{{#Wiki_filter:rJ:::lVlJ(                                                                                             Perry Nuclear PowerStation 10 Center Road FirstEnergy Nuclear Operating Company                                                                           Perry, Ohio44081 L William Peerce                                                                                                   440-280-5382 Vice President                                                                                               Fax: 440-280-8029 January 3, 2007 PY-CEI/OIE-0685L Mr. JamesL. Caldwell Nuclear Regulatory Commission RegionalAdministrator, RegionIII 2443Warrenville Road,Suite 210 Lisle, Illinois 60532-4352 Perry Nuclear PowerPlant Docket No. 50-440 License No. NPF-58
{{#Wiki_filter:rJ:::lVlJ(
Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 L William Peerce 440-280-5382 Vice President Fax: 440-280-8029 January 3, 2007 PY-CEI/OIE-0685L Mr. James L. Caldwell Nuclear Regulatory Commission Regional Administrator, Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58


==Subject:==
==Subject:==
Completionof Requirementsfor Transition from NRCMC0305 Action Matrix Column for Multiple/Repetitive DegradedCornerstoneto RoutineOversight
Completion of Requirements for Transition from NRC MC 0305 Action Matrix Column for Multiple/Repetitive Degraded Cornerstone to Routine Oversight


==DearMr. Caldwell,==
==Dear Mr. Caldwell,==
The purpose of this letter is to summarize the key actions implemented and improvements in performance achieved at the Perry Nuclear Power Plant (PNPP) since entering the Multiple/Repetitive Degraded Cornerstone Column of the NRC Manual Chapter 0305 (MC 0305)
Action Matrix (Column IV of the NRC Action Matrix) in August 2004. The Attachment to this letter provides a more detailed discussion of the basis for FENOCs request of NRC to transition to an appropriate reduced level of regulatory oversight consistent with the guidance set forth in NRC MC 0305.
The Perry management team made substantial improvements at PNPP, throughout the 2005 and 2006 timeframe and has sustained performance at substantially improved performance levels during most of the 2006 timeframe. The improvements have been confirmed through critical self-and peer-assisted assessments completed in 2006 as part of the closure of the individual performance improvement initiatives.
Those assessments also identified areas in which PNPP performance had not achieved FENOCs standards of excellence and defined specific areas in which additional improvements would be required in order to meet those standards. These areas for improvement have been included in the Perry Excellence Plans to ensure continuous improvement.
FENOC and the NRC will discuss overall improvement of station performance achieved through the completion of the Perry Performance Improvement Initiatives Phase 2 (PII P2) and the transition to the FENOC Fleet continuous improvement processes during a public meeting scheduled for January 10, 2007. As requested, FENOC is including, as an Attachment to this letter, a report that provides the basis for FENOCs request of NRC to transition to an appropriate reduced level of regulatory oversight consistent with the guidance set forth in NRC MC 0305. This report summarizes the actions taken to meet the requirements of NRC MC 0305, the accomplishments achieved through PII P2, the areas in which sustained improvements in performance have been achieved and examples of those areas where performance has not achieved FENOCs standards of excellence for each of the six focus areas of the Perry PII P2.
Each individual PII initiative has a detailed closure report documenting the results of the initiative, the specific improvements achieved, the conclusions of critical closure assessments


Thepurposeof this letter is to summarize      the key actions implemented and improvements    in performanceachievedat the Perry Nuclear PowerPlant (PNPP)since entering the Multiple/Repetitive DegradedCornerstone Columnof the NRCManualChapter 0305 (MC0305)
1-" I" -L-r-I/LJIr--ulooO L Page 2 and the areas in which additional improvements in performance are necessary to meet FENOCs standards of excellence. A more detailed closure report for PII P2, and the supporting reports for each initiative, has been made available to the NRC for inspection at the PNPP.
Action Matrix (ColumnIV of the NRCAction Matrix) in August2004. TheAttachmentto this letter providesa moredetailed discussionof the basis for FENOCs      requestof NRC  to transition to an appropriatereducedlevel of regulatory oversight consistent with the guidanceset forth in NRCMC0305.
The Perry management    team madesubstantial improvementsat PNPP,throughout the 2005 and 2006 timeframeand has sustained performanceat substantially improvedperformance levels during mostof the 2006 timeframe. The improvementshave been confirmed through critical self- and peer-assistedassessments    completedin 2006as part of the closure of the individual performanceimprovement    initiatives. Thoseassessments  also identified areas in which PNPPperformancehad not achieved FENOCsstandards of excellence and defined specific areas in whichadditional improvements    wouldbe required in order to meetthose standards. Theseareas for improvementhavebeenincluded in the Perry Excellence Plans to ensure continuous improvement.
FENOC  and the NRCwill discuss overall improvementof station performanceachieved through the completionof the Perry Performance      Improvement Initiatives Phase2 (PII P2) and the transition to the FENOC    Fleet continuousimprovementprocessesduring a public meeting scheduledfor January10, 2007. As requested, FENOC        is including, as an Attachmentto this letter, a report that providesthe basis for FENOCs  requestof NRCto transition to an appropriatereducedlevel of regulatory oversight consistent with the guidanceset forth in NRC MC0305. This report summarizesthe actions taken to meet the requirements of NRCMC0305, the accomplishments    achievedthrough PII P2, the areas in which sustained improvements      in performancehave been achieved and examplesof those areas where performancehas not achievedFENOCs    standardsof excellencefor eachof the six focus areas of the Perry PII P2.
Eachindividual PII initiative hasa detailed closure report documenting  the results of the initiative, the specific improvements  achieved,the conclusionsof critical closure assessments
 
1-" I" -L-r- I/LJIr--ulooO L Page2 and the areas in which additional improvementsin performanceare necessaryto meet FENOCs standardsof excellence.A moredetailed closure report for PII P2, andthe supportingreports for eachinitiative, has beenmadeavailable to the NRCfor inspection at the PNPP.


==Background:==
==Background:==
By letter dated August12, 2004, the NRCinformed FirstEnergy Nuclear Operating Company (FENOC)that the PNPPhad entered the Multiple/Repetitive DegradedCornerstone columnof the NRCMC0305 Reactor Oversight ProgramAction Matrix (ColumnIV of the Action Matrix) requiring supplementalinspections and increasedoversight. NRCalso identified substantivecross cutting issues in the ProblemIdentification andResolutionarea (in August 2004) and in the HumanPerformancearea (in March2005). In July 2005, the NRCissued Inspection Report2005003documentingthe results of the inspection conductedin accordance with Inspection Procedure(IP) 95003. By letters dated August8 and 17, 2005, FENOC                 provided its responseto the NRC findings, stated the results of the root andcontributing cause evaluations and beganimplementingthe Perry PerformanceImprovement          Initiative - Phase2 (PII P2). Consistentwith the requirementsfor ColumnIV of the Action Matrix, on September                   28, 2005, the NRCissued a Confirmatory Action Letter (CAL) to PNPP.The CALconfirmed the understandingof actions that FENOC     wasplanning to take to improvethe performanceat PNPP,confirmed FENOCs     specific commitmentsas stated in FENOC       letters dated August 8 and 17, 2005, and documented   the NRCcriteria for continuing an increasedlevel of oversight consistent with the MC0305requirements.
By {{letter dated|date=August 12, 2004|text=letter dated August 12, 2004}}, the NRC informed FirstEnergy Nuclear Operating Company (FENOC) that the PNPP had entered the Multiple/Repetitive Degraded Cornerstone column of the NRC MC 0305 Reactor Oversight Program Action Matrix (Column IV of the Action Matrix) requiring supplemental inspections and increased oversight. NRC also identified substantive cross cutting issues in the Problem Identification and Resolution area (in August 2004) and in the Human Performance area (in March 2005). In July 2005, the NRC issued Inspection Report 2005003 documenting the results of the inspection conducted in accordance with Inspection Procedure (IP) 95003. By letters dated August 8 and 17, 2005, FENOC provided its response to the NRC findings, stated the results of the root and contributing cause evaluations and began implementing the Perry Performance Improvement Initiative  
CALClosure: From August 2005 to October 2006, FENOC           completed the commitmentsset forth in the CALletter and performedself- and peer-assistedassessments        to confirm the effectiveness of its accomplishments.By letter dated December         20, 2006, FENOC     provided a summary of the actions taken, to completeeachof the 13 commitments         and to achieve and sustain improvedperformance  in the four areaslisted in the CALLetter (i.e., IP 95002Inspection Follow-up Issues, Corrective Action ProgramImplementation, HumanPerformance,and Emergency Preparedness.)In that letter, FENOC   also providedthe basis for its requestof the NRCto close the CALcommitments.
- Phase 2 (PII P2). Consistent with the requirements for Column IV of the Action Matrix, on September 28, 2005, the NRC issued a Confirmatory Action Letter (CAL) to PNPP. The CAL confirmed the understanding of actions that FENOC was planning to take to improve the performance at PNPP, confirmed FENOCs specific commitments as stated in FENOC letters dated August 8 and 17, 2005, and documented the NRC criteria for continuing an increased level of oversight consistent with the MC 0305 requirements.
PII P2 Scope:In addition to completingthe individual commitments       in the CAL,FENOC established and implementeda broader performanceimprovementplan, PII P2, to addressthe NRC95003Inspection findings and observationsand to resolve the root and contributing causes of the organizational and programmaticperformanceissues leading to PNPPsentry into Column IV of the Action Matrix. In developingthe PII P2, FENOC   included initiatives in Work Management,Training, EmployeeEngagementand Operational Focus because PNPP recognizedthe interrelationship betweenthe cross-cutting areas of Human           Performanceand Corrective Action Program(CAP)implementationand other processesand performanceareas.
CAL Closure: From August 2005 to October 2006, FENOC completed the commitments set forth in the CAL letter and performed self-and peer-assisted assessments to confirm the effectiveness of its accomplishments. By {{letter dated|date=December 20, 2006|text=letter dated December 20, 2006}}, FENOC provided a summary of the actions taken, to complete each of the 13 commitments and to achieve and sustain improved performance in the four areas listed in the CAL Letter (i.e., IP 95002 Inspection Follow-up Issues, Corrective Action Program Implementation, Human Performance, and Emergency Preparedness.) In that letter, FENOC also provided the basis for its request of the NRC to close the CAL commitments.
For example,the work management     process directly supportedtimely completionof corrective actions and an improvedtraining process supportedoverall humanperformanceimprovements.
PII P2 Scope: In addition to completing the individual commitments in the CAL, FENOC established and implemented a broader performance improvement plan, PII P2, to address the NRC 95003 Inspection findings and observations and to resolve the root and contributing causes of the organizational and programmatic performance issues leading to PNPPs entry into Column IV of the Action Matrix. In developing the PII P2, FENOC included initiatives in Work Management, Training, Employee Engagement and Operational Focus because PNPP recognized the interrelationship between the cross-cutting areas of Human Performance and Corrective Action Program (CAP) implementation and other processes and performance areas.
Overall, the PII P2 was successful and the Perry station management       teamand its employees havesubstantially improvedperformanceof equipmentand key programsfrom less than adequatelevels (in 2004)to medianindustry performance     levels, or above,at the close of 2006.
For example, the work management process directly supported timely completion of corrective actions and an improved training process supported overall human performance improvements.
Results and KeyLearnings: The substantial improvementsachievedthrough the PII P2 initiatives demonstratedFENOCs      broader commitment to improving performanceat the Perry station. Further, the successfulimplementation  of the PII P2initiatives providedseveral key lessonslearned that will be applied to accomplishthe objectives of FENOCs         continuous improvement   plans going forward. For example,the importanceof critical self-assessmentsand benchmarking   to identify performancegapswas one of the key lessons learned from the completionof the PII P2 and has becomea central elementof the continuous improvement culture at Perry. Also, the value of management     oversight and involvementbecameclear as the Perry management   teamworkedto resolve the issues that led to less than adequate performancein HumanPerformanceand Corrective Action Programimplementation. The Perry
Overall, the PII P2 was successful and the Perry station management team and its employees have substantially improved performance of equipment and key programs from less than adequate levels (in 2004) to median industry performance levels, or above, at the close of 2006.
Results and Key Learnings: The substantial improvements achieved through the PII P2 initiatives demonstrated FENOCs broader commitment to improving performance at the Perry station. Further, the successful implementation of the PII P2 initiatives provided several key lessons learned that will be applied to accomplish the objectives of FENOCs continuous improvement plans going forward. For example, the importance of critical self-assessments and benchmarking to identify performance gaps was one of the key lessons learned from the completion of the PII P2 and has become a central element of the continuous improvement culture at Perry. Also, the value of management oversight and involvement became clear as the Perry management team worked to resolve the issues that led to less than adequate performance in Human Performance and Corrective Action Program implementation. The Perry


Page3 teamalso has shownits ability to sustain improvements     simultaneouslyin multiple areas. By applying the lessons learned from its successes,during the period from August2004through December 2006, FENOC has madesteady progress toward identifying and correcting the specific problemsthat led to the entry of PNPP   into ColumnIV of the Action Matrix and achieving the goals andobjectives of PII P2.
Page 3 team also has shown its ability to sustain improvements simultaneously in multiple areas. By applying the lessons learned from its successes, during the period from August 2004 through December 2006, FENOC has made steady progress toward identifying and correcting the specific problems that led to the entry of PNPP into Column IV of the Action Matrix and achieving the goals and objectives of PII P2.
MC0305 RequirementsMet: The requisite licensee actions for performanceimprovement,as defined by the NRCMC0305for the Multiple/Repetitive DegradedCornerstone(i.e. ColumnIV of the Action Matrix), havebeenaccomplished    as follows:
MC 0305 Requirements Met: The requisite licensee actions for performance improvement, as defined by the NRC MC 0305 for the Multiple/Repetitive Degraded Cornerstone (i.e. Column IV of the Action Matrix), have been accomplished as follows:
Corrective action commitments to resolve the root causesand prevent recurrenceof the conditions that led to the White Findings in Mitigating Systemsand Emergency Preparednessare completeand effective.
Corrective action commitments to resolve the root causes and prevent recurrence of the conditions that led to the White Findings in Mitigating Systems and Emergency Preparedness are complete and effective.
Commitments identified in the CALare complete and the programmaticand organizational performanceissues identified through the NRC95003inspection have beenaddressedthrough the PII (Phases1 and 2) and are resolved.
Commitments identified in the CAL are complete and the programmatic and organizational performance issues identified through the NRC 95003 inspection have been addressed through the PII (Phases 1 and 2) and are resolved.
Corrective actions to resolve the root andcontributing causesof the substantive cross-cutting issues in HumanPerformanceand Corrective Action Program implementationare completeand there havebeenno newplant events or findings, during the past 12 months,that reveal similar significant performance   issues in these cross-cutting areas.
Corrective actions to resolve the root and contributing causes of the substantive cross-cutting issues in Human Performance and Corrective Action Program implementation are complete and there have been no new plant events or findings, during the past 12 months, that reveal similar significant performance issues in these cross-cutting areas.
Performancein the following areas has beensubstantially improvedand sustained as demonstrated throughthe results of specific PII initiatives, the completionof CAL Commitments   and key performanceindicators for eachof the following focus areas:
Performance in the following areas has been substantially improved and sustained as demonstrated through the results of specific PII initiatives, the completion of CAL Commitments and key performance indicators for each of the following focus areas:
o CAPImplementation (CAL and PII Focus Area) o HumanPerformance (CAL and PII Focus Area) o Work Management(PII Focus Area) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII Focus Area) o Training (PII FocusArea) o EmployeeEngagement(PII Focus Area).
o CAP Implementation (CAL and PII Focus Area) o Human Performance (CAL and PII Focus Area) o Work Management (PII Focus Area) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII Focus Area) o Training (PII Focus Area) o Employee Engagement (PII Focus Area).
Self- and peer-assisted assessments of performancein the six PII focus areas have beencompleted.In five of the areas, these assessments       ascertainedthat substantial improvements havebeenachievedtogether and also identified areas for improvement.In the area of Operational Focus(PII FocusArea), the assessment identified that limited improvements   had beenachieved,howeverimportant areas for improvementremained. Thesehave been carried forward to the Perry and FENOC Fleet ExcellencePlans.
Self-and peer-assisted assessments of performance in the six PII focus areas have been completed. In five of the areas, these assessments ascertained that substantial improvements have been achieved together and also identified areas for improvement. In the area of Operational Focus (PII Focus Area), the assessment identified that limited improvements had been achieved, however important areas for improvement remained. These have been carried forward to the Perry and FENOC Fleet Excellence Plans.
FENOC has the right management   team in place at PNPPand Excellence Plans havebeen developedto ensure continuedfocus on those areas for improvementthat will help ensure that performanceimprovements    are sustained and continuous progress toward excellence is madeat a pace prescribed by the FENOC         Fleet management   through the business plan and performanceimprovementmodel.
FENOC has the right management team in place at PNPP and Excellence Plans have been developed to ensure continued focus on those areas for improvement that will help ensure that performance improvements are sustained and continuous progress toward excellence is made at a pace prescribed by the FENOC Fleet management through the business plan and performance improvement model.
      -  NRCand Perry performanceindicators do not indicate significant performance weaknesses that have not been adequately addressed.
NRC and Perry performance indicators do not indicate significant performance weaknesses that have not been adequately addressed.


PY-CEI/OIE-0685L Page4 FENOC and Perry management has successfully used key performanceindicators to track performancecoupled with a management   review process to assure that Perry station performancegoals are achieved. Performance   trends will continue to be assessedagainst FENOC   standardsand KPIs will continue to be usedin achieving FENOCs Excellence Plan goals.
PY-CEI/OIE-0685L Page 4 FENOC and Perry management has successfully used key performance indicators to track performance coupled with a management review process to assure that Perry station performance goals are achieved. Performance trends will continue to be assessed against FENOC standards and KPIs will continue to be used in achieving FENOCs Excellence Plan goals.
Summary: the PII P2 provided the frameworkfor actions to achieveand sustain the necessary improvements in performancein the key programsand processesfor the six PII focus areas.
Summary:
The performanceimprovementswere confirmed through self- and peer-assisted assessments conductedas part of the formal closure of the PII. Theareasfor improvement     identified through these assessmentshave now been transitioned to the FENOC       continuous improvementprocess and the Excellence Plans. The FENOC   Fleet Excellence Plans provide the frameworkfor the behavioral improvementsneededfor a robust continuous improvementculture. The combination of continued use of critical self-assessment, management   oversight, the FENOC Fleet Business Plan and the implementationof the Excellence Plan provide reasonableassurancethat PNPP performance will continue to improve.
the PII P2 provided the framework for actions to achieve and sustain the necessary improvements in performance in the key programs and processes for the six PII focus areas.
FENOC has met the requirements of NRCMC0305, achieved substantial improvementin each of the four CALareas, performedcritical self-assessments   to confirm that improvements in HumanPerformanceand CAPImplementationhad been sustained and identify key areas for additional improvementthat are needed.FENOC     is committedto sustaining the improvements achievedthrough the Perry PII P2 and further improving performanceat PNPPthrough the continuous improvementprocess to reach the goals of the FENOC         Excellence Plan. FENOC therefore respectfully requeststhat NRC close the subject white findings, close the cross-cutting issues andtransition its level of regulatory oversight fromColumn  IV of the Action Matrix to an appropriatereducedlevel of regulatory oversight consistent with the guidancein set forth in NRC MC0305.
The performance improvements were confirmed through self-and peer-assisted assessments conducted as part of the formal closure of the PII. The areas for improvement identified through these assessments have now been transitioned to the FENOC continuous improvement process and the Excellence Plans. The FENOC Fleet Excellence Plans provide the framework for the behavioral improvements needed for a robust continuous improvement culture. The combination of continued use of critical self-assessment, management oversight, the FENOC Fleet Business Plan and the implementation of the Excellence Plan provide reasonable assurance that PNPP performance will continue to improve.
Thereare no additional commitments containedin this letter. If youhavequestionsor require additional information, please contact Mr. Jeffrey Lausberg- Manager,RegulatoryCompliance at (440) 280-5940.
FENOC has met the requirements of NRC MC 0305, achieved substantial improvement in each of the four CAL areas, performed critical self-assessments to confirm that improvements in Human Performance and CAP Implementation had been sustained and identify key areas for additional improvement that are needed. FENOC is committed to sustaining the improvements achieved through the Perry PII P2 and further improving performance at PNPP through the continuous improvement process to reach the goals of the FENOC Excellence Plan. FENOC therefore respectfully requests that NRC close the subject white findings, close the cross-cutting issues and transition its level of regulatory oversight from Column IV of the Action Matrix to an appropriate reduced level of regulatory oversight consistent with the guidance in set forth in NRC MC 0305.
Attachment cc:     DocumentControl Desk NRCProject Manager NRCResident Inspector E. Duncan,NRCRill
There are no additional commitments contained in this letter. If you have questions or require additional information, please contact Mr. Jeffrey Lausberg - Manager, Regulatory Compliance at (440) 280-5940.
Attachment cc:
Document Control Desk NRC Project Manager NRC Resident Inspector E. Duncan, NRC Rill


Attachment PY-CEI/OIE-0685L Page1 PERRY NUCLEARPOWERPLANT PERFORMANCE     IMPROVEMENTINITIATIVE           
Attachment PY-CEI/OIE-0685L Page 1 PERRY NUCLEAR POWER PLANT PERFORMANCE IMPROVEMENT INITIATIVE


==SUMMARY==
==SUMMARY==
REPORT Purpose Thepurposeof this report is to provide a summary   of the key results achievedat the Perry Nuclear PowerPlant (PNPP)through the implementationof the Performance         Improvement Initiative (PII) process. This report also provides a high level assessment   of the areas addressedby the PII, the sustained performanceachievedand future continuousimprovementfocus areas. Eachindividual PII initiative hasa detailed closure report documenting   the results andconclusionsof the improvements, and a moredetailed overall closure report for PII Phase2 (P2) has beenpreparedand approved.
REPORT Purpose The purpose of this report is to provide a summary of the key results achieved at the Perry Nuclear Power Plant (PNPP) through the implementation of the Performance Improvement Initiative (PII) process. This report also provides a high level assessment of the areas addressed by the PII, the sustained performance achieved and future continuous improvement focus areas. Each individual PII initiative has a detailed closure report documenting the results and conclusions of the improvements, and a more detailed overall closure report for PII Phase 2 (P2) has been prepared and approved.
Introduction In Augustof 2003, the NRCincreasedthe oversight of PNPP       as required for a DegradedMitigating SystemsCornerstoneresulting from two White Findings. The White Findings resulted from problems encounteredwith air binding in the Residual Heat Removaland LowPressure Core Spray (RHR/LPCS) systemsfollowing a loss of offsite power, and failure of an Emergency       Service Water(ESW)Pump coupling following maintenance.Further, performancedeficiencies encounteredin the evaluation and untimely executionof corrective actions for these WhiteFindings led the NRCto place PNPP       in the Repetitive DegradedCornerstoneof the ReactorOversight ProcessAction Matrix (ColumnIV of the Action Matrix) in Augustof 2004. This level of performance   also led the NRCto identify a substantive cross-cutting issue in the ProblemIdentification andResolutionarea (Augustof 2004). Based findings during inspectionsNRCalso identified a substantivecress-cutting issue in the Human Performancearea (in March2005). In accordancewith NRCInspection ManualChapter (MC) 0305, NRCconductedsupplementalinspections following Inspection Procedure(IP) 95003during the first half of 2005.
Introduction In August of 2003, the NRC increased the oversight of PNPP as required for a Degraded Mitigating Systems Cornerstone resulting from two White Findings. The White Findings resulted from problems encountered with air binding in the Residual Heat Removal and Low Pressure Core Spray (RHR/LPCS) systems following a loss of offsite power, and failure of an Emergency Service Water (ESW) Pump coupling following maintenance. Further, performance deficiencies encountered in the evaluation and untimely execution of corrective actions for these White Findings led the NRC to place PNPP in the Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix (Column IV of the Action Matrix) in August of 2004. This level of performance also led the NRC to identify a substantive cross-cutting issue in the Problem Identification and Resolution area (August of 2004). Based findings during inspections NRC also identified a substantive cress-cutting issue in the Human Performance area (in March 2005). In accordance with NRC Inspection Manual Chapter (MC) 0305, NRC conducted supplemental inspections following Inspection Procedure (IP) 95003 during the first half of 2005.
Beginningin 2004, First EnergyNuclear Operating Company         (FENOC) undertookextensive actions determinethe root causesof the deficiencies related to PNPP       systemperformance,program performance, and performanceof the PNPPorganization. These assessmentsled FENOC               to establish the PII in 2004to improveperformance    of the station organizationand the plant. Thepaceof improvement in 2004and the first half of 2005did not alwaysmeetthe expectationsof FENOC         or the NRC.Therefore, FENOC   established the PII P2 to respondto the NRC95003Inspection findings, to achievefurther improvement   in performance,to integrate the fleet programsinto the processand culture at PNPP,and to ensure that the performanceimprovementwouldbe sustained. Additionally, the NRC issueda confirmatoryaction letter (CAL)on September     28, 2005to confirm the acceptability commitmentsmadeby FENOC     to improve performanceat PNPPand to complete 13 specific actions in the PII P2 (i.e. CALCommitments)
Beginning in 2004, First Energy Nuclear Operating Company (FENOC) undertook extensive actions determine the root causes of the deficiencies related to PNPP system performance, program performance, and performance of the PNPP organization. These assessments led FENOC to establish the PII in 2004 to improve performance of the station organization and the plant. The pace of improvement in 2004 and the first half of 2005 did not always meet the expectations of FENOC or the NRC. Therefore, FENOC established the PII P2 to respond to the NRC 95003 Inspection findings, to achieve further improvement in performance, to integrate the fleet programs into the process and culture at PNPP, and to ensure that the performance improvement would be sustained. Additionally, the NRC issued a confirmatory action letter (CAL) on September 28, 2005 to confirm the acceptability commitments made by FENOC to improve performance at PNPP and to complete 13 specific actions in the PII P2 (i.e. CAL Commitments)
PNPP has nowcompletedimplementationof all of the actions identified through the CALCommitments, as well as the actions in the PII P2 (reference FENOC   letter dated December 20, 2006.) Throughthe PII P2 initiatives, PNPP   has madesubstantial improvements     in performance,has anchoredthose improvements   in its proceduresand processesto ensure that those improvements     are sustained in the future, and has established a culture of continuousimprovement      through the FENOC fleet standard programs.Theseachievements    provide sufficient basis for closure of the PII andallow the normal performanceimprovementprocesses, as prescribed in the FENOC           BusinessPlan, to support continuous improvement.
PNPP has now completed implementation of all of the actions identified through the CAL Commitments, as well as the actions in the PII P2 (reference FENOC {{letter dated|date=December 20, 2006|text=letter dated December 20, 2006}}.) Through the PII P2 initiatives, PNPP has made substantial improvements in performance, has anchored those improvements in its procedures and processes to ensure that those improvements are sustained in the future, and has established a culture of continuous improvement through the FENOC fleet standard programs. These achievements provide sufficient basis for closure of the PII and allow the normal performance improvement processes, as prescribed in the FENOC Business Plan, to support continuous improvement.
PerformanceImprovement      Initiative During the development   of PII Phase1 in eady2004, several equipmentand organizational root causes and collective significance reviews werecompleted.Out of these reviews, the PII wasdevelopedand wasprimarily a discoveryprocessfor organizationaleffectiveness. Theresult of this effort wasthe identification of performance gapsthat fed into the Phase2 effort. In addition, there weresignificant improvements madeto the plant equipment,including, for example,resolution of long standing technical
Performance Improvement Initiative During the development of PII Phase 1 in eady 2004, several equipment and organizational root causes and collective significance reviews were completed. Out of these reviews, the PII was developed and was primarily a discovery process for organizational effectiveness. The result of this effort was the identification of performance gaps that fed into the Phase 2 effort. In addition, there were significant improvements made to the plant equipment, including, for example, resolution of long standing technical


Attachment PY-CEI/OIE-0685L Page 2 issues with the EmergencyDiesel Generator Testable Rupture Disc and EmergencyService Water pumps.
Attachment PY-CEI/OIE-0685L Page 2 issues with the Emergency Diesel Generator Testable Rupture Disc and Emergency Service Water pumps.
In developingthe PII P2, FENOC     included initiatives in WorkManagement,     Training, Employee Engagement   and Operational FocusbecausePNPPrecognized the interrelationship betweenthe cross-cutting areas of HumanPerformanceand Corrective Action Program(CAP)implementation and other processesand performanceareas. Issued in August2005, the PII P2 has been completedover the last 16 months.Thegoals of the individual initiatives in the PII P2 wereto provide substantial, measurable improvementin the HumanPerformanceProgram, Corrective Action Program, and work management processimplementationsupportedby initiatives in employeeengagement,           operational focus, and training. The PII P2 wasintended to provide the meansto sustain the improvedperformancethrough anchoring the improvementsin enhancedprocesses and procedurescoupled with performance indicators to monitor results and a robust continuousimprovement      processand culture. A key learning for the station during PII P2wasthe ability to value critical self-assessments. Theessenceof a viable continuousimprovement  programis strong performancein the identification of performancegaps, the analysis andplanningof actions to close those gaps,andimplementation      of effective activities to improveplant safety andreliability.
In developing the PII P2, FENOC included initiatives in Work Management, Training, Employee Engagement and Operational Focus because PNPP recognized the interrelationship between the cross-cutting areas of Human Performance and Corrective Action Program (CAP) implementation and other processes and performance areas. Issued in August 2005, the PII P2 has been completed over the last 16 months. The goals of the individual initiatives in the PII P2 were to provide substantial, measurable improvement in the Human Performance Program, Corrective Action Program, and work management process implementation supported by initiatives in employee engagement, operational focus, and training. The PII P2 was intended to provide the means to sustain the improved performance through anchoring the improvements in enhanced processes and procedures coupled with performance indicators to monitor results and a robust continuous improvement process and culture. A key learning for the station during PII P2 was the ability to value critical self-assessments.
Throughthe PII P2, PNPPstation management           team and employeesimproved performanceof the equipmentand programsat the PNPP       station from less than adequatelevels in 2004 to medianindustry performancelevels, or above, at the close of 2006. The PNPPmanagement            team has demonstratedits ability to resolve the issues that led to less than adequatepast performance     andto continuouslyimprove HumanPerformanceand implementation of the Corrective Action Programat PNPP.During the period from August 2004 through December2006, FENOC         madesteady progress toward identifying and correcting the specific problemsthat led to the entry of PNPP   into Column IV of the Action Matrix, and designationof the two cross cutting issues, andachievingthe goals and objectives of PII P2.
The essence of a viable continuous improvement program is strong performance in the identification of performance gaps, the analysis and planning of actions to close those gaps, and implementation of effective activities to improve plant safety and reliability.
Therequisite licensee actions for performanceimprovement,as defined by the NRCMC0305for the Multiple/Repetitive DegradedCornerstone(i.e. ColumnIV of the Action Matrix), havebeen accomplishedas follows:
Through the PII P2, PNPP station management team and employees improved performance of the equipment and programs at the PNPP station from less than adequate levels in 2004 to median industry performance levels, or above, at the close of 2006. The PNPP management team has demonstrated its ability to resolve the issues that led to less than adequate past performance and to continuously improve Human Performance and implementation of the Corrective Action Program at PNPP. During the period from August 2004 through December 2006, FENOC made steady progress toward identifying and correcting the specific problems that led to the entry of PNPP into Column IV of the Action Matrix, and designation of the two cross cutting issues, and achieving the goals and objectives of PII P2.
        -  Corrective action commitments   to resolve the root causesand prevent recurrenceof the conditions that led to the WhiteFindings in Mitigating Systemsand Emergency Preparedness are completeand effective.
The requisite licensee actions for performance improvement, as defined by the NRC MC 0305 for the Multiple/Repetitive Degraded Cornerstone (i.e. Column IV of the Action Matrix), have been accomplished as follows:
Commitments   identified in the CALare completeand the programmaticand organizational performanceissues identified through the NRC95003inspection have been addressed throughthe PII (Phases1 and 2) andare resolved.
Corrective action commitments to resolve the root causes and prevent recurrence of the conditions that led to the White Findings in Mitigating Systems and Emergency Preparedness are complete and effective.
Correctiveactions to resolve the root andcontributing causesof the substantivecross-cutting issues in HumanPerformanceand Corrective Action Programimplementationare completeand there havebeenno newplant events or findings, during the past 12 months, that reveal similar significant performance issues in thesecross-cutting areas.
Commitments identified in the CAL are complete and the programmatic and organizational performance issues identified through the NRC 95003 inspection have been addressed through the PII (Phases 1 and 2) and are resolved.
Performance in the following areas has beensubstantially improvedand sustained as demonstrated throughthe results of specific PII initiatives, the completionof CAL Commitments and key performanceindicators for eachof the following focus areas:
Corrective actions to resolve the root and contributing causes of the substantive cross-cutting issues in Human Performance and Corrective Action Program implementation are complete and there have been no new plant events or findings, during the past 12 months, that reveal similar significant performance issues in these cross-cutting areas.
o CAPImplementation (CAL and PII Focus Area) o HumanPerformance (CAL and PII Focus Area) o Work Management(PII FocusArea) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII FocusArea) o Training (PII FocusArea) o EmployeeEngagement(PII Focus Area).
Performance in the following areas has been substantially improved and sustained as demonstrated through the results of specific PII initiatives, the completion of CAL Commitments and key performance indicators for each of the following focus areas:
o CAP Implementation (CAL and PII Focus Area) o Human Performance (CAL and PII Focus Area) o Work Management (PII FocusArea) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII Focus Area) o Training (PII Focus Area) o Employee Engagement (PII Focus Area).


Attachment PY-CEI/OIE-0685L Page 3 Self and peer-assisted assessments     of performancein the six PII focus areas havebeen completed.In five of the areas, these assessments     ascertainedthat substantial improvements havebeenachievedtogether and also identified areas for improvement.In the area of OperationalFocus(PII FocusArea), the assessment     identified that limited improvementshad been achieved, howeverimportant areas for improvementremained.
Attachment PY-CEI/OIE-0685L Page 3 Self and peer-assisted assessments of performance in the six PII focus areas have been completed. In five of the areas, these assessments ascertained that substantial improvements have been achieved together and also identified areas for improvement. In the area of Operational Focus (PII Focus Area), the assessment identified that limited improvements had been achieved, however important areas for improvement remained.
Thesehavebeen carried forward to the Perry and FENOC       Fleet Excellence Plans.
These have been carried forward to the Perry and FENOC Fleet Excellence Plans.
FENOC has the right management     team in place at PNPPand Excellence Plans have been developedto ensurecontinuedfocus on those areas for improvement         that will help ensure that performanceimprovements      are sustained and continuous progress toward excellence is madeat a pace prescribed by the FENOC       Fleet management through the business plan and performance improvementmodel.
FENOC has the right management team in place at PNPP and Excellence Plans have been developed to ensure continued focus on those areas for improvement that will help ensure that performance improvements are sustained and continuous progress toward excellence is made at a pace prescribed by the FENOC Fleet management through the business plan and performance improvement model.
        -  NRCand Perry performanceindicators do not indicate significant performanceweaknesses that have not been adequatelyaddressed.
NRC and Perry performance indicators do not indicate significant performance weaknesses that have not been adequately addressed.
FENOC and Perry management     has successfully used key performanceindicators to track performancecoupled with a management       review processto assure that Perry station performancegoals are achieved. Performancetrends will continue to be assessedagainst FENOC standards and KPIs will continue to be usedin achieving FENOCs         Excellence Plan goals.
FENOC and Perry management has successfully used key performance indicators to track performance coupled with a management review process to assure that Perry station performance goals are achieved. Performance trends will continue to be assessed against FENOC standards and KPIs will continue to be used in achieving FENOCs Excellence Plan goals.
In summary,the PII P2 provided the frameworkfor actions to achieveand sustain the necessary improvements   in performanceand for the key programsand processesfor the six PII focus areas. The performanceimprovementswere confirmed through self- and peer-assisted assessmentsconductedas part of the formal closure of the PII. This higher level of performance     has beensustainedand PNPP   has nowtransitioned from the PII P2 to the FENOC       Fleet ExcellencePlan. Foundedon the industrys PerformanceImprovementModelthe FENOC           Fleet Excellence Plan provides the frameworkfor the behavioral improvements   neededfor a robust continuousimprovementculture. Thecombinationof the improvementsachieved through the PII P2, the FENOC         Fleet BusinessPlan and the implementationof the ExcellencePlans provide the foundation for continuousimprovement        and achieving further improvementsin areas such as Operational Focus.
In summary, the PII P2 provided the framework for actions to achieve and sustain the necessary improvements in performance and for the key programs and processes for the six PII focus areas. The performance improvements were confirmed through self-and peer-assisted assessments conducted as part of the formal closure of the PII. This higher level of performance has been sustained and PNPP has now transitioned from the PII P2 to the FENOC Fleet Excellence Plan. Founded on the industrys Performance Improvement Model the FENOC Fleet Excellence Plan provides the framework for the behavioral improvements needed for a robust continuous improvement culture. The combination of the improvements achieved through the PII P2, the FENOC Fleet Business Plan and the implementation of the Excellence Plans provide the foundation for continuous improvement and achieving further improvements in areas such as Operational Focus.
Closure Assessment     for PII FocusAreas This section of this report summarizes     the moreimportant achievements and the related areas for continuedimprovement  identified througha series of critical self-assessments   performedin eachof the six PII focusareas.
Closure Assessment for PII Focus Areas This section of this report summarizes the more important achievements and the related areas for continued improvement identified through a series of critical self-assessments performed in each of the six PII focus areas.
Corrective Action Program ThePII P2 initiative for the Corrective Action Program(CAP)has beencompleted.Thetargeted areas of causeevaluation and implementationof corrective actions haveimproved.
Corrective Action Program The PII P2 initiative for the Corrective Action Program (CAP) has been completed. The targeted areas of cause evaluation and implementation of corrective actions have improved.
FocusAreasfor Improvement:     Theinitiative actions wereorganizedto align with the structure of a corrective action program.Theactions ensuredthe foundational elementsexisted and built performanceskills to strengthenthe overall performance.Theareas for improvement           include:
Focus Areas for Improvement:
        -  Ownership: Ownershipand station focus on CAP
The initiative actions were organized to align with the structure of a corrective action program. The actions ensured the foundational elements existed and built performance skills to strengthen the overall performance. The areas for improvement include:
        -  Identification: Self-identification of problemsandtrendingof issuesfor eadydetection
Ownership: Ownership and station focus on CAP Identification: Self-identification of problems and trending of issues for eady detection Analysis: Cause Analysis quality and timeliness and corrective action planning Documentation: Quality of closure documentation Program monitoring: Management oversight of the Corrective Action Program
        -  Analysis: CauseAnalysis quality and timeliness and corrective action planning
        -  Documentation:Quality of closure documentation
        -  Programmonitoring: Management       oversight of the Corrective Action Program


Attachment PY-CEI/OIE-0685L Page 4 Performance Results Corrective Action Program performance during 2006 has shown substantial improvement in the timeliness and quality of the cause evaluations. In particular, the timeliness of completing the evaluations and the implementation of corrective actions has improved demonstrating improved ownership by the line personnel. The controlling procedures and business practices contain expectations and goals commensurate           with industry standards for timeliness. Active participation in the Corrective Action Program OwnersGroup (CAPOG)by the Fleet Corrective Action Group assures that the program is current with industry standards. The CAPOG             is extremely active and FENOC   is hosting the 2007 biannual conference. The graphs below show the improvementin the 6-month rolling averages in the timeliness of apparent cause evaluations and corrective actions.
Attachment PY-CEI/OIE-0685L Page 4 Performance Results Corrective Action Program performance during 2006 has shown substantial improvement in the timeliness and quality of the cause evaluations. In particular, the timeliness of completing the evaluations and the implementation of corrective actions has improved demonstrating improved ownership by the line personnel. The controlling procedures and business practices contain expectations and goals commensurate with industry standards for timeliness. Active participation in the Corrective Action Program Owners Group (CAPOG) by the Fleet Corrective Action Group assures that the program is current with industry standards. The CAPOG is extremely active and FENOC is hosting the 2007 biannual conference. The graphs below show the improvement in the 6-month rolling averages in the timeliness of apparent cause evaluations and corrective actions.
Timeliness   of Apparent Causes 90.
Timeliness of Apparent Causes 90.
80 70 Pe rce nt       60 Completed 50 On Time 40 3O 2O 10 0-,    ,  ,
80 70 Pe rce nt 60 Completed 50 On Time 40 3O 2O 10 0-,
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006 t     ........
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006 t
Timeliness of Corrective Actions 90 80 7O Percent 60 50 Completed 40 On Time 30 20 10 0
Timeliness of Corrective Actions 90 80 7O Percent 60 Completed 50 40 On Time 30 20 10 0
Jan     Mar   May   Jul       Sep   Nov B Preventative   Actions 2006 mRemedial    Actions Timeliness for root cause evaluations and overall Condition report (CR) closures have likewise demonstrated sustained improvement over the period.
Jan Mar May Jul Sep Nov B Preventative Actions 2006 m Remedial Actions Timeliness for root cause evaluations and overall Condition report (CR) closures have likewise demonstrated sustained improvement over the period.
The quality of the products from the Corrective Action Programhas improved. The indicator showing the Corrective Action Review Board (CARB)approval of Apparent Causeevaluations is depicted below.
The quality of the products from the Corrective Action Program has improved. The indicator showing the Corrective Action Review Board (CARB) approval of Apparent Cause evaluations is depicted below.
The improvementin the quality of Apparent Causeevaluations demonstrated on the indicator is a product of the PII actions that increased the level of performanceof CARBand the training given to the
The improvement in the quality of Apparent Cause evaluations demonstrated on the indicator is a product of the PII actions that increased the level of performance of CARB and the training given to the


Attachment PY-CEI/OIE-0685L Page 5 CRevaluators and the CRAnalysts. This further demonstrates improvement even while the standards and expectations were being raised. This is an important indicator becauseit demonstrates improving managementownership and leadership.
Attachment PY-CEI/OIE-0685L Page 5 CR evaluators and the CR Analysts. This further demonstrates improvement even while the standards and expectations were being raised. This is an important indicator because it demonstrates improving management ownership and leadership.
Quality of Appare nt Causes 100       "~- .....       .........            .........        7"-~v-95 ~                                           ;;
Quality of Appare nt Cause s 100
Percent Approved90 by CARB         85 80 75 Jan Feb Mar Apt May Jun Jul                           Aug Sep Oct Nov 2006 A similar sustained improvementhas been achieved for root causes. This is demonstrated through the CARBapproval rate and the grade given to each root cause evaluation after review by CARB.
"~-.....
Additionally, this sameimprovementtrend can be demonstrated for corrective actions. The graph below showsthe improvementin the quality of the corrective actions over the period. A reject is counted if any of the reviews after completion find the corrective action to be deficient, whether the review is a CARB,Oversight, CR Analyst or other review.
7"-~v-95 ~
Corrective Actions Rejected 14 12                     " .............................................
Percent Approved 90 by CARB 85 80 75 Jan Feb Mar Apt May Jun Jul Aug Sep Oct Nov 2006 A similar sustained improvement has been achieved for root causes. This is demonstrated through the CARB approval rate and the grade given to each root cause evaluation after review by CARB.
10 Percent Rejected 8 6
Additionally, this same improvement trend can be demonstrated for corrective actions. The graph below shows the improvement in the quality of the corrective actions over the period. A reject is counted if any of the reviews after completion find the corrective action to be deficient, whether the review is a CARB, Oversight, CR Analyst or other review.
Corrective Actions Rejected 14 12 10 Percent Rejected 8 6
4 2
4 2
0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul                   Aug Sep Oct Nov 2005                                           2006 The 6-monthrolling averages for initiation rate and work-off rate of CRsdepicts a healthy programas shownon the following graphs. The threshold for identification is continuing to lower causing a higher initiation rate. Thestaff is able to maintain a work off rate of greater than 1.0, demonstratingthe ability to keep up with the higher influx. Thesegraphs demonstratethe result of effective actions taken to improvethe self-identification and prioritization of problemsand the sites priority for assuring the timely
0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2005 2006 The 6-month rolling averages for initiation rate and work-off rate of CRs depicts a healthy program as shown on the following graphs. The threshold for identification is continuing to lower causing a higher initiation rate. The staff is able to maintain a work off rate of greater than 1.0, demonstrating the ability to keep up with the higher influx. These graphs demonstrate the result of effective actions taken to improve the self-identification and prioritization of problems and the sites priority for assuring the timely


Attachment PY-CEI/OIE-0685L Page 6 implementation of CAP. The improved focus of the PNPPstaff on "working todays issues today" is also evident below.
Attachment PY-CEI/OIE-0685L Page 6 implementation of CAP. The improved focus of the PNPP staff on "working todays issues today" is also evident below.
ORsInitiation  Rate 800 700-600 500-400-300 200 100 0
ORs Initiation Rate 800 700-600 500-400-300 200 1000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006 The work-off rate is a ratio of the closed CRs to influx of new CRs. Anything greater than 1.0 indicates that more CRs were closed than were initiated.
Jan Feb Mar Apr May Jun Jul     Aug Sep Oct Nov 2006 The work-off rate is a ratio of the closed CRsto influx of newCRs. Anything greater than 1.0 indicates that more CRswere closed than were initiated.
CR Work Off Rate 1.15
CR Work Off Rate 1.15                               ~   .....        I 1.1 1.05 CR Closed per CR       1, Initated 0.95 0.9 0.85-Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006
~
I 1.1 1.05 CR Closed per CR 1,
Initated 0.95 0.9 0.85-Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006


Attachment PY-CEI/OIE-0685L Page 7 Finally, a true measureof the improvement of Corrective Action Programis, whenlooking at the graphs in aggregate,the throughputof the programis healthy andthe total inventory is decreasingto industry excellencestandards. A single unit plant inventory should be approximately500opencondition reports basedon industry benchmarking.PNPP,with a healthy input and goodattention to evaluating and resolving problems,showsa goodtrend towardsthis standardof excellence. Notethat the Total Open CRsgraphbelowis relatively newand no industry comparable   data is available for the first three months of this year.
Attachment PY-CEI/OIE-0685L Page 7 Finally, a true measure of the improvement of Corrective Action Program is, when looking at the graphs in aggregate, the throughput of the program is healthy and the total inventory is decreasing to industry excellence standards. A single unit plant inventory should be approximately 500 open condition reports based on industry benchmarking. PNPP, with a healthy input and good attention to evaluating and resolving problems, shows a good trend towards this standard of excellence. Note that the Total Open CRs graph below is relatively new and no industry comparable data is available for the first three months of this year.
Total Open CRs 1400-                                             E 1200                                             i 1000-800 600-400 200 o,A Jan     Mar     May     Jul     Sep   Nov 2006 PerformanceMonitoring EighteenKey PerformanceIndicators (KPIs) are usedto monitor the performanceof the main elements of the Corrective Action Program.Theseindicators are published and reviewedon a monthlybasis.
Total Open CRs 1400-E 1200 i
EachKPI graph showsthe performanceof the PNPP     organization in implementationof eachof the key CAPelements for eachmonthover the past 12 months. TheseKPIs are producedfor the PNPPsite as a wholeand for eachsection of the PNPP   organization.
1000-800 600-400 200 o,A Jan Mar May Jul Sep Nov 2006 Performance Monitoring Eighteen Key Performance Indicators (KPIs) are used to monitor the performance of the main elements of the Corrective Action Program. These indicators are published and reviewed on a monthly basis.
An aggregatescore card for 2005/2006wasproducedto showthe trend of these indicators on the following table over an extendedperiod of time. Eachrow of the score card representsone of the 18 KPIs. It showsthat performance of the Corrective Action Programis improvingby a shifting of predominantlyred or yellow windowsin 2005to predominantlywhite and green in the mostrecent monthsof 2006. KPI 15, MedianAge of CRshas not showndramatic improvement.The reason for only slight improvement is that as moreemphasisis placed on workingtodays problems,someof the older, less significant CRsare not being worked. Hence,the increasedage masksthe real improvement in culture being realized by the PNPP staff. KPI 16, %Effectiveness ReviewsThat ConcludeIneffective Corrective Actions to Prevent Recurrence(CAPRs),has shownrelatively poor performanceprimarily due to the low numberof data points.
Each KPI graph shows the performance of the PNPP organization in implementation of each of the key CAP elements for each month over the past 12 months. These KPIs are produced for the PNPP site as a whole and for each section of the PNPP organization.
An aggregate score card for 2005/2006 was produced to show the trend of these indicators on the following table over an extended period of time. Each row of the score card represents one of the 18 KPIs. It shows that performance of the Corrective Action Program is improving by a shifting of predominantly red or yellow windows in 2005 to predominantly white and green in the most recent months of 2006. KPI 15, Median Age of CRs has not shown dramatic improvement. The reason for only slight improvement is that as more emphasis is placed on working todays problems, some of the older, less significant CRs are not being worked. Hence, the increased age masks the real improvement in culture being realized by the PNPP staff. KPI 16, % Effectiveness Reviews That Conclude Ineffective Corrective Actions to Prevent Recurrence (CAPRs), has shown relatively poor performance primarily due to the low number of data points.


Attachment PY-CEI/OIE-0685L Page8 Pen/
Attachment PY-CEI/OIE-0685L Page 8 Pen/
pe~Non~.           i 5 ~DmC~C~p~
pe~ Non~.
        ~ Caro.
i 5 ~DmC~C~p~
Comple~dol ~.
~ Caro.
        % hmedKa& ~ ~Nm4N on~m~.
Comple~d ol ~.
ConceiveA~oe W~k~ ~,
% hmedKa&  
        ~e~..S
~ ~Nm4N on ~m~.
        . Evem Oee~l~,,~
Conceive A~oe W~k~  
~,
~e~..S Evem Oee~l~,,~
S4
S4
        ~
~.
        %Tlmeh~ T~a~Opeh C~
% Tlmeh~
5uper,.~o.v~one
T~a~ Opeh C~
                    .~,, r~
5uper,.~o.v~one  
        %Ce.ec~bac~Re~d,
.~,, r~
~.15   ued~
% Ce.e c~ bac~ Re~d,
~.15 ued~
Age of Cn=
Age of Cn=
I¢~r 19   rosaiol~mg~omge ~d 31~ge Relletd Correc~,e Closure AssessmentConclusion Throughthe conduct of self-assessments, review of performanceindicators, and the review of the CAP Pll actions by the Closure Validation and ReviewBoard(CVRB),FENOC                   has concluded that there has beensubstantialimprovement                  in the implementation of the CAP.Self-assessments haveconfirmedthat ownershipfor implementingthe CAPhas improvedas indicated by a clear understandingof roles and responsibilitiesamong              all levels withinthe organization.Interviewsconducted withworkersduringself-assessments indicated a good understanding of managementsexpectations with respect to CAP amongboth workersand supervisors. A low threshold for problemreporting and improvementin the classificationandpriodtizationof actionsto resolveidentified problems                 hasbeenobserved. Active management         oversight has lead to improvedquality in root and apparentcause evaluations and more effective correctiveactions. Thusthe effectiveness               of correctiveactionshasalso improved. Theareas for improvement               identified throughself-assessments are capturedin the corrective action program.
I¢~r 19 rosai ol~m g~ omge  
Asnotedabove,the root andcontributingcauseshavebeenaddressed                        by implementing the corrective actions throughthe CAPPII P2. Site personnel, including supervisors and managers,have been trained to expectationsandaccountabilitymethods                  usedto measure the implementationof the CAP.Part of the training included the role of a Corrective Action Programin a "learning organization"andhowCAPmust be used to drive station improvement.Newemployeesreceive introductory training of CAPduring the Plant Access           Training(PAT)andreceivean orientationmanual          that containskey aspectsof successful CAP.
~d 31~ge Relletd Correc~,e Closure Assessment Conclusion Through the conduct of self-assessments, review of performance indicators, and the review of the CAP Pll actions by the Closure Validation and Review Board (CVRB), FENOC has concluded that there has been substantial improvement in the implementation of the CAP. Self-assessments have confirmed that ownership for implementing the CAP has improved as indicated by a clear understanding of roles and responsibilities among all levels within the organization. Interviews conducted with workers during self-assessments indicated a good understanding of managements expectations with respect to CAP among both workers and supervisors. A low threshold for problem reporting and improvement in the classification and priodtization of actions to resolve identified problems has been observed.
In July 2005, an improvedset of CAPKPIswere developed and are periodically reviewed by management.           Variouslevels of management         review processeshavebeeninstituted to ensureadequate oversightof the health of CAPgoingforward.Theseincludethe CorrectiveActionReviewBoard (CARB), ManagementReview Board (MRB), Senior Leadership Team(SLT) and Management PerformanceReview(MPR)meetings. Intervention actions are implementedif declining unsatisfactory           performance   / trendsare identified.
Active management oversight has lead to improved quality in root and apparent cause evaluations and more effective corrective actions. Thus the effectiveness of corrective actions has also improved.
Continuous improvementin CAPimplementation is assured through: FENOC                   Fleet governance of the process,site ownership                 of the CAPimplementation, management oversight, soundprocedures and policies, monitonngof KeyPerformanceIndicators, and the use of cntical self-assessments and
The areas for improvement identified through self-assessments are captured in the corrective action program.
As noted above, the root and contributing causes have been addressed by implementing the corrective actions through the CAP PII P2. Site personnel, including supervisors and managers, have been trained to expectations and accountability methods used to measure the implementation of the CAP. Part of the training included the role of a Corrective Action Program in a "learning organization" and how CAP must be used to drive station improvement. New employees receive introductory training of CAP during the Plant Access Training (PAT) and receive an orientation manual that contains key aspects of successful CAP.
In July 2005, an improved set of CAP KPIs were developed and are periodically reviewed by management.
Various levels of management review processes have been instituted to ensure adequate oversight of the health of CAP going forward. These include the Corrective Action Review Board (CARB), Management Review Board (MRB), Senior Leadership Team (SLT) and Management Performance Review (MPR) meetings. Intervention actions are implemented if declining unsatisfactory performance  
/ trends are identified.
Continuous improvement in CAP implementation is assured through: FENOC Fleet governance of the process, site ownership of the CAP implementation, management oversight, sound procedures and policies, monitonng of Key Performance Indicators, and the use of cntical self-assessments and


Attachment PY-CEI/OIE-0685L Page 9 benchmarking. Fleet oversight is exercised through managementobservations of CARBand participation in monthlyperformancereview meetings.
Attachment PY-CEI/OIE-0685L Page 9 benchmarking. Fleet oversight is exercised through management observations of CARB and participation in monthly performance review meetings.
Fleet ownershipof the proceduresand businesspractices enhancethe level of assurancethat improvementswill be sustained becauseFENOC        business practices are benchmarked   to industry acceptedpractices and changesrequire concurrencefrom all sites involved. This coordination helps ensureaccuracyand consistencywhile at the sametime standardscomparefavorably to industry acceptedpractices.
Fleet ownership of the procedures and business practices enhance the level of assurance that improvements will be sustained because FENOC business practices are benchmarked to industry accepted practices and changes require concurrence from all sites involved. This coordination helps ensure accuracy and consistency while at the same time standards compare favorably to industry accepted practices.
The self-assessmentand benchmarkingprocessescontinue to be usedto evaluate the implementation of CAPand to ensure that subsequentanalysis of adversetrends promotecontinuous improvementby designingactions basedon the industrys top performers.
The self-assessment and benchmarking processes continue to be used to evaluate the implementation of CAP and to ensure that subsequent analysis of adverse trends promote continuous improvement by designing actions based on the industrys top performers.
Comparingcurrent performanceto the successmeasuresand the metrics described in the CAPPII, whichincludes site personnelroutinely meetingCAPexpectations, the incorporation of CAPinto performancemanagement    plans, collegial reviews of CAPperformance,and quality of corrective actions, indicates these measureshavebeenachieved. However,additional actions to sustain continued improvementare planned.
Comparing current performance to the success measures and the metrics described in the CAP PII, which includes site personnel routinely meeting CAP expectations, the incorporation of CAP into performance management plans, collegial reviews of CAP performance, and quality of corrective actions, indicates these measures have been achieved. However, additional actions to sustain continued improvement are planned.
It is therefore concludedthat the FENOC   Fleet businesspractices, in conjunctionwith the useof responsiveperformance    indicators and effective CAPoversight, provide sufficient frameworkto promote continuousimprovement    in the implementationof CAPat PNPP   and supportclosure of this initiative.
It is therefore concluded that the FENOC Fleet business practices, in conjunction with the use of responsive performance indicators and effective CAP oversight, provide sufficient framework to promote continuous improvement in the implementation of CAP at PNPP and support closure of this initiative.
Conclusion In summary,the threshold for capturing problemsin the Corrective Action Programhas beenloweredto levels that ensureissuesof low significance are beingidentified. Thereviewandprioritization process for CRsprovides confidence that problemsare visible for managements       attention. PNPP performance demonstrates that the staff is able to focus on evaluating andsolving the problemswith improved timeliness and improvedquality. Additionally, the PNPP     staff has demonstratedthat it can sustain these improvements in timeliness and causeevaluation quality while also improvingclosure quality and handling an increasednumberof CRs.Theultimate benefit of goodCAPperformanceis morereliable equipment, improved organizational performance,and enhancedsafety. The improvementsevidenced by CAPperformance    indicators, coupledwith improvedsafety systemunavailability, illustrate that the disciplined execution of the Corrective Action Programhas become     an integral and effective component of the day-to-day business at PNPP.
Conclusion In summary, the threshold for capturing problems in the Corrective Action Program has been lowered to levels that ensure issues of low significance are being identified. The review and prioritization process for CRs provides confidence that problems are visible for managements attention. PNPP performance demonstrates that the staff is able to focus on evaluating and solving the problems with improved timeliness and improved quality. Additionally, the PNPP staff has demonstrated that it can sustain these improvements in timeliness and cause evaluation quality while also improving closure quality and handling an increased number of CRs. The ultimate benefit of good CAP performance is more reliable equipment, improved organizational performance, and enhanced safety. The improvements evidenced by CAP performance indicators, coupled with improved safety system unavailability, illustrate that the disciplined execution of the Corrective Action Program has become an integral and effective component of the day-to-day business at PNPP.
HumanPerformance The PII P2 initiative for Human     Performancehas been completed.The improveduse of humanerror reductionstools alongwith strengthenedbarriers haveprovento be effective in limiting human performance errors that result in plant eventsor challengesto the operationsstaff.
Human Performance The PII P2 initiative for Human Performance has been completed. The improved use of human error reductions tools along with strengthened barriers have proven to be effective in limiting human performance errors that result in plant events or challenges to the operations staff.
FocusAreasfor Improvement:     Theinitiative  actions wereorganizedin three distinct stages which include:
Focus Areas for Improvement:
        -  ProgramStructure: Setting performanceexpectations and communication       of roles and responsibilities
The initiative actions were organized in three distinct stages which include:
        -  BehaviorModification: Enhancement   of and training on Error Prevention Tools and line ownership,alignment, and integration
Program Structure: Setting performance expectations and communication of roles and responsibilities Behavior Modification: Enhancement of and training on Error Prevention Tools and line ownership, alignment, and integration Discipline in Execution: Monitoring and line accountability for results, procedure adherence, and confirmation of effectiveness of actions
        -  Discipline in Execution:Monitoringand line accountability for results, procedureadherence, andconfirmationof effectivenessof actions


Attachment PY-CEI/OIE-0685L Page 10 PerformanceResults The Human Performanceprogrampromotesthe prevention of plant events due to humanerror by focusing on sustaining error-prevention behaviors. ThePerry PII for Human       Performancedrove improvement in the behaviorswhichproduceda decreasein consequentialevents that "reset" the Station Clock. Thegraph belowshowsthis improvingtrend starting in the secondquarter of 2005. This wasaccomplished  in three distinct stages. First, the programstructure wasestablished to provide enhancedroles and responsibilities, management       expectations, and improvedprocesses. Oncethe programstructure wasin place, training on expectedbehaviorsand error-prevention tools was conductedfor all site personnel.Servingboth to increasethe skills and behaviorsof the workers,the newlevel of awareness   on human performance resulted in a reduction in station events attributable to human errors. Finally, the disciplined executionof the processesandbehaviorscontinuedthis improvingtrend to a low numberof station events. This level of performancehas nowbeensustained for four quarters.
Attachment PY-CEI/OIE-0685L Page 10 Performance Results The Human Performance program promotes the prevention of plant events due to human error by focusing on sustaining error-prevention behaviors. The Perry PII for Human Performance drove improvement in the behaviors which produced a decrease in consequential events that "reset" the Station Clock. The graph below shows this improving trend starting in the second quarter of 2005. This was accomplished in three distinct stages. First, the program structure was established to provide enhanced roles and responsibilities, management expectations, and improved processes. Once the program structure was in place, training on expected behaviors and error-prevention tools was conducted for all site personnel. Serving both to increase the skills and behaviors of the workers, the new level of awareness on human performance resulted in a reduction in station events attributable to human errors. Finally, the disciplined execution of the processes and behaviors continued this improving trend to a low number of station events. This level of performance has now been sustained for four quarters.
Station   Human Performance Clock Resets 7
Station Human Performance Clock Resets 7
6 5
6 5
4 2
4 2
1-0 1st   2nd 3rd     4th   1st   2nd 3rd     4th 2005                     2006 SectionClockresets are eventsof lower significance than the Station Clockresets, but eacheventis considereda learning opportunity. Thestations ability to preventconsequentialevents causedby human error is enhanced   by the study and learning from the precursor events of low significance. The indicator belowshowsan increaseduse of this learning tool demonstratinga greater focus on learning from precursor events. The2005horizontal line indicates an approximatesteady state numberof resets or learning opportunities. The2006line indicates a newsteadystate numberof learning opportunities
1-0 1st 2nd 3rd 4th 1st 2nd 3rd 4th 2005 2006 Section Clock resets are events of lower significance than the Station Clock resets, but each event is considered a learning opportunity. The stations ability to prevent consequential events caused by human error is enhanced by the study and learning from the precursor events of low significance. The indicator below shows an increased use of this learning tool demonstrating a greater focus on learning from precursor events. The 2005 horizontal line indicates an approximate steady state number of resets or learning opportunities. The 2006 line indicates a new steady state number of learning opportunities


Attachment PY-CEI/OIE-0685L Page 11 eachquarter beginningin 2006. This step changecoincides with completionof key PII actions and confirmsthe effectivenessof this initiative.
Attachment PY-CEI/OIE-0685L Page 11 each quarter beginning in 2006. This step change coincides with completion of key PII actions and confirms the effectiveness of this initiative.
Section       Human Performance Clock Resets 90 ~
Section Human Performance Clock Resets 90 ~
                                                                      ----T-80 7
7
                                                    ====
----T-80
 
====
70
70
                      /60 i ......Change=~---~
......Change=~---~
50       /       __
60 i
40   /     .....          -
/
50  
/
40  
/
30,,~
30,,~
20~
20 10 ~
10 o
o 1st 2nd 3rd 4th 1st 2nd 3rd 4th 2005 2006 Closure Assessment
1st   2nd 3rd 4th         1st 2nd 3rd 4th 2005                           2006 Closure AssessmentConclusion:
Following a reviewof the self-assessmentresults, performance            indicators, and the effectiveness of HU PII, FENOC  concludedthat there had been substantial improvementin HumanPerformanceat PNPP and that these improvements      are sustainable. Self-assessments        haveconfirmed that expectationsfor humanperformancehavebeenestablished, communicated              and reinforced with all station personnel.
Management  field observations and supervisory oversight ensure that humanperformance fundamentals  are being demonstrated      at all levels of the organization. Line accountability is being demonstratedthrough daily interactions, increasedemphasison monitoring and analysis of human performanceerrors, and support of the observation program.The root causesof procedureuse and adherenceissues including procedureupgradesare being addressedand are continuing to havea positive impact on HumanPerformanceimprovementefforts.
Sustained improvementin HumanPerformanceis being assured through four primary mechanisms.
Thesemechanisms    include efficiently and effectively implementinghumanperformanceprocesses, monitoring performancethrough responsive performanceindicators, continuing an active management observationprogram,and conductingcritical self-assessments.
Theactions and improvements      noted in this HUPII havebeenanchoredwithin Fleet businesspractices which provide reasonableassuranceof continuousimprovement                due to the fact that all FENOC businesspractices are coordinatedthrough the FENOC            Fleet and require concurrencefrom all sites involved. This coordination helps ensureaccuracyand consistencywhile at the sametime being compared to industry acceptedpractices. ThePNPP            organization continues to utilize these business practices in the evaluation and improvement          of humanperformanceat all levels thus ensuring that performanceexpectations are achieved.
Performanceindicators for monitoring humanperformanceare usedto monitor and improve performanceacross the PNPPsite. Theseindicators havebeen adaptedfrom top performing organizations and are usedby management          to provide reasonableassurancethat adversetrends will be promptly identified to station management.          Theself-assessmentand benchmarking      processeswill continue to be usedto ensure these indicators and subsequentanalysis of adversetrends promote continuous improvement.


Attachment PY-CEI/OIE-O685L Page 12 The PNPPstation performance,described above, clearly demonstratesthat the HumanPerformance Initiative has beensuccessful in achieving and sustaining improvedlevels of performance.Thesuccess measures  andmetrics set forth in the HUPII (i.e. the site successclock goal of greater than 45 daysfor a 12-monthrolling averagebetweenresets and sustaining greater than 120field observationsper month for a 3-monthperiod) havebeen achieved.
== Conclusion:==
Conclusion The HumanPerformanceEffectiveness Self-Assessmentperformedin September,2006, confirmed that the desired behaviorshavebeeninstilled in the organizationat all levels. Benefitsof increased attention to human error preventionhavealso beenobservedin the industrial safety statistics for the PNPP  site. In this area of industrial safety, PNPP    has achievedzero OSHA  recordablefor all of 2006.
Following a review of the self-assessment results, performance indicators, and the effectiveness of HU PII, FENOC concluded that there had been substantial improvement in Human Performance at PNPP and that these improvements are sustainable. Self-assessments have confirmed that expectations for human performance have been established, communicated and reinforced with all station personnel.
In addition, plant personnelcontinueto achievean Industrial Safety AccidentRateof 0.00 against an industry top quartile of 0.16 OSHA      recordables per 200,000man-hours.ThePNPPstaff has recently achievedthe notablemilestoneof over 2 million person-hours      without a lost time accident.
Management field observations and supervisory oversight ensure that human performance fundamentals are being demonstrated at all levels of the organization. Line accountability is being demonstrated through daily interactions, increased emphasis on monitoring and analysis of human performance errors, and support of the observation program. The root causes of procedure use and adherence issues including procedure upgrades are being addressed and are continuing to have a positive impact on Human Performance improvement efforts.
Additionally, overall plant reliability hasimprovedwith a Capability Factor of approximately97%for 2006 up from a 2 year averageof 82%in Januaryof 2006, and ForcedLoss Rate of approximately1.1%,
Sustained improvement in Human Performance is being assured through four primary mechanisms.
improvedfrom a 2 year averageof 7.8%in Januaryof 2006. Thesehigh level indicators of safe and reliable plant performancedemonstratethe roll-up affect of improvedHuman          Performance.
These mechanisms include efficiently and effectively implementing human performance processes, monitoring performance through responsive performance indicators, continuing an active management observation program, and conducting critical self-assessments.
Work Management Effective WorkManagement      is a direct contributor to performancein the cross-cutting area of Human Performanceand also contributes to improvedimplementationof CAP.As such, effective Work Management  is a key attribute of a growingand improvingsafety culture at PNPP.ThePII P2 initiative for WorkManagement      has achievedperformancelevels that are comparableto the other nuclear stations in the FENOC      fleet and meetsor exceedsindustry standards. The WorkManagement        process providesthe fundamental      structure for efficient useof station resourcesas well as overall improvement of equipmentcondition. Thework management        processis one of an integrated set of processesfor the operationand supportof nuclear plants.
The actions and improvements noted in this HU PII have been anchored within Fleet business practices which provide reasonable assurance of continuous improvement due to the fact that all FENOC business practices are coordinated through the FENOC Fleet and require concurrence from all sites involved. This coordination helps ensure accuracy and consistency while at the same time being compared to industry accepted practices. The PNPP organization continues to utilize these business practices in the evaluation and improvement of human performance at all levels thus ensuring that performance expectations are achieved.
Theprinciples of the Effective WorkManagement        improvement actions wereorganized into four general areas:
Performance indicators for monitoring human performance are used to monitor and improve performance across the PNPP site. These indicators have been adapted from top performing organizations and are used by management to provide reasonable assurance that adverse trends will be promptly identified to station management.
          -  Timelyidentification: Providingtimely identification, selection, planning,coordination,and executionof worknecessaryto maximizethe availability andreliability of station equipment and systems.
The self-assessment and benchmarking processes will continue to be used to ensure these indicators and subsequent analysis of adverse trends promote continuous improvement.
          -   Managed  risk: To manage  the risk associated with conductingwork.
          -  Discipline in Execution:To identify the impactof workto the station andworkgroupsandto protect the station from unanticipatedtransients dueto the conductof work
          -  Efficiency and Effectiveness:To maximizethe efficiency andeffectivenessof station staff and matedal resources An effective work management      process should accomplishthe following:
: 1. Promoteandimprovenuclear, industrial, and radiological safety performance.
: 2. Improveequipmentperformanceand systemhealth.
: 3. Increaseproductivity throughthe efficient useof resources.
: 4. Provide for a long-rangeplan to include major designchangesandpredictive and periodic maintenance  activities. This should include provisions to addressequipmentobsolescenceand asset management.
Eachof these is discussedin moredetail below.


Attachment PY-CEI/OIE-0685L Page 13 PerformanceResults
Attachment PY-CEI/OIE-O685L Page 12 The PNPP station performance, described above, clearly demonstrates that the Human Performance Initiative has been successful in achieving and sustaining improved levels of performance. The success measures and metrics set forth in the HU PII (i.e. the site success clock goal of greater than 45 days for a 12-month rolling average between resets and sustaining greater than 120 field observations per month for a 3-month period) have been achieved.
: 1. Promote              andimprove                  nuclear, industrial, andradiologicalsafety performance.
Conclusion The Human Performance Effectiveness Self-Assessment performed in September, 2006, confirmed that the desired behaviors have been instilled in the organization at all levels. Benefits of increased attention to human error prevention have also been observed in the industrial safety statistics for the PNPP site. In this area of industrial safety, PNPP has achieved zero OSHA recordable for all of 2006.
WorkManagement                        performance                    improvement                    wasimplemented                          to ultimately improveoverall system healthfor nuclearsafetyandreliability. Nuclearsafetyhasimproved                                                                                                    overthe past 10 months                                  as indicatedby overall performance                                            andavailability of safety systems.Forexample:
In addition, plant personnel continue to achieve an Industrial Safety Accident Rate of 0.00 against an industry top quartile of 0.16 OSHA recordables per 200,000 man-hours. The PNPP staff has recently achieved the notable milestone of over 2 million person-hours without a lost time accident.
Emergency AC Power TheEmergency                    ACPowerindicator showsan improvingtrend in unavailability hours. This is a measure of timely and effective maintenance                                                      performedon the Emergency                                            Diesel Generators.Past management maintenance                strategyservedto improvethe reliability of the EDGs                                                                                  by performing                    requiredmaintenance on-line. Theconsequences                                    of this strategywerean adverseeffect on unavailabilityhours.Present management              has implemented                        a revisedstrategy that hasbothimproved                                                                the reliability of the EDGs                                          and improved          the unavailabilityhoursthrougha balanced                                                                  approach              to divisionaloutagesandrefuel outage work.
Additionally, overall plant reliability has improved with a Capability Factor of approximately 97% for 2006 up from a 2 year average of 82% in January of 2006, and Forced Loss Rate of approximately 1.1%,
EMERGENCYAC POWER 0.0250 ..........................................................................................................................................................................................................................................................................
improved from a 2 year average of 7.8% in January of 2006. These high level indicators of safe and reliable plant performance demonstrate the roll-up affect of improved Human Performance.
340 0.0200 265 r~~                ........................                                                                                                        i....................
Work Management Effective Work Management is a direct contributor to performance in the cross-cutting area of Human Performance and also contributes to improved implementation of CAP. As such, effective Work Management is a key attribute of a growing and improving safety culture at PNPP. The PII P2 initiative for Work Management has achieved performance levels that are comparable to the other nuclear stations in the FENOC fleet and meets or exceeds industry standards. The Work Management process provides the fundamental structure for efficient use of station resources as well as overall improvement of equipment condition. The work management process is one of an integrated set of processes for the operation and support of nuclear plants.
0.0,50                              """
The principles of the Effective Work Management improvement actions were organized into four general areas:
lm.o~,,B.~ -~                                Budget Unavailability i                                                                                                                      ,90 o,.
Timely identification: Providing timely identification, selection, planning, coordination, and execution of work necessary to maximize the availability and reliability of station equipment and systems.
0.O100 l                                                                            i                                                                                                                      115
Managed risk: To manage the risk associated with conducting work.
                                                                                                                                                                                                      /
Discipline in Execution: To identify the impact of work to the station and work groups and to protect the station from unanticipated transients due to the conduct of work Efficiency and Effectiveness: To maximize the efficiency and effectiveness of station staff and matedal resources An effective work management process should accomplish the following:
0.0050                                                                                                                                                                                                                              40
1.
                                                                                        ~                                                                                                          B 0.0000                                                                                  .... r ...............      ~................................................. ~.............. - .................~ ............            35 JAN              FEB              MAR              APR              MAY              JUN                JUL              AUG              SEP              OCT              NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours High PressureCore SpraylReactorCore Recirculation A similar trendis seenonthe safetysystem                                                  indicatorsfor HPCS/RCIC                              systems.
Promote and improve nuclear, industrial, and radiological safety performance.
HIGH PRESSURE                          CORESPRAY/ REACTORCOREISOLATION COOLING 0.0400 115 0.0350.                          ",~~,Month    Actual
2.
              ~.                ]      ........                                                                                                                                                                                          95 0.0300.                            ~,~,,,., Mon=    Budget
Improve equipment performance and system health.
                                /          .....
3.
                ~/~
Increase productivity through the efficient use of resources.
0.0250                                                                                                                                                                                                                                    75
4.
                ~~
Provide for a long-range plan to include major design changes and predictive and periodic maintenance activities.
0.0200
This should include provisions to address equipment obsolescence and asset management.
                                                                            -           -                      -                                                                                                                          55 0.0150 35 0.0100 0.0050                                                                                                                                                                                                                                    15 0.0000                                                            ~                ~                                                                        r~                ~                                                      -5 JAN              FEB              MAR                APR              MAY                JUN              JUL              AUG              SEP                OCT              NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours
Each of these is discussed in more detail below.


Attachment PY-CEI/OIE-0685L Page 14 Residual Heat Removal Residual Heat removal shows a similar          improving trend. Present performance supports future top quartile performancelevels.
Attachment PY-CEI/OIE-0685L Page 13 Performance Results
RESIDUAL HEAT REMOVAL 0.0150                                                                                                                      65 60 55 50 0.0100.                                                                                             ..................
: 1. Promote and improve nuclear, industrial, and radiological safety performance.
Work Management performance improvement was implemented to ultimately improve overall system health for nuclear safety and reliability. Nuclear safety has improved over the past 10 months as indicated by overall performance and availability of safety systems. For example:
Emergency AC Power The Emergency AC Power indicator shows an improving trend in unavailability hours. This is a measure of timely and effective maintenance performed on the Emergency Diesel Generators. Past management maintenance strategy served to improve the reliability of the EDGs by performing required maintenance on-line. The consequences of this strategy were an adverse effect on unavailability hours. Present management has implemented a revised strategy that has both improved the reliability of the EDGs and improved the unavailability hours through a balanced approach to divisional outages and refuel outage work.
EMERGENCY AC POWER 0.0250..........................................................................................................................................................................................................................................................................
340 0.0200 265 r~~
i....................
Budget Unavailability 0.0,50 lm.o~,,B.~ -~
i
i
                                                                                              ~i<~ii                          40 35 30 0.0050.                     I--Ac~,SLlnavailabilty      INPO1st Qtr       [                   ~";~
,90 l
o,.
i 0.O100
/
115 0.0050
~
B 40 0.0000
.... r...............
~.................................................
~.............. -.................~............
35 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours High Pressure Core SpraylReactor Core Recirculation A similar trend is seen on the safety system indicators for HPCS/RCIC systems.
HIGH PRESSURE CORE SPRAY / REACTOR CORE ISOLATION COOLING 0.0400 115 0.0350.
~.
",~~,Month Actual
]
0.0300.
~/~
~,~,,,., Mon=
Budget
/
95 0.0250
~~
75 0.0200 55 0.0150 0.0100 35 0.0050 15 0.0000
~
~
r~
~
-5 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours
 
Attachment PY-CEI/OIE-0685L Page 14 Residual Heat Removal Residual Heat removal shows a similar improving trend. Present performance supports future top quartile performance levels.
RESIDUAL HEAT REMOVAL 0.0150 65 60 55 50 i
40 0.0100.
~ i<~ii
 
35 I--
Ac~,S Llnavailabilty INPO 1st Qtr
[
;~
30
~
~
25 0.0050.
I --~-
Budgeted Unavailabilty
~
:~.;-,
:~.;-,
25 I --~-  Budgeted Unavailabilty ........    ~                                                  20 0.0000       ,    ~,         ~     ~       ~                         ~             m~       ?! ,~                        0 JAN   FEB       MAR       APR       MAY     JUN       JUL       AUG     SEP     OCT           NOV Note: Left Axis - 3 Year Rolling AverageUnavailability Ratio. Right Axis - Unavailability Hours It is clear that top quartile performancehas not been achieved, but the actions of the WorkManagement PII have been successful in improving nuclear safety.
20 0.0000
As discussed above in the humanperformance improvement section above, the PNPPstation industrial safety statistics have improved. PNPPhas achieved zero OSHArecordable incidents in 2006. In addition, plant personnel continue to achieve an Industrial Safety Accident Rate of 0.00 against an industry top quartile of 0.16 OSHArecordables per 200,000 man-hours.
~,  
In the area of radiological safety, challenges continue to exist. PNPPcontinues to be in the bottom quartile for accumulateddose at nuclear plants in the country. However,a major chemical cleaning effort to reduce the source term will be completed during the next outage. Thesesource term reduction plans for the next refueling outage and other dose reduction plans have been reviewed by several outside agencies and deemedappropriate.
~  
~  
~
~
m ~  
?!
0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours It is clear that top quartile performance has not been achieved, but the actions of the Work Management PII have been successful in improving nuclear safety.
As discussed above in the human performance improvement section above, the PNPP station industrial safety statistics have improved. PNPP has achieved zero OSHA recordable incidents in 2006. In addition, plant personnel continue to achieve an Industrial Safety Accident Rate of 0.00 against an industry top quartile of 0.16 OSHA recordables per 200,000 man-hours.
In the area of radiological safety, challenges continue to exist. PNPP continues to be in the bottom quartile for accumulated dose at nuclear plants in the country. However, a major chemical cleaning effort to reduce the source term will be completed during the next outage. These source term reduction plans for the next refueling outage and other dose reduction plans have been reviewed by several outside agencies and deemed appropriate.
: 2. Improve equipment performance and system health.
: 2. Improve equipment performance and system health.
The Work Management   process is focused on improving overall system health for reliability.                             System health reports have shown acceptable and steady system performance throughout the year 2006. Use of system health reports as an input to Plant Health Committeepriority decisions and subsequent integration with work managementprocess has provided the methodology of implementing actions neededto improve equipmentand systemreliability            issues. High level indications of reliability                 are plant Capability Factor and Forced Loss Rate.
The Work Management process is focused on improving overall system health for reliability.
System health reports have shown acceptable and steady system performance throughout the year 2006. Use of system health reports as an input to Plant Health Committee priority decisions and subsequent integration with work management process has provided the methodology of implementing actions needed to improve equipment and system reliability issues. High level indications of reliability are plant Capability Factor and Forced Loss Rate.
 
Attachment PY-CEI/OIE-O685L Page 15 The Capability Factor chart shows a high level of performance throughout the year. Although challenges have occurred, the significance of these and the severity have been decreased such that plant management has been able to control the impact on plant operation.
CAPABILITY FACTOR LLII 80
~
i 0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV The Forced Loss Rate has been maintained at very low levels.
During the month of May, 2006, an unplanned down power was performed to repair a hydraulic oil leak on the Reactor Recirculation Flow Control Valve actuator. In December, operators manually removed the reactor from operation due to degrading instrument air pressure. The plant was restarted 8 days later when the off gas system was returned to operation. Complications with high temperatures in the charcoal beds were the primary reason for the down time. During the period, the Forced Loss Rate has improved, returning to the business plan value. It is recognized that there will be plant issues that affect this indicator, but solid organizational performance will enable an improvement as demonstrated below.
FORCED LOSS RATE 14-12-lo- ~-- ir~onth~
- YTDActual I
8-
, ~ YTDBudgetJ 6-4-
2-o-
~
~
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 3, Increase productivity through the efficient use of resources.
The Business Plan was developed with assumptions and goals that reflect good performance as benchmarked with the Electric Utility Cost Group. PNPP finished on plan which demonstrates efficient and effective use of resources.
4.
Provide for a long-range plan to include major design changes and predictive and periodic maintenance activities, This should include provisions to address equipment obsolescence and asset management.
The Equipment Reliability, Maintenance, Outage, and the Work Management Excellence Plans contain the actions going forward for continuing to improve equipment and plant safety and reliability.
The plans also address obsolescence and asset management.


Attachment PY-CEI/OIE-O685L Page 15 The Capability Factor chart showsa high level of performance throughout the year. Although challenges have occurred, the significance of these and the severity have been decreased such that plant management    has been able to control the impact on plant operation.
Attachment PY-CEI/OIE-0685L Page 16 Closure Assessment
CAPABILITYFACTOR 80 LLII    ---
                                                            ~
i 0          ,        ,            ,        ,                                ,
JAN        FEB  MAR APR    MAY      JUN    JUL      AUG    SEP      OCT    NOV The ForcedLossRatehas beenmaintained          at verylow levels.Duringthe monthof May,2006,an unplanned    downpowerwas performed    to repaira hydraulic      oil leakon the ReactorRecirculation  Flow Control Valve actuator. In December,operators manually removedthe reactor from operation due to degrading instrument air pressure. The plant was restarted 8 days later whenthe off gas system was returned to operation. Complications with high temperatures in the charcoal beds were the primary reason for the downtime. During the period, the Forced Loss Rate has improved, returning to the businessplan value. It is recognizedthat there will be plant issues that affect this indicator, but solid organizational performance will enable an improvementas demonstrated below.
FORCEDLOSS RATE 14-12-lo- ~-- ir~onth~
          - YTDActual 8-  , ~ IYTDBudgetJ 6-4-
2-o-                                                              ~          ~
JAN        FEB  MAR    APR    MAY        JUN    JUL    AUG    SEP      OCT    NOV 3, Increase productivity through the efficient    use of resources.
The Business Plan was developed with assumptions and goals that reflect good performance as benchmarkedwith the Electric Utility Cost Group. PNPPfinished on plan which demonstrates efficient and effective use of resources.
: 4. Provide for a long-range plan to include major design changesand predictive and periodic maintenanceactivities,    This should include provisions to address equipment obsolescence and asset management.
The Equipment Reliability,      Maintenance, Outage, and the Work ManagementExcellence Plans contain the actions going forward for continuing to improve equipmentand plant safety and reliability.      The plans also address obsolescence and asset management.


Attachment PY-CEI/OIE-0685L Page 16 Closure AssessmentConclusion:
== Conclusion:==
Followinga reviewof the self-assessmentresults, performance     indicators, andthe effectivenessof the WorkManagement    PIt, FENOC concludedthat there has been substantial improvementin Work Management at PNPPand that these improvementsare sustainable. Self-assessmentshave confirmed throughobservations, interviews and performance   result reviewsthat expectationsfor process performancehavebeenestablished, communicated     and reinforced, with the end result that the basic expectationsare understoodby all affected station personnel. Theseassessments        also identified areas for improvement in workplanning, executionof scheduledworkand craft participation in work package walk downs,which are being addressedin the excellence plans.
Following a review of the self-assessment results, performance indicators, and the effectiveness of the Work Management PIt, FENOC concluded that there has been substantial improvement in Work Management at PNPP and that these improvements are sustainable. Self-assessments have confirmed through observations, interviews and performance result reviews that expectations for process performance have been established, communicated and reinforced, with the end result that the basic expectations are understood by all affected station personnel. These assessments also identified areas for improvement in work planning, execution of scheduled work and craft participation in work package walk downs, which are being addressed in the excellence plans.
Line organization accountability is being demonstrated through daily interactions, increasedemphasis on monitoring and analysis of work management   performance,and support of the observation program both in WorkManagement    meetingsand field observations. Thecausal factors of poor execution (poor preparation,failure to meetkeyprocessmilestones,lack of rigor in preparationactivities, poor communication and hand-offs betweenwork groups, and a lack of accountability for the successof the process) have beeneffectively addressedand the emphasison continued improvementof work preparationis apparent.
Line organization accountability is being demonstrated through daily interactions, increased emphasis on monitoring and analysis of work management performance, and support of the observation program both in Work Management meetings and field observations. The causal factors of poor execution (poor preparation, failure to meet key process milestones, lack of rigor in preparation activities, poor communication and hand-offs between work groups, and a lack of accountability for the success of the process) have been effectively addressed and the emphasis on continued improvement of work preparation is apparent.
The deepercausesof inadequately managed     changesand staffing reductions are nowhistorical, and improvements not related to the WorkManagement    PII havebeenimplementedat the fleet level to prevent future changemanagement    issues. Management   turnover in the outage managerand work management managerpositions remains a challenge that the PNPPsenior management             will monitor and addressuntil resolved.
The deeper causes of inadequately managed changes and staffing reductions are now historical, and improvements not related to the Work Management PII have been implemented at the fleet level to prevent future change management issues. Management turnover in the outage manager and work management manager positions remains a challenge that the PNPP senior management will monitor and address until resolved.
Continued improvementin WorkManagement        is assured through three primary mechanisms.These mechanisms include efficient and effective procedures,responsiveperformanceindicators, and an active management   observation program. Evidenceof this can be seen in the WorkManagement performanceindicators showingsteady improvement       that has been sustained over an extendedperiod of one year at acceptableand/or improvinglevels. Wherethere havebeennegative trends, management has taken action to recover and improvespecific functions or performancegaps.
Continued improvement in Work Management is assured through three primary mechanisms. These mechanisms include efficient and effective procedures, responsive performance indicators, and an active management observation program. Evidence of this can be seen in the Work Management performance indicators showing steady improvement that has been sustained over an extended period of one year at acceptable and/or improving levels. Where there have been negative trends, management has taken action to recover and improve specific functions or performance gaps.
The actions and improvementsnoted in this WorkManagement          PII have been anchoredwithin Fleet businesspractices. This provides reasonableassuranceof continuousimprovement            due to the fact that all FENOC businesspractices are coordinatedthroughthe Fleet and require concurrencefrom all sites involved. This fleet/peer ownershipand oversight ensuresconsistencywhile at the sametime incorporating industry acceptedpractices. ThePNPP    organization continuesto utilize these business practices in the implementationand improvement   of work management     at all levels.
The actions and improvements noted in this Work Management PII have been anchored within Fleet business practices. This provides reasonable assurance of continuous improvement due to the fact that all FENOC business practices are coordinated through the Fleet and require concurrence from all sites involved. This fleet/peer ownership and oversight ensures consistency while at the same time incorporating industry accepted practices. The PNPP organization continues to utilize these business practices in the implementation and improvement of work management at all levels.
Conclusion Overall, the Effective WorkManagement  PII waseffective in improvingplant safety, plant reliability, industrial safety, and radiological safety. Challengesexist in ensuringthe radiological improvement plans continue to receive attention. Theradiological plans are solidly basedon fundamentaldose reduction and sourceterm elimination. Theoutagerelated actions of the performance         initiative were movedto the OutageExcellencePlan eadier in 2006and continue to be implementedby plant management. Throughpracticing teambuilding skills and OutageControl Center protocols during Divisional outages,the staff hasimprovedtheir overall performance     in dealing with periodsof high workload.Thelast two Divisional outageswereeffectively implemented         and provided for meetingor exceedingunavailability goals. Perry, through effective use of the work management         process, has achieved performancenumberscommensurate      with the other FENOC     plants, yet progress needsto continue to reduce backlogs of Elective Maintenance.Preventive Maintenanceperformanceand percentagedeep in grace is a key focus for the FENOC       fleet. WorkManagement      performance indicators are reported at each Monthly PerformanceReviewand are highly scrutinized by FENOC executives.
Conclusion Overall, the Effective Work Management PII was effective in improving plant safety, plant reliability, industrial safety, and radiological safety. Challenges exist in ensuring the radiological improvement plans continue to receive attention. The radiological plans are solidly based on fundamental dose reduction and source term elimination. The outage related actions of the performance initiative were moved to the Outage Excellence Plan eadier in 2006 and continue to be implemented by plant management.
Through practicing team building skills and Outage Control Center protocols during Divisional outages, the staff has improved their overall performance in dealing with periods of high workload. The last two Divisional outages were effectively implemented and provided for meeting or exceeding unavailability goals. Perry, through effective use of the work management process, has achieved performance numbers commensurate with the other FENOC plants, yet progress needs to continue to reduce backlogs of Elective Maintenance. Preventive Maintenance performance and percentage deep in grace is a key focus for the FENOC fleet. Work Management performance indicators are reported at each Monthly Performance Review and are highly scrutinized by FENOC executives.


Attachment PY-CEI/OIE-0685L Page 17 Traininq Training programsdirectly affect performance   of the personnelat the plant. Hence,training wasintegral to the improvementsrealized in HumanPerformanceand Corrective Action. ThePII P2 wasmeantto strengthenand improvethe training programsto further continuousimprovements.
Attachment PY-CEI/OIE-0685L Page 17 Traininq Training programs directly affect performance of the personnel at the plant. Hence, training was integral to the improvements realized in Human Performance and Corrective Action. The PII P2 was meant to strengthen and improve the training programs to further continuous improvements.
TheNational Nuclear Accrediting Boardmet in May2005and placed the maintenanceand technical training programson probation. Specifically the Boardstated:
The National Nuclear Accrediting Board met in May 2005 and placed the maintenance and technical training programs on probation. Specifically the Board stated:
    -  Thestation has not beeneffective in using training to improveplant andpersonnelperformance.
The station has not been effective in using training to improve plant and personnel performance.
(ACADObjective 1)
(ACAD Objective 1)
    -  Althoughrecent improvements   havebeennoted, the ability of the station to sustain these improvementsremains to be demonstrated.(ACADObjective: ALL)
Although recent improvements have been noted, the ability of the station to sustain these improvements remains to be demonstrated. (ACAD Objective: ALL)
    -  Training effectiveness evaluation has beenineffective, with noted weaknesses   in self-assessmentand the corrective action program.(ACADObjective: 6)
Training effectiveness evaluation has been ineffective, with noted weaknesses in self-assessment and the corrective action program. (ACAD Objective: 6)
Theweaknesses  identified by the Accrediting Boardformedthe basesfor the Training PII. Althoughthe Training PII wasfocusedon the maintenance     and technical programs,actions werealso taken in parallel to strengthenthe Operationstraining programs.Theapproachof the initiative wasto specifically cover ACAD Objectives 1 and 6 in detail and to provide for improvement   in the remainingACAD  Objective areas to ensure the training programswerecommensurate      with industry practices and standards.
The weaknesses identified by the Accrediting Board formed the bases for the Training PII. Although the Training PII was focused on the maintenance and technical programs, actions were also taken in parallel to strengthen the Operations training programs. The approach of the initiative was to specifically cover ACAD Objectives 1 and 6 in detail and to provide for improvement in the remaining ACAD Objective areas to ensure the training programs were commensurate with industry practices and standards.
PerformanceResults TheTraining to ImprovePerformance    PII resulted in the programbeing removedfrom probation in the fall of 2005after the November     16, 2005National Academy   for Nuclear Training board meeting. The PNPPtraining programnowconformsto acceptedindustry standards. The organization has demonstrated self-critical behaviorsthat assessfor gapsandestablishesaction plans to drive for excellence.
Performance Results The Training to Improve Performance PII resulted in the program being removed from probation in the fall of 2005 after the November 16, 2005 National Academy for Nuclear Training board meeting. The PNPP training program now conforms to accepted industry standards. The organization has demonstrated self-critical behaviors that assess for gaps and establishes action plans to drive for excellence.
Thefinal effectivenessreviewfor the Training PII wasconductedby a teamof line andtraining personnel. Theteam concludedthere has beensubstantial improvementin the PNPPtraining programs since implementing this initiative. Line ownershiphas beeninstilled throughimproveduseof training coordinators and line managerobservations. Eadyin the timeline of improvements,       training committees wereinconsistent and poorly attended. Presently, improvedownershipby the line and embeddinga protocol that focusesthe committeeson using training to improveperformance      has resulted in training committeesthat are standardized, consistent, and showinga strong emphasison improving performance.For example,line managers       acted as subject matter experts during training sessions. For example,the MaintenanceManagerled HumanPerformanceTraining in the dynamicflow loop simulator to ensurehis expectationswereclear and understood.
The final effectiveness review for the Training PII was conducted by a team of line and training personnel. The team concluded there has been substantial improvement in the PNPP training programs since implementing this initiative.
Oneof the key mechanisms     for enabling line ownershipand ddving improvements   through training is a healthy training committeestructure and protocol. Actions taken to strengthenthe committeestructure wereeffective in that the committeesare muchmorefocusedon performancerelated topics.
Line ownership has been instilled through improved use of training coordinators and line manager observations. Eady in the timeline of improvements, training committees were inconsistent and poorly attended. Presently, improved ownership by the line and embedding a protocol that focuses the committees on using training to improve performance has resulted in training committees that are standardized, consistent, and showing a strong emphasis on improving performance. For example, line managers acted as subject matter experts during training sessions. For example, the Maintenance Manager led Human Performance Training in the dynamic flow loop simulator to ensure his expectations were clear and understood.
Additionally, committeesdiscussionscentering on howtraining can be usedto resolve issues in the plant occur frequently and are documented   in the meetingminutesfor future reference. Further, the hierarchy of committeeshasbeeneffective in engagingall levels in the organization. CognitiveTrending Reports and Condition Reports are central themesthroughout the meetings.The sustained improvementsin these programscomplimentthe effectiveness of the Curriculum ReviewCommittee (CRC)and Training ReviewCommittees(TRCs).
One of the key mechanisms for enabling line ownership and ddving improvements through training is a healthy training committee structure and protocol. Actions taken to strengthen the committee structure were effective in that the committees are much more focused on performance related topics.
Training performanceindicators monitor attributes under eachACAD      Objective. Theattributes are scoredbasedon survey and other objective data and provide a traditional color codecorrespondingto the level of performance.A programrated all Greenwouldindicate high confidencein the programsand training process.This graphprovides an overall indication of the improvement     in the confidenceof the
Additionally, committees discussions centering on how training can be used to resolve issues in the plant occur frequently and are documented in the meeting minutes for future reference. Further, the hierarchy of committees has been effective in engaging all levels in the organization. Cognitive Trending Reports and Condition Reports are central themes throughout the meetings. The sustained improvements in these programs compliment the effectiveness of the Curriculum Review Committee (CRC) and Training Review Committees (TRCs).
Training performance indicators monitor attributes under each ACAD Objective. The attributes are scored based on survey and other objective data and provide a traditional color code corresponding to the level of performance. A program rated all Green would indicate high confidence in the programs and training process. This graph provides an overall indication of the improvement in the confidence of the


Attachment PY-CEI/OIE-0685L Page 18 training programs.A high confidencein training results from improvedownershipby the line, which translatesinto realizing, morevalueout of training. This is a measure   of the effective useof training committees and improvedownershipby the line organization. It is clear that the overall health and training performance   has increased.Thereare 100 attributes total.
Attachment PY-CEI/OIE-0685L Page 18 training programs. A high confidence in training results from improved ownership by the line, which translates into realizing, more value out of training. This is a measure of the effective use of training committees and improved ownership by the line organization. It is clear that the overall health and training performance has increased. There are 100 attributes total.
ConfidenceLevel of Training Effectiveness
Confidence Level of Training Effectiveness go
                                  ~
~
go        ::
70 60 Number of 50 Highly Rated 40 ~__
70 60 Numberof 50 Highly Rated 40 ~__
Attributes 30 20 i
Attributes 30 20                                                     i 10                                                   i
i 10 0~-
                              ~-
1st 2nd 3rd 4th 1st 2nd 3rd 2005 2006 There are 100 attributes scored. There was no data in I st quarter 2005 due to refueling outage As described above, the line organization and training staff has sustained an acceptable level of confidence and ownership in training effectiveness.
0 1st   2nd 3rd   4th   1st 2nd 3rd 2005             2006 Thereare 100 attributes scored. Therewasno data in I st quarter 2005due to refueling outage As describedabove,the line organizationandtraining staff hassustainedan acceptablelevel of confidenceandownershipin training effectiveness.
AGAD Objective 2 is Management of Training Processes and Resources. This objective contains the highest vulnerability based on the analysis of the indicators. The dominate reason for poor performance was the effective and efficient use of training resources. This issue has been discussed with the Senior Training Advisory Committee (STAG) and SLT and is being resolved for the coming year in the Training Excellence Plan.
AGAD Objective 2 is Management     of Training Processesand Resources.This objective contains the highest vulnerability basedon the analysis of the indicators. Thedominatereasonfor poor performance wasthe effective andefficient use of training resources.This issue has beendiscussedwith the Senior Training Advisory Committee(STAG)and SLTand is being resolved for the comingyear in the Training ExcellencePlan.
Conclusion The Training to Improve Performance PII resulted in the Technical Training program being removed from probation in the fall of 2005 after the November 16, 2005 National Academy of Nuclear Training board meeting. The training program now is in line with industry standards and a self-critical organization is continuing to assess gaps and develop action plans to continue to strive for excellence.
Conclusion TheTraining to ImprovePerformancePII resulted in the Technical Training programbeing removed from probation in the fall of 2005after the November     16, 2005National Academy   of NuclearTraining boardmeeting.Thetraining programnowis in line with industry standardsand a self-critical organizationis continuing to assessgapsanddevelopaction plans to continueto strive for excellence.
Employee Engagement and Communication (EECI)
EmployeeEngagementand Communication(EECI)
The purpose of this initiative is to have employees actively engaged in recognizing, understanding and improving PNPPs performance through the Perry Improvement Initiative and other key activities, such as, effective communications, the Plant Safety Committee, ALARA Committee, Consistent Supervision Committee and the FENOC Transformation Team.
Thepurposeof this initiative is to haveemployees      actively engaged in recognizing, understandingand improvingPNPPsperformancethrough the Perry Improvement       Initiative and other key activities, such as, effective communications,the Plant Safety Committee,ALARA         Committee,Consistent Supervision Committeeand the FENOC         Transformation Team.
Several factors contributed to a sense of historical frustration and dissatisfaction by the workforce at PNPP. It was important to reverse this trend to ensure the plant improves its overall performance and can sustain excellence in the long run.
Severalfactors contributedto a senseof historical frustration anddissatisfaction by the workforceat PNPP.It wasimportantto reversethis trend to ensurethe plant improvesits overall performance           and cansustain excellencein the long run.
These initiative actions were organized to address the main areas affecting employee engagement:
Theseinitiative    actions wereorganizedto addressthe mainareas affecting employeeengagement:
Employee engagement: Active involvement of employees in key improvement initiatives
    -  Employeeengagement:Active involvementof employeesin key improvementinitiatives


Attachment PY-CEI/OIE-0685L Page 19 Performance Managementand Standards: Standards and accountability built                             into the way of doing business and driven through the performance managementprocess.
Attachment PY-CEI/OIE-0685L Page 19 Performance Management and Standards: Standards and accountability built into the way of doing business and driven through the performance management process.
Communications: Keeping employees informed Performance Results Whenthe results of the actions completed by this and other key performance improvementinitiatives                                  are viewed in the aggregate, employee engagement and communications at PNPPappear to be better than 18 months ago.
Communications: Keeping employees informed Performance Results When the results of the actions completed by this and other key performance improvement initiatives are viewed in the aggregate, employee engagement and communications at PNPP appear to be better than 18 months ago.
The most recent Safety Conscious Work Environment (SCWE)survey provided someadditional                                      insights into the overall employeemorale and feelings towards plant processes.
The most recent Safety Conscious Work Environment (SCWE) survey provided some additional insights into the overall employee morale and feelings towards plant processes.
Negative Responses
Negative Responses t-
                                                                ,2,.
,2,.
t-IFOUR IpIU, Aim Of A Uue~ = CO~iCIOeJSWOB.EIDIYDU~41D~
V Good IFOUR IpIU, Aim Of A Uue~ = CO~iCIOeJS WOB.E IDIYDU~41D~
V Good 10%
10%
H 6%
H 6%
  ",,                BASICPRINCIPLES                ,&#xa2;         20/0
BASIC PRINCIPLES
    ......        . .........                                  0%       ...........
, &#xa2; 20/0 0%
Pillar I         Pillar 2 Pillar 3 Pillar 4 There was a slight increase in negative responses whencomparing 2006 to 2005. Additionally, frustration and dissatisfaction remains amongsomeemployeesregarding Pillar 2, Effective Normal ProblemResolution Process. The increase in negative responses to questions related to this pillar reflects the aggressive efforts to improve CAPand the need for longer term successes to be communicatedand leveraged amongemployees. Additionally,                               in analyzing the commentsand response to survey questions, it is clear that the handling of the mid-year performance management                               process highly impacted the survey results.
Pillar I Pillar 2 Pillar 3 Pillar 4 There was a slight increase in negative responses when comparing 2006 to 2005. Additionally, frustration and dissatisfaction remains among some employees regarding Pillar 2, Effective Normal Problem Resolution Process. The increase in negative responses to questions related to this pillar reflects the aggressive efforts to improve CAP and the need for longer term successes to be communicated and leveraged among employees. Additionally, in analyzing the comments and response to survey questions, it is clear that the handling of the mid-year performance management process highly impacted the survey results.
Condition Reports were written for each pillar rated as red as required by the SCWE                             process.
Condition Reports were written for each pillar rated as red as required by the SCWE process.
Additionally the condition of SCWE                 is monitored through a fleet business practice. The process has been in place for over 2 years and has proven to provide a sustainable process for addressing issues raised during the surveys.
Additionally the condition of SCWE is monitored through a fleet business practice. The process has been in place for over 2 years and has proven to provide a sustainable process for addressing issues raised during the surveys.
The Transformation Teamconcept is a fleet-wide program to include all levels of employeesin participation of FENOCs           transformation to top quartile industry performance. This participation comes in the form of initial training on standards and methodsof changemanagement                            coupled with basic skills required for effective change. Then the team is then distributed to areas of management                             processes to coach and facilitate           the groups in proper behaviors to assure progress towards excellence. For example, a Transformation Teammemberattends all Executive Leadership Teammeetings and actively participates in agendaitems and post meeting critiques. There have been two graduating classes of the Transformation Teamwith upwardsof 30 people from across all of the sites and corporate.
The Transformation Team concept is a fleet-wide program to include all levels of employees in participation of FENOCs transformation to top quartile industry performance. This participation comes in the form of initial training on standards and methods of change management coupled with basic skills required for effective change. Then the team is then distributed to areas of management processes to coach and facilitate the groups in proper behaviors to assure progress towards excellence. For example, a Transformation Team member attends all Executive Leadership Team meetings and actively participates in agenda items and post meeting critiques.
Finally, PNPPhas established several successful employee engagementgroups such as the Human Performance Advocates and the CR Analysts. The involvement and ownership demonstrated by these groups can be tied to the Employee Engagementand Communications PII, such as active employee
There have been two graduating classes of the Transformation Team with upwards of 30 people from across all of the sites and corporate.
: Finally, PNPP has established several successful employee engagement groups such as the Human Performance Advocates and the CR Analysts. The involvement and ownership demonstrated by these groups can be tied to the Employee Engagement and Communications PII, such as active employee


Attachment PY-CEI/OIE-0685L Page 20 participation and communications,strong management     presencepersonal accountability and structure to these processes.
Attachment PY-CEI/OIE-0685L Page 20 participation and communications, strong management presence personal accountability and structure to these processes.
Conclusion Employeeengagement    has improvedthrough the last 18 months.It is clear that from the Human Performanceteams, the Training teams, and the Safety teamsthat the engagement       from employeesis occurring andis resulting in improvements.
Conclusion Employee engagement has improved through the last 18 months. It is clear that from the Human Performance teams, the Training teams, and the Safety teams that the engagement from employees is occurring and is resulting in improvements.
Operational Focus Thepurposeof this initiative is to strengthenthe operationalfocusacrossthe organization.This is accomplished   by ensuringcommon  goals andpriorities result in excellent materiel condition and equipmentreliability that supportsafe and reliable operations. Thepurposeof the OperationalFocusPII wasto establish the appropriate attitudes and behaviorsof personnel,along with the frameworkof policies andprocedures,to ensurethat nuclearsafety is an integral part of everyoperationaldecision.
Operational Focus The purpose of this initiative is to strengthen the operational focus across the organization. This is accomplished by ensuring common goals and priorities result in excellent materiel condition and equipment reliability that support safe and reliable operations. The purpose of the Operational Focus PII was to establish the appropriate attitudes and behaviors of personnel, along with the framework of policies and procedures, to ensure that nuclear safety is an integral part of every operational decision.
FocusAreasfor Improvement:     Theinitiative actions wereorganizedinto five generalconceptsto achieve the Operational FocusedOrganization:
Focus Areas for Improvement:
    -  Goalsand priorities: Creation of an Operationally FocusedOrganization aligned with common goals andpriorities supportingtimely resolution of operationalchallengeswhile minimizingrisk to plant operations.
The initiative actions were organized into five general concepts to achieve the Operational Focused Organization:
    -  OperationalDecisionMaking:Ensurethat nuclear safety is an integral part of every operational decision.
Goals and priorities:
    -  OperationsLeadership: Establish Operationsleadershipin the organization, craft ownership, and a strong engineering presence.
Creation of an Operationally Focused Organization aligned with common goals and priorities supporting timely resolution of operational challenges while minimizing risk to plant operations.
    -  Long-termStaffing: Developa long-term staffing plan to ensurethat operational knowledgeand experienceis present throughoutthe PNPP     organization.
Operational Decision Making: Ensure that nuclear safety is an integral part of every operational decision.
    &deg; Operator Fundamentals:Developa focus on the fundamentalsof safe plant operation.
Operations Leadership : Establish Operations leadership in the organization, craft ownership, and a strong engineering presence.
PerformanceResults Therehavebeenseveral recent indicators that additional workis required to fully achievean operationally focused organization. Self-assessmentshave confirmedthat while someimprovements          in focusing on common   priorities have been made,further improvementsare neededto reach FENOCs top quartile performanceobjectives. Improvements     have beennoted in the MorningTurnover, The Management   Alignment and OwnershipMeeting, Management       ReviewBoard, Plant Health Committee, Duty TeamSetting Site Priorities and use of SystemHealth Reports. Other improvements       in Operations leadership, developmentof staffing plans, Duty Teamupdates, and implementationof some performanceindicators havealso beeneffective. Theoperationsstaff recently has demonstrated         strong performance in operating the plant. Several challengeshavebeenexpertly handledwithout incident, including a recent transient involving degradinginstrumentair pressure.Thenext level of organizational performance will be achievedthrough a stronger operationally focusedorganization lead by the high standardsof the operations staff. A self-assessmentindicated the operations departmenthas not yet achievedthe level of alignmentand demanding     standardsnecessaryto drive the organization to achieve fleet expectations.Giventhis level of alignment,operationshasnot consistently assumed       the leadership position normally achievedthrough consistent demands   on the supporting organizations for resolutionof organizationalshortfalls, andas a result driving organizationalaccountability.
Long-term Staffing: Develop a long-term staffing plan to ensure that operational knowledge and experience is present throughout the PNPP organization.
&deg; Operator Fundamentals: Develop a focus on the fundamentals of safe plant operation.
Performance Results There have been several recent indicators that additional work is required to fully achieve an operationally focused organization. Self-assessments have confirmed that while some improvements in focusing on common priorities have been made, further improvements are needed to reach FENOCs top quartile performance objectives. Improvements have been noted in the Morning Turnover, The Management Alignment and Ownership Meeting, Management Review Board, Plant Health Committee, Duty Team Setting Site Priorities and use of System Health Reports. Other improvements in Operations leadership, development of staffing plans, Duty Team updates, and implementation of some performance indicators have also been effective. The operations staff recently has demonstrated strong performance in operating the plant. Several challenges have been expertly handled without incident, including a recent transient involving degrading instrument air pressure. The next level of organizational performance will be achieved through a stronger operationally focused organization lead by the high standards of the operations staff. A self-assessment indicated the operations department has not yet achieved the level of alignment and demanding standards necessary to drive the organization to achieve fleet expectations. Given this level of alignment, operations has not consistently assumed the leadership position normally achieved through consistent demands on the supporting organizations for resolution of organizational shortfalls, and as a result driving organizational accountability.


Attachment PY-CEI/OIE-0685L Page 21 Implementation of this OperationalFocusPll hasnot achievedthe desired overall results of establishing an Operationally FocusedOrganization. Actions for future improvement   are being carried forward to the FENOC Excellence Plan for Operations. For example, the OperationsExcellence Plan addresses,in part, reinforcementof Operationsstandardsand expectations, reactivity management,       and succession planningandstaffing.
Attachment PY-CEI/OIE-0685L Page 21 Implementation of this Operational Focus Pll has not achieved the desired overall results of establishing an Operationally Focused Organization. Actions for future improvement are being carried forward to the FENOC Excellence Plan for Operations. For example, the Operations Excellence Plan addresses, in part, reinforcement of Operations standards and expectations, reactivity management, and succession planning and staffing.
Assurance and Continuous Improvement Asthe PII P2 initiatives closed, future gapclosure actionsandinitiatives goingforwardare containedin the Fleet Excellence Plans to assure continuous improvement.The FENOC         Management   Modeldepicts the management structure and methodsused to implementthe processesnecessaryto meet the BusinessPlan objectives. A significant portion of the management   modelis focusedon driving and monitoring the continuousperformanceimprovement    processes,including critical self assessments.
Assurance and Continuous Improvement As the PII P2 initiatives closed, future gap closure actions and initiatives going forward are contained in the Fleet Excellence Plans to assure continuous improvement. The FENOC Management Model depicts the management structure and methods used to implement the processes necessary to meet the Business Plan objectives. A significant portion of the management model is focused on driving and monitoring the continuous performance improvement processes, including critical self assessments.
Theseprocessesalign with the INPOmodelfor ContinuousPerformanceImprovement.
These processes align with the INPO model for Continuous Performance Improvement.
TheExcellencePlan is a discrete portion of the BusinessPlan designedto achieveobjectives, measuredby key metrics, are used to showBusinessPlan effectiveness and goals. Theseplans are maintainedby the fleet peer groups, which are led by the Fleet ProgramManager.The Excellence Plans and the continuous improvementframeworkof the fleet processesand programssupply the necessarymotive force for continuousimprovement    such that performanceissues are proactively addressedby both the PNPP   staff and actively monitoredby the FENOC   Fleet staff.
The Excellence Plan is a discrete portion of the Business Plan designed to achieve objectives, measured by key metrics, are used to show Business Plan effectiveness and goals. These plans are maintained by the fleet peer groups, which are led by the Fleet Program Manager. The Excellence Plans and the continuous improvement framework of the fleet processes and programs supply the necessary motive force for continuous improvement such that performance issues are proactively addressed by both the PNPP staff and actively monitored by the FENOC Fleet staff.
Theoverall strategy for continuousimprovement  is therefore achievedthroughthree tiers of fleet structure. Thefirst tier providesan umbrellaover the entire operation. It includesthe BusinessPlan, Management   Model, IndependentOversight, and the Company     Nuclear ReviewBoard. Answeringto this tier is the secondlayer whichincludes the structural programssuchas the Peer Groups,Human Performance Programand Training Committees.Finally, providing the foundation of the structure are the functional programsof Corrective Action, Self-Assessment,Benchmarking,     and Field Observations.
The overall strategy for continuous improvement is therefore achieved through three tiers of fleet structure. The first tier provides an umbrella over the entire operation. It includes the Business Plan, Management Model, Independent Oversight, and the Company Nuclear Review Board. Answering to this tier is the second layer which includes the structural programs such as the Peer Groups, Human Performance Program and Training Committees. Finally, providing the foundation of the structure are the functional programs of Corrective Action, Self-Assessment, Benchmarking, and Field Observations.
Thesefunctional programsprovide the traction for the organizationto realize gapsand providesolutions to achieveexcellence.
These functional programs provide the traction for the organization to realize gaps and provide solutions to achieve excellence.
FENOC has proven that it is dedicatedto improvingthe performanceof its plants and has demonstrated successin doing so. For example,at Davis Besse, FENOC     achievedsustained higher levels of performanceas indicated by their return to the normal ReactorOversightProcessand continued operation in the LicenseeResponseColumn.Additionally, BeaverValley has showncontinuous improvementand progress towards excellence with a world class steamgenerator replacementoutage andcontinuedhigh levels of reliability andsafety. Webelieve that by applyingthe lessonslearnedfrom the improvementsat Davis Besseand BeaverValley and with continued focus by both the PNPP organization and FENOC   as a wholesimilar performanceresults will be achievedat PNPP.
FENOC has proven that it is dedicated to improving the performance of its plants and has demonstrated success in doing so. For example, at Davis Besse, FENOC achieved sustained higher levels of performance as indicated by their return to the normal Reactor Oversight Process and continued operation in the Licensee Response Column. Additionally, Beaver Valley has shown continuous improvement and progress towards excellence with a world class steam generator replacement outage and continued high levels of reliability and safety. We believe that by applying the lessons learned from the improvements at Davis Besse and Beaver Valley and with continued focus by both the PNPP organization and FENOC as a whole similar performance results will be achieved at PNPP.
Theactions takenand behaviorsinstilled in the organizationwill workto lessenthe frequencyand severity of plant events. FENOC viewsall eventsas opportunities to identify additional improvement actions to strive for excellencein performance.Througha robust culture of continuousimprovement and placing safety andreliability at the forefront of the BusinessPlan andExcellencePlans, FENOC     will ensure sustained performanceimprovement.
The actions taken and behaviors instilled in the organization will work to lessen the frequency and severity of plant events. FENOC views all events as opportunities to identify additional improvement actions to strive for excellence in performance. Through a robust culture of continuous improvement and placing safety and reliability at the forefront of the Business Plan and Excellence Plans, FENOC will ensure sustained performance improvement.
Since the FENOC reorganization in Augustof 2004, FENOC   has focused on standardization of processesacrossthe three nuclear sites. In accomplishingthis, a significant amountof benchmarking and assessmenthas taken place. The FENOC     staff is madeup of manysenior managersand technical personnelwhohavediverse industry experienceat top fleets acrossthe nation. This facilitates many industry contacts makingbenchmarkingand assessmentan ingrained way of doing business.
Since the FENOC reorganization in August of 2004, FENOC has focused on standardization of processes across the three nuclear sites. In accomplishing this, a significant amount of benchmarking and assessment has taken place. The FENOC staff is made up of many senior managers and technical personnel who have diverse industry experience at top fleets across the nation. This facilitates many industry contacts making benchmarking and assessment an ingrained way of doing business.
Presently, there is a corporate groupdedicatedto the assessment   program,traversing across site and departmentalboundaries.This groupnot only performsindependentassessment,       but facilitates the self-assessmentprogram, programmetrics, and programoversight.
Presently, there is a corporate group dedicated to the assessment program, traversing across site and departmental boundaries. This group not only performs independent assessment, but facilitates the self-assessment program, program metrics, and program oversight.


Attachment PY-CEI/OIE-0685L Page 22 Finally, there is continuousFENOC  oversight of PNPP in the form of:
Attachment PY-CEI/OIE-0685L Page 22 Finally, there is continuous FENOC oversight of PNPP in the form of:
    -    Monthly PerformanceReviews(implementedin the sameweekas the other fleet stations with cross-attendancefrom senior leadership of the other FENOC   plants)
Monthly Performance Reviews (implemented in the same week as the other fleet stations with cross-attendance from senior leadership of the other FENOC plants)
    -    Quarterly Performance Reviewsat a Fleet level
Quarterly Performance Reviews at a Fleet level Fleet standard performance indicators with goals based on industry best quartile performance Integrated and coordinated Company Nuclear Review Boards Assessment by the independent and centralized Fleet Oversight group Structured and formal Safety Culture Assessment process facilitated by the Fleet Independent Oversight Department INPO corporate evaluation of culture and performance every 4 years. As a mid-cycle activity, FENOC performs a corporate self assessment every four years, staggered with the INPO corporate evaluation. This evaluation is a critical look by industry peers with an in-house team to comprehensively assess the continuous improvement cycle and the performance of the fleet programs.
    -    Fleet standardperformanceindicators with goals basedon industry best quartile performance
Overall Conclusion In summary, PNPP has improved and sustained overall plant performance through both on-site initiatives and, fleet standard programs and oversight. Since the establishment of the PII P2 in the summer of 2005, NRC findings do not indicate any significant performance weaknesses in the areas of Human Performance, Corrective Action Program and Work Management. Likewise, FENOC and NRC performance indicators do not indicate any significant performance weaknesses, and many key performance indicators show substantial performance improvement during 2006. Although, a recent industry evaluation identified some areas where additional focus must be given, particulady in the areas of operational focus and decision making, these areas are being addressed through the Excellence Plan.
    -    Integrated and coordinated Company   Nuclear ReviewBoards
Continuous improvement is assured by a fleet standard framework of procedures and processes, a culture of continual assessment against industry excellence, and the people behaving in a manner that shows a bias for improvement. FENOC has focused on developing fleet processes benchmarked against the industry, and now has in place a management team that is imposing the right expectations and standards on a day-to-day basis. The PNPP staff has responded to these challenges and has demonstrated their dedication to improvement and proper execution of the procedures. Finally, identification and resolution of gaps against top levels of industry performance is being addressed through the Excellence Plans and performance improvement processes.}}
    -    Assessment by the independentand centralized Fleet Oversight group
    -    Structured and formal Safety Culture Assessment processfacilitated by the Fleet Independent Oversight Department
      -  INPOcorporate evaluation of culture andperformanceevery 4 years. As a mid-cycle activity, FENOC performs a corporate self assessmentevery four years, staggeredwith the INPO corporateevaluation. This evaluationis a critical look by industry peerswith an in-houseteam to comprehensively assessthe continuous improvement   cycle and the performanceof the fleet programs.
Overall Conclusion In summary,PNPP     has improvedand sustained overall plant performancethrough both on-site initiatives and, fleet standardprogramsandoversight. Sincethe establishmentof the PII P2in the summer   of 2005, NRCfindings do not indicate any significant performanceweaknesses    in the areas of HumanPerformance, Corrective Action Program and Work Management.Likewise, FENOCand NRC performanceindicators do not indicate any significant performanceweaknesses,       and manykey performanceindicators showsubstantial performanceimprovementduring 2006. Although, a recent industry evaluation identified someareas whereadditional focus mustbe given, particulady in the areas of operational focus and decision making,these areas are being addressedthrough the Excellence Plan.
Continuousimprovement    is assuredby a fleet standard frameworkof proceduresand processes, a culture of continual assessment   against industry excellence, and the peoplebehavingin a mannerthat showsa bias for improvement. FENOC     has focused on developing fleet processes benchmarked against the industry, and nowhas in place a management     teamthat is imposingthe right expectations and standards on a day-to-day basis. The PNPP     staff has respondedto these challenges and has demonstrated   their dedication to improvement andproper executionof the procedures.Finally, identification andresolution of gapsagainst top levels of industry performance is beingaddressed through the Excellence Plans and performanceimprovementprocesses.}}

Latest revision as of 04:26, 15 January 2025

Transition Letter and Attachment (1/3/07)
ML070090262
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/03/2007
From: Pearce L
FirstEnergy Nuclear Operating Co
To: Caldwell J
Region 3 Administrator
References
PY-CEI/OIE-0685L
Download: ML070090262 (26)


Text

rJ:::lVlJ(

Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 L William Peerce 440-280-5382 Vice President Fax: 440-280-8029 January 3, 2007 PY-CEI/OIE-0685L Mr. James L. Caldwell Nuclear Regulatory Commission Regional Administrator, Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58

Subject:

Completion of Requirements for Transition from NRC MC 0305 Action Matrix Column for Multiple/Repetitive Degraded Cornerstone to Routine Oversight

Dear Mr. Caldwell,

The purpose of this letter is to summarize the key actions implemented and improvements in performance achieved at the Perry Nuclear Power Plant (PNPP) since entering the Multiple/Repetitive Degraded Cornerstone Column of the NRC Manual Chapter 0305 (MC 0305)

Action Matrix (Column IV of the NRC Action Matrix) in August 2004. The Attachment to this letter provides a more detailed discussion of the basis for FENOCs request of NRC to transition to an appropriate reduced level of regulatory oversight consistent with the guidance set forth in NRC MC 0305.

The Perry management team made substantial improvements at PNPP, throughout the 2005 and 2006 timeframe and has sustained performance at substantially improved performance levels during most of the 2006 timeframe. The improvements have been confirmed through critical self-and peer-assisted assessments completed in 2006 as part of the closure of the individual performance improvement initiatives.

Those assessments also identified areas in which PNPP performance had not achieved FENOCs standards of excellence and defined specific areas in which additional improvements would be required in order to meet those standards. These areas for improvement have been included in the Perry Excellence Plans to ensure continuous improvement.

FENOC and the NRC will discuss overall improvement of station performance achieved through the completion of the Perry Performance Improvement Initiatives Phase 2 (PII P2) and the transition to the FENOC Fleet continuous improvement processes during a public meeting scheduled for January 10, 2007. As requested, FENOC is including, as an Attachment to this letter, a report that provides the basis for FENOCs request of NRC to transition to an appropriate reduced level of regulatory oversight consistent with the guidance set forth in NRC MC 0305. This report summarizes the actions taken to meet the requirements of NRC MC 0305, the accomplishments achieved through PII P2, the areas in which sustained improvements in performance have been achieved and examples of those areas where performance has not achieved FENOCs standards of excellence for each of the six focus areas of the Perry PII P2.

Each individual PII initiative has a detailed closure report documenting the results of the initiative, the specific improvements achieved, the conclusions of critical closure assessments

1-" I" -L-r-I/LJIr--ulooO L Page 2 and the areas in which additional improvements in performance are necessary to meet FENOCs standards of excellence. A more detailed closure report for PII P2, and the supporting reports for each initiative, has been made available to the NRC for inspection at the PNPP.

Background:

By letter dated August 12, 2004, the NRC informed FirstEnergy Nuclear Operating Company (FENOC) that the PNPP had entered the Multiple/Repetitive Degraded Cornerstone column of the NRC MC 0305 Reactor Oversight Program Action Matrix (Column IV of the Action Matrix) requiring supplemental inspections and increased oversight. NRC also identified substantive cross cutting issues in the Problem Identification and Resolution area (in August 2004) and in the Human Performance area (in March 2005). In July 2005, the NRC issued Inspection Report 2005003 documenting the results of the inspection conducted in accordance with Inspection Procedure (IP) 95003. By letters dated August 8 and 17, 2005, FENOC provided its response to the NRC findings, stated the results of the root and contributing cause evaluations and began implementing the Perry Performance Improvement Initiative

- Phase 2 (PII P2). Consistent with the requirements for Column IV of the Action Matrix, on September 28, 2005, the NRC issued a Confirmatory Action Letter (CAL) to PNPP. The CAL confirmed the understanding of actions that FENOC was planning to take to improve the performance at PNPP, confirmed FENOCs specific commitments as stated in FENOC letters dated August 8 and 17, 2005, and documented the NRC criteria for continuing an increased level of oversight consistent with the MC 0305 requirements.

CAL Closure: From August 2005 to October 2006, FENOC completed the commitments set forth in the CAL letter and performed self-and peer-assisted assessments to confirm the effectiveness of its accomplishments. By letter dated December 20, 2006, FENOC provided a summary of the actions taken, to complete each of the 13 commitments and to achieve and sustain improved performance in the four areas listed in the CAL Letter (i.e., IP 95002 Inspection Follow-up Issues, Corrective Action Program Implementation, Human Performance, and Emergency Preparedness.) In that letter, FENOC also provided the basis for its request of the NRC to close the CAL commitments.

PII P2 Scope: In addition to completing the individual commitments in the CAL, FENOC established and implemented a broader performance improvement plan, PII P2, to address the NRC 95003 Inspection findings and observations and to resolve the root and contributing causes of the organizational and programmatic performance issues leading to PNPPs entry into Column IV of the Action Matrix. In developing the PII P2, FENOC included initiatives in Work Management, Training, Employee Engagement and Operational Focus because PNPP recognized the interrelationship between the cross-cutting areas of Human Performance and Corrective Action Program (CAP) implementation and other processes and performance areas.

For example, the work management process directly supported timely completion of corrective actions and an improved training process supported overall human performance improvements.

Overall, the PII P2 was successful and the Perry station management team and its employees have substantially improved performance of equipment and key programs from less than adequate levels (in 2004) to median industry performance levels, or above, at the close of 2006.

Results and Key Learnings: The substantial improvements achieved through the PII P2 initiatives demonstrated FENOCs broader commitment to improving performance at the Perry station. Further, the successful implementation of the PII P2 initiatives provided several key lessons learned that will be applied to accomplish the objectives of FENOCs continuous improvement plans going forward. For example, the importance of critical self-assessments and benchmarking to identify performance gaps was one of the key lessons learned from the completion of the PII P2 and has become a central element of the continuous improvement culture at Perry. Also, the value of management oversight and involvement became clear as the Perry management team worked to resolve the issues that led to less than adequate performance in Human Performance and Corrective Action Program implementation. The Perry

Page 3 team also has shown its ability to sustain improvements simultaneously in multiple areas. By applying the lessons learned from its successes, during the period from August 2004 through December 2006, FENOC has made steady progress toward identifying and correcting the specific problems that led to the entry of PNPP into Column IV of the Action Matrix and achieving the goals and objectives of PII P2.

MC 0305 Requirements Met: The requisite licensee actions for performance improvement, as defined by the NRC MC 0305 for the Multiple/Repetitive Degraded Cornerstone (i.e. Column IV of the Action Matrix), have been accomplished as follows:

Corrective action commitments to resolve the root causes and prevent recurrence of the conditions that led to the White Findings in Mitigating Systems and Emergency Preparedness are complete and effective.

Commitments identified in the CAL are complete and the programmatic and organizational performance issues identified through the NRC 95003 inspection have been addressed through the PII (Phases 1 and 2) and are resolved.

Corrective actions to resolve the root and contributing causes of the substantive cross-cutting issues in Human Performance and Corrective Action Program implementation are complete and there have been no new plant events or findings, during the past 12 months, that reveal similar significant performance issues in these cross-cutting areas.

Performance in the following areas has been substantially improved and sustained as demonstrated through the results of specific PII initiatives, the completion of CAL Commitments and key performance indicators for each of the following focus areas:

o CAP Implementation (CAL and PII Focus Area) o Human Performance (CAL and PII Focus Area) o Work Management (PII Focus Area) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII Focus Area) o Training (PII Focus Area) o Employee Engagement (PII Focus Area).

Self-and peer-assisted assessments of performance in the six PII focus areas have been completed. In five of the areas, these assessments ascertained that substantial improvements have been achieved together and also identified areas for improvement. In the area of Operational Focus (PII Focus Area), the assessment identified that limited improvements had been achieved, however important areas for improvement remained. These have been carried forward to the Perry and FENOC Fleet Excellence Plans.

FENOC has the right management team in place at PNPP and Excellence Plans have been developed to ensure continued focus on those areas for improvement that will help ensure that performance improvements are sustained and continuous progress toward excellence is made at a pace prescribed by the FENOC Fleet management through the business plan and performance improvement model.

NRC and Perry performance indicators do not indicate significant performance weaknesses that have not been adequately addressed.

PY-CEI/OIE-0685L Page 4 FENOC and Perry management has successfully used key performance indicators to track performance coupled with a management review process to assure that Perry station performance goals are achieved. Performance trends will continue to be assessed against FENOC standards and KPIs will continue to be used in achieving FENOCs Excellence Plan goals.

Summary:

the PII P2 provided the framework for actions to achieve and sustain the necessary improvements in performance in the key programs and processes for the six PII focus areas.

The performance improvements were confirmed through self-and peer-assisted assessments conducted as part of the formal closure of the PII. The areas for improvement identified through these assessments have now been transitioned to the FENOC continuous improvement process and the Excellence Plans. The FENOC Fleet Excellence Plans provide the framework for the behavioral improvements needed for a robust continuous improvement culture. The combination of continued use of critical self-assessment, management oversight, the FENOC Fleet Business Plan and the implementation of the Excellence Plan provide reasonable assurance that PNPP performance will continue to improve.

FENOC has met the requirements of NRC MC 0305, achieved substantial improvement in each of the four CAL areas, performed critical self-assessments to confirm that improvements in Human Performance and CAP Implementation had been sustained and identify key areas for additional improvement that are needed. FENOC is committed to sustaining the improvements achieved through the Perry PII P2 and further improving performance at PNPP through the continuous improvement process to reach the goals of the FENOC Excellence Plan. FENOC therefore respectfully requests that NRC close the subject white findings, close the cross-cutting issues and transition its level of regulatory oversight from Column IV of the Action Matrix to an appropriate reduced level of regulatory oversight consistent with the guidance in set forth in NRC MC 0305.

There are no additional commitments contained in this letter. If you have questions or require additional information, please contact Mr. Jeffrey Lausberg - Manager, Regulatory Compliance at (440) 280-5940.

Attachment cc:

Document Control Desk NRC Project Manager NRC Resident Inspector E. Duncan, NRC Rill

Attachment PY-CEI/OIE-0685L Page 1 PERRY NUCLEAR POWER PLANT PERFORMANCE IMPROVEMENT INITIATIVE

SUMMARY

REPORT Purpose The purpose of this report is to provide a summary of the key results achieved at the Perry Nuclear Power Plant (PNPP) through the implementation of the Performance Improvement Initiative (PII) process. This report also provides a high level assessment of the areas addressed by the PII, the sustained performance achieved and future continuous improvement focus areas. Each individual PII initiative has a detailed closure report documenting the results and conclusions of the improvements, and a more detailed overall closure report for PII Phase 2 (P2) has been prepared and approved.

Introduction In August of 2003, the NRC increased the oversight of PNPP as required for a Degraded Mitigating Systems Cornerstone resulting from two White Findings. The White Findings resulted from problems encountered with air binding in the Residual Heat Removal and Low Pressure Core Spray (RHR/LPCS) systems following a loss of offsite power, and failure of an Emergency Service Water (ESW) Pump coupling following maintenance. Further, performance deficiencies encountered in the evaluation and untimely execution of corrective actions for these White Findings led the NRC to place PNPP in the Repetitive Degraded Cornerstone of the Reactor Oversight Process Action Matrix (Column IV of the Action Matrix) in August of 2004. This level of performance also led the NRC to identify a substantive cross-cutting issue in the Problem Identification and Resolution area (August of 2004). Based findings during inspections NRC also identified a substantive cress-cutting issue in the Human Performance area (in March 2005). In accordance with NRC Inspection Manual Chapter (MC) 0305, NRC conducted supplemental inspections following Inspection Procedure (IP) 95003 during the first half of 2005.

Beginning in 2004, First Energy Nuclear Operating Company (FENOC) undertook extensive actions determine the root causes of the deficiencies related to PNPP system performance, program performance, and performance of the PNPP organization. These assessments led FENOC to establish the PII in 2004 to improve performance of the station organization and the plant. The pace of improvement in 2004 and the first half of 2005 did not always meet the expectations of FENOC or the NRC. Therefore, FENOC established the PII P2 to respond to the NRC 95003 Inspection findings, to achieve further improvement in performance, to integrate the fleet programs into the process and culture at PNPP, and to ensure that the performance improvement would be sustained. Additionally, the NRC issued a confirmatory action letter (CAL) on September 28, 2005 to confirm the acceptability commitments made by FENOC to improve performance at PNPP and to complete 13 specific actions in the PII P2 (i.e. CAL Commitments)

PNPP has now completed implementation of all of the actions identified through the CAL Commitments, as well as the actions in the PII P2 (reference FENOC letter dated December 20, 2006.) Through the PII P2 initiatives, PNPP has made substantial improvements in performance, has anchored those improvements in its procedures and processes to ensure that those improvements are sustained in the future, and has established a culture of continuous improvement through the FENOC fleet standard programs. These achievements provide sufficient basis for closure of the PII and allow the normal performance improvement processes, as prescribed in the FENOC Business Plan, to support continuous improvement.

Performance Improvement Initiative During the development of PII Phase 1 in eady 2004, several equipment and organizational root causes and collective significance reviews were completed. Out of these reviews, the PII was developed and was primarily a discovery process for organizational effectiveness. The result of this effort was the identification of performance gaps that fed into the Phase 2 effort. In addition, there were significant improvements made to the plant equipment, including, for example, resolution of long standing technical

Attachment PY-CEI/OIE-0685L Page 2 issues with the Emergency Diesel Generator Testable Rupture Disc and Emergency Service Water pumps.

In developing the PII P2, FENOC included initiatives in Work Management, Training, Employee Engagement and Operational Focus because PNPP recognized the interrelationship between the cross-cutting areas of Human Performance and Corrective Action Program (CAP) implementation and other processes and performance areas. Issued in August 2005, the PII P2 has been completed over the last 16 months. The goals of the individual initiatives in the PII P2 were to provide substantial, measurable improvement in the Human Performance Program, Corrective Action Program, and work management process implementation supported by initiatives in employee engagement, operational focus, and training. The PII P2 was intended to provide the means to sustain the improved performance through anchoring the improvements in enhanced processes and procedures coupled with performance indicators to monitor results and a robust continuous improvement process and culture. A key learning for the station during PII P2 was the ability to value critical self-assessments.

The essence of a viable continuous improvement program is strong performance in the identification of performance gaps, the analysis and planning of actions to close those gaps, and implementation of effective activities to improve plant safety and reliability.

Through the PII P2, PNPP station management team and employees improved performance of the equipment and programs at the PNPP station from less than adequate levels in 2004 to median industry performance levels, or above, at the close of 2006. The PNPP management team has demonstrated its ability to resolve the issues that led to less than adequate past performance and to continuously improve Human Performance and implementation of the Corrective Action Program at PNPP. During the period from August 2004 through December 2006, FENOC made steady progress toward identifying and correcting the specific problems that led to the entry of PNPP into Column IV of the Action Matrix, and designation of the two cross cutting issues, and achieving the goals and objectives of PII P2.

The requisite licensee actions for performance improvement, as defined by the NRC MC 0305 for the Multiple/Repetitive Degraded Cornerstone (i.e. Column IV of the Action Matrix), have been accomplished as follows:

Corrective action commitments to resolve the root causes and prevent recurrence of the conditions that led to the White Findings in Mitigating Systems and Emergency Preparedness are complete and effective.

Commitments identified in the CAL are complete and the programmatic and organizational performance issues identified through the NRC 95003 inspection have been addressed through the PII (Phases 1 and 2) and are resolved.

Corrective actions to resolve the root and contributing causes of the substantive cross-cutting issues in Human Performance and Corrective Action Program implementation are complete and there have been no new plant events or findings, during the past 12 months, that reveal similar significant performance issues in these cross-cutting areas.

Performance in the following areas has been substantially improved and sustained as demonstrated through the results of specific PII initiatives, the completion of CAL Commitments and key performance indicators for each of the following focus areas:

o CAP Implementation (CAL and PII Focus Area) o Human Performance (CAL and PII Focus Area) o Work Management (PII FocusArea) o Emergency Preparedness (CAL) o Maintenance Procedures (CAL) o Operational Focus (PII Focus Area) o Training (PII Focus Area) o Employee Engagement (PII Focus Area).

Attachment PY-CEI/OIE-0685L Page 3 Self and peer-assisted assessments of performance in the six PII focus areas have been completed. In five of the areas, these assessments ascertained that substantial improvements have been achieved together and also identified areas for improvement. In the area of Operational Focus (PII Focus Area), the assessment identified that limited improvements had been achieved, however important areas for improvement remained.

These have been carried forward to the Perry and FENOC Fleet Excellence Plans.

FENOC has the right management team in place at PNPP and Excellence Plans have been developed to ensure continued focus on those areas for improvement that will help ensure that performance improvements are sustained and continuous progress toward excellence is made at a pace prescribed by the FENOC Fleet management through the business plan and performance improvement model.

NRC and Perry performance indicators do not indicate significant performance weaknesses that have not been adequately addressed.

FENOC and Perry management has successfully used key performance indicators to track performance coupled with a management review process to assure that Perry station performance goals are achieved. Performance trends will continue to be assessed against FENOC standards and KPIs will continue to be used in achieving FENOCs Excellence Plan goals.

In summary, the PII P2 provided the framework for actions to achieve and sustain the necessary improvements in performance and for the key programs and processes for the six PII focus areas. The performance improvements were confirmed through self-and peer-assisted assessments conducted as part of the formal closure of the PII. This higher level of performance has been sustained and PNPP has now transitioned from the PII P2 to the FENOC Fleet Excellence Plan. Founded on the industrys Performance Improvement Model the FENOC Fleet Excellence Plan provides the framework for the behavioral improvements needed for a robust continuous improvement culture. The combination of the improvements achieved through the PII P2, the FENOC Fleet Business Plan and the implementation of the Excellence Plans provide the foundation for continuous improvement and achieving further improvements in areas such as Operational Focus.

Closure Assessment for PII Focus Areas This section of this report summarizes the more important achievements and the related areas for continued improvement identified through a series of critical self-assessments performed in each of the six PII focus areas.

Corrective Action Program The PII P2 initiative for the Corrective Action Program (CAP) has been completed. The targeted areas of cause evaluation and implementation of corrective actions have improved.

Focus Areas for Improvement:

The initiative actions were organized to align with the structure of a corrective action program. The actions ensured the foundational elements existed and built performance skills to strengthen the overall performance. The areas for improvement include:

Ownership: Ownership and station focus on CAP Identification: Self-identification of problems and trending of issues for eady detection Analysis: Cause Analysis quality and timeliness and corrective action planning Documentation: Quality of closure documentation Program monitoring: Management oversight of the Corrective Action Program

Attachment PY-CEI/OIE-0685L Page 4 Performance Results Corrective Action Program performance during 2006 has shown substantial improvement in the timeliness and quality of the cause evaluations. In particular, the timeliness of completing the evaluations and the implementation of corrective actions has improved demonstrating improved ownership by the line personnel. The controlling procedures and business practices contain expectations and goals commensurate with industry standards for timeliness. Active participation in the Corrective Action Program Owners Group (CAPOG) by the Fleet Corrective Action Group assures that the program is current with industry standards. The CAPOG is extremely active and FENOC is hosting the 2007 biannual conference. The graphs below show the improvement in the 6-month rolling averages in the timeliness of apparent cause evaluations and corrective actions.

Timeliness of Apparent Causes 90.

80 70 Pe rce nt 60 Completed 50 On Time 40 3O 2O 10 0-,

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006 t

Timeliness of Corrective Actions 90 80 7O Percent 60 Completed 50 40 On Time 30 20 10 0

Jan Mar May Jul Sep Nov B Preventative Actions 2006 m Remedial Actions Timeliness for root cause evaluations and overall Condition report (CR) closures have likewise demonstrated sustained improvement over the period.

The quality of the products from the Corrective Action Program has improved. The indicator showing the Corrective Action Review Board (CARB) approval of Apparent Cause evaluations is depicted below.

The improvement in the quality of Apparent Cause evaluations demonstrated on the indicator is a product of the PII actions that increased the level of performance of CARB and the training given to the

Attachment PY-CEI/OIE-0685L Page 5 CR evaluators and the CR Analysts. This further demonstrates improvement even while the standards and expectations were being raised. This is an important indicator because it demonstrates improving management ownership and leadership.

Quality of Appare nt Cause s 100

"~-.....

7"-~v-95 ~

Percent Approved 90 by CARB 85 80 75 Jan Feb Mar Apt May Jun Jul Aug Sep Oct Nov 2006 A similar sustained improvement has been achieved for root causes. This is demonstrated through the CARB approval rate and the grade given to each root cause evaluation after review by CARB.

Additionally, this same improvement trend can be demonstrated for corrective actions. The graph below shows the improvement in the quality of the corrective actions over the period. A reject is counted if any of the reviews after completion find the corrective action to be deficient, whether the review is a CARB, Oversight, CR Analyst or other review.

Corrective Actions Rejected 14 12 10 Percent Rejected 8 6

4 2

0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2005 2006 The 6-month rolling averages for initiation rate and work-off rate of CRs depicts a healthy program as shown on the following graphs. The threshold for identification is continuing to lower causing a higher initiation rate. The staff is able to maintain a work off rate of greater than 1.0, demonstrating the ability to keep up with the higher influx. These graphs demonstrate the result of effective actions taken to improve the self-identification and prioritization of problems and the sites priority for assuring the timely

Attachment PY-CEI/OIE-0685L Page 6 implementation of CAP. The improved focus of the PNPP staff on "working todays issues today" is also evident below.

ORs Initiation Rate 800 700-600 500-400-300 200 1000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006 The work-off rate is a ratio of the closed CRs to influx of new CRs. Anything greater than 1.0 indicates that more CRs were closed than were initiated.

CR Work Off Rate 1.15

~

I 1.1 1.05 CR Closed per CR 1,

Initated 0.95 0.9 0.85-Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2006

Attachment PY-CEI/OIE-0685L Page 7 Finally, a true measure of the improvement of Corrective Action Program is, when looking at the graphs in aggregate, the throughput of the program is healthy and the total inventory is decreasing to industry excellence standards. A single unit plant inventory should be approximately 500 open condition reports based on industry benchmarking. PNPP, with a healthy input and good attention to evaluating and resolving problems, shows a good trend towards this standard of excellence. Note that the Total Open CRs graph below is relatively new and no industry comparable data is available for the first three months of this year.

Total Open CRs 1400-E 1200 i

1000-800 600-400 200 o,A Jan Mar May Jul Sep Nov 2006 Performance Monitoring Eighteen Key Performance Indicators (KPIs) are used to monitor the performance of the main elements of the Corrective Action Program. These indicators are published and reviewed on a monthly basis.

Each KPI graph shows the performance of the PNPP organization in implementation of each of the key CAP elements for each month over the past 12 months. These KPIs are produced for the PNPP site as a whole and for each section of the PNPP organization.

An aggregate score card for 2005/2006 was produced to show the trend of these indicators on the following table over an extended period of time. Each row of the score card represents one of the 18 KPIs. It shows that performance of the Corrective Action Program is improving by a shifting of predominantly red or yellow windows in 2005 to predominantly white and green in the most recent months of 2006. KPI 15, Median Age of CRs has not shown dramatic improvement. The reason for only slight improvement is that as more emphasis is placed on working todays problems, some of the older, less significant CRs are not being worked. Hence, the increased age masks the real improvement in culture being realized by the PNPP staff. KPI 16, % Effectiveness Reviews That Conclude Ineffective Corrective Actions to Prevent Recurrence (CAPRs), has shown relatively poor performance primarily due to the low number of data points.

Attachment PY-CEI/OIE-0685L Page 8 Pen/

pe~ Non~.

i 5 ~DmC~C~p~

~ Caro.

Comple~d ol ~.

% hmedKa&

~ ~Nm4N on ~m~.

Conceive A~oe W~k~

~,

~e~..S Evem Oee~l~,,~

S4

~.

% Tlmeh~

T~a~ Opeh C~

5uper,.~o.v~one

.~,, r~

% Ce.e c~ bac~ Re~d,

~.15 ued~

Age of Cn=

I¢~r 19 rosai ol~m g~ omge

~d 31~ge Relletd Correc~,e Closure Assessment Conclusion Through the conduct of self-assessments, review of performance indicators, and the review of the CAP Pll actions by the Closure Validation and Review Board (CVRB), FENOC has concluded that there has been substantial improvement in the implementation of the CAP. Self-assessments have confirmed that ownership for implementing the CAP has improved as indicated by a clear understanding of roles and responsibilities among all levels within the organization. Interviews conducted with workers during self-assessments indicated a good understanding of managements expectations with respect to CAP among both workers and supervisors. A low threshold for problem reporting and improvement in the classification and priodtization of actions to resolve identified problems has been observed.

Active management oversight has lead to improved quality in root and apparent cause evaluations and more effective corrective actions. Thus the effectiveness of corrective actions has also improved.

The areas for improvement identified through self-assessments are captured in the corrective action program.

As noted above, the root and contributing causes have been addressed by implementing the corrective actions through the CAP PII P2. Site personnel, including supervisors and managers, have been trained to expectations and accountability methods used to measure the implementation of the CAP. Part of the training included the role of a Corrective Action Program in a "learning organization" and how CAP must be used to drive station improvement. New employees receive introductory training of CAP during the Plant Access Training (PAT) and receive an orientation manual that contains key aspects of successful CAP.

In July 2005, an improved set of CAP KPIs were developed and are periodically reviewed by management.

Various levels of management review processes have been instituted to ensure adequate oversight of the health of CAP going forward. These include the Corrective Action Review Board (CARB), Management Review Board (MRB), Senior Leadership Team (SLT) and Management Performance Review (MPR) meetings. Intervention actions are implemented if declining unsatisfactory performance

/ trends are identified.

Continuous improvement in CAP implementation is assured through: FENOC Fleet governance of the process, site ownership of the CAP implementation, management oversight, sound procedures and policies, monitonng of Key Performance Indicators, and the use of cntical self-assessments and

Attachment PY-CEI/OIE-0685L Page 9 benchmarking. Fleet oversight is exercised through management observations of CARB and participation in monthly performance review meetings.

Fleet ownership of the procedures and business practices enhance the level of assurance that improvements will be sustained because FENOC business practices are benchmarked to industry accepted practices and changes require concurrence from all sites involved. This coordination helps ensure accuracy and consistency while at the same time standards compare favorably to industry accepted practices.

The self-assessment and benchmarking processes continue to be used to evaluate the implementation of CAP and to ensure that subsequent analysis of adverse trends promote continuous improvement by designing actions based on the industrys top performers.

Comparing current performance to the success measures and the metrics described in the CAP PII, which includes site personnel routinely meeting CAP expectations, the incorporation of CAP into performance management plans, collegial reviews of CAP performance, and quality of corrective actions, indicates these measures have been achieved. However, additional actions to sustain continued improvement are planned.

It is therefore concluded that the FENOC Fleet business practices, in conjunction with the use of responsive performance indicators and effective CAP oversight, provide sufficient framework to promote continuous improvement in the implementation of CAP at PNPP and support closure of this initiative.

Conclusion In summary, the threshold for capturing problems in the Corrective Action Program has been lowered to levels that ensure issues of low significance are being identified. The review and prioritization process for CRs provides confidence that problems are visible for managements attention. PNPP performance demonstrates that the staff is able to focus on evaluating and solving the problems with improved timeliness and improved quality. Additionally, the PNPP staff has demonstrated that it can sustain these improvements in timeliness and cause evaluation quality while also improving closure quality and handling an increased number of CRs. The ultimate benefit of good CAP performance is more reliable equipment, improved organizational performance, and enhanced safety. The improvements evidenced by CAP performance indicators, coupled with improved safety system unavailability, illustrate that the disciplined execution of the Corrective Action Program has become an integral and effective component of the day-to-day business at PNPP.

Human Performance The PII P2 initiative for Human Performance has been completed. The improved use of human error reductions tools along with strengthened barriers have proven to be effective in limiting human performance errors that result in plant events or challenges to the operations staff.

Focus Areas for Improvement:

The initiative actions were organized in three distinct stages which include:

Program Structure: Setting performance expectations and communication of roles and responsibilities Behavior Modification: Enhancement of and training on Error Prevention Tools and line ownership, alignment, and integration Discipline in Execution: Monitoring and line accountability for results, procedure adherence, and confirmation of effectiveness of actions

Attachment PY-CEI/OIE-0685L Page 10 Performance Results The Human Performance program promotes the prevention of plant events due to human error by focusing on sustaining error-prevention behaviors. The Perry PII for Human Performance drove improvement in the behaviors which produced a decrease in consequential events that "reset" the Station Clock. The graph below shows this improving trend starting in the second quarter of 2005. This was accomplished in three distinct stages. First, the program structure was established to provide enhanced roles and responsibilities, management expectations, and improved processes. Once the program structure was in place, training on expected behaviors and error-prevention tools was conducted for all site personnel. Serving both to increase the skills and behaviors of the workers, the new level of awareness on human performance resulted in a reduction in station events attributable to human errors. Finally, the disciplined execution of the processes and behaviors continued this improving trend to a low number of station events. This level of performance has now been sustained for four quarters.

Station Human Performance Clock Resets 7

6 5

4 2

1-0 1st 2nd 3rd 4th 1st 2nd 3rd 4th 2005 2006 Section Clock resets are events of lower significance than the Station Clock resets, but each event is considered a learning opportunity. The stations ability to prevent consequential events caused by human error is enhanced by the study and learning from the precursor events of low significance. The indicator below shows an increased use of this learning tool demonstrating a greater focus on learning from precursor events. The 2005 horizontal line indicates an approximate steady state number of resets or learning opportunities. The 2006 line indicates a new steady state number of learning opportunities

Attachment PY-CEI/OIE-0685L Page 11 each quarter beginning in 2006. This step change coincides with completion of key PII actions and confirms the effectiveness of this initiative.

Section Human Performance Clock Resets 90 ~

7


T-80

==

70

......Change=~---~

60 i

/

50

/

40

/

30,,~

20 10 ~

o 1st 2nd 3rd 4th 1st 2nd 3rd 4th 2005 2006 Closure Assessment

Conclusion:

Following a review of the self-assessment results, performance indicators, and the effectiveness of HU PII, FENOC concluded that there had been substantial improvement in Human Performance at PNPP and that these improvements are sustainable. Self-assessments have confirmed that expectations for human performance have been established, communicated and reinforced with all station personnel.

Management field observations and supervisory oversight ensure that human performance fundamentals are being demonstrated at all levels of the organization. Line accountability is being demonstrated through daily interactions, increased emphasis on monitoring and analysis of human performance errors, and support of the observation program. The root causes of procedure use and adherence issues including procedure upgrades are being addressed and are continuing to have a positive impact on Human Performance improvement efforts.

Sustained improvement in Human Performance is being assured through four primary mechanisms.

These mechanisms include efficiently and effectively implementing human performance processes, monitoring performance through responsive performance indicators, continuing an active management observation program, and conducting critical self-assessments.

The actions and improvements noted in this HU PII have been anchored within Fleet business practices which provide reasonable assurance of continuous improvement due to the fact that all FENOC business practices are coordinated through the FENOC Fleet and require concurrence from all sites involved. This coordination helps ensure accuracy and consistency while at the same time being compared to industry accepted practices. The PNPP organization continues to utilize these business practices in the evaluation and improvement of human performance at all levels thus ensuring that performance expectations are achieved.

Performance indicators for monitoring human performance are used to monitor and improve performance across the PNPP site. These indicators have been adapted from top performing organizations and are used by management to provide reasonable assurance that adverse trends will be promptly identified to station management.

The self-assessment and benchmarking processes will continue to be used to ensure these indicators and subsequent analysis of adverse trends promote continuous improvement.

Attachment PY-CEI/OIE-O685L Page 12 The PNPP station performance, described above, clearly demonstrates that the Human Performance Initiative has been successful in achieving and sustaining improved levels of performance. The success measures and metrics set forth in the HU PII (i.e. the site success clock goal of greater than 45 days for a 12-month rolling average between resets and sustaining greater than 120 field observations per month for a 3-month period) have been achieved.

Conclusion The Human Performance Effectiveness Self-Assessment performed in September, 2006, confirmed that the desired behaviors have been instilled in the organization at all levels. Benefits of increased attention to human error prevention have also been observed in the industrial safety statistics for the PNPP site. In this area of industrial safety, PNPP has achieved zero OSHA recordable for all of 2006.

In addition, plant personnel continue to achieve an Industrial Safety Accident Rate of 0.00 against an industry top quartile of 0.16 OSHA recordables per 200,000 man-hours. The PNPP staff has recently achieved the notable milestone of over 2 million person-hours without a lost time accident.

Additionally, overall plant reliability has improved with a Capability Factor of approximately 97% for 2006 up from a 2 year average of 82% in January of 2006, and Forced Loss Rate of approximately 1.1%,

improved from a 2 year average of 7.8% in January of 2006. These high level indicators of safe and reliable plant performance demonstrate the roll-up affect of improved Human Performance.

Work Management Effective Work Management is a direct contributor to performance in the cross-cutting area of Human Performance and also contributes to improved implementation of CAP. As such, effective Work Management is a key attribute of a growing and improving safety culture at PNPP. The PII P2 initiative for Work Management has achieved performance levels that are comparable to the other nuclear stations in the FENOC fleet and meets or exceeds industry standards. The Work Management process provides the fundamental structure for efficient use of station resources as well as overall improvement of equipment condition. The work management process is one of an integrated set of processes for the operation and support of nuclear plants.

The principles of the Effective Work Management improvement actions were organized into four general areas:

Timely identification: Providing timely identification, selection, planning, coordination, and execution of work necessary to maximize the availability and reliability of station equipment and systems.

Managed risk: To manage the risk associated with conducting work.

Discipline in Execution: To identify the impact of work to the station and work groups and to protect the station from unanticipated transients due to the conduct of work Efficiency and Effectiveness: To maximize the efficiency and effectiveness of station staff and matedal resources An effective work management process should accomplish the following:

1.

Promote and improve nuclear, industrial, and radiological safety performance.

2.

Improve equipment performance and system health.

3.

Increase productivity through the efficient use of resources.

4.

Provide for a long-range plan to include major design changes and predictive and periodic maintenance activities.

This should include provisions to address equipment obsolescence and asset management.

Each of these is discussed in more detail below.

Attachment PY-CEI/OIE-0685L Page 13 Performance Results

1. Promote and improve nuclear, industrial, and radiological safety performance.

Work Management performance improvement was implemented to ultimately improve overall system health for nuclear safety and reliability. Nuclear safety has improved over the past 10 months as indicated by overall performance and availability of safety systems. For example:

Emergency AC Power The Emergency AC Power indicator shows an improving trend in unavailability hours. This is a measure of timely and effective maintenance performed on the Emergency Diesel Generators. Past management maintenance strategy served to improve the reliability of the EDGs by performing required maintenance on-line. The consequences of this strategy were an adverse effect on unavailability hours. Present management has implemented a revised strategy that has both improved the reliability of the EDGs and improved the unavailability hours through a balanced approach to divisional outages and refuel outage work.

EMERGENCY AC POWER 0.0250..........................................................................................................................................................................................................................................................................

340 0.0200 265 r~~

i....................

Budget Unavailability 0.0,50 lm.o~,,B.~ -~

i

,90 l

o,.

i 0.O100

/

115 0.0050

~

B 40 0.0000

.... r...............

~.................................................

~.............. -.................~............

35 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours High Pressure Core SpraylReactor Core Recirculation A similar trend is seen on the safety system indicators for HPCS/RCIC systems.

HIGH PRESSURE CORE SPRAY / REACTOR CORE ISOLATION COOLING 0.0400 115 0.0350.

~.

",~~,Month Actual

]

0.0300.

~/~

~,~,,,., Mon=

Budget

/

95 0.0250

~~

75 0.0200 55 0.0150 0.0100 35 0.0050 15 0.0000

~

~

r~

~

-5 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours

Attachment PY-CEI/OIE-0685L Page 14 Residual Heat Removal Residual Heat removal shows a similar improving trend. Present performance supports future top quartile performance levels.

RESIDUAL HEAT REMOVAL 0.0150 65 60 55 50 i

40 0.0100.

~ i<~ii

35 I--

Ac~,S Llnavailabilty INPO 1st Qtr

[

~

30

~

~

25 0.0050.

I --~-

Budgeted Unavailabilty

~

~.;-,

20 0.0000

~,

~

~

~

~

m ~

?!

0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Note: Left Axis - 3 Year Rolling Average Unavailability Ratio. Right Axis - Unavailability Hours It is clear that top quartile performance has not been achieved, but the actions of the Work Management PII have been successful in improving nuclear safety.

As discussed above in the human performance improvement section above, the PNPP station industrial safety statistics have improved. PNPP has achieved zero OSHA recordable incidents in 2006. In addition, plant personnel continue to achieve an Industrial Safety Accident Rate of 0.00 against an industry top quartile of 0.16 OSHA recordables per 200,000 man-hours.

In the area of radiological safety, challenges continue to exist. PNPP continues to be in the bottom quartile for accumulated dose at nuclear plants in the country. However, a major chemical cleaning effort to reduce the source term will be completed during the next outage. These source term reduction plans for the next refueling outage and other dose reduction plans have been reviewed by several outside agencies and deemed appropriate.

2. Improve equipment performance and system health.

The Work Management process is focused on improving overall system health for reliability.

System health reports have shown acceptable and steady system performance throughout the year 2006. Use of system health reports as an input to Plant Health Committee priority decisions and subsequent integration with work management process has provided the methodology of implementing actions needed to improve equipment and system reliability issues. High level indications of reliability are plant Capability Factor and Forced Loss Rate.

Attachment PY-CEI/OIE-O685L Page 15 The Capability Factor chart shows a high level of performance throughout the year. Although challenges have occurred, the significance of these and the severity have been decreased such that plant management has been able to control the impact on plant operation.

CAPABILITY FACTOR LLII 80

~

i 0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV The Forced Loss Rate has been maintained at very low levels.

During the month of May, 2006, an unplanned down power was performed to repair a hydraulic oil leak on the Reactor Recirculation Flow Control Valve actuator. In December, operators manually removed the reactor from operation due to degrading instrument air pressure. The plant was restarted 8 days later when the off gas system was returned to operation. Complications with high temperatures in the charcoal beds were the primary reason for the down time. During the period, the Forced Loss Rate has improved, returning to the business plan value. It is recognized that there will be plant issues that affect this indicator, but solid organizational performance will enable an improvement as demonstrated below.

FORCED LOSS RATE 14-12-lo- ~-- ir~onth~

- YTDActual I

8-

, ~ YTDBudgetJ 6-4-

2-o-

~

~

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 3, Increase productivity through the efficient use of resources.

The Business Plan was developed with assumptions and goals that reflect good performance as benchmarked with the Electric Utility Cost Group. PNPP finished on plan which demonstrates efficient and effective use of resources.

4.

Provide for a long-range plan to include major design changes and predictive and periodic maintenance activities, This should include provisions to address equipment obsolescence and asset management.

The Equipment Reliability, Maintenance, Outage, and the Work Management Excellence Plans contain the actions going forward for continuing to improve equipment and plant safety and reliability.

The plans also address obsolescence and asset management.

Attachment PY-CEI/OIE-0685L Page 16 Closure Assessment

Conclusion:

Following a review of the self-assessment results, performance indicators, and the effectiveness of the Work Management PIt, FENOC concluded that there has been substantial improvement in Work Management at PNPP and that these improvements are sustainable. Self-assessments have confirmed through observations, interviews and performance result reviews that expectations for process performance have been established, communicated and reinforced, with the end result that the basic expectations are understood by all affected station personnel. These assessments also identified areas for improvement in work planning, execution of scheduled work and craft participation in work package walk downs, which are being addressed in the excellence plans.

Line organization accountability is being demonstrated through daily interactions, increased emphasis on monitoring and analysis of work management performance, and support of the observation program both in Work Management meetings and field observations. The causal factors of poor execution (poor preparation, failure to meet key process milestones, lack of rigor in preparation activities, poor communication and hand-offs between work groups, and a lack of accountability for the success of the process) have been effectively addressed and the emphasis on continued improvement of work preparation is apparent.

The deeper causes of inadequately managed changes and staffing reductions are now historical, and improvements not related to the Work Management PII have been implemented at the fleet level to prevent future change management issues. Management turnover in the outage manager and work management manager positions remains a challenge that the PNPP senior management will monitor and address until resolved.

Continued improvement in Work Management is assured through three primary mechanisms. These mechanisms include efficient and effective procedures, responsive performance indicators, and an active management observation program. Evidence of this can be seen in the Work Management performance indicators showing steady improvement that has been sustained over an extended period of one year at acceptable and/or improving levels. Where there have been negative trends, management has taken action to recover and improve specific functions or performance gaps.

The actions and improvements noted in this Work Management PII have been anchored within Fleet business practices. This provides reasonable assurance of continuous improvement due to the fact that all FENOC business practices are coordinated through the Fleet and require concurrence from all sites involved. This fleet/peer ownership and oversight ensures consistency while at the same time incorporating industry accepted practices. The PNPP organization continues to utilize these business practices in the implementation and improvement of work management at all levels.

Conclusion Overall, the Effective Work Management PII was effective in improving plant safety, plant reliability, industrial safety, and radiological safety. Challenges exist in ensuring the radiological improvement plans continue to receive attention. The radiological plans are solidly based on fundamental dose reduction and source term elimination. The outage related actions of the performance initiative were moved to the Outage Excellence Plan eadier in 2006 and continue to be implemented by plant management.

Through practicing team building skills and Outage Control Center protocols during Divisional outages, the staff has improved their overall performance in dealing with periods of high workload. The last two Divisional outages were effectively implemented and provided for meeting or exceeding unavailability goals. Perry, through effective use of the work management process, has achieved performance numbers commensurate with the other FENOC plants, yet progress needs to continue to reduce backlogs of Elective Maintenance. Preventive Maintenance performance and percentage deep in grace is a key focus for the FENOC fleet. Work Management performance indicators are reported at each Monthly Performance Review and are highly scrutinized by FENOC executives.

Attachment PY-CEI/OIE-0685L Page 17 Traininq Training programs directly affect performance of the personnel at the plant. Hence, training was integral to the improvements realized in Human Performance and Corrective Action. The PII P2 was meant to strengthen and improve the training programs to further continuous improvements.

The National Nuclear Accrediting Board met in May 2005 and placed the maintenance and technical training programs on probation. Specifically the Board stated:

The station has not been effective in using training to improve plant and personnel performance.

(ACAD Objective 1)

Although recent improvements have been noted, the ability of the station to sustain these improvements remains to be demonstrated. (ACAD Objective: ALL)

Training effectiveness evaluation has been ineffective, with noted weaknesses in self-assessment and the corrective action program. (ACAD Objective: 6)

The weaknesses identified by the Accrediting Board formed the bases for the Training PII. Although the Training PII was focused on the maintenance and technical programs, actions were also taken in parallel to strengthen the Operations training programs. The approach of the initiative was to specifically cover ACAD Objectives 1 and 6 in detail and to provide for improvement in the remaining ACAD Objective areas to ensure the training programs were commensurate with industry practices and standards.

Performance Results The Training to Improve Performance PII resulted in the program being removed from probation in the fall of 2005 after the November 16, 2005 National Academy for Nuclear Training board meeting. The PNPP training program now conforms to accepted industry standards. The organization has demonstrated self-critical behaviors that assess for gaps and establishes action plans to drive for excellence.

The final effectiveness review for the Training PII was conducted by a team of line and training personnel. The team concluded there has been substantial improvement in the PNPP training programs since implementing this initiative.

Line ownership has been instilled through improved use of training coordinators and line manager observations. Eady in the timeline of improvements, training committees were inconsistent and poorly attended. Presently, improved ownership by the line and embedding a protocol that focuses the committees on using training to improve performance has resulted in training committees that are standardized, consistent, and showing a strong emphasis on improving performance. For example, line managers acted as subject matter experts during training sessions. For example, the Maintenance Manager led Human Performance Training in the dynamic flow loop simulator to ensure his expectations were clear and understood.

One of the key mechanisms for enabling line ownership and ddving improvements through training is a healthy training committee structure and protocol. Actions taken to strengthen the committee structure were effective in that the committees are much more focused on performance related topics.

Additionally, committees discussions centering on how training can be used to resolve issues in the plant occur frequently and are documented in the meeting minutes for future reference. Further, the hierarchy of committees has been effective in engaging all levels in the organization. Cognitive Trending Reports and Condition Reports are central themes throughout the meetings. The sustained improvements in these programs compliment the effectiveness of the Curriculum Review Committee (CRC) and Training Review Committees (TRCs).

Training performance indicators monitor attributes under each ACAD Objective. The attributes are scored based on survey and other objective data and provide a traditional color code corresponding to the level of performance. A program rated all Green would indicate high confidence in the programs and training process. This graph provides an overall indication of the improvement in the confidence of the

Attachment PY-CEI/OIE-0685L Page 18 training programs. A high confidence in training results from improved ownership by the line, which translates into realizing, more value out of training. This is a measure of the effective use of training committees and improved ownership by the line organization. It is clear that the overall health and training performance has increased. There are 100 attributes total.

Confidence Level of Training Effectiveness go

~

70 60 Number of 50 Highly Rated 40 ~__

Attributes 30 20 i

i 10 0~-

1st 2nd 3rd 4th 1st 2nd 3rd 2005 2006 There are 100 attributes scored. There was no data in I st quarter 2005 due to refueling outage As described above, the line organization and training staff has sustained an acceptable level of confidence and ownership in training effectiveness.

AGAD Objective 2 is Management of Training Processes and Resources. This objective contains the highest vulnerability based on the analysis of the indicators. The dominate reason for poor performance was the effective and efficient use of training resources. This issue has been discussed with the Senior Training Advisory Committee (STAG) and SLT and is being resolved for the coming year in the Training Excellence Plan.

Conclusion The Training to Improve Performance PII resulted in the Technical Training program being removed from probation in the fall of 2005 after the November 16, 2005 National Academy of Nuclear Training board meeting. The training program now is in line with industry standards and a self-critical organization is continuing to assess gaps and develop action plans to continue to strive for excellence.

Employee Engagement and Communication (EECI)

The purpose of this initiative is to have employees actively engaged in recognizing, understanding and improving PNPPs performance through the Perry Improvement Initiative and other key activities, such as, effective communications, the Plant Safety Committee, ALARA Committee, Consistent Supervision Committee and the FENOC Transformation Team.

Several factors contributed to a sense of historical frustration and dissatisfaction by the workforce at PNPP. It was important to reverse this trend to ensure the plant improves its overall performance and can sustain excellence in the long run.

These initiative actions were organized to address the main areas affecting employee engagement:

Employee engagement: Active involvement of employees in key improvement initiatives

Attachment PY-CEI/OIE-0685L Page 19 Performance Management and Standards: Standards and accountability built into the way of doing business and driven through the performance management process.

Communications: Keeping employees informed Performance Results When the results of the actions completed by this and other key performance improvement initiatives are viewed in the aggregate, employee engagement and communications at PNPP appear to be better than 18 months ago.

The most recent Safety Conscious Work Environment (SCWE) survey provided some additional insights into the overall employee morale and feelings towards plant processes.

Negative Responses t-

,2,.

V Good IFOUR IpIU, Aim Of A Uue~ = CO~iCIOeJS WOB.E IDIYDU~41D~

10%

H 6%

BASIC PRINCIPLES

, ¢ 20/0 0%

Pillar I Pillar 2 Pillar 3 Pillar 4 There was a slight increase in negative responses when comparing 2006 to 2005. Additionally, frustration and dissatisfaction remains among some employees regarding Pillar 2, Effective Normal Problem Resolution Process. The increase in negative responses to questions related to this pillar reflects the aggressive efforts to improve CAP and the need for longer term successes to be communicated and leveraged among employees. Additionally, in analyzing the comments and response to survey questions, it is clear that the handling of the mid-year performance management process highly impacted the survey results.

Condition Reports were written for each pillar rated as red as required by the SCWE process.

Additionally the condition of SCWE is monitored through a fleet business practice. The process has been in place for over 2 years and has proven to provide a sustainable process for addressing issues raised during the surveys.

The Transformation Team concept is a fleet-wide program to include all levels of employees in participation of FENOCs transformation to top quartile industry performance. This participation comes in the form of initial training on standards and methods of change management coupled with basic skills required for effective change. Then the team is then distributed to areas of management processes to coach and facilitate the groups in proper behaviors to assure progress towards excellence. For example, a Transformation Team member attends all Executive Leadership Team meetings and actively participates in agenda items and post meeting critiques.

There have been two graduating classes of the Transformation Team with upwards of 30 people from across all of the sites and corporate.

Finally, PNPP has established several successful employee engagement groups such as the Human Performance Advocates and the CR Analysts. The involvement and ownership demonstrated by these groups can be tied to the Employee Engagement and Communications PII, such as active employee

Attachment PY-CEI/OIE-0685L Page 20 participation and communications, strong management presence personal accountability and structure to these processes.

Conclusion Employee engagement has improved through the last 18 months. It is clear that from the Human Performance teams, the Training teams, and the Safety teams that the engagement from employees is occurring and is resulting in improvements.

Operational Focus The purpose of this initiative is to strengthen the operational focus across the organization. This is accomplished by ensuring common goals and priorities result in excellent materiel condition and equipment reliability that support safe and reliable operations. The purpose of the Operational Focus PII was to establish the appropriate attitudes and behaviors of personnel, along with the framework of policies and procedures, to ensure that nuclear safety is an integral part of every operational decision.

Focus Areas for Improvement:

The initiative actions were organized into five general concepts to achieve the Operational Focused Organization:

Goals and priorities:

Creation of an Operationally Focused Organization aligned with common goals and priorities supporting timely resolution of operational challenges while minimizing risk to plant operations.

Operational Decision Making: Ensure that nuclear safety is an integral part of every operational decision.

Operations Leadership : Establish Operations leadership in the organization, craft ownership, and a strong engineering presence.

Long-term Staffing: Develop a long-term staffing plan to ensure that operational knowledge and experience is present throughout the PNPP organization.

° Operator Fundamentals: Develop a focus on the fundamentals of safe plant operation.

Performance Results There have been several recent indicators that additional work is required to fully achieve an operationally focused organization. Self-assessments have confirmed that while some improvements in focusing on common priorities have been made, further improvements are needed to reach FENOCs top quartile performance objectives. Improvements have been noted in the Morning Turnover, The Management Alignment and Ownership Meeting, Management Review Board, Plant Health Committee, Duty Team Setting Site Priorities and use of System Health Reports. Other improvements in Operations leadership, development of staffing plans, Duty Team updates, and implementation of some performance indicators have also been effective. The operations staff recently has demonstrated strong performance in operating the plant. Several challenges have been expertly handled without incident, including a recent transient involving degrading instrument air pressure. The next level of organizational performance will be achieved through a stronger operationally focused organization lead by the high standards of the operations staff. A self-assessment indicated the operations department has not yet achieved the level of alignment and demanding standards necessary to drive the organization to achieve fleet expectations. Given this level of alignment, operations has not consistently assumed the leadership position normally achieved through consistent demands on the supporting organizations for resolution of organizational shortfalls, and as a result driving organizational accountability.

Attachment PY-CEI/OIE-0685L Page 21 Implementation of this Operational Focus Pll has not achieved the desired overall results of establishing an Operationally Focused Organization. Actions for future improvement are being carried forward to the FENOC Excellence Plan for Operations. For example, the Operations Excellence Plan addresses, in part, reinforcement of Operations standards and expectations, reactivity management, and succession planning and staffing.

Assurance and Continuous Improvement As the PII P2 initiatives closed, future gap closure actions and initiatives going forward are contained in the Fleet Excellence Plans to assure continuous improvement. The FENOC Management Model depicts the management structure and methods used to implement the processes necessary to meet the Business Plan objectives. A significant portion of the management model is focused on driving and monitoring the continuous performance improvement processes, including critical self assessments.

These processes align with the INPO model for Continuous Performance Improvement.

The Excellence Plan is a discrete portion of the Business Plan designed to achieve objectives, measured by key metrics, are used to show Business Plan effectiveness and goals. These plans are maintained by the fleet peer groups, which are led by the Fleet Program Manager. The Excellence Plans and the continuous improvement framework of the fleet processes and programs supply the necessary motive force for continuous improvement such that performance issues are proactively addressed by both the PNPP staff and actively monitored by the FENOC Fleet staff.

The overall strategy for continuous improvement is therefore achieved through three tiers of fleet structure. The first tier provides an umbrella over the entire operation. It includes the Business Plan, Management Model, Independent Oversight, and the Company Nuclear Review Board. Answering to this tier is the second layer which includes the structural programs such as the Peer Groups, Human Performance Program and Training Committees. Finally, providing the foundation of the structure are the functional programs of Corrective Action, Self-Assessment, Benchmarking, and Field Observations.

These functional programs provide the traction for the organization to realize gaps and provide solutions to achieve excellence.

FENOC has proven that it is dedicated to improving the performance of its plants and has demonstrated success in doing so. For example, at Davis Besse, FENOC achieved sustained higher levels of performance as indicated by their return to the normal Reactor Oversight Process and continued operation in the Licensee Response Column. Additionally, Beaver Valley has shown continuous improvement and progress towards excellence with a world class steam generator replacement outage and continued high levels of reliability and safety. We believe that by applying the lessons learned from the improvements at Davis Besse and Beaver Valley and with continued focus by both the PNPP organization and FENOC as a whole similar performance results will be achieved at PNPP.

The actions taken and behaviors instilled in the organization will work to lessen the frequency and severity of plant events. FENOC views all events as opportunities to identify additional improvement actions to strive for excellence in performance. Through a robust culture of continuous improvement and placing safety and reliability at the forefront of the Business Plan and Excellence Plans, FENOC will ensure sustained performance improvement.

Since the FENOC reorganization in August of 2004, FENOC has focused on standardization of processes across the three nuclear sites. In accomplishing this, a significant amount of benchmarking and assessment has taken place. The FENOC staff is made up of many senior managers and technical personnel who have diverse industry experience at top fleets across the nation. This facilitates many industry contacts making benchmarking and assessment an ingrained way of doing business.

Presently, there is a corporate group dedicated to the assessment program, traversing across site and departmental boundaries. This group not only performs independent assessment, but facilitates the self-assessment program, program metrics, and program oversight.

Attachment PY-CEI/OIE-0685L Page 22 Finally, there is continuous FENOC oversight of PNPP in the form of:

Monthly Performance Reviews (implemented in the same week as the other fleet stations with cross-attendance from senior leadership of the other FENOC plants)

Quarterly Performance Reviews at a Fleet level Fleet standard performance indicators with goals based on industry best quartile performance Integrated and coordinated Company Nuclear Review Boards Assessment by the independent and centralized Fleet Oversight group Structured and formal Safety Culture Assessment process facilitated by the Fleet Independent Oversight Department INPO corporate evaluation of culture and performance every 4 years. As a mid-cycle activity, FENOC performs a corporate self assessment every four years, staggered with the INPO corporate evaluation. This evaluation is a critical look by industry peers with an in-house team to comprehensively assess the continuous improvement cycle and the performance of the fleet programs.

Overall Conclusion In summary, PNPP has improved and sustained overall plant performance through both on-site initiatives and, fleet standard programs and oversight. Since the establishment of the PII P2 in the summer of 2005, NRC findings do not indicate any significant performance weaknesses in the areas of Human Performance, Corrective Action Program and Work Management. Likewise, FENOC and NRC performance indicators do not indicate any significant performance weaknesses, and many key performance indicators show substantial performance improvement during 2006. Although, a recent industry evaluation identified some areas where additional focus must be given, particulady in the areas of operational focus and decision making, these areas are being addressed through the Excellence Plan.

Continuous improvement is assured by a fleet standard framework of procedures and processes, a culture of continual assessment against industry excellence, and the people behaving in a manner that shows a bias for improvement. FENOC has focused on developing fleet processes benchmarked against the industry, and now has in place a management team that is imposing the right expectations and standards on a day-to-day basis. The PNPP staff has responded to these challenges and has demonstrated their dedication to improvement and proper execution of the procedures. Finally, identification and resolution of gaps against top levels of industry performance is being addressed through the Excellence Plans and performance improvement processes.