_MTG_SUMMARY.WPD After declaring this document An Official Agency Record it will be released to the Public.
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION - NRC INSPECTION REPORT 50-277/02-10, 50-278/02-10


To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS NAME DLew (JTY for)
==Dear Mr. Skolds:==
DATE 09/16/02  09/ /02  09/ /02 09/ /02 09/ /02 OFFICIAL RECORD COPY
On August 15, 2002, the NRC essentially completed the second of three inspections of your application for renewal of the operating licenses for the Peach Bottom Atomic Power Station (PSAPS), Units 2 and 3. Two members of the inspection team returned to Peach Bottom Atomic Power Station the week of September 16, 2002, to complete the inspection by performing a walkdown of the Unit 2 containment during the regularly scheduled outage. The results of the inspection were discussed with members of your staff on August 15, 2002, at a public exit meeting held at the Peach Bottom Inn, Restaurant and Lounge. The enclosed inspection report presents the results of that inspection.
 
The inspection was conducted in accordance with NRC Manual Chapter 2516, Policy and Guidance for the License Renewal Inspection Program, using NRC Inspection Procedure 71002, License Renewal Inspections. The inspection was the second of three NRC inspections that review your application for a renewed license for the PBAPS facilities. The inspection consisted of a selected examination of procedures and representative records, systems walkdowns, and interviews with personnel regarding the aging management of systems, structures and components within the scope of license renewal in accordance with the Code of Federal Regulations (10 CFR Part 54).
 
The aging management portion of your license renewal activities were being implemented or planned as described in your license renewal application. The documentation supporting your application is in an auditable and retrievable form. The team identified three open items for which your staff must take further action to assure your application is complete and accurate:
(1) the aging management program that will be applied to fuse clips has not been specified, (2) one Boiling Water Owners Group Vessel Internals Program procedure was included in the application before the procedure was endorsed by the NRC, and (3) a training kit, used to assure that inspectors can identify cable aging effects, did not include samples of the kinds of cable that are installed at Peach Bottom. Except for these open items, your aging management programs can acceptably identify and manage the structures, systems, and components within the scope of license renewal.
 
Mr. John In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If you have any questions, please contact David Lew of my staff at (610) 337-5120.
 
Sincerely,
/RA/
Wayne D. Lanning, Director Division of Reactor Safety Docket Nos:
50-277, 50-278 License Nos: DPR-44, DPR-56 Enclosure:
Inspection Report Nos. 50-277/02-10 and 50-278/02-10 Attachments: (1) Supplemental Information (2) Structures/Systems Selected for Inspection
 
Mr. John
}}
}}

Latest revision as of 15:42, 16 January 2025

IR 05000277-02-010, 05000278-02-010, July 8 - August 15, 2002; Peach Bottom Atomic Power Station, Units 2 & 3. License Renewal Application, Aging Management Inspection Report
ML022700571
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/27/2002
From: Lanning W
Division of Reactor Safety I
To: Skolds J
Exelon Generation Co
References
IR-02-010
Download: ML022700571 (32)


Text

September 27, 2002

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - NRC INSPECTION REPORT 50-277/02-10, 50-278/02-10

Dear Mr. Skolds:

On August 15, 2002, the NRC essentially completed the second of three inspections of your application for renewal of the operating licenses for the Peach Bottom Atomic Power Station (PSAPS), Units 2 and 3. Two members of the inspection team returned to Peach Bottom Atomic Power Station the week of September 16, 2002, to complete the inspection by performing a walkdown of the Unit 2 containment during the regularly scheduled outage. The results of the inspection were discussed with members of your staff on August 15, 2002, at a public exit meeting held at the Peach Bottom Inn, Restaurant and Lounge. The enclosed inspection report presents the results of that inspection.

The inspection was conducted in accordance with NRC Manual Chapter 2516, Policy and Guidance for the License Renewal Inspection Program, using NRC Inspection Procedure 71002, License Renewal Inspections. The inspection was the second of three NRC inspections that review your application for a renewed license for the PBAPS facilities. The inspection consisted of a selected examination of procedures and representative records, systems walkdowns, and interviews with personnel regarding the aging management of systems, structures and components within the scope of license renewal in accordance with the Code of Federal Regulations (10 CFR Part 54).

The aging management portion of your license renewal activities were being implemented or planned as described in your license renewal application. The documentation supporting your application is in an auditable and retrievable form. The team identified three open items for which your staff must take further action to assure your application is complete and accurate:

(1) the aging management program that will be applied to fuse clips has not been specified, (2) one Boiling Water Owners Group Vessel Internals Program procedure was included in the application before the procedure was endorsed by the NRC, and (3) a training kit, used to assure that inspectors can identify cable aging effects, did not include samples of the kinds of cable that are installed at Peach Bottom. Except for these open items, your aging management programs can acceptably identify and manage the structures, systems, and components within the scope of license renewal.

Mr. John In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions, please contact David Lew of my staff at (610) 337-5120.

Sincerely,

/RA/

Wayne D. Lanning, Director Division of Reactor Safety Docket Nos:

50-277, 50-278 License Nos: DPR-44, DPR-56 Enclosure:

Inspection Report Nos. 50-277/02-10 and 50-278/02-10 Attachments: (1) Supplemental Information (2) Structures/Systems Selected for Inspection

Mr. John