* AppendixC                     Job Performance Measure                   Form ES-C-1 WORKSHEET Facility:   -Oyster Creek                     Task No.:   2000301403    __           -
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:  
Task Title:         Complete th-e TechnicarI;pecif!c_ation_sLog Sheet __
-Oyster Creek Task No.:
Job Performance Measure No.:           NRC
2000301 403 __
                                          -  - JPM ADMlN-R01 (RO)
Task
 
==Title:==
Complete th-e TechnicarI;pecif!c_ation_s Log Sheet __
Job Performance Measure No.:
NRC JPM ADMlN-R01 (RO)
WA  
WA  


==Reference:==
==Reference:==
Generic 2.1.18 (RO 2.9)
Generic 2.1.18 (RO 2.9)
Examinee:                                     Examiner:
Examinee:
Facility Evaluator:         - .-    I     -    Date:                 _ -        _- -
Examiner:
Facility Evaluator:
I Date:
Method of Testing:
Method of Testing:
Simulated Performance                         Actual Performance         - -
X I
X
Simulated Performance Actual Performance Simulator x
                                                                                  -- -  I Classroom          _.  -
Plant Classroom Read to the Examinee:
Simulator           x     -  Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. The plant is rated power.
: 1. The plant is rated power.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
: 3. The current datehime is April 20, 2008 at 1700.
: 3. The current datehime is April 20, 2008 at 1700.
Task Standard: Page E l - 1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.
Task Standard: Page El-1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.
Required Materials: A completed page E l -1 (for the 11-7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.
Required Materials: A completed page El -1 (for the 11 -7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.
General  
General  


==References:==
==References:==
: 1. Procedure 681.4.004, Technical Specifications     Log Sheet, revision 12.
: 1. Procedure 681.4.004, Technical Specifications Log Sheet, revision 12.
initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
NRC JPM ADMIN R 0 1                                                       Page 1 of 11
NRC JPM ADMIN R 0 1 Page 1 of 11  


x I*-         %
1 Appendix C x I*-
                                                --
Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.
1
Validation Time:
10 Minutes.
NRC JPM ADMlN R 0 1 Page 2 of 11


Appendix C               Job Performance Measure Form ES-C-1 WORKSHEET
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Denote critical steps with a check mark J Note 1 : The values may be recorded in any order.
                  -
Time Critical Task: No.
Validation Time:    10 Minutes.
NRC J P M ADMlN R 0 1                              Page 2 of 11
 
Appendix C                  Job Performance Measure                  Form ES-C-1 WORKSHEET Denote critical steps with a check mark J Note 1: The values may be recorded in any order.
Note 2: The discrepancies noted while completing the log may be reported at the time of discovery or some other time during the JPM.
Note 2: The discrepancies noted while completing the log may be reported at the time of discovery or some other time during the JPM.
Note 3: Hand the Candidate the partially clompleted procedure.
Note 3: Hand the Candidate the partially clompleted procedure.  
__    -~
-~
Performance Step: 1
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
__      -~
Provides repeat back of initiating cue. Evaluafor acknowledges the repeat back.  
Procedure Step: Provides repeat back of initiating cue.
-~
Standard:      Provides repeat back of initiating cue. Evaluafor acknowledges the repeat back.
Standard:
JPM Start Time:
JPM Start Time:
Comment:
Comment:
            -
Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.
Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.
Standard:      Records position of valve AOG V-7-31 as closed on Panel 1OXF Comment:           -.
Records position of valve AOG V-7-31 as closed on Panel 1 OXF Standard:
NRC JPM ADMIN R 0 1                                                   Page 3 of 11
Comment:
NRC JPM ADMIN R 0 1 Page 3 of 11  


Appendix C                 Job Performance Measure             Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:
LT-37 LT-38 Narrow Range on Panel 9 X R Standard:    Records Torus water level from the following instruments as on the KEY:
LT-37 LT-38 Narrow Range on Panel 9XR Records Torus water level from the following instruments as on the KEY:
LT-37 (Indicator on Panel 1F/2F) LT-38 (Indicator on Panel 1F/2F)
0 Standard:
Narrow Range Recorder on Panel 9XR
LT-37 (Indicator on Panel 1 F/2F)
                                                                    -
LT-38 (Indicator on Panel 1 F/2F)
Performance Step: 4 Procedure Step: Records Torus water temperature from the following indicators:
Narrow Range Recorder on Panel 9XR Performance Step: 4 Procedure Step: Records Torus water temperature from the following indicators:
DIV I DIV II Standard:   Records Torus water temperature from the following indicators as on the KEY: (Indicator on Panel 1F/2F)
DIV I DIV II Standard:
Records Torus water temperature from the following indicators as on the KEY: (Indicator on Panel 1 F/2F)
DIV I DIV I I Comment:
DIV I DIV I I Comment:
                - -  -
SAT/U NSAT NRC JPM ADMIN R 0 1 Page 4 of 11  
SAT/U NSAT N R C JPM ADMIN R 0 1                                             Page 4 of 11


                                        .-.
..~..  
                                          " I
"I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 5 Procedure Step: Records Isolation Condenser area temperatures from the following instruments:
                                                          ..~..
1B06A 0
, . .
IB06B IB06C IB06D Standard:
Appendix C               Job Performance Measure                 Form ES-C-1 WORKSHEET
Records Isolation Condenser area temperatures from the following instruments as or] the KEY: (Panel 10R)
      -  -    __
IB06A 0
Performance Step: 5 Procedure Step: Records Isolation Condenser area temperatures from the following instruments:
IB06B IBO6C IB06D  
1B06A 0   IB06B IB06C IB06D Standard:   Records Isolation Condenser area temperatures from the following instruments as or] the KEY: (Panel 10R)
-~
IB06A 0   IB06B IBO6C IB06D
                    -~   -        -
SATlUNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:
SATlUNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:
IG06A 0 IG06B Standard:     Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1F/2F)
IG06A 0
IG06B Standard:
Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1F/2F)
IG06A IG06B Comment:
IG06A IG06B Comment:
SAT/U NSAT NRC JPM ADMlN R 0 1                                               Page 5 of 11
SAT/U NSAT NRC JPM ADMlN R 0 1 Page 5 of 11  


. L
L Appendix C Job Performance Measure Form ES-C-1 WORKSFEET J
* Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSFEET J     Performance Step: 7
Performance Step: 7  
      - ~ -      -
- ~
Procedure Step: Record Nitrogen Makeup and calculate nitrogen use for the shift and for the day.
Procedure Step: Record Nitrogen Makeup and calculate nitrogen use for the shift and for the day.
Standard:     Records Nitrogen Makeup and calculates nitrogen use for the shift, as on the KEY.
Standard:
Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-11 integrator reading, as on the KEY.
Records Nitrogen Makeup and calculates nitrogen use for the shift, as on the KEY.
Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-1 1 integrator reading, as on the KEY.
Recognizes/reports that the daily nitrogen use is > 250 units.
Recognizes/reports that the daily nitrogen use is > 250 units.
Comment:                     -
Comment:
Performance Step: 8
Performance Step: 8 Procedure Step: Record RB 119 radiation levels from:
__
0 Radiation monitor 8-9 Radiation monitor C-9 0
Procedure Step: Record RB 119 radiation levels from:
Radiation monitor 6-9 Standard:
0   Radiation monitor 8-9 Radiation monitor C-9 Standard:     Records RB 119 radiation levels from:
Records RB 119 radiation levels from:
0    Radiation monitor 6-9 Radiation monitor C-9 as on the key.
Radiation monitor C-9 as on the key.  
Comment:                    ~                 - - - -          -  ___ ~ ~~ - -
~ -  
                                                  .  -                  -        - -_
~~  
SAT/UNSAT NRC JPM ADMlN R 0 1                                                  Page 6 of 11
~
Comment:
SAT/UNSAT NRC JPM ADMlN R01 Page 6 of 11  


. i .
i Appendix C Job Performance Measure WORKS t-I EET Form ES-C-1 Performance Step: 9 Procedure Step: Record RE!, Vent Radiation Monitor levels:  
Appendix C                 Job Performance Measure                 Form ES-C-1 WORKS t-IEET
~~
          ~~  _ _ _
Radiation monitor Channel 1 Radiation monitor Channel 2 Standard:
Performance Step: 9 Procedure Step: Record RE!, Vent Radiation Monitor levels:
Procedure Step: Records HB Vent Radiation Monitor levels:
Radiation monitor Channel 1 Radiation monitor Channel 2 Standard:       Procedure Step: Records HB Vent Radiation Monitor levels:
Radiation monitor Channel 2, as on the KEY.
Radiation monitor Channel 1 0  Radiation monitor Channel 2, as on the KEY.
Radiation monitor Channel 1 0
Com ment:
Com ment:
      ~~    ~ __
Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.  
Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.
~~
Standard:       Records the Shutdown CcjoJing Room lowest temperature, as on the KEY. (Panel 10R)
~
NRC JPM ADMIN R 0 1                                                  Page 7 of 11
Standard:
Records the Shutdown CcjoJing Room lowest temperature, as on the KEY. (Panel 10R)
NRC JPM ADMIN R01 Page 7 of 11  


I .
I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 11 Procedure Step: Calculate Fuel Pool Slab AT Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.
Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET
Standard:
          - __
Performance Step: 11 Procedure Step: Calculate Fuel Pool Slab AT Standard:    Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.
Comment:
Comment:
__             __  - ~-
__ - ~-
J       Performance Step: 12
J Performance Step: 12 Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.
    -  -  -  -
Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.
Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.
Standard:      Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.
Reports the differential level is greater than allowed (actual is >
Reports the differential level is greater than allowed (actual is >
250 Units allowed).
250 Units allowed).
Cue:         The previous days lowest Torus water level from Panel 9XR is 150.0  O F .
Standard:
Cue:
Comment.
Comment.
                                -            -
The previous days lowest Torus water level from Panel 9XR is 150.0 O F.
Terminating Cue: Page E l -1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.
Terminating Cue: Page E l -1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMlN R 0 1                                                    Page 8 of 11
NRC JPM ADMlN R01 Page 8 of 11  


. . .                                                        Form ES-C-1 Appendix C                Job Performance Measure WORKSHEET Validation of Completion JPM Number:           NRC JPM ADMIN R 0 1~
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:  
                          ~~-    -~                     _ _
~~-
Examinees Name:               _    __    ~ __ _
NRC -~
Examine r s Nam e:
JPM ADMIN R 0 1  
~
Examinees Name:  
~
Exam in e r s N am e:
Date Performed:
Date Performed:
Facility Evaluator:   -    _ _ __          -    _~   -
Facility Evaluator:
Number of Attempts:   -    ~   - - ~
_~
Time to Complete:               ___ ~-   _ ~-
Number of Attempts:  
Question:
~
          -   ~.                   ~ .~     ~
~
Result:              Sat isfactory/Unsat isfactory Examiners Signature and Date:
Time to Complete:
NRC JPM ADMIN R 0 1                                     Page 9 of 11
_ _ _ ~-
_ ~-
Question:  
- ~.
Result:
~  
.~  
~
Sat isfactory/U nsat isfactory Examiners Signature and Date:
NRC JPM ADMIN R 0 1 Page 9 of 11  


_I *I Appendix C                 Job Performance Measure             Form ES-C-1 WORKSHEET Simulator Setup
_I  
*I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup
: 1. Reset to full power IC-65
: 1. Reset to full power IC-65
: 2. Insert the following:
: 2. Insert the following:
: a. SW I-RMS050A to 1.1 (RB 1 19 E39 rad)
: a. SW I-RMS050A to 1.1 (RB 1 19 E39 rad)
: b. SWI-RMS063A to 1.1 (RN 119 rad C9)
: b. SWI-RMS063A to 1.1 (RN 119 rad C9)
: c. SWI-RMS066A to 1.O(RB vent rad mon)
: c. SWI-RMS066A to 1.O (RB vent rad mon)
: d. SWI-RMS067A to 1.O(RB vent rad mon)
: d. SWI-RMS067A to 1.O (RB vent rad mon)
: 3. Have ready a 681.4.004 Attachment 1, completed for the 11-7 and 7-3 shifts (see Completed 681.4.004)
: 3. Have ready a 681.4.004 Attachment 1, completed for the 11 -7 and 7-3 shifts (see Completed 681.4.004)
NRC JPM ADMIN R 0 1                                            Page 10of 11
NRC JPM ADMIN R01 Page 10of 11  


=. -                                                                      Form ES-C-1 Appendix C                   Job Performance Measure WORKS t l EET STUDENT HANDOUT Initial Conditions:
=.
Appendix C Job Performance Measure WORKS t l EET Form ES-C-1 STUDENT HANDOUT Initial Conditions:
: 1. The plant is rated power.
: 1. The plant is rated power.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
: 2. You are the on-shift Reactor Operator on the 4-12 shift.
Line 174: Line 193:
Task Cue:
Task Cue:
Complete page E l -1 only of the Techni,cal Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
Complete page E l -1 only of the Techni,cal Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.
NRC JPM ADMIN R 0 1                                                  Page 11 of 11
NRC JPM ADMIN R01 Page 11 of 11
* Appendix C                     Job Performance Measure                   Form ES-C-1 WORKSHEET Facility:     _Oyster
* Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Facility:
                    ~. - Creek                   Task No.:       2000101404 Task Title:         Perform- a_-_Manualcore Heat Balance-Calculation-
_Oyster  
                      ~-                                                       ~ _-___~ ~ -
~. -
Job Performance Measure No.:             NRC JPM -
Creek Task No.:
                                                -  -  ADMIN
20001 01404 Task
                                                          .  - R02_(RO)_--
 
                                                                ~  -
==Title:==
~-
Perform  
- a
_-_ Manualcore Heat Balance-Calculation-  
~
_ - _ _ _ ~ ~
Job Performance Measure No.:
NRC JPM ADMIN
~
R02_(RO)_--
WA  
WA  


==Reference:==
==Reference:==
      ~ __- _ - 2.1.20 (RO_4.3)
~ Generic
Generic      ~       _
__- _ - 2.1.20  
Examinee:        _ - - _ -    -  -  -  ~- -  E3 xam ine r:
~
Facility Evaluator:       - __
(RO _ _
4.3)
E3 xam in e r :
~
Examinee:
Facility Evaluator:
Method of Testing:
Method of Testing:
Simulated Performance                           Actual Performance         -      X Classroom                       Simulator       -    ~~
X Simulated Performance Actual Performance Classroom Simulator X
X      Plant Read to the Examinee:
Plant
~~
Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. The reactor has been steady at full power for several hours.
: 1. The reactor has been steady at full power for several hours.
Line 201: Line 237:


==References:==
==References:==
 
1. Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation -
1 . Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation -
Power Range, revision 27.
Power Range, revision 27.
Initiating Cue: Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.
Initiating Cue: Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.
NRC JPM ADMIN R 0 2                                                        Page 1 of 17
NRC JPM ADMIN R02 Page 1 of 17  


I AppendixC                 Job Performance Measure Form ES-C-1 WORKS t-iEET
I AppendixC Form ES-C-1 Job Performance Measure WORKS t-i EET
    ~ ~~
~  
Time Critical Task: No Validation Time: 19 minutes NRC JPM ADMIN R 0 2                             Page 2 of 17
~~
Time Critical Task: No Validation Time:
19 minutes NRC JPM ADMIN R 0 2 Page 2 of 17  


Appendix C                   Job Performance Measure                   Form ES-C-1 WORKS t-iEET Pe rforma nce Information Denote critical steps with a check mark 4
Appendix C Job Performance Measure Form ES-C-1 WORKS t-i EET P e rfo rm a n ce Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
                  --  -
~
Performance Step: 1
Standard:
    ~      ._
Provides repeat back of initiating the repeat back.
Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:              -
cue. Evaluator acknowledges Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.  
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
- ~ _ _ _
Performance Step: 2
Standard:
  -      - ~___
Reviews Precautions and Limitations.
Procedure Step: Reviews Precautions and Limitations.
Comment:  
Standard:       Reviews Precautions and Limitations.
~
Comment:
                      ~           -
SAT/U NSAT Note: The expected values are provided in the KEY.
SAT/U NSAT Note: The expected values are provided in the KEY.
NRC JPM ADMIN R 0 2                                                    Page 3 of 17
NRC JPM ADMIN R02 Page 3 of 17  


' AppendixC                 Job Performance Measure                 Form ES-C-1 WORKSI-IEET Performance Information J       Performance Step: 3
' AppendixC Job Performance Measure Form ES-C-1 WORKSI-IEET Performance Information J
~-
Performance Step: 3  
~-
Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.
Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.
Standard:     Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.
Standard:
Cue:         As the EO,report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.
Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.
  -  ~~   ~
Cue:
J       Performance Step: 4
As the EO, report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.  
_
~~  
Procedure Step: 5.1.1.2 Record Feedwater temper!ature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.
~
Standard:     Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line 6 Comment:
J Performance Step: 4 Procedure Step: 5.1.1.2 Record Feedwater temper!ature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.
                                ~ __  _
Standard:
_              ~
Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line 6 Comment:  
SAT/U NSAT NRC JPM ADMlN R 0 2                                                Page 4 of 17
~  
~
SAT/U NSAT NRC JPM ADMlN R02 Page 4 of 17  


" AppendixC             Job Performance Measure                 Form ES-C-1 WORKSHEET Pe rfo rma nce I '1f o r mat io n J     Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 110 psia and the temperature recorded ir.1 Step 5.1.1.2from Attachment 1001.6-3 or ASME approved steam tables.
" AppendixC Job Performance Measure Form ES-C-1 WORKSHEET P e rf o r m a n ce I '1 f o r m a t i o n J
Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 110 psia and the temperature recorded ir.1 Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables.
Obtain the specific volume (v) the temperature recorded iri Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.
w=
w=
Standard:
Standard:
                                                \
the Feedwater at 110 psia and  
Obtain the specific volume (v) the Feedwater at 110 psia and the temperature recorded iri Step 5.1.1.2from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.
\\
J     Performance Step: 6
J Performance Step: 6  
  ~   -  - . _
~
Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:
Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:
F = 0.0429387 SQRT (QPh)
F = 0.0429387 SQRT (QPh)
Standard: Calculates total Feedwater flow using the following equation:
Standard:
Calculates total Feedwater flow using the following equation:
F = 0.0429387 SQRT (APiv) and records on the Feedwater Flow Calculation Worksheet, Line D.
F = 0.0429387 SQRT (APiv) and records on the Feedwater Flow Calculation Worksheet, Line D.
Comment:
Comment:
NRC JPM ADMlN R02                                               Page 5 of 17
NRC JPM ADMlN R02 Page 5 of 17  


AppendixC               Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
_    _
Performance Step: 7 Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)
J    Performance Step: 7
Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.  
  ~~~    ~
~~~
Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)
~
Standard:  Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.
Standard:
Comment:
Comment:  
                ~         ~ ~   ~ ~ _ ~ _ ~   ~~ -. ~ ~~ _-    -
~  
J   Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)
~
Standard: Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.
~
Comment:
~
                            ~                         ..
~  
NRC JPM ADMIN R 0 2                                             Page 6 of 17
~  
* AppendixC             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 9
~-
    -    ~~
~  
~  
~~  
~
J Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)
Standard:
Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.
Comment:  
~
NRC JPM ADMIN R 0 2 Page 6 of 17  
 
AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J
Performance Step: 9  
~~
Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).
Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).
Standard: Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.
Standard:
SAT/U NSAT J     Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure.
Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.
Standard:  Calculate the reactor absoilute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.
S AT/U N SAT J
Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure.
Calculate the reactor absoilute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.
Standard:
Comment:
Comment:
SATlUNSAT NRC JPM ADMIN R 0 2                                              Page 7 of 17
SATlUNSAT NRC JPM ADMIN R02 Page 7 of 17
* AppendixC               Job Performance Measure                 Form ES-C-1 WORKS ti EET Performance Information J     Performance Step: 11
* AppendixC Job Performance Measure Form ES-C-1 WORKS ti EET Performance Information J
  ~- -  -~ ~-
Performance Step: 11 Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.  
Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.
~-
Standard:   Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E.
- -~
_-
~-
SAT/U NSAT J     Performance Step: 12
Standard:
          .~
Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E.
Procedure Step: 5.2.6 Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 1100 psia using Feedwater temperature.
S AT/U N SAT J
Standard:   Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 1100 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F SAT/U NSAT NRC JPM ADMIN R 0 2                                              Page 8 of 17
Performance Step: 12 Procedure Step: 5.2.6  
* AppendixC                     Job Performance Measure                   Form ES-C-1 WORKSHEET
.~
  ~~       -~     ~
Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature.
Performance Information J         Performance Step: 13 Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.
Standard:
Standard:       Calculates the difference of the Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.
Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F SAT/U NSAT NRC JPM ADMIN R02 Page 8 of 17  
Comment:
 
                    ~ _- .  ~         -~                   ~         ~~   ~       -
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET  
SAT/U NSAT J         Performance Step: 14
~~  
        ~  ~~-~
-~  
Procedure Step: 5.2.8 Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.
~
Standard:       Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.
Performance Information J
Comment:
Performance Step: 13 Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.
                    ~- ~~~         ~   _ ~   _~~ -    ~~   ~~ - -  -~     -  __ -
Standard:
NRC JPM ADMlN R 0 2                                                      Page 9 of 17
Calculates the difference of the Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.
Comment:  
~  
~~  
~  
~ _.
~  
-~
S AT/U N SAT J
Performance Step: 14 Procedure Step: 5.2.8  
~
~~-~
Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.
Standard:
Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.
Comment:  
~-  
~~~  
~  
~
~~  
~~  
~~  
-~
NRC JPM ADMlN R02 Page 9 of 17  


. ' AppendixC               Job Performance Measure                 Form ES-C-1 WORKS t  iEET Performance Information J       Performance Step: 15
. ' AppendixC Job Performance Measure Form ES-C-1 WORKS ti E ET Performance Information J
            ~~
Performance Step: 15 Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTUIhr.  
Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTUIhr.
~~
Standard:   Calculates the product of the Feedwater flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet.
Standard:
Calculates the product of the Feedwater flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet.
Line I.
Line I.
Comment:
Comment:
J     Performance Step: 16 Procedure Step: 5.2.10 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).
J Performance Step: 16 Procedure Step: 5.2.1 0 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).
Standard:   Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.
Standard:
Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.
Comment:
Comment:
SAT/UNSAT NRC JPM ADMlN R 0 2                                             Page 10 of 17
SAT/UNSAT NRC JPM ADMlN R 0 2 Page 10 of 17  


. ,                        Job Performance Measure                 Form ES-C-1 AppendixC WORKS-IEET Performance Information J     Performance Step: 17
AppendixC Job Performance Measure Form ES-C-1 WORKS-IEET Performance Information J
    ~- -
Performance Step: 17  
~- -
Procedure Step: 5.2.1 1 Record RWCU flow to the nearest gpm (recorder Panel 3F) on Line K of Attachment 1001 6-2.
Procedure Step: 5.2.1 1 Record RWCU flow to the nearest gpm (recorder Panel 3F) on Line K of Attachment 1001 6-2.
Standard: Reads RWCU flow to the nlearest gpm (recorder Panel 3F) and records on the Heat Balanc:e Data, Calculation, and Analysis Worksheet, Line K.
Standard:
                ~         ~       ~
Reads RWCU flow to the nlearest gpm (recorder Panel 3F) and records on the Heat Balanc:e Data, Calculation, and Analysis Worksheet, Line K.  
SAT/U NSAT J     Performance Step: 18 Procedure Step: 5.2.12 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation.
~  
Enter the appropriate value for Fixed Losses on Line L of Attachment 1001.6-2.
~  
Fixed Losses = [(K) x 0.01:36] + 9.0 Standard: Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.
~
S AT/U N SAT J
Performance Step: 18 Procedure Step: 5.2.1 2 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation.
Enter the appropriate value for Fixed Losses on Line L of 001.6-2.
Fixed Losses = [(K) x 0.01 :36] + 9.0 Standard:
Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.
Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:
Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:
SAT/UNSAT NRC JPM ADMlN R 0 2                                            Page 11 of 17
SAT/UNSAT NRC JPM ADMlN R02 Page 11 of 17  


. *. . Appendix C                 Job Performance Measure                 Form ES-C:-1 WORKS HE ET Performance Information J         Performance Step: 19
. *.. Appendix C Job Performance Measure Form ES-C:-1 WORKS H E ET Performance Information J
                ~~
Performance Step: 19  
~~
Procedure Step: 5.2.13 Add the Fixed Losses from Line L to the Megawatts from Line J and record the Calculated CTP on Line N.
Procedure Step: 5.2.13 Add the Fixed Losses from Line L to the Megawatts from Line J and record the Calculated CTP on Line N.
Standard:       Adds the Fixed Losses frorn step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.
Standard:
Adds the Fixed Losses frorn step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.
Comment:
Comment:
                    -    . .-
S AT/U N SAT Cue:
SAT/U NSAT J         Performance Step: 20
J Performance Step: 20  
                  ~.
~.
Procedure Step: 5.2.14 Record PPC Core Thermali Power (CTP) in Line M.
Procedure Step: 5.2.14 Record PPC Core Thermali Power (CTP) in Line M.
Cue:           The PPC has been returned to service long enough to establish the 15 minute average Core Thermal Power (CTP). The current CTP value is 1927 MWth.
Standard:
Standard:      Records the PPC 15 minute average Core Thermal Power (CTP) on the Heat Balance Data, Calculation, and Analysis Worksheet, Line M.
The PPC has been returned to service long enough to establish the 15 minute average Core Thermal Power (CTP). The current CTP value is 1927 MWth.
Records the PPC 15 minute average Core Thermal Power (CTP) on the Heat Balance Data, Calculation, and Analysis Worksheet, Line M.
Comment:
Comment:
NRC JPM ADMIN R 0 2                                                Page 12 of 17
NRC JPM ADMIN R02 Page 12 of 17  


                                                                            -~~
Appendix C Job Performarice Measure WORKSIHEET
. *.
-~~
* Job Performarice Measure                  Form ES-C-1 Appendix C WORKSIHEET Performance Information J     Performance Step: 21
Form ES-C-1 Performance Information J
        - -
Standard:
Procedure Step: 5.2.15 Subtract the Calculated CTP from the PPC Core Thermal Power
Comment:
Performance Step: 21 Procedure Step: 5.2.1 5 Subtract the Calculated CTP from the PPC Core Thermal Power
[Line M - Line N]. If this value is positive, the comparison is considered conservative. It negative, the comparison is non-conservative. Place an X in the appropriate box.
[Line M - Line N]. If this value is positive, the comparison is considered conservative. It negative, the comparison is non-conservative. Place an X in the appropriate box.
Standard:    Subtracts Calculated Core Power in step 5.2.1 3 from the PPC Core Thermal Power in step 5.2.14 and records on the Heat Balance Data, Calculation and Analysis Worksheet, Line 0.
Subtracts Calculated Core Power in step 5.2.1 3 from the PPC Core Thermal Power in step 5.2.14 and records on the Heat Balance Data, Calculation and Analysis Worksheet, Line 0.
Checks the negative value -4 Non-Conservative box on the Heat Balance Data, Calculation, and Analysis Worksheet.
Checks the negative value -4 Non-Conservative box on the Heat Balance Data, Calculation, and Analysis Worksheet.
Comment:
Cue:
Performance Step: 22
Performance Step: 22 Procedure Step: 5.3 Verify that the RWCU system differential temperature is < 80 deg F.
                .
Another Operator will verify the RWCU system differential temperature is < 80 deg F. This complete this JPM.
                . .
Procedure Step: 5.3 Verify that the RWCU system differential temperature is < 80 deg F.
Cue:        Another Operator will verify the RWCU system differential temperature is < 80 deg F. This complete this JPM.
Standard:
Standard:
Comment:
Comment:  
                                                      -                  ~~
~~
S AT/U NSAT NRC JPM ADMIN R 0 2                                                  Page 13 of 17
S AT/U N SAT NRC JPM ADMIN R02 Page 13 of 17  


. 1, . Appendix C               Job Performance Measure               Form ES-C-1 WORKSHEET Performance Information Terminating Cue: A manual core heat balance has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
. 1,. Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Terminating Cue: A manual core heat balance has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN R 0 2                                           Page 14 of 17
NRC JPM ADMIN R 0 2 Page 14 of 17  


" *. a Appendix C                 Job Performance Measure   Form ES-C-1 W 0R KSHEET Validation of Completion JPM Number:          -~NRC JPM._ -~ADMIN R .0 2 ~-
a Appendix C Job Performance Measure W 0 R KS H E ET Form ES-C-1 Validation of Completion NRC JPM  
                                              ~
-~
Examinee's Name:       -
ADMIN  
~
R 0 2  
. ~-
JPM Number:
-~
Examinee's Name:
Examiner's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts: ~
Number of Attempts:  
~
Time to Complete:
Time to Complete:
Question:
Question:
                                                                      .-
Result:
Result:               Sat isfactory/Unsatisfactory Examiner's Signature and Date:
Sat isfactory/U nsatisfactory Examiner's Signature and Date:
NRC JPM ADMIN R 0 2                                   Page 15 of 17
NRC JPM ADMIN R 0 2 Page 15 of 17  


1 .
1.
Appendix C                 Job Performar*ice Measure             Form ES-C-1 WORKSHEET Simulator Setup
Appendix C Job Performar*ice Measure Form ES-C-1 WORKSHEET Simulator Setup
: 1. Reset to full power IC-65.
: 1. Reset to full power IC-65.
: 2. Insert the following:
: 2. Insert the following:
: a. SWI-NSS021A to 1020.0 psig (Reactor press recorder 5F/6F)
: a. SWI-NSS021 A to 1020.0 psig (Reactor press recorder 5F/6F)
: b. SWI-CFW002A to 31 1 "F (FW temperature recorder 5F/6F)
: b. SWI-CFW002A to 31 1 "F (FW temperature recorder 5F/6F)
: c. SWI-NIS001 B to 150090 Ib/hr (recirculation flow recorder 3F)
: c. SWI-NIS001 B to 150090 Ib/hr (recirculation flow recorder 3F)
: d. SWI-RCU002A to 400.1 gprri (RWCU flow recorder 3F)
: d. SWI-RCU002A to 400.1 gprri (RWCU flow recorder 3F)
: 3. Have a blank copy   of procedure 1001.6 ready.
: 3. Have a blank copy of procedure 1001.6 ready.
4 Provide the Candidate a calculator.
4 Provide the Candidate a calculator.
NRC JPM ADMIN R 0 2                                               Page 160f 17
NRC JPM ADMIN R 0 2 Page 160f 17  


. -. . Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET STUDENT biANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT biANDOUT Initial Conditions:
: 1. The reactor has been steady at full power for several hours.
: 1. The reactor has been steady at full power for several hours.
: 2. The PPC is currently unavailable but is expected back shortly.
: 2. The PPC is currently unavailable but is expected back shortly.
Line 389: Line 486:
Task Cue:
Task Cue:
Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.
Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.
NRC JPM ADMIN R02                                                   Page 17 of 17
NRC JPM ADMIN R02 Page 17 of 17
: 7. AppendixC                         Job Performance Measure                 Form ES-C-1 W 0R KS t-iEET Facility:     _ Oyster
: 7.
_      Creek ~                 Task No.:   21 501 01
AppendixC Job Performance Measure Form ES-C-1 W 0 R KS t-i E ET Facility:
                                                                  ~~       _023
__ Oyster Creek
                                                                            . - ~     ___ -
~
Task Title:         Perform APRM Drawer Count Job Performance Measure No.:               NRC JF:)M ADMlN R 0 3 (RO)
Task No.:
21  
~~
501 01 023 -  
~
Task
 
==Title:==
Perform APRM Drawer Count Job Performance Measure No.:
NRC JF:)M ADMlN R 0 3 (RO)
WA  
WA  


==Reference:==
==Reference:==
Generic 2.2.12-~(RO 3.0)
Generic 2.2.1 2
Examinee:         ~-     ~     ~   _  _  ~     Examin er :
-~
Facility Evaluator:         ~   ~   __        - [late:           ~    _ __    ~
(RO 3.0)
Method of Testing Simulated Performance                           Actual Performance               X
Exam in e r :  
                                                                                        ~
~-  
Classroom             ~             Simulator         X         Plant Read to the Examinee:
~  
~  
~
Examinee:  
~
~
Facility Evaluator:  
~  
~  
- [late:
Method of Testing Simulated Performance Actual Performance X  
~
Classroom  
~
Simulator X
Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
: 1. The plant is at rated power.
: 1. The plant is at rated power.
Task Standard: Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not indicate bypassed.
Task Standard: Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not indicate bypassed.
Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs 36-17B, 28-090 and 44-25D shown as bypassed.
Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs 36-17B, 28-090 and 44-25D shown as bypassed.
Gene raI References :
Gene ra I References :
1 . Procedure 202.1, Power Operation, revision 109.
1. Procedure 202.1, Power Operation, revision 109.
: 2. Procedure 403, LPRM-APRM System Operations, revision 13.
: 2. Procedure 403, LPRM-APRM System Operations, revision 13.
Initiating Cue: Perform Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.
Initiating Cue: Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.
Time Critical Task:     No.
Time Critical Task: No.
Validation Time:         13 minutes NRC JPM ADMlN R 0 3                                                         Page 1 of 11
Validation Time:
13 minutes NRC JPM ADMlN R 0 3 Page 1 of 11  


' ' AppendixC                   Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4
' AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark 4  
            ~-       ~
~-  
Performance Step: 1
~
    - -    -
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:             __
Standard:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Comment:
Comment:
                                ~-~     ~
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Performance Step: 2
~-~  
                -
~
Procedure Step. 1 of Attachment 202.1-1.
Performance Step: 2 Procedure Step. 1 of Attachment 202.1 -1.
Place an X in the box next to the LPRMs that are Bypassed.
Place an X in the box next to the LPRMs that are Bypassed.
Standard:       Places an X in the box next to LPRMs 36-176,28-09D,and 44-25Din the APRM 8 column.
Standard:
Comment:
Places an X in the box next to LPRMs 36-176,28-09D, and 44-25D in the APRM 8 column.
                        ~
Comment:  
SAT/U NSAT NRC JPM ADMIN R 0 3                                                   Page 2 of 11
~
SAT/U NSAT NRC JPM ADMIN R 0 3 Page 2 of 11  


' AppendixC                   Job Performance Measure                 Form ES-C-1 WORKSHEET
' AppendixC Job Performance Measure WORKSHEET Form ES-C-1  
          ~   --
~
Performance information Performance Step: 3 Procedure Step: 2 of Attachment 202.1-1.
Performance information Performance Step: 3 Procedure Step: 2 of Attachment 202.1 -1.
Place the number of un-bypassed inputs in the last row.
Place the number of un-bypassed inputs in the last row.
Standard: Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.
Standard:
Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.
Comment:
Comment:
              --              _ _
S AT/U N SAT Performance Step: 4 Standard:
_.
CUE:
SAT/U NSAT Performance Step: 4 Procedure Step: 5.: 3.8.1 of Procedure 403.
Comment:
Obtains permission 'om tbg US for LPRM input to APRM draw count.
Procedure Step: 5.:
Standard:
Obtains permission count.
1 1 Obtains ermissioq 'om the US for LPRM input to APRM draw count.      P            I CUE:      The can idate ma                not ask permission since he was directed go perfo r d          :. If the candidate does ask, state th they havie permissic          dorm the APRM drawer count.
Obtains ermissioq count. P I
I          I Comment:                          I
The can idate ma directed go pe rfo r d they havie permissic I
                            .------r I            I
I I
.------r I
I SAT/U NSAT I
I I
I i
~
I I
NRC JPM ADMIN R O ~
3.8.1 of Procedure 403.  
'om tbg US for LPRM input to APRM draw  
'om the US for LPRM input to APRM draw 1
1 not ask permission since he was
:. If the candidate does ask, state th dorm the APRM drawer count.
_ ~ _
_ ~ _
I SAT/U NSAT          I I
Page 3 o 11  
I
                    ~
                      '
i I
I NRC JPM ADMIN R O ~                                                  Page 3 o 11


- I . 4 Appendix C                   Job Performar-ice Measure           Form ES-C-1 W ORKSH ET STUDENT HANDOUT Initial Conditions:
I. 4 Appendix C Job Performar-ice Measure Form ES-C-1 W ORKSH ET STUDENT HANDOUT Initial Conditions:
: 1. The plant is at rated power.
: 1. The plant is at rated power.
Task Cue:
Task Cue:
Perform Section 2 of Attachment 202.1-1, APHM Status Check, for APRM 8.
Perform Section 2 of Attachment 202.1-1, APHM Status Check, for APRM 8.
Notify the Unit Supervisor of your results.
Notify the Unit Supervisor of your results.
NRC JPM ADMlN R 0 3                                             Page 11 of 11
NRC JPM ADMlN R 0 3 Page 11 of 11  


. P,. .
. P,.
Appendix C                     Job Performance Measure                                 Form ES-C-1 WORKS t-i EET Facility:     Oysler Creek                     Task No.:           2000501 433 Task Title:         Determine -RPV Water- Level
Appendix C Job Performance Measure Form ES-C-1 WORKS t-i EET Facility:
                              ~                            -    Instrument Availability
Oysler Creek Task No.:
                                                                                  -
2000501 433 Task
Job Performance Measure No.:             NRC JFM ADMIN R 0 4 (RO)     -~
 
==Title:==
Determine  
~
- RPV Water Level Instrument Availability Job Performance Measure No.:
NRC JFM ADMIN R04
-~ (RO)
K/A  
K/A  


==Reference:==
==Reference:==
 
f:! xa m in e r :
Examinee:         ~~     -
Examinee:  
                                                        !:f xa mine r :
~~
Facility Evaluator:                               [late:
Facility Evaluator:
[late:
Method of Testing:
Method of Testing:
Simulated Performance                 ~~         Actual Performance                         X Class room             X       Simulator                             Plant Read to the Examinee:
Simulated Performance  
~~
Actual Performance X
Class room X
Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 482: Line 623:
: 3. RPV pressure is 200 psig and stable.
: 3. RPV pressure is 200 psig and stable.
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
Temp.
I Temp.  
I
~ Recorder lnstr7iment NO.
                                                                        ~   Recorder         Temperature  I lnstr7iment NO.             Point       1     F      I i-                     I                   t
Point 1
                                                ~   TE-103-450         1 1
I t
40 I
i-1 I  
TE- 103-451                 41 TE-103-452                   42-I                      1-                  t TE- 103-453       I       43 1
~
TE-103-454         1         44       1 L--             ~
TE-103-450 1
                                                                  ~
40 TE-103-451 41 42-I t
                                                                    - _1 _-~ - .-  -
TE-103-452 TE-103-453 I
                                                                                    -. - .-
43 TE-103-454 1
1 NRC JPM ADMIN R 0 4                                                                      Page 1 of 8
44 1
1 -
c 1
~
1-1 L--  
~  
- _ _ ~ -. -..-
Temperature I
F I
NRC JPM ADMIN R04 Page 1 of 8  


, ,* . Appendix C                 Job Performance Measure               Form ES-C-1 W ORKSI-IEET Task Standard: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
Appendix C Job Performance Measure Form ES-C-1 W ORKSI-I EET Task Standard: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
Required Materials: None.
Required Materials: None.
General  
General  


==References:==
==References:==
 
1. EMG-SP28, Level Instrumentation Availability, revision 0.
1 . EMG-SP28, Level Instrumentation Availability, revision 0.
Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each F3PV water level instrument is available for RPV water level indication or is not available.
Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each F3PV water level instrument is available for RPV water level indication or is not available.
Time Critical Task: No.
Time Critical Task: No.
Validation Time:     7 minutes NRC JPM ADMIN R 0 4                                                   Page 2 of 8
Validation Time:
7 minutes NRC JPM ADMIN R 0 4 Page 2 of 8  


. * '
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark   J Performance Step: 1
~~
          - ~~
JPM Start Time:
Procedure Step: Provides repeat back of initiating cue.
Standard:
JPM Start Time:               __
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Comment:
Comment:
                                                    - -  -
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
J           Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.
J Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.
Standard:       Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.
Standard:
Comment:
Comment:
SAT/U NSAT NRC JPM ADMlN R 0 4                                                     Page 3 of 8
Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.
SAT/U NSAT NRC JPM ADMlN R 0 4 Page 3 of 8  


. . 0 Appendix C             Job Performarce Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
0 Appendix C Job Performarce Measure Form ES-C-1 WORKSHEET Performance Information J
Standard: Compares the NR GEMAC A and NR GEMAC B indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.
Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard:
Compares the NR GEMAC A and NR GEMAC B indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.
Determines that NR GEMAC B is in the Safe Region and thus is available for RPV water level instrumentation.
Determines that NR GEMAC B is in the Safe Region and thus is available for RPV water level instrumentation.
Comment:
Comment:
J     Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
J Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard: Compares the YARWAY B indicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY B is not in the Safe Region and thus is not available for RPV water level instrumentation.
Standard:
Compares the YARWAY B indicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY B is not in the Safe Region and thus is not available for RPV water level instrumentation.
Comment:
Comment:
SAT/UNSAT NRC JPM ADMIN R 0 4                                               Page 4 of 8
SAT/UNSAT NRC JPM ADMIN R 0 4 Page 4 of 8  


> # .
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Appendix C                 Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J       Performance Step: 5 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Performance Step: 5 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.
Standard:     Compares the WR GEMAC indicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.
Standard:
Compares the WR GEMAC indicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.
Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.
Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.
Comment:
Comment:  
                              ~   ~ -.
~  
~ -.
SAT/U NSAT Terminating Cue: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
SAT/U NSAT Terminating Cue: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.
JPM Stop Time:             -
JPM Stop Time:
NRC JPM ADMlN R 0 4                                                 Page 5 of 8
NRC JPM ADMlN R 0 4 Page 5 of 8  


. ? -
?
Appendix C                   Job Performarice Measure     Form ES-C-1 WORKSHEET Validation of Completion JPM Number:            _NRC
Appendix C Job Performarice Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM _
_  JPM_ ADMIN   _ 1304
~
                                                      -~ _
ADMIN 1304 JPM Number:
Examinees Name:         -  --        - -    -      -
Examinees Name:
Examiners Name:     ~       -~   -      --.        -
Examiners Name:  
Date Performed:                                   _
~  
Facility Evaluator:             -      _          ~_ _
-~ -
Number of Attempts:       ~ ~   _ _ ~           -_. -
Date Performed:
Time to Complete:             -
Facility Evaluator:  
~
Number of Attempts:  
~  
~
_ _ ~
Time to Complete:
Question:
Question:
Result                 SatisfactoryAJnsatisfactory Examiners Signature and Date:               -          ~
Result SatisfactoryAJnsatisfactory Examiners Signature and Date:  
NRC JPM ADMIN R 0 4                                          Page 6 of 8
~
NRC JPM ADMIN R04 Page 6 of 8  


I -4 Appendix C                   Job Performance Measure         Form ES-C-1 WORKSHEET Simulator Setup
I  
-4 Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup
: 1. None.
: 1. None.
: 2. Have a blank copy of Support Procedure 28, EMG-SP28, Level In st r umentation Availability ready.
: 2. Have a blank copy of Support Procedure 28, EMG-SP28, Level In st r u menta tion Availability ready.
NRC JPM ADMIN R 0 4                                             Page 7 of 8
NRC JPM ADMIN R 0 4 Page 7 of 8  


.. a, Appendix C                   Job Performarlce Measure                   Form ES-C-1 WORKSHEET STUDENT tjANDOUT Initial Conditions:
a, Appendix C Job Performarlce Measure WORKSHEET Form ES-C-1 STUDENT tjANDOUT Initial Conditions:
: 1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
: 1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
: 2. The Primary Containment Control EOP has been entered.
: 2. The Primary Containment Control EOP has been entered.
: 3. RPV pressure is 200 psig and stable.
: 3. RPV pressure is 200 psig and stable.
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
: 4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:
i   Level Instrument   1   RPVWater         !      Temp. 1 Recorder 1 TemDerature   I 1 Level Readinq I- Instrument No. Point
I i
[ -
Level Instrument 1
F
RPVWater Temp.
                                                                                          -
1 Recorder 1 TemDerature F
89
1 Level Readinq Instrument No.
                                              - -
Point I-  
1   TE-103-450
~
                                                                      ~
[
1   40
89 1
                                                                              --
340 i ---
1     340 1    TE-103-451
1 TE-103-450 1
                                                          -
40 1
i ---
TE-103-452 42 360 1
335
1 TE-103-451 335 Task Cue:
                                                                                              - 1 1  TE-103-452      42          360 Task Cue:
IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.
IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.
NRC JPM ADMIN R 0 4                                                        Page 8 of 8
NRC JPM ADMIN R04 Page 8 of 8  
 
?
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:
-Oyster Creek Task


, ? -* AppendixC                      Job Performance Measure                          Form ES-C-1 WORKSHEET Facility:    -Oyster Creek Task Title:         Review a____Shift Turnover     - IChecklist
==Title:==
                                                              -- ~~   ~--  -    _  ~ __
Review a ____
_      ~
Shift Turnover  
Job Performance Measure No.:                 NRC- JPM
- IChecklist  
                                                  ----      - - _ADMlN-- SROJ LSRO)
~~  
__ - -
~-  
~
~
Job Performance Measure No.:
NRC - JPM  
- - _ ADMlN -- SROJ LSRO)
WA  
WA  


==Reference:==
==Reference:==
  -Ge-neric 2.1.3 (SRO 3.41-                     _~
  -Ge-neric 2.1.3 (SRO 3.41-
Examinee:          _ -    _.
_~
_ _~
_ _~
                                                      -
Examiner:
Examiner:                         -
Examinee:
Facility Evaluator:               -~     _ _ _ _  -  Date:            - ..__._            -
Date:
Facility Evaluator:  
-~
Method of Testing:
Method of Testing:
S imu lated Performance                         -   Actual Performance         - __    X
X S im u lated Performance  
                                                                                                - __ -
- Actual Performance Classroom X
Classroom             X
Simulator
                          . _
~
                                    ~
Plant Read to the Examinee:
Simulator              .__
Plant       __ -  - ___-  -
Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 618: Line 787:
: 3. Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.
: 3. Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.
: 4. Procedure 324, Thermal Dilution Pumps, revision 69.
: 4. Procedure 324, Thermal Dilution Pumps, revision 69.
NRC JPM ADMIN SRO1                                                                 Page 1 of 14
NRC JPM ADMIN SRO1 Page 1 of 14  


, I I 7 AppendixC                   Job Performance Measure               Form ES-C-1 WORKS I--IE ET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.
I I
Time Critical Task:   No.
7 AppendixC Job Performance Measure Form ES-C-1 WORKS I--I E ET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.
Validation Time:     22 minutes NRC JPM ADMIN SROI                                                 Page 2 of 14
Time Critical Task: No.
Validation Time:
22 minutes NRC JPM ADMIN SROI Page 2 of 14  


. I AppendixC                   Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Inf o rmatio n Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
. I AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance I n f o rmat io n Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the completed Turnover Sheet.
Standard:
Comment:
Comment:
                    ~ ~ . _ .
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the completed Turnover Sheet.
~ ~. _.
SAT/UNSAT Note: The following steps may be performed in any order.
SAT/UNSAT Note: The following steps may be performed in any order.
J           Performance Step: 2
J Performance Step: 2 Procedure Step: Reviews the Turnover Checklist.
    -
Standard:
Procedure Step: Reviews the Turnover Checklist.
Reviews the Turnover Checklist and notes the following:
Standard:       Reviews the Turnover Checklist and notes the following:
The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)
The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)
Comment:
Comment:
NRC JPM ADMlN SRO1                                                   Page 3 of 14
NRC JPM ADMlN SRO1 Page 3 of 14  


. AppendixC             Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 3 Procedure Step: Reviews the Turnover Checklist.
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Standard: Reviews the Turnover Checklist and notes the following:
Performance Step: 3 Procedure Step: Reviews the Turnover Checklist.
0 Technical Specification 3.7 C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours at greater than 80% rated load until repairs are completed.
Standard:
Procedure OP-OC-I08-104-1001 , Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours from when EGD 1 was declared inoperable - not 24 lhours from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4 013, EDG 2 Load Test) by 2000 on April 19, 2008.
Reviews the Turnover Checklist and notes the following:
Comment:
0 Technical Specification 3.7 C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours at greater than 80% rated load until repairs are completed.
            ~- -    -~   ~~~~     -    ~~       ~-        ~~           -
Procedure OP-OC-I 08-1 04-1001, Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours from when EGD 1 was declared inoperable - not 24 lhours from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4 013, EDG 2 Load Test) by 2000 on April 19, 2008.
NRC JPM ADMIN SROl                                               Page 4 of 14
Comment:  
~~  
~~  
~-
-~  
~~~~  
~- -
NRC JPM ADMIN SROl Page 4 of 14  


.. . , AppendixC                 Job Performarice Measure                   Form ES-C-1 WORKSHEET Perf or mance lnf or mation J       Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.
AppendixC Job Performarice Measure Form ES-C-1 WORKSHEET Perf or mance lnf or mat ion J
Standard:     Reviews the Turnover Checklist and notes the following:
Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.
IAW Procedure 324, if all dilution pumps are tripped (which is the case of a loss of power to the dilution plant) and cannot be immediatc?lyrestarted, reduce power as necessary to maintain main condenser outlet temperature c 97 "F to minimize the impact on the environment. A 2-hour report to the [IEP via the NJDEP Environmental Hotline (1-877-927-6337) shall be made. A written report shall be generated IAW the NJPDES part IV if bridge temperature exceeds 97 "F.
Standard:
Reviews the Turnover Checklist and notes the following:
IAW Procedure 324, if all dilution pumps are tripped (which is the case of a loss of power to the dilution plant) and cannot be immediatc?ly restarted, reduce power as necessary to maintain main condenser outlet temperature c 97 "F to minimize the impact on the environment. A 2-hour report to the [IEP via the NJDEP Environmental Hotline (1 -877-927-6337) shall be made. A written report shall be generated IAW the NJPDES part IV if bridge temperature exceeds 97 "F.
Comment:
Comment:
                        - _        -  -              -      -            _ _    -    -
Terminating Cue: The Candidate has reviewed the turnover checklist and noted the discrepancies and any associated actions.
Terminating Cue: The Candidate has reviewed the turnover checklist and noted the discrepancies and any associated actions.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN SROl                                                     Page 5 of 14
NRC JPM ADMIN SROl Page 5 of 14  


., . I AppendixC                   Job Performance Measure   Form ES-C-1 WORKSHEET Validation of Completion JPM Number:           NRC-JPM ADMIN SRO1
. I AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:  
                            .~-          ~     ~~    ~
.~
Examinees Name:     - -~ - _-_
NRC  
Date Performed:
- - JPM  
Facility Evaluator:             __    ~~          __
~ ADMIN  
~~
SRO1
~
Examinees Name:  
- -~ -
Date Performed:  
~~
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question:
Question:
Result:               Satisfactory/Unsatisfactory Examiners Signature and Date:       ~      ~.
Result:
                                                    - - ~-
Satisfactory/Unsatisfactory  
NRC JPM ADMlN SRO1                                     Page 6 of 14
~
Examiners Signature and Date:  
~.  
- ~-
NRC JPM ADMlN SRO1 Page 6 of 14  


I *
I 8
* 8 AppendixC         Job Performarice Measure Form ES-C-1 WORKSHEET Sirnulato! Setup
AppendixC Job Performarice Measure Form ES-C-1 WORKSHEET Sirnulato! Setup
: 1. None.
: 1. None.
NRC JPM ADMIN SROl                         Page 7 of 14
NRC JPM ADMIN SROl Page 7 of 14  


. .'* '..
I.' '..
I        Appendix C                   Job Performance Measure               Form ES-C-1 W 0R KSHE ET STUDENT HANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 W 0 R KS H E ET STUDENT HANDOUT Initial Conditions:
: 1. The plant is at rated power.
: 1. The plant is at rated power.
: 2. You are the oncoming Unit Supervisor after being off for the last 12 hours.
: 2. You are the oncoming Unit Supervisor after being off for the last 12 hours.
Line 680: Line 871:
Task Cue:
Task Cue:
As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.
As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.
NRC JPM ADMIN SRO1                                                   Page 8 of 14
NRC JPM ADMIN SRO1 Page 8 of 14  
: i     L 0P-0c-100-1002 Revision 5 DCC FILE # 2'0 70 01 01 03 MAIN CONTROL ROOM TURNOVER CHECKLIST (OPERATING MODE)
 
Xenon(Checkone)                 7Rising                                  1                                                        x         i I
i L
                                                                                                                                                        - -    - 1
0P-0c-100-1002 Revision 5 DCC FILE # 2'0 70 01 01 03 MAIN CONTROL ROOM TURNOVER CHECKLIST (OPERATING MODE)
_______                                      __ ----           -_______________                            __
Xenon(Checkone) 7 Rising x
I
i 1
        -     __-
1 I
Surveillance(s) in progress 1
- -I 1 Stack RAGEMS SampleandEff&ent Flow - Functional Test, 621 3 024 Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 I
Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 Stack RAGEMS SampleandEff&ent Flow - Functional Test, 621 3 024
I Surveillance(s) in progress I
                                                                                                                                                              - -I I
I Fire Hose Station, Hose House and Fire Hydrant Inspection, 645 6 003, I followinga fire drill earlier in the shift Activities in progress I
                                                                , Fire I
Safety System Status rGai;if&&n or comooncnts that are in a dczraded mode ofooeration ocrmittcd bi the Technical Soecifications. For each system, comoare the i.
                                                                  - - Hose Station, Hose House and Fire Hydrant Inspection, 645
1 length of time it i\\ degraded with the Technicai Specification Acbon Statenlent. Specify the ficcpency ol redundant sy\\tern verification or tevting and tIlctlate/tinle of the last test  
                                                                          -                            I - -                          -  _ -
~
6 003, Activities in progress I followinga fire drill__earlier in the shift
APRM 1 is in BYPASS due to failure of the APRM Surveillance Test - Front Panel Check (620.4.002) All other EDG 7 tagged out of service at - 2%O-On4/18/08-7:day-LCO EDG 2 testing-every 24 hours APRMs operable-
                                                                      -
__ - - - -~
                                                                                                -
C om p ensa t olllyC om m en t s
I Safety System Status
~
___-___-___
Li5t m y cornpenutorj actions in effect as a result of Procedure CC-AA-I 12 (1 emp Mod), Procculure WC-AA-IO1 (On-Line Maintenance). out of 1-ice pl:iiit equlpinent or components, or a s directid hy the M I or OS.
rGai;if&&n               or comooncnts that are in a dczraded mode ofooeration ocrmittcd bi the Technical Soecifications. For each system, comoare the 1            i .
EDG 2 and associated systemSare protected IAW Procedure 341 due to EDG 1 inoperable (annunciators T4b, T5b)
length of time it i\ degraded with the Technicai Specification Acbon Statenlent. Specify the ficcpency ol redundant sy\tern verification or tevting and tIlctlate/tinleof the last test -_ - -            __      __-____ _        ~       _                -          ______ _________                    -
Recording
APRM 1 is in BYPASS due to failure of the APRM Surveillance Test - Front Panel Check (620.4.002) All other APRMs operable-                        .                                                            __  - - - -~                              __  - -
_ Offgas Radiation
EDG 7 tagged out of service at- 2%O-On4/18/08-7:day-LCO       -_                    EDG 2 testing-every 24 hours           __    _
---p__
__                 ______                                    ~Com      p ensa
Monitor levekevery-hour due io AOG trp Noadverse trends noted p
_ ___ _- __t olllyC omments _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
- p__-
______-_                                                    -
Turnover Comments EDG 1 declared inoperable at 2000 on 4/18/08, and tagged out for repair at 2300 on 4/18/08 Electrical Maintenance reports a ground in the control system and is continuing to investigate. There is currently no estimate on the return-to-service time IAW Technical Specifications,
Li5t m y cornpenutorj actions in effect as a result of Procedure CC-AA-I 12 (1emp Mod), Procculure WC-AA-IO1 (On-Line Maintenance). out of 1-       ice pl:iiit equlpinent or components, or a s directid hy the M I or O S .             -  _-    __                          --          --
__ EDG  
EDG 2 and associated _ _      _ systemSare protected IAW Procedure 341 due to EDG 1 inoperable (annunciators T4b, T5b)
-- 2 must p com-plete a satisfactory surveiance by2300-on 4/19/08 The Dilution Plant tripped at 090Oonb/l9/08 Alternate power cannot be tied-in Electrical Maintenance suspects a short and are continuing to investigate Intake temperature is 50 "F No actions have occurred yet except to investigate (Annunciators 12XR2-4, 12XR2-6, 12XR3-4, 12XR35, and 12XR3-6)
                                                -
AOG tripped 1600 4/18/08 and remains out of service All required actions completed (Annunciatok 10F3b, 10XF3d, 1 OXF4d)
                        -   --                   -    p__-
Page 9 of 14  
                                                                    - -
Recording -        _Offgas Radiation Monitor -levekevery-
                                            ---p__    -    -              hour due   io AOG t r p Noadverse trends .      notedp _  _    -
___________      Turnover Comments                                                   ______
EDG 1 declared inoperable at 2000 on 4/18/08, and tagged out for repair at 2300 on 4/18/08 Electrical Maintenance reports a ground in the control system and is continuing to investigate. There is currently no estimate on the return-to-service time IAW Technical Specifications,
                                        -    -                        _ _ EDG --2 must com-plete a satisfactory surveiance by2300-on 4/19/08 p -
                                                                                                                                          -    -
The Dilution Plant tripped at 090Oonb/l9/08 Alternate power cannot be tied-in Electrical Maintenance suspects a short and are continuing to investigate Intake temperature is 50 "F No actions have occurred yet except to investigate (Annunciators 12XR2-4, 12XR2-6, 12XR3-4, 12XR35, and 12XR3-6)
                                      -
AOG tripped 1600 4/18/08 and remains out of service All required actions completed (Annunciatok 10F3b, 10XF3d, 1OXF4d)
                                                                                                                                            -    -        . _
Page 9 of 14


0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Going                                                     Coming Shift                                                     Shift *
0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Going Shift Coming Shift
      -                                -                                                      _  _            _  1
* 1
* Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-105-101 NRC JPM ADMlN SRO1                                                                             Page 10 of 14
* Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-105-101 NRC JPM ADMlN SRO1 Page 10 of 14  


  . 1 .
1.
0P-0c-100-1002 Revision 5 DCC FILE # 20.70.31.01 03 MAIN CONTROL ROOM TIJ IINOVER CNECKI,ISrc (CONTINUED)
MAIN CONTROL ROOM TIJ IINOVER CNECKI,ISrc (CONTINUED) 0P-0c-100-1002 Revision 5 DCC FILE # 20.70.31.01 03 BYP CHAN 1 in nojmal_
BYP CHAN 1 in nojmal_
TORUS/DWVENT &PURGE isol VLVS HIRAD I Yes I + N O
TORUS/DWVENT & P U R G E isol VLVS HIRAD                     I Yes
.L-Main Generator Digital Protective Relay System (DPRS A and B) operating with no abnormal 1
                                                                    .L-
x 1 Yes indications  
                                                                                  +I NO Main Generator Digital Protective Relay System (DPRS A and B) operating with no abnormal indications-
- -1  
        -   -                   -            - -1 1
- l--
                                                      - -
NRC JPM ADMlN SRO1 Page 11 of 14  
x
                                                            -
1 Yes l--
NRC JPM ADMlN SRO1                                                           Page 11 of 14


0P-0c-100-1002 Revision 5 DCC FILE il20.70.01.01.03
0P-0c-100-1002 Revision 5 DCC FILE il20.70.01.01.03 General Turnover Checks
__ __ _. - -                        ___ __ __ .- . . - _-
:ore-Maneuvering Daily Instruction Sheet, Attachment 1001.22-3 is current and reflects-plant operating con@tions.  
__ - .- ___.                        - . -    __  __      ___  - __    - ___ -
~
General--Turnover Checks
Control room panel walkdown performed neaiend of shift
            ~                      -
~  
                          ^ _ - _ _  _ ~  _  - -  -  -    _  _  _  I  _    _ -  -  _  I    -  -  -  I    _    --_
~  
:ore-Maneuvering Daily Instruction Sheet, Attachment 1001.22-3 is current and reflects-plant operating con@tions.                   ---    - - - ~
-~
Control room panel walkdown performed neaiend of s h i f t      -        ~     ~ -~
Control room-panelwalkdown performed with oncoming shift.  
Reviewed reasons for annunciated alarms with all operators Control room-panelwalkdown performed with oncoming shift.       -            ~
~
Performedlight test on alarm winJows. ___    ~ -           - - -___  -     A X NRC JPM ADMIN SROI                                                                             Page 12 of 14
Performedlight test on alarm winJows.  
~
A X
~  
^ _ - _ _
- _~_----___I__--_I---I_--_
Reviewed reasons for annunciated alarms with all operators NRC JPM ADMIN SROI Page 12 of 14
: 0..,
0P-0c-100~~1002 Revision 5 DCC FILE ii 20 70.01.01.03 Shift 0000 - 1200 A 1% <I 1) 13 V G A 15 (1
: 1) I' I' A
1% C I) E I' Control Room Alarm Sheet Date 41 I 9/08
/\\
li c 1)
E I.'
G I1 A
1% c I) 15 I'
A I3 C
: 1) 13 E'
Page 1 h R C D E 1 ;
NRC JPM ADMlN SRO1 Page 13 of 14  


. 0. .,                                                              0P-0c-100~~1002 Revision 5 DCC FILE ii 20 70.01.01.03 Control Room Alarm Sheet                            Page 1 Shift 0000 - 1200  Date 41 I 9/08 A 1% <I 1) 13 V G        /\  li  c 1) E I.' G I1 A  1% c  I) 15 I'                          h R C D E 1 ;
Control Room Alarm Sheet 1 OF 1;
A 15 (1 1) I' I' A 1% C I)  E I'                            A I3 C 1) 13 E' NRC JPM ADMlN SRO1                                                      Page 13 of 14
3 -I - I-tx I x 'xi 1 2 3 4 5 6 7 8 9 10 4
i 1 - '
I 0P-0c-100-1002 Revision 5 DCC FILE ff 20.70.01.01.03 Page2 9XF 1 2 3 4 5 6 12F NRC JPM ADMIN SROl Page 14 of 14  


0P-0c-100-1002 Revision 5 DCC FILE ff 20.70.01.01.03 Control Room Alarm Sheet                                Page2 9XF 1 2 3 4 5 6 1 OF 1;
Appendix C Job Performance Measure Form ES-C-1 WORKSIHEET
1 2 3 4 5 6 7 8 9 10 3
~
4
~
                                  -I I-
Facility:
                                    -
Oyster Creek
i 1-'
~
I tx x 'xi
Task NO.:
                                              '- I 12F N R C JPM ADMIN SROl                                      Page 14 of 14
~-  
~
P
~ la n
~~ t P e r s o n n
-~~
e I Event Not if ica
-~ t io._
n Task


Appendix C                        Job Performance Measure                          Form ES-C-1 WORKSIHEET Facility:      Oyster Creek
==Title:==
                          ~    ~                    Task NO.:            ~
Job Performance Measure No.:
                                                                                  ~-  ~  -
NRC  
Task Title:             ~  ~~          e I Event N o t if ica Pla nt Pers o nn-~~                    -~t io
~ JPM  
                                                                  ._n      . -      - --
-~
Job Performance Measure No.:                 NRC
ADMIN SR02
                                              -  ~ JPM
_ _ ISRO)
                                                      -~     _-
ADMIN       SR02
                                                                      - _ _ ISRO)
                                                                                -
WA  
WA  


==Reference:==
==Reference:==
Generic
Generic  
                        ~-       2.1.141SRO 3.3)~
~-
Examinee:           ~~                               Examine r:
2.1.141SRO  
~ 3.3)
Examinee:  
~~
Exam in e r:
Facility Evaluator:
Facility Evaluator:
Method of Testing:
Method of Testing:
Simulated Performance             ~~   -            Actual Performance             -~   -
X Simulated Performance  
X Classroom               X
~~
                        -.
Actual Performance  
Simulator           -      __    __
-~
Read to the Examinee:
Classroom X
Simulator Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure wil I be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure wil I be satisfied.
Initial Conditions:
Initial Conditions:
Line 798: Line 1,003:
Task Standard: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected YZ scram and entry into a 5 72-hour shutdown LCO.
Task Standard: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected YZ scram and entry into a 5 72-hour shutdown LCO.
Required Materials: None.
Required Materials: None.
NRC JPM ADMIN SR02                                                                 Page 1 of 14
NRC JPM ADMIN SR02 Page 1 of 14  


Appendix C                     Job Performance Measure             Form ES-C-1 WORKSHEET General  
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET General  


==References:==
==References:==
: 1. Technical Specif icat ions. (have available)
: 1.
: 2. Procedure OP-AA-106-101, Significant Event Reporting, revision 8. (Note:
: 2.
: 3.
: 4.
: 5.
: 6.
Technical Specif icat ions. (have available)
Procedure OP-AA-106-101, Significant Event Reporting, revision 8. (Note:
ONLY provide Attachment 2 of the procedure.) (handout)
ONLY provide Attachment 2 of the procedure.) (handout)
: 3. Procedure RAP-SXF7d, 24 VDC PP-A LOST, revision 0. (handout)
Procedure RAP-SXF7d, 24 VDC PP-A LOST, revision 0. (handout)
: 4. Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Opera.tions, revision 0.
Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Opera.tions, revision 0.
: 5. EP-AA-I010, Exelon Nuclear Radiological Emergency Plan Annes for Oyster Creek Station, revision 0 (have available)
EP-AA-I 01 0, Exelon Nuclear Radiological Emergency Plan Annes for Oyster Creek Station, revision 0 (have available)
: 6. Exelon Reportability Manual (have available)
Exelon Reportability Manual (have available)
Initiating Cue: Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator. Determine who the Shift Manager notifies of this event.
Initiating Cue: Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator. Determine who the Shift Manager notifies of this event.
Determining the requirement for a written report and LER will be performed by another Operator.
Determining the requirement for a written report and LER will be performed by another Operator.
Time Critical Task:   No Validation Time:       22 minutes NRC JPM ADMIN SR02                                                   Page 2 of 14
Time Critical Task: No Validation Time:
22 minutes NRC JPM ADMIN SR02 Page 2 of 14  


Appendix C                 Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark Performance Step: 1
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
  ~~  ~~      ._
~~
Procedure Step: Provides repeat back of initiating cue.
~~
JPM Start Time:             -
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Standard:
Comment:
Comment:
Performance Step: 2
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
.    - . - .
Performance Step: 2 Procedure Step: Record dalte/time of the event on Attachment 2.
Procedure Step: Record dalte/time of the event on Attachment 2.
Standard:
Standard:       Records datehime of the event on Attachment 2 as 4/19/08 1000.
Records datehime of the event on Attachment 2 as 4/19/08 1000.
Note:           Completion of the Attachment may be performed in any order Comment:
Note:
                                - ~             -   -  .  ~-    ~~   ~-
Comment:
SAT/UNSAT NRC JPM ADMIN S R 0 2                                                Page 3 of 14
Completion of the Attachment may be performed in any order  
  ~-  
~~  
~-
~
SAT/UNSAT NRC JPM ADMIN SR02 Page 3 of 14  


1 . I Appendix C               Job Performance Measure               Form ES-C-1 WORKSHEET Pe rformance Inf o rmat ion Performance Step: 3
1 I
_  -
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Pe rfo rman ce I n f o r ma t io n Performance Step: 3 Procedure Step: Records current power/mode on Attachment 2.
Procedure Step: Records current power/mode on Attachment 2.
Standard:
Standard:   Records current power/motJe on Attachment 2 as 1%, Startup, or midscale on Range 8 of t h e IRMs, Startup.
Records current power/motJe on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.
Note:       Only Performance Step 3 or performance Step 4 is critical, with STARTUP mode listed.
Note:
Performance Step: 4
Only Performance Step 3 or performance Step 4 is critical, with STARTUP mode listed.
              ~-
Performance Step: 4 Procedure Step: Records prior power/mode on Attachment 2.  
Procedure Step: Records prior power/mode on Attachment 2.
~-
Standard:   Records prior power/mode on Attachment 2 as 1%, Startup, or midscale on Range 8 of the IRMs, Startup.
Standard:
NRC JPM ADMIN SR02                                             Page 4 of 14
Records prior power/mode on Attachment 2 as 1 %, Startup, or midscale on Range 8 of the IRMs, Startup.
NRC JPM ADMIN SR02 Page 4 of 14  


Appendix C                 Job Performarice Measure                 Form ES-C-1 WORKSHEET Pe rforma nce Inf o rmat ion Performance Step: 5
Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET P e rfo r m a n ce I n f o r ma t io n Performance Step: 5 Procedure Step: Records description.
  -    _ _ -
Standard:
Procedure Step: Records description.
Records a short description of the event: receipt of annunciator 24 VDC PP-A LOST, or loss of 24 VDC PP-A, or similar wording. The description may contain the plant impact of Y" scram as well.
Standard:     Records a short description of the event: receipt of annunciator 24 VDC PP-A LOST, or loss of 24 VDC PP-A, or similar wording. The description may contain the plant impact of Y" scram as well.
SAT/UNSAT Performance Step: 6 Procedure Step: Determines if the event requires an EP declaration.  
SAT/UNSAT Performance Step: 6
~
~ .__~  -
_~ -
Procedure Step: Determines if the event requires an EP declaration.
Standard:
Standard:     Determines that the event does not require an EP declaration.
Comment:
Comment:
NRC JPM ADMIN SR02                                                   Page 5 of 14
Determines that the event does not require an EP declaration.
NRC JPM ADMIN SR02 Page 5 of 14  


Appendix C             Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Performance Step: 7 Procedure Step: Determines if the event requires reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Performance Step: 7 Procedure Step: Determines if the event requires reporting to the NRC via ENS or to an outside agency per the Exelon Reportability Reference Manual.
Standard: Determines that the event does not require reporting to the NRC via ENS or to an outside asiency per the Exelon Reportability Reference Manual.
Standard:
Determines that the event does not require reporting to the NRC via ENS or to an outside asiency per the Exelon Reportability Reference Manual.
Comment:
Comment:
Performance Step: 8 Procedure Step: Determine:s if an oil discharge into/upon waters or adjoining shoreline.
Performance Step: 8 Procedure Step: Determine:s if an oil discharge into/upon waters or adjoining shoreline.
Standard: Determines there is no oil discharge intohpon waters or adjoining shoreline.
Standard:
Comment:
Comment:
NRC JPM ADMlN SR02                                               Page 6 of 14
Determines there is no oil discharge intohpon waters or adjoining shoreline.
NRC JPM ADMlN SR02 Page 6 of 14  


I I .
I I
Appendix C               Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 9 Procedure Step: Determines if a leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or upon surface waters, groundwater, or onto the ground.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Pe rfo rman ce Information J
Standard: Determines there is no leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a
Performance Step: 9 Procedure Step: Determines if a leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge into or upon surface waters, groundwater, or onto the ground.
                                                                            . .
Standard:
reportable discharge ii                                           r onto the ground.
Determines there is no leak or discharge of petroleum product or hazardous substance from the warehouse drop tank; or a spill or discharge of hazardous materials in a quantity that constitutes a reportable discharge ii r
onto the ground.
Comment:
Comment:
SAT/UNSAT Performance Step: 1C Procedure Step: Determines if a release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
SAT/UNSAT Performance Step: 1 C Procedure Step: Determines if a release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
Standard: Determines no release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
Standard:
Determines no release of designated hazardous substances in amounts equal to or in excess of EPA reportable quantity.
Comment:
Comment:
NRC JPM ADMIN SR02                                                 Page 7 of 14
NRC JPM ADMIN SR02 Page 7 of 14  
* I .
 
Appendix C               Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information Performance Step: 11
I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 11 Procedure Step: Determines if any of the following occurred:
      -_ -  -      -
Procedure Step: Determines if any of the following occurred:
RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
Standard:     Determines none of the following occurred: RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
Standard:
Performance Step: 12
Determines none of the following occurred: RCRA Program Exception Report submitted, or Environmental Noncompliance endangering health or environment.
        -      -_
Performance Step: 12 Procedure Step: Determines if the event is threatening health or environment or release equal to or in excess of EPA reportable quantity.
Procedure Step: Determines if the event is threatening health or environment or release equal to or in excess of EPA reportable quantity.
Standard:
Standard:     Determines the event is not threatening health or environment or release equal to or in excess of EPA reportable quantity.
Determines the event is not threatening health or environment or release equal to or in excess of EPA reportable quantity.  
                      ~                                                     -    -
~
SAT/U NSAT NRC JPM ADMIN SR02                                                   Page 8 of 14
SAT/U NSAT NRC JPM ADMIN SR02 Page 8 of 14  


2 Appendix C                 Job Performance Measure                   Form ES-C-I WORKSIHEET Performance Information Performance Step: 13
2 Appendix C Job Performance Measure Form ES-C-I WORKSIHEET Performance Information Performance Step: 13 Procedure Step: Determines if any of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.  
    ~_~
~_~
Procedure Step: Determines if any of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Standard:
Standard:   Determines none of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Determines none of the following occurred: loss of 10 or more sirens, or spurious activation signal with 1 or more sirens still sounding.
Comment:
Comment:  
                    -          ~.       ~
~.  
      -      ~
~  
J       Performance Step: 14
~
  -    ~~
J Performance Step: 14  
~~
Procedure Step: Determines if any of the following occurred:
Procedure Step: Determines if any of the following occurred:
react iv ity management event ; haza rdo us materia I incident ; fitness for duty; injury resulting in offsite medical attention; major enforcement action; non-routine communication to/from the NRC; reactor water condition above EPRl Action Level II; any event outside the plant design basis; any event proceeds differently than expected: unexpected Y2 scram, unexpected and significant plant transient, LCO action that will not be met within deadline, initiation of a prompt investigation, or, an unexplained risk change.
react iv i ty ma nag em en t event ; h aza rdo us materia I incident ; fitness for duty; injury resulting in offsite medical attention; major enforcement action; non-routine communication to/from the NRC; reactor water condition above EPRl Action Level II; any event outside the plant design basis; any event proceeds differently than expected: unexpected Y2 scram, unexpected and significant plant transient, LCO action that will not be met within deadline, initiation of a prompt investigation, or, an unexplained risk change.
Standard:   Determines that an unexpected '/2 scram has occurred. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector.
Standard:
Determines that an unexpected '/2 scram has occurred. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector.
Comment:
Comment:
NRC JPM ADMIN S R 0 2                                                  Page 9 of 14
NRC JPM ADMIN SR02 Page 9 of 14  


. *. ,
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Appendix C             Job Performance Measure                   Form ES-C-1 WORKSHEET Performance Information J     Performance Step: 15 Procedure Step: Determines if any of the following occurred: the event forced entry into a 5 72 hour shutdown LCO; the event forced a plant shutdown or unplanned power reduction; the event involved a significant breakdown of plant radiological or environmental controls.
Performance Step: 15 Procedure Step: Determines if any of the following occurred: the event forced entry into a 5 72 hour shutdown LCO; the event forced a plant shutdown or unplanned power reduction; the event involved a significant breakdown of plant radiological or environmental controls.
Standard: Procedure Step: Determines that the event forced entry into a 5 72 hour shutdown LCO (10~~s   of this Bus is a 30 hour shutdown IAW TS 3.7.B. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector.
Standard:
NRC JPM ADMIN SR02                                               Page 10 of 14
Procedure Step: Determines that the event forced entry into a 5 72 hour shutdown LCO (10~~s of this Bus is a 30 hour shutdown IAW TS 3.7.B. Checks YES to perform notifications and notifies the SOS/OD, DSM, and NRC Resident Inspector.
NRC JPM ADMIN SR02 Page 10 of 14  


.. 5 .
5.
Appendix C                     Job Performance Measure               Form ES-C-1 WORKSHEET Performance Information Performance Step: 16 Procedure Step: Determines if any of the TS 6.9.3 Unique Reportability Requirements occurred.
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Performance Step: 16 Standard:
Standard:        Determines that none of the TS 6.9.3 Unique Reportability Requirements occurred.
Procedure Step: Determines if any of the TS 6.9.3 Unique Reportability Requirements occurred.
Determines that none of the TS 6.9.3 Unique Reportability Requirements occurred.
Comment:
Comment:
SAT/UNSAT Terminating Cue: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected YZ scram and entry into a 572-hour shutdown LCO. SOS/OD, DSM and NRC Resident Inspector notifications are required.
SAT/UNSAT Terminating Cue: The Candidate completes the Shift Managers Notification Worksheet IAW OP-AA-106-101, Significant Event Reporting, and determines notification is required due to an unexpected YZ scram and entry into a 572-hour shutdown LCO. SOS/OD, DSM and NRC Resident Inspector notifications are required.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMIN SR02                                                 Page 11 of 14
NRC JPM ADMIN SR02 Page 11 of 14  


I 0. I Appendix C                 Job Performame Measure       Form ES-C-1 WORKSHEET Validation of Completion JPM Number:             NRC
I
                                -   JPM ADMIN !SR02
: 0.
                                            -~
I Appendix C Job Performame Measure Form ES-C-1 WORKSHEET Validation of Completion JPM Number:
Examinee's Name:         -            .  .  - ~ -- -
NRC JPM ADMIN
Examiner's Name:     ~           ~   --
-~
!SR02  
~
Examinee's Name:
Examiner's Name:  
~  
~
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:  
Time to Complete:       ~-        ~-
~-
Question:
Time to Complete:  
          ~~
~-
Question:  
~~  


===Response===
===Response===
          -      ~       - -        -      -  -  ~-      -- -          -- -
~-  
Result:                 SatisfactoryAJnsatisfactory Examiner's Signature and Date:
~
NRC JPM ADMIN SR02                                       Page 12 of 14
Result:
SatisfactoryAJnsatisfactory Examiner's Signature and Date:
NRC JPM ADMIN SR02 Page 12 of 14  


1 .C L Appendix C           Job Performarlce Measure Form ES-C-1 WORKSlHEET Simulator SetuD
1  
.C L
Appendix C Job Performarlce Measure Form ES-C-1 WORKSlHEET Simulator SetuD
: 1. None.
: 1. None.
NRC JPM ADMIN S R 0 2                          Page 13 of 14
NRC JPM ADMIN SR02 Page 13 of 14  


Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
: 1. A plant startup is in progress.
: 1. A plant startup is in progress.
: 2. The REACTOR MODE SELECTOR switch is in STARTUP.
: 2. The REACTOR MODE SELECTOR switch is in STARTUP.
Line 941: Line 1,177:
Task Cue:
Task Cue:
Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator.
Complete Attachment 2, Shift Managers Notification Worksheet, of OP-AA-106-101, Significant Event Reporting, for receipt of the 24 VDC PP-A PWR LOST annunciator.
Determine who the Shift Manager notifies of this event.
Determine who the Shift Manager notifies of this event.
Determining the requirement for a written report and LER will be performed by another Operator.
Determining the requirement for a written report and LER will be performed by another Operator.
NRC JPM ADMIN SR02                                                   Page 14 of 14
v NRC JPM ADMIN SR02 Page 14 of 14  


' 1 Appendix C                           Job Performance Measure                             Form ES-C-1 WORKSHEET Facility:       OysKCCeek                                 rask No.:       -2260201402           ______
Appendix C 1
Task Title:         _ Review
Job Performance Measure Form ES-C-1 WORKSHEET Facility:
                          - __    ~ .Acceptance
OysKCCeek rask No.:  
_ ~ _ -_- _ _-  Criteria for a Completed
- 2260201402 Task
_~                ~ ~- Surveillance_ _ Test
 
___
==Title:==
Job Performance Measure No.:                   NRC JPM ADMIN
_ Review  
                                                          ~  _  ~ - __ ~ _ _S R 0 3
~
_          ~_
~
Acceptance
_- Criteria
_~ for a Completed  
~  
~- Surveillance Test Job Performance Measure No.:
NRC ~
~
JPM ADMIN
__ ~
SR03
~_
WA  
WA  


==Reference:==
==Reference:==
      --Generic       _ _ _ 2 (SRO 3.4)-
Generic 2.2.1 2 (SRO 3.4)
                                - - - _ 2.2.1              _
Exam in e r :
Examinee:       _    __            _  -    _  -      Exam ine r :              .
Examinee:
Facility Evaluator:         ~                   ~   _    Date:
Facility Evaluator:  
                                                              ~  -                _      _ .
~
~
~
Date:
Method of Testing:
Method of Testing:
Simulated Performance               _  ~ _-  _-      Actual Performance             _ _ ~ -
X Simulated Performance  
X
~
                                                                                                      -
Actual Performance
Classroom             X
_ _ ~ - -
_-            Simulator                             Plant       -      - _
Classroom X
Read to the Examinee:
Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
1 . The plant is at rated power.
: 1.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service W at e r System 1 Pu mp 0pe rabiIity and I            Comp rehe ns ive/Preserv ice/Post -
: 2.
: 3.
The plant is at rated power.
Surveillance test, 607.4.004, Containment Spray and Emergency Service W a t e r System 1 P u m p 0 p e ra b i I i t y and IC o m p re h e n s iv e/ P re s e rv ice/ P o s t -
Maintenance Inservice Test, has just been completed.
Maintenance Inservice Test, has just been completed.
: 3. The test was a normally scheduled test.
The test was a normally scheduled test.
Task Standard: The Candidate reviews the surveillance test Acceptance Criteria, recognizes the component discrepancies, and states the required action for each component discrepancy.
Task Standard: The Candidate reviews the surveillance test Acceptance Criteria, recognizes the component discrepancies, and states the required action for each component discrepancy.
Required Materials: None.
Required Materials: None.
Line 979: Line 1,232:
: 1. Procedure 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Cornprehensive/Prestrvice/Post-Maintenance Inservice Test, revision 62.
: 1. Procedure 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Cornprehensive/Prestrvice/Post-Maintenance Inservice Test, revision 62.
: 2. AD-AA-101, Processing of Procedures and T&RMs, revision 18.
: 2. AD-AA-101, Processing of Procedures and T&RMs, revision 18.
NRC JPM ADMIN SR03                                                                       Page 1 of 10
NRC JPM ADMIN SR03 Page 1 of 10  


1 ' ' AppendixC                     Job Performance Measure               Form ES-C-1 WORKSHEET Initiating Cue: Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your' observations on the attached sheets.
1  
' ' AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Initiating Cue: Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your' observations on the attached sheets.
State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions Time Critical Task:     No.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions Time Critical Task: No.
Validation Time:       20 minutes.
Validation Time:
NRC JPM ADMlN SR03                                                   Page 2 of 10
20 minutes.
NRC JPM ADMlN SR03 Page 2 of 10  


'
AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
* AppendixC                   Job Performance Measure                 Form ES-C-1 WORKSHEET Denote critical steps with a check mark 4 Performance Step: 1
~
      ~
Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:       Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate with the section of the completed procedure and the attached sheets.
Standard:
Comment:
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the Candidate with the section of the completed procedure and the attached sheets.
                    ~-     ~
Comment:  
NRC JPM ADMIN SR03                                                   Page 3 of 10
~
~-
NRC JPM ADMIN SR03 Page 3 of 10
 
' Appendix C L
b Job Performarice Measure WORKSHEET Form ES-C-1 Step 7.1.1 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.2.1 SAT/UNSAT ACCEPTANCE CRITERIA Req u ired Act ion if U N S AT/R easo n UNSAT CRITICAL Incorrect use of temporary procedure change for TS surveillance acceptance criteria of ESW flow > 3000 SAT gpm. Declare ESW Pump 52A inoperable and apply TS due to low flow.
SAT NRC JPM ADMIN SR03 Page 4 of 10  


L b
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step SAT/UNSAT 7.2.2 SAT Required Action if UNSAT/Reason 7.2.3 UNSAT CRITICAL Containment Spray Pump 51 B vibration 4A is above the action range. Declare Containment Spray Pump 51 B inoperable and apply TS.  
    " ' Appendix C          Job Performarice Measure                 Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step   SAT/UNSAT           Req uired Act ion if UNSAT/R easo n 7.1.1 7.1.2 7.1.3 7.1.4    UNSAT   Incorrect use of temporary procedure change for TS CRITICAL surveillance acceptance criteria of ESW flow > 3000 gpm. Declare ESW Pump 52A inoperable and apply TS due to low flow.
~
7.1.5    SAT 7.1.6 7.2.1    SAT NRC JPM ADMIN SR03                                             Page 4 of 10
~~~~~~
~
~~~
7.2.4 UNSAT Valve V-21-17 strokes outside the accept range but CRITICAL less than the limiting value. Retest immediately or declare inoperable and apply TS.  
~~
7.3 7.4 SAT SAT None
~~
NRC JPM ADMIN SR03 Page 5 of 10  


* .
AppendixC Job Performarce Measure Form ES-C-1 WORKS 1-1 E ET Validation of Completion JPM Number:
AppendixC            Job Performance Measure                      Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step  SAT/UNSAT            Required Action if UNSAT/Reason 7.2.2    SAT 7.2.3    UNSAT    Containment Spray Pump 51 B vibration 4A is above CRITICAL  the action range. Declare Containment Spray Pump 51 B inoperable and apply TS.
NRC JPM ADMIN SR03 Examinees Name:
                      ~        -  _- ~~~                    ~  ~~~~~~    -    - -
Exam in e r s N am e :
7.2.4    UNSAT    Valve V-21-17 strokes outside the accept range but CRITICAL  less than the limiting value. Retest immediately or declare inoperable and apply TS.
Date Performed:  
                                                                            ~~
~_  
7.3      SAT 7.4      SAT      None
~-
                            ~~
Facility Evaluator:  
NRC JPM ADMIN SR03                                                Page 5 of 10
~_  
* AppendixC                   Job Performarce Measure   Form ES-C-1 WORKS 1-1EET Validation of Completion JPM Number:           NRC JPM ADMIN S R 0 3    _
~
Examinees Name:
Numberof Attempts:  
Examine rs Nam e :     -  _      -          _
~  
Date Performed:       ~_   ___    _    ~-  _      -
~.
Facility Evaluator:   _.~_     __    _    ~
Numberof Attempts: ~   _  -_      -    __    ~. _ _
Time to Complete:
Time to Complete:
Question:
Question:
Response :
Result:
Satisfactory/Unsatisfactory Examiners Signature and Date:
NRC JPM ADMIN SR03 Page 6 of 10


===Response===
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Simulator: Setup
Result:                Satisfactory/Unsatisfactory Examiners Signature and Date:
NRC JPM ADMIN S R 0 3                                  Page 6 of 10
 
'
* AppendixC                 Job Performance Measure                 Form ES-C-1 WORKSHEET Simulator: Setup
: 1. None.
: 1. None.
: 2. Provide pages 43 through E4-4 ONLY of 607.4.004.
: 2. Provide pages 43 through E4-4 ONLY of 607.4.004.
: 3. Make the following steps unsat on the test:
: 3. Make the following steps unsat on the test:
: a. Step 7.1.4: Lineout 3100 and insert 3000. Initial and date.
: a. Step 7.1.4: Lineout 31 00 and insert 3000. Initial and date.
: b. On the IST Pump Summary Sheet table, insert ESW 52A flow at 3050 gpm. Have all other flows acceptable.
: b. On the IST Pump Summary Sheet table, insert ESW 52A flow at 3050 gpm. Have all other flows acceptable.
: c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec) d . In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACiCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds )
: c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec)
: d. In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACiCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds )
: e. In the IST Valve Summary Sheet, lineout 3100 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.
: e. In the IST Valve Summary Sheet, lineout 3100 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.
NRC JPM ADMIN S R 0 3                                              Page 7 of 10
NRC JPM ADMIN SR03 Page 7 of 10  


. 1, Appendix C                     Job Performance Measure               Form ES-C-1 WORKS'HEET STUDENT HANDOUT Initial Conditions:
. 1, Appendix C Job Performance Measure Form ES-C-1 WORKS'HEET STUDENT HANDOUT Initial Conditions:
: 1. The plant is at rated power.
: 1. The plant is at rated power.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Comprehensive/Preservice/Post-Maintenance Inservice Test, has ju!;t been completed.
: 2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Comprehensive/Preservice/Post-Maintenance Inservice Test, has ju!;t been completed.
Line 1,039: Line 1,303:
Task Cue:
Task Cue:
Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN S R 0 3                                                Page 8 of 10
State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN SR03 Page 8 of 10  


. ' AppendixC             Job Performance Measure             Form ES-C-1 WORKSHEET STUDENT. HANDOUT ACCEPTANCE CR ITER IA Step   SATIUNSAT           Requived Action if UNSAT/Reason NRC JPM ADMIN S R 0 3                                    Page 9 of 10
AppendixC Job Performance Measure WORKSHEET Form ES-C-1 STUDENT. HANDOUT ACCEPTANCE CR ITER I A Step SATIUNSAT Requived Action if UNSAT/Reason NRC JPM ADMIN SR03 Page 9 of 10  


. 2, c Appendix C            Job Performance Measure             Form ES-C-1 WORKSHEET STUDENT HANDOUT ACC EPTANC: E CR ITER I A Step   SAT/UNSAT         Required Act ion if UNSAT/Reason 7.2.3 73        SAT   None
Appendix C
                -                                                      -
. 2, c
7.4         SAT   None
Job Performance Measure WORKSHEET Form ES-C-1 STUDENT HANDOUT ACC E PTANC: E CR ITER I A Step SAT/UNSAT Required Act ion if U NSAT/Reason 7.2.3 7 3 SAT None None 7.4 SAT  
                -    - -  - ~-    -                            -
- ~-
NRC JPM ADMlN SR03                                       Page 10 of 10
NRC JPM ADMlN SR03 Page 10 of 10  


c Appendix C                           Job Performarice Measure             Form ES-C-1 WORKS HE ET Facility:     Oyster Creek
c Appendix C Job Performarice Measure Form ES-C-1 WORKS H E ET Facility:
_.                                    Task No.:
Oyster Creek Task No.:
Task Title:         Initiate
Task
__  ~   -   Dose Control Extension Forms
 
                                                ~~~ ~       ~~         .          -~ . -
==Title:==
Job Performance Measure No.:                 NRC JPM ADMIN SR04 (SRO)
Initiate  
~ -
Dose Control  
~~~
Extension
~  
~~
Forms
-~. -
Job Performance Measure No.:
NRC JPM ADMIN SR04 (SRO)
K/A  
K/A  


==Reference:==
==Reference:==
Generic
Generic 2.3.1 (SRO 3.0)
_ _ _ 2.3.1 (SRO 3.0)
Exam in e r:  
Examinee:                   ~     ~   ~~~~ ~-~   Examine r:
~  
Facility Evaluator:                                 Date:             .    ~       .
~  
~~~~  
~-~
Examinee:
Facility Evaluator:
Date:  
~
Method of Testing:
Method of Testing:
Simulated Performance               -~           ~- .Actual Performance ~     _ _X Classroom           - X
X Simulated Performance  
__      ~
-~  
Simulator      ~_  ~
~-.Actual Performance  
Plant Read to the Examinee:
~
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues When you complete the task successfully, the objective for this job performance measure will be satisfied.
~
          ~-                     ~~                                       -      ~-
Plant Classroom  
NRC JPM ADMIN SR04                                                         Page 1 of 10
- __ X Simulator
~_
~
Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues When you complete the task successfully, the objective for this job performance measure will be satisfied.  
~-  
~-
~~
NRC JPM ADMIN SR04 Page 1 of 10  


I Appendix C                       Job Performance Measure                       Form ES-C-1 W 0RKSHEET Initial Conditions:
I Appendix C  
- - 1 I --Name-
-1 &
Current year 1 TED E mrem 1
11 1-1 1-1 11 1 1950 1 Fully qualified EO I
350 1750
~ Fully qualified EO 1 Fully qualified EO; Declared pregnant on 1/1/08 Bill Block Dave Draper 333-33-3333
~
I
~
Job Performance Measure Form ES-C-1 W 0 R KS H E ET Initial Conditions:
: 1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
: 1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
: 2. No Reactor Recirculation Pumps are running.
: 2. No Reactor Recirculation Pumps are running.
: 3. The following job is scheduled for next shift:
: 3. The following job is scheduled for next shift:
: b. Manually cycle the valve once (0 -    t  C, C  -
: a. Grease the suction valve lirriitorque in Recirculation Loops B and C.
: a. Grease the suction valve lirriitorque in Recirculation Loops B and C.
: 0) after lubrication.
: b. Manually cycle the valve once (0 - t C, C - 0) after lubrication.
: c. Perform RBCCW valve lineups on Reactor Recirculation Pumps and Motors B and C.
: c. Perform RBCCW valve lineups on Reactor Recirculation Pumps and Motors B and C.
: d. The job will be performed by 2 Equipment Operators; each performing the work on 1 Reactor Recirculation Pumps/Motors.
: d. The job will be performed by 2 Equipment Operators; each performing the work on 1 Reactor Recirculation Pumps/Motors.
: e. The dose rate in the work area is 325 mrem/hr.
: e. The dose rate in the work area is 325 mrem/hr.
: f. Greasing each valve will take 10 minutes.
: f.
: g. Manually cycling the valve (0 -+ C, C     -+   0) will take 10 minutes.
Greasing each valve will take 10 minutes.
: g. Manually cycling the valve (0 -+
C, C -+ 0) will take 10 minutes.
: h. The RBCCW valve lineup for each pump/motor will take 10 minutes.
: h. The RBCCW valve lineup for each pump/motor will take 10 minutes.
: i. Independent verifications on the valve lineup will be performed later.
: i. Independent verifications on the valve lineup will be performed later.
: 4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work.
: 4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work.
I  --Name-            -1      &
EO candidate in the OJT 1 Phase NRC JPM ADMIN SR04 Page 2 of 10  
                                      - -          -  -
Current year
                                            -
TED E-1
                                                                        -
                                                                                              -  - 1
                                                                                                -:
mrem Bill Block
                            -  - -
11 1-11-1111
                                        -
1950 11 Fully- qualified EO
                                                                              -
  .  -  -
                                                        -  1-          -      -  -        - - _
350        1 Fully qualified EO; Declared
                                                                                        - -  -
pregnant on 1/1/08 I
Dave Draper
            ~    -
I 333-33-3333  ~
1750
                                                    -- - -
                                                            ~  Fully qualified EO
                                                                              -
                                                                                  -      -
EO candidate in the OJT Phase NRC JPM ADMIN S R 0 4                                                          Page 2 of 10


I * . I Appendix C                     Job Performance Measure                   Form ES-C-1 WORKSHEET
I I
        - -~         __      _________~___           ~       _        _    ___________
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET  
                                                                              .      ~
- -~
_________~___ ~
~
Task Standard: Dave Draper and Greg Galler are selected to perform the job. A Dose Control Level Extension Form is initiated for each individual.
Task Standard: Dave Draper and Greg Galler are selected to perform the job. A Dose Control Level Extension Form is initiated for each individual.
Required Materials: Calculator.
Required Materials: Calculator.
Line 1,128: Line 1,402:
Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the job, if required.
Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the job, if required.
The selected individual(s) will sign the form if the form is required, after initiation.
The selected individual(s) will sign the form if the form is required, after initiation.
Time Critical Task:     No.
Time Critical Task: No.
Validation Time:       22 minutes NRC JPM ADMIN SR04                                                         Page 3 of 10
Validation Time:
22 minutes NRC JPM ADMIN SR04 Page 3 of 10  


. <
Appendix C Job Performance Measure Form ES-C-1 WORKSIHEET Performance Information Denote critical steps with a check mark J' Standard:
Appendix C                   Job Performance Measure                 Form ES-C-1 WORKSIHEET Performance Information Denote critical steps with a check mark J' Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
Comment:
Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:
Standard:      Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.
Comment:
S AT/U N SAT Note: The step below is not proceduralized but is necessary to determine the dose to be received while performing the job.
SAT/U NSAT Note: The step below is not proceduralized but is necessary to determine the dose to be received while performing the job.
J Performance Step: 2  
J         Performance Step: 2
~
                ~
Procedure Step: Determines dose received to each worker.
Procedure Step: Determines dose received to each worker.
Standard:       Determines dose received to each worker:
Standard:
Determines dose received to each worker:
10 minutes to grease the suction valve Iimitorque 10 minutes to cycle the suction valve 10 minutes to perform valve lineup o Total time per pump: 30 minutes o Total exposure for each worker: 0.5 hr x 325 mrem/hr =
10 minutes to grease the suction valve Iimitorque 10 minutes to cycle the suction valve 10 minutes to perform valve lineup o Total time per pump: 30 minutes o Total exposure for each worker: 0.5 hr x 325 mrem/hr =
162.5 mrem Comment:
162.5 mrem Comment:
SAT/UNSAT NRC JPM ADMIN SR04                                                   Page 4 of 10
SAT/UNSAT NRC JPM ADMIN SR04 Page 4 of 10  


* .
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J
Appendix C               Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information J       Performance Step: 3
Performance Step: 3 Procedure Step: Determines who is eligible to perform the job.
              -
Standard:
Procedure Step: Determines who is eligible to perform the job.
Determines who is eligible to perform the job.
Standard:   Determines who is eligible to perform the job.
Determines that Carol Casper cannot perform the job since the dose received is greater than allowed for a declared pregnant worker (500 mR)
Determines that Carol Casper cannot perform the job since the dose received is greater than allowed for a declared pregnant worker (500 mR)
Determines that Frank Fick cannot perform the job since he is not qualified.
Determines that Frank Fick cannot perform the job since he is not qualified.
Determines that of the 3 workers left, that Dave Draper and Greg Galler have the lowest current yearly accumulated dose and should be selected.
Determines that of the 3 workers left, that Dave Draper and Greg Galler have the lowest current yearly accumulated dose and should be selected.
Comment:
Comment:
J       Performance Step: 4
J Performance Step: 4  
          - -~
- -~
Procedure Step: Determines total dose to the workers Standard:         Dave Draper: 1750 162.5 = 1912.5 mrem o   Because his total does is less than the administrative limit of 2000 mrem, no dose extension is required Greg Galler: 1875 + 162.5 = 2037.5 mrem o   Because his total does is greater than the administrative limit of 2000 mrem, a Dose Control Level Extension Form is required Comment:
Procedure Step: Determines total dose to the workers Standard:
SATIUNSAT NRC JPM ADMlN SR04                                                 Page 5 of 10
Dave Draper: 1750 162.5 = 1912.5 mrem o Because his total does is less than the administrative limit of 2000 mrem, no dose extension is required Greg Galler: 1875 + 162.5 = 2037.5 mrem o Because his total does is greater than the administrative limit of 2000 mrem, a Dose Control Level Extension Form is required Comment:
SATIUNSAT NRC JPM ADMlN SR04 Page 5 of 10  


p i .
p i
Appendix C                 Job Performance Measure                     Form ES-C-1 W ORKSHEET Performance Information J       Performance Step: 4 Procedure Step: Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler.
Appendix C Job Performance Measure Form ES-C-1 W ORKSHEET Performance Information J
Standard:   Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler:
Performance Step: 4 Procedure Step: Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler.
Name: Greg Galler (critical step)
Standard:
Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler:
0 Comment:
SAT/U NSAT Name: Greg Galler (critical step)
SSN: 555-55-5555 (critical step)
SSN: 555-55-5555 (critical step)
Answers NO to the question: Are other qualified individuals with a lower current year routine TEDE available to perform this work? (not critical step)
Answers NO to the question: Are other qualified individuals with a lower current year routine TEDE available to perform this work? (not critical step)
States why an exten.sion above 2000 mrem routine TEDE for the year is neces:;ary for this individual: To perform limitorque greasing, valve cycling, and valve lineups (or similar). (not critical)
States why an exten.sion above 2000 mrem routine TEDE for the year is neces:;ary for this individual: To perform limitorque greasing, valve cycling, and valve lineups (or similar). (not critical)
Requests a dose extension to 2500 mrem (1875 + 162.5 =
Requests a dose extension to 2500 mrem (1 875 + 162.5 =
2037.5 mrem.) (critical step) Signs the form as the Requestor and dates not critical)
2037.5 mrem.) (critical step)
Comment:
Signs the form as the Requestor and dates not critical)
__
Terminating Cue: Dave Draper and Greg Galler are selected to perform the job.
                        -
SAT/U NSAT Terminating Cue: Dave Draper and Greg Galler are selected to perform the job.
A Dose Control Level Extension Form is initiated for Greg Galler.
A Dose Control Level Extension Form is initiated for Greg Galler.
JPM Stop Time:
JPM Stop Time:
NRC JPM ADMlN S R 0 4                                                  Page 6 o f 10
NRC JPM ADMlN SR04 Page 6of 10  


. a ? . Appendix C                   Job Performance Measure   Form ES-C-1 WORKSHEET Validation of Completion JPM Number:          - NRC
. a ?.
__    JPM ADMlN SR04
Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMlN  
                                            ~~       ~~~
~~  
Examinees Name:       ~ ~   ~-~~     ~.
~~~ SR04 JPM Number:
Examinees Name:  
~  
~  
~-~~ ~.
Examiners Name:
Examiners Name:
Date Performed:               ~~-      -
Date Performed:  
Number of Attempts: -                --
~~-
Time to Complete:                         _~
Number of Attempts: -
Question:
Time to Complete:
_~
Question:  


===Response===
===Response===
Result:               SatisfactoryAJnsatisfactory Examiners Signature and Date:           ~     ~ ~-~
Result:
NRC JPM ADMIN SR04                                     Page 7 of 10
SatisfactoryAJnsatisfactory Examiners Signature and Date:  
~  
~ ~-~
NRC JPM ADMIN SR04 Page 7 of 10  


e t . Appendix C           Job Performarice Measure Form ES-C-1 WORKSHEET
e t.
Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET
: 1. None.
: 1. None.
NRC JPM ADMIN S R 0 4                          Page 8 of 10
NRC JPM ADMIN SR04 Page 8 of 10  


*,
Appendix C l l 1-1 1-1 1 l l Bill Block Carol Casper 1 222-22-2222 1950 300
* Appendix C                         Job Performance Measure                             Form ES-C-1 WORKSHEET STUDENT tiANDOUT Initial Conditions:
_ _ - _ - ~
~~
Job Performance Measure Form ES-C-1 WORKSHEET Dave Draper 1 333-33-3333 444 4444 STUDENT tiANDOUT 1750 1575 Initial Conditions:
: 1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
: 1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
: 2. No Reactor Recirculation Pumps are running.
: 2. No Reactor Recirculation Pumps are running.
Line 1,205: Line 1,494:
: e. The dose rate in the work area is 325 mrem/hr.
: e. The dose rate in the work area is 325 mrem/hr.
: f. Greasing each valve will take 10 minutes.
: f. Greasing each valve will take 10 minutes.
: g. Manually cycling the valve (0- + C , C                 0) will take 10 minutes.
: g. Manually cycling the valve (0  
- + C, C
: h. The RBCCW valve lineup for each pump/motor will take 10 rnin Utes.
: h. The RBCCW valve lineup for each pump/motor will take 10 rnin Utes.
: i. Independent verifications on [he valve lineup will be performed later.
: i.
: 4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work 1                     1 I -      Name I
Independent verifications on [he valve lineup will be performed later.
SSN j
: 0) will take 10 minutes.
Current year TEDEns EO Status                 I Bill Block              l l 1-1 1-11 l l            1950          Fully qualified EO
: 4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work Name 1
    .              _ _        __  -  _- ~  _ ~~  _  -      ---  - -  -            - ____-    -  ~
SSN 1
4 Carol Casper          1 222-22-2222                  300          Fully qualified EO; Declared         -1
Current year I
              - -
I j
Dave Draper
T E D E n s EO Status I
            -       - _
Fully qualified EO Fully qualified EO; Declared  
1 333-33-3333 444 4444
-1 1
                                                  . -    -
Fully qualified EO EO candidate in the OJT Phase Fully qualified EO
1750 1575
~
_
4 pregnant on 1/1/08 I
pregnant on 1/1/08
1
                                                                        - _            ~
~
Fully qualified EO
~
                                                                                        -
I NRC JPM ADMlN SR04 Page 9 of 10  
                                                                                              ~
                                                                                              -_
EO candidate in the OJT 1
                                                                                                              <
I 1
I Phase
                                                                    -
Fully qualified EO
                                                                            -              -    -          _
NRC JPM ADMlN SR04                                                                       Page 9 of 10


c-. . Appendix C                   Job Performance Measure                   Form ES-C-1 WORKSHEET Task Cue:
c-..
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Cue:
Select the 2 Equipment Operators to perform the job.
Select the 2 Equipment Operators to perform the job.
Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the jots, if required.
Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the jots, if required.
The selected individual(s) will sign the form if the form is required after initiation.
The selected individual(s) will sign the form if the form is required after initiation.
NRC JPM ADMIN SR04                                                     Page 10 of 10
NRC JPM ADMIN SR04 Page 10 of 10  


c AppendixC                       Job Performanlce Measure                 Form ES-C-1 WORKSHEET Facility:     - Oyster Creek                   Task NO.:     2OOO5O2401-   -. __ - __
c AppendixC Job Performanlce Measure Form ES-C-1 WORKSHEET Facility:
Determine Emergency Classification and Protective Action Task Title:           - Recommendations
Oyster Creek Task NO.:
_. -                            - -  _ _ ~ - -
2OOO5O2401- -. __ - __
Job Performance Measure No.:             NRC JPM ADMIN S R 0 5 (SRO)
Determine Emergency Classification and Protective Action Task
 
==Title:==
- Recommendations
_ _ ~ - -
Job Performance Measure No.:
NRC JPM ADMIN SR05 (SRO)
WA  
WA  


==Reference:==
==Reference:==
      ~~ Generic 2.4.29 (SRO 4.0)
~~ Generic 2.4.29 (SRO 4.0)
Examinee:                                       E! xam ine r:       -
Examinee:
E! xam in e r :
Method of Testing:
Method of Testing:
Simulated Performance                           Actual Performance             X Classroom                       Simulator                   Plant Read to the Examinee:
Simulated Performance Actual Performance X
Classroom Simulator Plant Read to the Examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1o/o CHRRMS #l indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMIN S R 0 5                                                      Page 1 of 9
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #l indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMIN SR05 Page 1 of 9  


1 ' AppendixC                     Job Performance Measure             Form ES-C-1 WORKSHEET Task Standard: The emergency has been classified and the PARS have been determined.
1 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: The emergency has been classified and the PARS have been determined.
Required Materials: None.
Required Materials: None.
General  
General  
Line 1,264: Line 1,553:
: 1. EP-AA-1010, Radiological Emergericy Plan Annez for Oyster Creek Station, revision 0.
: 1. EP-AA-1010, Radiological Emergericy Plan Annez for Oyster Creek Station, revision 0.
: 2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
: 2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
: 3. EP-AA-111-F-10, Oyster Creek Plant Based PAR Flowchart, revision A.
: 3. EP-AA-111 -F-10, Oyster Creek Plant Based PAR Flowchart, revision A.
Initiating Cue: Classify the emergency event IAW EP-AA-1010 (include the EAL designation). State the reason for this classification.
Initiating Cue: Classify the emergency event IAW EP-AA-1010 (include the EAL designation). State the reason for this classification.
Time Critical Task: Yes.
Time Critical Task: Yes.
Validation Time:       12 minutes Part 1 10 minutes Part 2 NRC JPM ADMlN SR05                                                 Page 2 of 9
Validation Time:
12 minutes Part 1 10 minutes Part 2 NRC JPM ADMlN SR05 Page 2 of 9  


AppendixC                     Job Performance Measure                 Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1
AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.  
          - ~-
- ~-
Procedure Step: Provides repeat back of initiating cue.
JPM Start Time:
JPM Start Time:             -
Standard:
Standard:       Provides repeat back of iniiiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.
Comment:
Comment:
                      ~
Provides repeat back of iniiiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.
J     Performance Step: 2
~
  ~- ~~~~
J Performance Step: 2  
~-  
~~~~
Procedure Step: Classifies ihe emergency as a General Emergency (FG1).
Procedure Step: Classifies ihe emergency as a General Emergency (FG1).
Standard:       Classifies the emergency as a General Emergency (FGI). This classification is made within 15 minutes from the JPM Start Time.
Standard:
Reasons: Loss of Fuel Clad barrier (RPV water level c -20); Loss of Reactor Coolant barrier (RPV water level 0); and Potential Loss of Primary Containment barrier (CHRRMS 1210 R/hr less than 2 hours after shutdown).
Classifies the emergency as a General Emergency (FGI). This classification is made within 15 minutes from the JPM Start Time.
Note:           Record time that the first page of the STUDENT HANOUT is received from each Candidate.
Reasons: Loss of Fuel Clad barrier (RPV water level c -20); Loss of Reactor Coolant barrier (RPV water level Loss of Primary Containment barrier (CHRRMS than 2 hours after shutdown).
Comment:
0); and Potential 121 0 R/hr less Note:
                                  -    ~                     ~
Record time that the first page of the STUDENT HANOUT is received from each Candidate.
SAT/U NSAT NRC JPM ADMIN SR05                                                     Page 3 of 9
Comment:  
~  
~
SAT/U NSAT NRC JPM ADMIN SR05 Page 3 of 9  


, . L Job Performarwce Measure               Form ES-C-1 h
L Appendix C h
Appendix C WORKSHEET Performance Information
Job Performarwce Measure Form ES-C-1 WORKSHEET Performance Information  
          ~
~
J     Performance Step: 3         JPM Start Time: __
J Performance Step: 3 JPM Start Time: __
Note:     Once the first page of the STUDENT HANDOUT is collected from all Candidates, provide the second page, read the Additional Conditions, the Cue. and record new start time for this section.
Note:
Cue:
Once the first page of the STUDENT HANDOUT is collected from all Candidates, provide the second page, read the Additional Conditions, the Cue. and record new start time for this section.
Determine the Protective Action Recommendations (PARs) IAW EP-AA-111 and EP-AA-11I -F-10. Provides repeat back of initiating cue. Evaluator acmowledges the repeat back Procedure Step: Determines the Protective Action Recommendations (PARS),
Determine the Protective Action Recommendations (PARs) IAW EP-AA-111 and EP-AA-11 I -F-10. Provides repeat back of initiating cue. Evaluator acmowledges the repeat back Cue:
Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwind include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages Standard: Determines the Protective Action Recommendations (PARs):
Procedure Step: Determines the Protective Action Recommendations (PARS),
Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwind include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages Standard:
Determines the Protective Action Recommendations (PARs):
Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwincr include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages The PARs are determined within 15 minutes from the General Emergency classification.
Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwincr include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages The PARs are determined within 15 minutes from the General Emergency classification.
Note:     Record time that the second page of the STUDENT HANOUT is received from each Candidate.
Note:
Comment:
Comment:
                            ~       ~-                                         ~-
Record time that the second page of the STUDENT HANOUT is received from each Candidate.
                  ~ __
~  
SATUNSAT NRC JPM ADMIN SR05                                                 Page 4 of 9
~-  
~-  
~ __
SATUNSAT NRC JPM ADMIN SR05 Page 4 of 9  


Appendix C               Job Performarice Measure           Form ES-C-1 WORKSHEET Performance Information Terminating Cue: The emergency has been classified and the PARS have been determined. Record stop time on each Candidates second page.
Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET Performance Information Terminating Cue: The emergency has been classified and the PARS have been determined. Record stop time on each Candidates second page.
NRC JPM ADMIN SR05                                             Page 5 of 9
NRC JPM ADMIN SR05 Page 5 of 9  


, - - Appendix C                   Job Performance Measure             Form ES-C-1 WORKSHEET
Appendix C Job Performance Measure WORKSHEET Form ES-C-1  
                      ~~
~~
Va I idat ion of CompIet ion JPM Number:            - NRC
Va I id at ion of Co m p I e t io n NRC JPM ADMIN SR05
__ JPM ADMIN     - - ~S- _R-0_5 Examinees Name:         -_-      _.._    -- -          -
- - ~
Examiners Name:                             _ _
JPM Number:
Date Performed:                   -          -      -        _
Examinees Name:
Facility Evaluator:   -  -    -__        _~        -
Examiners Name:
Number of Attempts:                                   --    _  -
Date Performed:
Time to Complete:                 - -                      -
Facility Evaluator:
Number of Attempts:
Time to Complete:
_~
Question:
Question:
                -      _ -        _
Result:
Result:                 Sat isfactory/U nsatisfactory Examiners Signature and Date:
Sat isfactory/U nsatisfactory Examiners Signature and Date:
NRC JPM ADMIN SR05                                                   Page 6 of 9
NRC JPM ADMIN SR05 Page 6 of 9  


Job Performarice Measure Form ES-C-1 G I -
Appendix C G
Appendix C WORKSHEET Simulator Setup
I Job Performarice Measure Form ES-C-1 WORKSHEET Simulator Setup
: 1. None.
: 1. None.
NRC JPM ADMIN SR05                           Page 7 of 9
NRC JPM ADMIN SR05 Page 7 of 9  


, 9.
, 9.
* Appendix C                     Job Performance Measure               Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem Task Cue:
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem Task Cue:
Classify the emergency event IAW EP-AA-1010 (include the EAL designation) and state the reason for this classification.
Classify the emergency event IAW EP-AA-1010 (include the EAL designation) and state the reason for this classification.
Emergency Classification:
Emergency Classification:
Emergency Action Level designation:
Emergency Action Level designation:
Reason:                                                                       -
Reason:
Name:                                                   Time: ..______I___
Name:
Time:..______I___
(NRC Only)
(NRC Only)
When complete, hand in this paqe.
When complete, hand in this paqe.
NRC JPM ADMIN SR05                                                     Page 8 of 9
NRC JPM ADMIN SR05 Page 8 of 9  


. 0. -
d
Appendix C d
: 0.
Job Performance Measure               Form ES-C-1 WORKS 1-1E ET STUDENT hANDOUT Initial Conditions:
Appendix C Job Performance Measure Form ES-C-1 WORKS 1-1 E ET STUDENT hANDOUT Initial Conditions:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60' with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1O h CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115 mRem Additional Initial Conditions:
All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60' with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 O h CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 11 5 mRem Additional Initial Conditions:
Environmental conditions show that the wind is from 50"at 20 mph There are no travel impediments Task Cue:
Environmental conditions show that the wind is from 50" at 20 mph There are no travel impediments Task Cue:
e Actibn Recommendations (PARS)
e Actibn Recommendations (PARS)
Protective Action Recommendations:
Protective Action Recommendations:
Name:                              __-.______          Time: ~
Time: ~
Name:
(NRC Only)
(NRC Only)
NRC JPM ADMIN SR05                                                     Page 9 of 9}}
NRC JPM ADMIN SR05 Page 9 of 9}}

Latest revision as of 16:48, 14 January 2025

Draft - Section a Operating Exam (Folder 2)
ML081330652
Person / Time
Site: Oyster Creek
Issue date: 02/29/2008
From: Ludlam G
AmerGen Energy Co
To: Caruso J
Operations Branch I
Hansell S
Shared Package
ML072851077 List:
References
50-219/08-301, U01688
Download: ML081330652 (97)


Text

,>

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:

-Oyster Creek Task No.:

2000301 403 __

Task

Title:

Complete th-e TechnicarI;pecif!c_ation_s Log Sheet __

Job Performance Measure No.:

NRC JPM ADMlN-R01 (RO)

WA

Reference:

Generic 2.1.18 (RO 2.9)

Examinee:

Examiner:

Facility Evaluator:

I Date:

Method of Testing:

X I

Simulated Performance Actual Performance Simulator x

Plant Classroom Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1. The plant is rated power.
2. You are the on-shift Reactor Operator on the 4-12 shift.
3. The current datehime is April 20, 2008 at 1700.

Task Standard: Page El-1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.

Required Materials: A completed page El -1 (for the 11 -7 and 7-3 shifts) of Procedure 681.4.004, Technical Specification Log Sheet.

General

References:

1. Procedure 681.4.004, Technical Specifications Log Sheet, revision 12.

initiating Cue: Complete page E l -1 only of the Technical Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.

NRC JPM ADMIN R 0 1 Page 1 of 11

1 Appendix C x I*-

Job Performance Measure Form ES-C-1 WORKSHEET Time Critical Task: No.

Validation Time:

10 Minutes.

NRC JPM ADMlN R 0 1 Page 2 of 11

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Denote critical steps with a check mark J Note 1 : The values may be recorded in any order.

Note 2: The discrepancies noted while completing the log may be reported at the time of discovery or some other time during the JPM.

Note 3: Hand the Candidate the partially clompleted procedure.

-~

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

Provides repeat back of initiating cue. Evaluafor acknowledges the repeat back.

-~

Standard:

JPM Start Time:

Comment:

Performance Step: 2 Procedure Step: Records position of AOG valve V-7-31.

Records position of valve AOG V-7-31 as closed on Panel 1 OXF Standard:

Comment:

NRC JPM ADMIN R 0 1 Page 3 of 11

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 3 Procedure Step: Records Torus water level from the following instruments:

LT-37 LT-38 Narrow Range on Panel 9XR Records Torus water level from the following instruments as on the KEY:

0 Standard:

LT-37 (Indicator on Panel 1 F/2F)

LT-38 (Indicator on Panel 1 F/2F)

Narrow Range Recorder on Panel 9XR Performance Step: 4 Procedure Step: Records Torus water temperature from the following indicators:

DIV I DIV II Standard:

Records Torus water temperature from the following indicators as on the KEY: (Indicator on Panel 1 F/2F)

DIV I DIV I I Comment:

SAT/U NSAT NRC JPM ADMIN R 0 1 Page 4 of 11

..~..

"I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 5 Procedure Step: Records Isolation Condenser area temperatures from the following instruments:

1B06A 0

IB06B IB06C IB06D Standard:

Records Isolation Condenser area temperatures from the following instruments as or] the KEY: (Panel 10R)

IB06A 0

IB06B IBO6C IB06D

-~

SATlUNSAT Performance Step: 6 Procedure Step: Records Isolation Condenser levels from the following instruments:

IG06A 0

IG06B Standard:

Records Isolation Condenser levels from the following instruments as on the KEY: (Indicator on Panel 1F/2F)

IG06A IG06B Comment:

SAT/U NSAT NRC JPM ADMlN R 0 1 Page 5 of 11

L Appendix C Job Performance Measure Form ES-C-1 WORKSFEET J

Performance Step: 7

- ~

Procedure Step: Record Nitrogen Makeup and calculate nitrogen use for the shift and for the day.

Standard:

Records Nitrogen Makeup and calculates nitrogen use for the shift, as on the KEY.

Calculates and records nitrogen use for the day by subtracting the previous day 3-1 1 integrator reading from the current 3-1 1 integrator reading, as on the KEY.

Recognizes/reports that the daily nitrogen use is > 250 units.

Comment:

Performance Step: 8 Procedure Step: Record RB 119 radiation levels from:

0 Radiation monitor 8-9 Radiation monitor C-9 0

Radiation monitor 6-9 Standard:

Records RB 119 radiation levels from:

Radiation monitor C-9 as on the key.

~ -

~~

~

Comment:

SAT/UNSAT NRC JPM ADMlN R01 Page 6 of 11

i Appendix C Job Performance Measure WORKS t-I EET Form ES-C-1 Performance Step: 9 Procedure Step: Record RE!, Vent Radiation Monitor levels:

~~

Radiation monitor Channel 1 Radiation monitor Channel 2 Standard:

Procedure Step: Records HB Vent Radiation Monitor levels:

Radiation monitor Channel 2, as on the KEY.

Radiation monitor Channel 1 0

Com ment:

Performance Step: 10 Procedure Step: Record the Shutdown Cooling Room lowest temperature.

~~

~

Standard:

Records the Shutdown CcjoJing Room lowest temperature, as on the KEY. (Panel 10R)

NRC JPM ADMIN R01 Page 7 of 11

I Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Step: 11 Procedure Step: Calculate Fuel Pool Slab AT Calculates Fuel Pool Slab AT by subtracting the Shutdown Cooling Room temperature from the Fuel Pool temperature, as on the key.

Standard:

Comment:

__ - ~-

J Performance Step: 12 Procedure Step: Record the previous day lowest Torus water level, todays highest Torus water level, and the differential.

Records the previous day lowest Torus water level, todays highest Torus water level, and the differential, as on the KEY.

Reports the differential level is greater than allowed (actual is >

250 Units allowed).

Standard:

Cue:

Comment.

The previous days lowest Torus water level from Panel 9XR is 150.0 O F.

Terminating Cue: Page E l -1 of the Technical Specifications Log Sheet is correctly completed and the discrepancies are noted.

JPM Stop Time:

NRC JPM ADMlN R01 Page 8 of 11

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:

~~-

NRC -~

JPM ADMIN R 0 1

~

Examinees Name:

~

Exam in e r s N am e:

Date Performed:

Facility Evaluator:

_~

Number of Attempts:

~

~

Time to Complete:

_ _ _ ~-

_ ~-

Question:

- ~.

Result:

~

.~

~

Sat isfactory/U nsat isfactory Examiners Signature and Date:

NRC JPM ADMIN R 0 1 Page 9 of 11

_I

1. Reset to full power IC-65
2. Insert the following:
a. SW I-RMS050A to 1.1 (RB 1 19 E39 rad)
b. SWI-RMS063A to 1.1 (RN 119 rad C9)
c. SWI-RMS066A to 1.O (RB vent rad mon)
d. SWI-RMS067A to 1.O (RB vent rad mon)
3. Have ready a 681.4.004 Attachment 1, completed for the 11 -7 and 7-3 shifts (see Completed 681.4.004)

NRC JPM ADMIN R01 Page 10of 11

=.

Appendix C Job Performance Measure WORKS t l EET Form ES-C-1 STUDENT HANDOUT Initial Conditions:

1. The plant is rated power.
2. You are the on-shift Reactor Operator on the 4-12 shift.
3. The current datehime is April 20, 2008 at 1700.

Task Cue:

Complete page E l -1 only of the Techni,cal Specification Log Sheet, Procedure 681.4.004, Technical Specification Log Sheet. Notify the Unit Supervisor when complete and of any discrepancies or actions that may be required.

NRC JPM ADMIN R01 Page 11 of 11

_Oyster

~. -

Creek Task No.:

20001 01404 Task

Title:

~-

Perform

- a

_-_ Manualcore Heat Balance-Calculation-

~

_ - _ _ _ ~ ~

Job Performance Measure No.:

NRC JPM ADMIN

~

R02_(RO)_--

WA

Reference:

~ Generic

__- _ - 2.1.20

~

(RO _ _

4.3)

E3 xam in e r :

~

Examinee:

Facility Evaluator:

Method of Testing:

X Simulated Performance Actual Performance Classroom Simulator X

Plant

~~

Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1. The reactor has been steady at full power for several hours.
2. The PPC is currently unavailable but is expected back shortly.
3. All prerequisites to perform this Frocedure have been met.

Task Standard: A manual core heat balarice has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.

Required Materials: Calculator.

General

References:

1. Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation -

Power Range, revision 27.

Initiating Cue: Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.

NRC JPM ADMIN R02 Page 1 of 17

I AppendixC Form ES-C-1 Job Performance Measure WORKS t-i EET

~

~~

Time Critical Task: No Validation Time:

19 minutes NRC JPM ADMIN R 0 2 Page 2 of 17

Appendix C Job Performance Measure Form ES-C-1 WORKS t-i EET P e rfo rm a n ce Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

~

Standard:

Provides repeat back of initiating the repeat back.

JPM Start Time:

cue. Evaluator acknowledges Performance Step: 2 Procedure Step: Reviews Precautions and Limitations.

- ~ _ _ _

Standard:

Reviews Precautions and Limitations.

Comment:

~

SAT/U NSAT Note: The expected values are provided in the KEY.

NRC JPM ADMIN R02 Page 3 of 17

' AppendixC Job Performance Measure Form ES-C-1 WORKSI-IEET Performance Information J

Performance Step: 3

~-

Procedure Step: 5.1.1.1 Records local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room.

Standard:

Directs EO to read local total Feedwater AP in inches of water from the venture transmitter (FT-422-1) in the Feedwater Pump Room, and records on the Feedwater Flow Calculation Worksheet, Line A.

Cue:

As the EO, report reading on the venture transmitter (FT-422-1) in the Feedwater Pump Room as 492.5 inches.

~~

~

J Performance Step: 4 Procedure Step: 5.1.1.2 Record Feedwater temper!ature (ID 101) from Panel 5F/6F recorder to the nearest whole degree.

Standard:

Reads Feedwater temperature (ID 101) from Panel 5F/6F recorder to the nearest whole degree and records on the Feedwater Flow Calculation Worksheet, Line 6 Comment:

~

~

SAT/U NSAT NRC JPM ADMlN R02 Page 4 of 17

" AppendixC Job Performance Measure Form ES-C-1 WORKSHEET P e rf o r m a n ce I '1 f o r m a t i o n J

Performance Step: 5 Procedure Step: 5.1.1.3 Obtain the specific volume (v) at the Feedwater at 110 psia and the temperature recorded ir.1 Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables.

Obtain the specific volume (v) the temperature recorded iri Step 5.1.1.2 from Attachment 1001.6-3 or ASME approved steam tables, and records on the Feedwater Flow Calculation Worksheet, Line C.

w=

Standard:

the Feedwater at 110 psia and

\\

J Performance Step: 6

~

Procedure Step: 5.1.1.4 Calculates total Feedwater flow using the following equation:

F = 0.0429387 SQRT (QPh)

Standard:

Calculates total Feedwater flow using the following equation:

F = 0.0429387 SQRT (APiv) and records on the Feedwater Flow Calculation Worksheet, Line D.

Comment:

NRC JPM ADMlN R02 Page 5 of 17

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 7 Procedure Step: 5.2.1 Record reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F)

Reads reactor pressure to the nearest whole pound (Narrow range recorder - Panel 5F/6F) and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line A.

~~~

~

Standard:

Comment:

~

~

~

~

~

~

~-

~

~

~~

~

J Performance Step: 8 Procedure Step: 5.2.2 Record Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F)

Standard:

Reads Feedwater temperature to the nearest whole degree (Recorder Panel 5F/6F) or transfers the Feedwater temperature obtained earlier, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line B.

Comment:

~

NRC JPM ADMIN R 0 2 Page 6 of 17

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information J

Performance Step: 9

~~

Procedure Step: 5.2.3 Record recirculation flow to the nearest thousand gpm (Recorder Panel 3F).

Standard:

Reads recirculation flow to the nearest thousand gpm (Recorder Panel 3F), and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line C.

S AT/U N SAT J

Performance Step: 10 Procedure Step: 5.2.4 Calculate the reactor absolute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure.

Calculate the reactor absoilute pressure by adding the value of step 5.2.1 + 14.7 pounds pressure, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line D.

Standard:

Comment:

SATlUNSAT NRC JPM ADMIN R02 Page 7 of 17

Performance Step: 11 Procedure Step: 5.2.5 Record Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure.

~-

- -~

~-

Standard:

Reads Main Steam enthalpy from Attachment 1001.6-5 or an ASME approved steam table, at saturated conditions using calculated absolute pressure in step 5.2.4 and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line E.

S AT/U N SAT J

Performance Step: 12 Procedure Step: 5.2.6

.~

Record the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature.

Standard:

Reads the Feedwater enthalpy from Attachment 1001.6-6 or ASME approved steam table for compressed water at 11 00 psia using Feedwater temperature in step 5.2.2, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line F SAT/U NSAT NRC JPM ADMIN R02 Page 8 of 17

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET

~~

-~

~

Performance Information J

Performance Step: 13 Procedure Step: 5.2.7 Calculate the difference of the Main Steam and Feedwater enthalpies.

Standard:

Calculates the difference of the Main Steam and Feedwater enthalpies by subtracting Feedwater enthalpy in step 5.2.6 from Main Steam enthalpy in step 5.2.5, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line G.

Comment:

~

~~

~

~ _.

~

-~

S AT/U N SAT J

Performance Step: 14 Procedure Step: 5.2.8

~

~~-~

Record total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet.

Standard:

Copies total Feedwater flow FLO (tot) for differential pressure 3 loop and/or local venture (single element) methods from the Feedwater Flow Calculation Worksheet, Line D, onto the Heat Balance Data, Calculation, and Analysis Worksheet, Line H.

Comment:

~-

~~~

~

~

~~

~~

~~

-~

NRC JPM ADMlN R02 Page 9 of 17

. ' AppendixC Job Performance Measure Form ES-C-1 WORKS ti E ET Performance Information J

Performance Step: 15 Procedure Step: 5.2.9 Calculate the product of the Feedwater flow and the enthalpy difference to obtain MBTUIhr.

~~

Standard:

Calculates the product of the Feedwater flow in step 5.2.8 and the enthalpy difference in step 5.2.7 to obtain MBTU/hr, and records on the Heat Balance Data, Calculation, and Analysis Worksheet.

Line I.

Comment:

J Performance Step: 16 Procedure Step: 5.2.1 0 Convert MBTU/hr to Megawatts (MBTU/hr x 0.293).

Standard:

Converts MBTU/hr to Megawatts by multiplying MBTU/hr in step 5.2.9 by 0.293, records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line J.

Comment:

SAT/UNSAT NRC JPM ADMlN R 0 2 Page 10 of 17

AppendixC Job Performance Measure Form ES-C-1 WORKS-IEET Performance Information J

Performance Step: 17

~- -

Procedure Step: 5.2.1 1 Record RWCU flow to the nearest gpm (recorder Panel 3F) on Line K of Attachment 1001 6-2.

Standard:

Reads RWCU flow to the nlearest gpm (recorder Panel 3F) and records on the Heat Balanc:e Data, Calculation, and Analysis Worksheet, Line K.

~

~

~

S AT/U N SAT J

Performance Step: 18 Procedure Step: 5.2.1 2 Calculate the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation.

Enter the appropriate value for Fixed Losses on Line L of 001.6-2.

Fixed Losses = [(K) x 0.01 :36] + 9.0 Standard:

Calculates the CRD, recirc. pump power, RWCU and ambient losses adjustment (Fixed L.osses), per the following equation, and records on the Heat Balance Data, Calculation, and Analysis Worksheet, Line L.

Fixed Losses = [(Line K) x 0.01361 + 9.0 Comment:

SAT/UNSAT NRC JPM ADMlN R02 Page 11 of 17

. *.. Appendix C Job Performance Measure Form ES-C:-1 WORKS H E ET Performance Information J

Performance Step: 19

~~

Procedure Step: 5.2.13 Add the Fixed Losses from Line L to the Megawatts from Line J and record the Calculated CTP on Line N.

Standard:

Adds the Fixed Losses frorn step 5.2.12 to the Megawatts from step 5.2.10 and record the Calculated CTP on Line N on the Heat Balance Data, Calculation, and Analysis Worksheet.

Comment:

S AT/U N SAT Cue:

J Performance Step: 20

~.

Procedure Step: 5.2.14 Record PPC Core Thermali Power (CTP) in Line M.

Standard:

The PPC has been returned to service long enough to establish the 15 minute average Core Thermal Power (CTP). The current CTP value is 1927 MWth.

Records the PPC 15 minute average Core Thermal Power (CTP) on the Heat Balance Data, Calculation, and Analysis Worksheet, Line M.

Comment:

NRC JPM ADMIN R02 Page 12 of 17

Appendix C Job Performarice Measure WORKSIHEET

-~~

Form ES-C-1 Performance Information J

Standard:

Comment:

Performance Step: 21 Procedure Step: 5.2.1 5 Subtract the Calculated CTP from the PPC Core Thermal Power

[Line M - Line N]. If this value is positive, the comparison is considered conservative. It negative, the comparison is non-conservative. Place an X in the appropriate box.

Subtracts Calculated Core Power in step 5.2.1 3 from the PPC Core Thermal Power in step 5.2.14 and records on the Heat Balance Data, Calculation and Analysis Worksheet, Line 0.

Checks the negative value -4 Non-Conservative box on the Heat Balance Data, Calculation, and Analysis Worksheet.

Cue:

Performance Step: 22 Procedure Step: 5.3 Verify that the RWCU system differential temperature is < 80 deg F.

Another Operator will verify the RWCU system differential temperature is < 80 deg F. This complete this JPM.

Standard:

Comment:

~~

S AT/U N SAT NRC JPM ADMIN R02 Page 13 of 17

. 1,. Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Terminating Cue: A manual core heat balance has been completed IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range.

JPM Stop Time:

NRC JPM ADMIN R 0 2 Page 14 of 17

a Appendix C Job Performance Measure W 0 R KS H E ET Form ES-C-1 Validation of Completion NRC JPM

-~

ADMIN

~

R 0 2

. ~-

JPM Number:

-~

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

~

Time to Complete:

Question:

Result:

Sat isfactory/U nsatisfactory Examiner's Signature and Date:

NRC JPM ADMIN R 0 2 Page 15 of 17

1.

Appendix C Job Performar*ice Measure Form ES-C-1 WORKSHEET Simulator Setup

1. Reset to full power IC-65.
2. Insert the following:
a. SWI-NSS021 A to 1020.0 psig (Reactor press recorder 5F/6F)
b. SWI-CFW002A to 31 1 "F (FW temperature recorder 5F/6F)
c. SWI-NIS001 B to 150090 Ib/hr (recirculation flow recorder 3F)
d. SWI-RCU002A to 400.1 gprri (RWCU flow recorder 3F)
3. Have a blank copy of procedure 1001.6 ready.

4 Provide the Candidate a calculator.

NRC JPM ADMIN R 0 2 Page 160f 17

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT biANDOUT Initial Conditions:

1. The reactor has been steady at full power for several hours.
2. The PPC is currently unavailable but is expected back shortly.
3. All prerequisites to perform this procedure have been met.

Task Cue:

Perform a manual core heat balance IAW Procedure 1001.6, Core Heat Balance and Feedwater Flow Calculation - Power Range. Compare this calculation to the reactor power displayed on the PPC when the PPC is returned to service.

NRC JPM ADMIN R02 Page 17 of 17

7.

AppendixC Job Performance Measure Form ES-C-1 W 0 R KS t-i E ET Facility:

__ Oyster Creek

~

Task No.:

21

~~

501 01 023 -

~

Task

Title:

Perform APRM Drawer Count Job Performance Measure No.:

NRC JF:)M ADMlN R 0 3 (RO)

WA

Reference:

Generic 2.2.1 2

-~

(RO 3.0)

Exam in e r :

~-

~

~

~

Examinee:

~

~

Facility Evaluator:

~

~

- [late:

Method of Testing Simulated Performance Actual Performance X

~

Classroom

~

Simulator X

Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

1. The plant is at rated power.

Task Standard: Section 2 of Attachment 202.1-1, APRM Status Check, for APRM 8 is complete and LPRM 44-25D does not indicate bypassed.

Required Materials: A completed attachment 403-2, with no APRMs bypassed, and LPRMs36-17B, 28-090 and 44-25D shown as bypassed.

Gene ra I References :

1. Procedure 202.1, Power Operation, revision 109.

2. Procedure 403, LPRM-APRM System Operations, revision 13.

Initiating Cue: Perform Section 2 of Attachment 202.1 -1, APRM Status Check, for APRM 8. Notify the Unit Supervisor of your results.

Time Critical Task: No.

Validation Time:

13 minutes NRC JPM ADMlN R 0 3 Page 1 of 11

' AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance Information Denote critical steps with a check mark 4

~-

~

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

~-~

~

Performance Step: 2 Procedure Step. 1 of Attachment 202.1 -1.

Place an X in the box next to the LPRMs that are Bypassed.

Standard:

Places an X in the box next to LPRMs36-176,28-09D, and 44-25D in the APRM 8 column.

Comment:

~

SAT/U NSAT NRC JPM ADMIN R 0 3 Page 2 of 11

' AppendixC Job Performance Measure WORKSHEET Form ES-C-1

~

Performance information Performance Step: 3 Procedure Step: 2 of Attachment 202.1 -1.

Place the number of un-bypassed inputs in the last row.

Standard:

Places the number of un-bypassed inputs (5) in the last row for APRM 8, marked UN-BYPASSED.

Comment:

S AT/U N SAT Performance Step: 4 Standard:

CUE:

Comment:

Procedure Step: 5.:

Obtains permission count.

Obtains ermissioq count. P I

The can idate ma directed go pe rfo r d they havie permissic I

I I

.------r I

I SAT/U NSAT I

I I

I i

~

I I

NRC JPM ADMIN R O ~

3.8.1 of Procedure 403.

'om tbg US for LPRM input to APRM draw

'om the US for LPRM input to APRM draw 1

1 not ask permission since he was

. If the candidate does ask, state th dorm the APRM drawer count.

_ ~ _

Page 3 o 11

I. 4 Appendix C Job Performar-ice Measure Form ES-C-1 W ORKSH ET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.

Task Cue:

Perform Section 2 of Attachment 202.1-1, APHM Status Check, for APRM 8.

Notify the Unit Supervisor of your results.

NRC JPM ADMlN R 0 3 Page 11 of 11

. P,.

Appendix C Job Performance Measure Form ES-C-1 WORKS t-i EET Facility:

Oysler Creek Task No.:

2000501 433 Task

Title:

Determine

~

- RPV Water Level Instrument Availability Job Performance Measure No.:

NRC JFM ADMIN R04

-~ (RO)

K/A

Reference:

f:! xa m in e r :

Examinee:

~~

Facility Evaluator:

[late:

Method of Testing:

Simulated Performance

~~

Actual Performance X

Class room X

Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
2. The Primary Containment Control EOF has been entered.
3. RPV pressure is 200 psig and stable.
4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:

I Temp.

~ Recorder lnstr7iment NO.

Point 1

I t

i-1 I

~

TE-103-450 1

40 TE-103-451 41 42-I t

TE-103-452 TE-103-453 I

43 TE-103-454 1

44 1

1 -

c 1

~

1-1 L--

~

- _ _ ~ -. -..-

Temperature I

F I

NRC JPM ADMIN R04 Page 1 of 8

Appendix C Job Performance Measure Form ES-C-1 W ORKSI-I EET Task Standard: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.

Required Materials: None.

General

References:

1. EMG-SP28, Level Instrumentation Availability, revision 0.

Initiating Cue: IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each F3PV water level instrument is available for RPV water level indication or is not available.

Time Critical Task: No.

Validation Time:

7 minutes NRC JPM ADMIN R 0 4 Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

~~

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

J Performance Step: 2 Procedure Step: 3.4 Verify that the instrument reference leg temperatures are in the SAFE REGION of the RPV Saturation Temperature Curve.

Standard:

Comment:

Compares the provided reference leg temperatures for all level instruments at the given RPV pressure against the RPV Saturation Temperature curve. Determines that YARWAY A is not in the SAFE REGION and thus is not available for RPV water level instrumentation.

SAT/U NSAT NRC JPM ADMlN R 0 4 Page 3 of 8

0 Appendix C Job Performarce Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 3 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the NR GEMAC A and NR GEMAC B indicated water levels at the given reference leg temperatures on the GEMAC NARROW RANGE curve. Determines that NR GEMAC A is not in the Safe Region and thus is not available for RPV water level instrumentation.

Determines that NR GEMAC B is in the Safe Region and thus is available for RPV water level instrumentation.

Comment:

J Performance Step: 4 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the YARWAY B indicated water level at the given reference leg temperatures on the YARWAY curve. Determines that YARWAY B is not in the Safe Region and thus is not available for RPV water level instrumentation.

Comment:

SAT/UNSAT NRC JPM ADMIN R 0 4 Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 5 Procedure Step: 3.5 For each instrument below, the instrument reads in the Safe Region of its respective curve.

Standard:

Compares the WR GEMAC indicated water level at the given reference leg temperatures on the GEMAC Wide Range curve.

Determines that WR GEMAC is not in the Safe Region and thus is not available for RPV water level instrumentation.

Comment:

~

~ -.

SAT/U NSAT Terminating Cue: IAW the reference provided, the Candidate has determined that only NR GEMAC B is available for RPV water level indication.

JPM Stop Time:

NRC JPM ADMlN R 0 4 Page 5 of 8

?

Appendix C Job Performarice Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM _

~

ADMIN 1304 JPM Number:

Examinees Name:

Examiners Name:

~

-~ -

Date Performed:

Facility Evaluator:

~

Number of Attempts:

~

~

_ _ ~

Time to Complete:

Question:

Result SatisfactoryAJnsatisfactory Examiners Signature and Date:

~

NRC JPM ADMIN R04 Page 6 of 8

I

-4 Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Simulator Setup

1. None.
2. Have a blank copy of Support Procedure 28, EMG-SP28, Level In st r u menta tion Availability ready.

NRC JPM ADMIN R 0 4 Page 7 of 8

a, Appendix C Job Performarlce Measure WORKSHEET Form ES-C-1 STUDENT tjANDOUT Initial Conditions:

1. The Plant was at rated power when a LOCA occurred in the Primary Containment.
2. The Primary Containment Control EOP has been entered.
3. RPV pressure is 200 psig and stable.
4. The table below contains data recorded from Recorder TR-IA55 on Panel 8R, for the instrument reference leg vertical run temperatures, along with the current water level indications:

I i

Level Instrument 1

RPVWater Temp.

1 Recorder 1 TemDerature F

1 Level Readinq Instrument No.

Point I-

~

[

89 1

340 i ---

1 TE-103-450 1

40 1

TE-103-452 42 360 1

1 TE-103-451 335 Task Cue:

IAW EMG-SP28, Level Instrumentation Availability, and the information provided, state whether each RPV water level instrument is available for RPV water level indication or is not available.

NRC JPM ADMIN R04 Page 8 of 8

?

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Facility:

-Oyster Creek Task

Title:

Review a ____

Shift Turnover

- IChecklist

~~

~-

~

~

Job Performance Measure No.:

NRC - JPM

- - _ ADMlN -- SROJ LSRO)

WA

Reference:

-Ge-neric 2.1.3 (SRO 3.41-

_~

_ _~

Examiner:

Examinee:

Date:

Facility Evaluator:

-~

Method of Testing:

X S im u lated Performance

- Actual Performance Classroom X

Simulator

~

Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The plant is at rated power.
2. You are the oncoming Unit Supervisor after being off for the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3. Your last shift was completed at 2400 on April 18, 2008.
4. The current date/time is April 19, 2008 at 1200.

Task Standard: The Candidate has reviewed the turnover checklist and noted the discrepancies and any associated actions.

Required Materials: None.

General

References:

1. OP-OC-100-1002, Main Control Room Turnover Checklist (Operating Mode), revision 5.
2. Technical Specifications 3.7, Auxiliary Electrical Power.
3. Procedure OP-OC-108-104-1001, Guidance for Limiting and Administrative Conditions for Operations, revision 0.
4. Procedure 324, Thermal Dilution Pumps, revision 69.

NRC JPM ADMIN SRO1 Page 1 of 14

I I

7 AppendixC Job Performance Measure Form ES-C-1 WORKS I--I E ET Initiating Cue: As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.

Time Critical Task: No.

Validation Time:

22 minutes NRC JPM ADMIN SROI Page 2 of 14

. I AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Performance I n f o rmat io n Denote critical steps with a check mark J Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Standard:

Comment:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back. Provide the completed Turnover Sheet.

~ ~. _.

SAT/UNSAT Note: The following steps may be performed in any order.

J Performance Step: 2 Procedure Step: Reviews the Turnover Checklist.

Standard:

Reviews the Turnover Checklist and notes the following:

The TORUS/DW VENT & PURGE ISOL VLVS HI RAD BYP CHAN 2 switch position is not annotated. (The switch should be in NORMAL.)

Comment:

NRC JPM ADMlN SRO1 Page 3 of 14

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 3 Procedure Step: Reviews the Turnover Checklist.

Standard:

Reviews the Turnover Checklist and notes the following:

0 Technical Specification 3.7 C.2 states that if one diesel generator becomes inoperable during power operation, repairs shall be initiated immediately and the other diesel shall be operated at least one hour every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at greater than 80% rated load until repairs are completed.

Procedure OP-OC-I 08-1 04-1001, Guidance for Limiting and Administrative Conditions for Operations, states that EDG 2 shall be satisfactorily tested by 2000 on April 19, 2008. This is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from when EGD 1 was declared inoperable - not 24 lhours from when EDG 1 was tagged out for repair. To comply with Technical Specifications, EDG 2 needs to be tested (636.4 013, EDG 2 Load Test) by 2000 on April 19, 2008.

Comment:

~~

~~

~-

-~

~~~~

~- -

NRC JPM ADMIN SROl Page 4 of 14

AppendixC Job Performarice Measure Form ES-C-1 WORKSHEET Perf or mance lnf or mat ion J

Performance Step: 4 Procedure Step: Reviews the Turnover Checklist.

Standard:

Reviews the Turnover Checklist and notes the following:

IAW Procedure 324, if all dilution pumps are tripped (which is the case of a loss of power to the dilution plant) and cannot be immediatc?ly restarted, reduce power as necessary to maintain main condenser outlet temperature c 97 "F to minimize the impact on the environment. A 2-hour report to the [IEP via the NJDEP Environmental Hotline (1 -877-927-6337) shall be made. A written report shall be generated IAW the NJPDES part IV if bridge temperature exceeds 97 "F.

Comment:

Terminating Cue: The Candidate has reviewed the turnover checklist and noted the discrepancies and any associated actions.

JPM Stop Time:

NRC JPM ADMIN SROl Page 5 of 14

. I AppendixC Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion JPM Number:

.~

NRC

- - JPM

~ ADMIN

~~

SRO1

~

Examinees Name:

- -~ -

Date Performed:

~~

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question:

Result:

Satisfactory/Unsatisfactory

~

Examiners Signature and Date:

~.

- ~-

NRC JPM ADMlN SRO1 Page 6 of 14

I 8

AppendixC Job Performarice Measure Form ES-C-1 WORKSHEET Sirnulato! Setup

1. None.

NRC JPM ADMIN SROl Page 7 of 14

I.' '..

Appendix C Job Performance Measure Form ES-C-1 W 0 R KS H E ET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.
2. You are the oncoming Unit Supervisor after being off for the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3. Your last shift was completed at 2400 on April 18, 2008.
4. The current datehime is April 19, 2008 at 1200.

Task Cue:

As the oncoming Unit Supervisor, review the completed Main Control Room Turnover Checklist (Operating Mode) and note any discrepancies and/or any required actions.

NRC JPM ADMIN SRO1 Page 8 of 14

i L

0P-0c-100-1002 Revision 5 DCC FILE # 2'0 70 01 01 03 MAIN CONTROL ROOM TURNOVER CHECKLIST (OPERATING MODE)

Xenon(Checkone) 7 Rising x

i 1

1 I

- -I 1 Stack RAGEMS SampleandEff&ent Flow - Functional Test, 621 3 024 Reactor Hi/Lo Level Bistable Test and Calibration, 619.3 113 I

I Surveillance(s) in progress I

I Fire Hose Station, Hose House and Fire Hydrant Inspection, 645 6 003, I followinga fire drill earlier in the shift Activities in progress I

Safety System Status rGai;if&&n or comooncnts that are in a dczraded mode ofooeration ocrmittcd bi the Technical Soecifications. For each system, comoare the i.

1 length of time it i\\ degraded with the Technicai Specification Acbon Statenlent. Specify the ficcpency ol redundant sy\\tern verification or tevting and tIlctlate/tinle of the last test

~

APRM 1 is in BYPASS due to failure of the APRM Surveillance Test - Front Panel Check (620.4.002) All other EDG 7 tagged out of service at - 2%O-On4/18/08-7:day-LCO EDG 2 testing-every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> APRMs operable-

__ - - - -~

C om p ensa t olllyC om m en t s

~

Li5t m y cornpenutorj actions in effect as a result of Procedure CC-AA-I 12 (1 emp Mod), Procculure WC-AA-IO1 (On-Line Maintenance). out of 1-ice pl:iiit equlpinent or components, or a s directid hy the M I or OS.

EDG 2 and associated systemSare protected IAW Procedure 341 due to EDG 1 inoperable (annunciators T4b, T5b)

Recording

_ Offgas Radiation

---p__

Monitor levekevery-hour due io AOG trp Noadverse trends noted p

- p__-

Turnover Comments EDG 1 declared inoperable at 2000 on 4/18/08, and tagged out for repair at 2300 on 4/18/08 Electrical Maintenance reports a ground in the control system and is continuing to investigate. There is currently no estimate on the return-to-service time IAW Technical Specifications,

__ EDG

-- 2 must p com-plete a satisfactory surveiance by2300-on 4/19/08 The Dilution Plant tripped at 090Oonb/l9/08 Alternate power cannot be tied-in Electrical Maintenance suspects a short and are continuing to investigate Intake temperature is 50 "F No actions have occurred yet except to investigate (Annunciators 12XR2-4, 12XR2-6, 12XR3-4, 12XR35, and 12XR3-6)

AOG tripped 1600 4/18/08 and remains out of service All required actions completed (Annunciatok 10F3b, 10XF3d, 1 OXF4d)

Page 9 of 14

0P-0c-100-1002 Revision 5 DCC FILE # 20.70.01.01.03 Going Shift Coming Shift

  • 1
  • Signature acknowledges all qualifications to stand watch are current and any changes in medical status have been reported IAW OP-AA-105-101 NRC JPM ADMlN SRO1 Page 10 of 14

1.

MAIN CONTROL ROOM TIJ IINOVER CNECKI,ISrc (CONTINUED) 0P-0c-100-1002 Revision 5 DCC FILE # 20.70.31.01 03 BYP CHAN 1 in nojmal_

TORUS/DWVENT &PURGE isol VLVS HIRAD I Yes I + N O

.L-Main Generator Digital Protective Relay System (DPRS A and B) operating with no abnormal 1

x 1 Yes indications

- -1

- l--

NRC JPM ADMlN SRO1 Page 11 of 14

0P-0c-100-1002 Revision 5 DCC FILE il20.70.01.01.03 General Turnover Checks

ore-Maneuvering Daily Instruction Sheet, Attachment 1001.22-3 is current and reflects-plant operating con@tions.

~

Control room panel walkdown performed neaiend of shift

~

~

-~

Control room-panelwalkdown performed with oncoming shift.

~

Performedlight test on alarm winJows.

~

A X

~

^ _ - _ _

- _~_----___I__--_I---I_--_

Reviewed reasons for annunciated alarms with all operators NRC JPM ADMIN SROI Page 12 of 14

0..,

0P-0c-100~~1002 Revision 5 DCC FILE ii 20 70.01.01.03 Shift 0000 - 1200 A 1% 3000 SAT gpm. Declare ESW Pump 52A inoperable and apply TS due to low flow.

SAT NRC JPM ADMIN SR03 Page 4 of 10

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET ACCEPTANCE CRITERIA Step SAT/UNSAT 7.2.2 SAT Required Action if UNSAT/Reason 7.2.3 UNSAT CRITICAL Containment Spray Pump 51 B vibration 4A is above the action range. Declare Containment Spray Pump 51 B inoperable and apply TS.

~

~~~~~~

~

~~~

7.2.4 UNSAT Valve V-21-17 strokes outside the accept range but CRITICAL less than the limiting value. Retest immediately or declare inoperable and apply TS.

~~

7.3 7.4 SAT SAT None

~~

NRC JPM ADMIN SR03 Page 5 of 10

AppendixC Job Performarce Measure Form ES-C-1 WORKS 1-1 E ET Validation of Completion JPM Number:

NRC JPM ADMIN SR03 Examinees Name:

Exam in e r s N am e :

Date Performed:

~_

~-

Facility Evaluator:

~_

~

Numberof Attempts:

~

~.

Time to Complete:

Question:

Response :

Result:

Satisfactory/Unsatisfactory Examiners Signature and Date:

NRC JPM ADMIN SR03 Page 6 of 10

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Simulator: Setup

1. None.
2. Provide pages 43 through E4-4 ONLY of 607.4.004.
3. Make the following steps unsat on the test:
a. Step 7.1.4: Lineout 31 00 and insert 3000. Initial and date.
b. On the IST Pump Summary Sheet table, insert ESW 52A flow at 3050 gpm. Have all other flows acceptable.
c. On the vibration table for point 4A for Containment Spray Pump 51 6, insert a value greater than the ACTION limit. Mark all other vibrations below the ALERT values. (0.26 in/sec)
d. In the valve stroke summary table, make the OPENING time for V-21-18 greater than the ACiCEPT RANGE, but less than the LIMITING VALUE. Mark all others in the ACCEPT RANGE (37.4 seconds )
e. In the IST Valve Summary Sheet, lineout 3100 gpm and insert 3000 gpm for ESW Pump 52A flow. Initial and date.

NRC JPM ADMIN SR03 Page 7 of 10

. 1, Appendix C Job Performance Measure Form ES-C-1 WORKS'HEET STUDENT HANDOUT Initial Conditions:

1. The plant is at rated power.
2. Surveillance test, 607.4.004, Containment Spray and Emergency Service Water System 1 Pump Operability and Comprehensive/Preservice/Post-Maintenance Inservice Test, has ju!;t been completed.
3. The test was a normally scheduled test.

Task Cue:

Perform the Acceptance Criteria section of the completed surveillance test, 607.4.004. Write your observations on the attached sheets. State any test discrepancies and any required actions for any noted discrepancy. Some Steps have already been evaluated as Satisfactory and are complete.

State if the step is SAT or UNSAT If UNSAT, state the reason and the required actions NRC JPM ADMIN SR03 Page 8 of 10

AppendixC Job Performance Measure WORKSHEET Form ES-C-1 STUDENT. HANDOUT ACCEPTANCE CR ITER I A Step SATIUNSAT Requived Action if UNSAT/Reason NRC JPM ADMIN SR03 Page 9 of 10

Appendix C

. 2, c

Job Performance Measure WORKSHEET Form ES-C-1 STUDENT HANDOUT ACC E PTANC: E CR ITER I A Step SAT/UNSAT Required Act ion if U NSAT/Reason 7.2.3 7 3 SAT None None 7.4 SAT

- ~-

NRC JPM ADMlN SR03 Page 10 of 10

c Appendix C Job Performarice Measure Form ES-C-1 WORKS H E ET Facility:

Oyster Creek Task No.:

Task

Title:

Initiate

~ -

Dose Control

~~~

Extension

~

~~

Forms

-~. -

Job Performance Measure No.:

NRC JPM ADMIN SR04 (SRO)

K/A

Reference:

Generic 2.3.1 (SRO 3.0)

Exam in e r:

~

~

~~~~

~-~

Examinee:

Facility Evaluator:

Date:

~

Method of Testing:

X Simulated Performance

-~

~-.Actual Performance

~

~

Plant Classroom

- __ X Simulator

~_

~

Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues When you complete the task successfully, the objective for this job performance measure will be satisfied.

~-

~-

~~

NRC JPM ADMIN SR04 Page 1 of 10

I Appendix C

- - 1 I --Name-

-1 &

Current year 1 TED E mrem 1

11 1-1 1-1 11 1 1950 1 Fully qualified EO I

350 1750

~ Fully qualified EO 1 Fully qualified EO; Declared pregnant on 1/1/08 Bill Block Dave Draper 333-33-3333

~

I

~

Job Performance Measure Form ES-C-1 W 0 R KS H E ET Initial Conditions:

1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
2. No Reactor Recirculation Pumps are running.
3. The following job is scheduled for next shift:
a. Grease the suction valve lirriitorque in Recirculation Loops B and C.
b. Manually cycle the valve once (0 - t C, C - 0) after lubrication.
c. Perform RBCCW valve lineups on Reactor Recirculation Pumps and Motors B and C.
d. The job will be performed by 2 Equipment Operators; each performing the work on 1 Reactor Recirculation Pumps/Motors.
e. The dose rate in the work area is 325 mrem/hr.
f.

Greasing each valve will take 10 minutes.

g. Manually cycling the valve (0 -+

C, C -+ 0) will take 10 minutes.

h. The RBCCW valve lineup for each pump/motor will take 10 minutes.
i. Independent verifications on the valve lineup will be performed later.
4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work.

EO candidate in the OJT 1 Phase NRC JPM ADMIN SR04 Page 2 of 10

I I

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET

- -~

_________~___ ~

~

Task Standard: Dave Draper and Greg Galler are selected to perform the job. A Dose Control Level Extension Form is initiated for each individual.

Required Materials: Calculator.

General

References:

1. Procedure RP-AA-203, Exposure Control and Authorization, revision 3.

Initiating Cue:

Select the 2 Equipment Operators to perform the job.

Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the job, if required.

The selected individual(s) will sign the form if the form is required, after initiation.

Time Critical Task: No.

Validation Time:

22 minutes NRC JPM ADMIN SR04 Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSIHEET Performance Information Denote critical steps with a check mark J' Standard:

Comment:

Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

JPM Start Time:

Provides repeat back of initiating cue. Evaluator acknowledges the repeat back.

S AT/U N SAT Note: The step below is not proceduralized but is necessary to determine the dose to be received while performing the job.

J Performance Step: 2

~

Procedure Step: Determines dose received to each worker.

Standard:

Determines dose received to each worker:

10 minutes to grease the suction valve Iimitorque 10 minutes to cycle the suction valve 10 minutes to perform valve lineup o Total time per pump: 30 minutes o Total exposure for each worker: 0.5 hr x 325 mrem/hr =

162.5 mrem Comment:

SAT/UNSAT NRC JPM ADMIN SR04 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Performance Information J

Performance Step: 3 Procedure Step: Determines who is eligible to perform the job.

Standard:

Determines who is eligible to perform the job.

Determines that Carol Casper cannot perform the job since the dose received is greater than allowed for a declared pregnant worker (500 mR)

Determines that Frank Fick cannot perform the job since he is not qualified.

Determines that of the 3 workers left, that Dave Draper and Greg Galler have the lowest current yearly accumulated dose and should be selected.

Comment:

J Performance Step: 4

- -~

Procedure Step: Determines total dose to the workers Standard:

Dave Draper: 1750 162.5 = 1912.5 mrem o Because his total does is less than the administrative limit of 2000 mrem, no dose extension is required Greg Galler: 1875 + 162.5 = 2037.5 mrem o Because his total does is greater than the administrative limit of 2000 mrem, a Dose Control Level Extension Form is required Comment:

SATIUNSAT NRC JPM ADMlN SR04 Page 5 of 10

p i

Appendix C Job Performance Measure Form ES-C-1 W ORKSHEET Performance Information J

Performance Step: 4 Procedure Step: Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler.

Standard:

Initiates Section 1 of the Dose Control Level Extension Form for Greg Galler:

0 Comment:

SAT/U NSAT Name: Greg Galler (critical step)

SSN: 555-55-5555 (critical step)

Answers NO to the question: Are other qualified individuals with a lower current year routine TEDE available to perform this work? (not critical step)

States why an exten.sion above 2000 mrem routine TEDE for the year is neces:;ary for this individual: To perform limitorque greasing, valve cycling, and valve lineups (or similar). (not critical)

Requests a dose extension to 2500 mrem (1 875 + 162.5 =

2037.5 mrem.) (critical step)

Signs the form as the Requestor and dates not critical)

Terminating Cue: Dave Draper and Greg Galler are selected to perform the job.

A Dose Control Level Extension Form is initiated for Greg Galler.

JPM Stop Time:

NRC JPM ADMlN SR04 Page 6of 10

. a ?.

Appendix C Job Performance Measure WORKSHEET Form ES-C-1 Validation of Completion NRC JPM ADMlN

~~

~~~ SR04 JPM Number:

Examinees Name:

~

~

~-~~ ~.

Examiners Name:

Date Performed:

~~-

Number of Attempts: -

Time to Complete:

_~

Question:

Response

Result:

SatisfactoryAJnsatisfactory Examiners Signature and Date:

~

~ ~-~

NRC JPM ADMIN SR04 Page 7 of 10

e t.

Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET

1. None.

NRC JPM ADMIN SR04 Page 8 of 10

Appendix C l l 1-1 1-1 1 l l Bill Block Carol Casper 1 222-22-2222 1950 300

_ _ - _ - ~

~~

Job Performance Measure Form ES-C-1 WORKSHEET Dave Draper 1 333-33-3333 444 4444 STUDENT tiANDOUT 1750 1575 Initial Conditions:

1. The plant was shutdown for an extended outage to replace valves in Reactor Recirculation Loop A.
2. No Reactor Recirculation Pumps are running.
3. The following job is scheduled for vext shift:
a. Grease the suction valve limrtorque in Recirculation Loops B and C.
b. Manually cycle the valve once (0 -- C, C - 0) after lubrication.
c. Perform RBCCW valve lineups on Reactor Recirculation Pumps and Motors B and C.
d. The job will be performed by 2 Equipment Operators; each performing the work on 1 Reactor Recirculation Pumps/Motors.
e. The dose rate in the work area is 325 mrem/hr.
f. Greasing each valve will take 10 minutes.
g. Manually cycling the valve (0

- + C, C

h. The RBCCW valve lineup for each pump/motor will take 10 rnin Utes.
i.

Independent verifications on [he valve lineup will be performed later.

0) will take 10 minutes.
4. The available Equipment Operators next shift are listed below. No other qualified individuals with lower current year routine TEDE will be available to perform this work Name 1

SSN 1

Current year I

I j

T E D E n s EO Status I

Fully qualified EO Fully qualified EO; Declared

-1 1

Fully qualified EO EO candidate in the OJT Phase Fully qualified EO

~

4 pregnant on 1/1/08 I

1

~

~

I NRC JPM ADMlN SR04 Page 9 of 10

c-..

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET Task Cue:

Select the 2 Equipment Operators to perform the job.

Initiate Section 1 of Attachment 1, Dose Control Level Extension Form, to Procedure RP-AA-203, Exposure Control and Authorization, for the individuals selected to perform the jots, if required.

The selected individual(s) will sign the form if the form is required after initiation.

NRC JPM ADMIN SR04 Page 10 of 10

c AppendixC Job Performanlce Measure Form ES-C-1 WORKSHEET Facility:

Oyster Creek Task NO.:

2OOO5O2401- -. __ - __

Determine Emergency Classification and Protective Action Task

Title:

- Recommendations

_ _ ~ - -

Job Performance Measure No.:

NRC JPM ADMIN SR05 (SRO)

WA

Reference:

~~ Generic 2.4.29 (SRO 4.0)

Examinee:

E! xam in e r :

Method of Testing:

Simulated Performance Actual Performance X

Classroom Simulator Plant Read to the Examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:

All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #l indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem NRC JPM ADMIN SR05 Page 1 of 9

1 AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Task Standard: The emergency has been classified and the PARS have been determined.

Required Materials: None.

General

References:

1. EP-AA-1010, Radiological Emergericy Plan Annez for Oyster Creek Station, revision 0.
2. EP-AA-111, Emergency Classification and Protective Action Recommendations, revision 13.
3. EP-AA-111 -F-10, Oyster Creek Plant Based PAR Flowchart, revision A.

Initiating Cue: Classify the emergency event IAW EP-AA-1010 (include the EAL designation). State the reason for this classification.

Time Critical Task: Yes.

Validation Time:

12 minutes Part 1 10 minutes Part 2 NRC JPM ADMlN SR05 Page 2 of 9

AppendixC Job Performance Measure Form ES-C-1 WORKSHEET Performance Information Denote critical steps with a check mark 4 Performance Step: 1 Procedure Step: Provides repeat back of initiating cue.

- ~-

JPM Start Time:

Standard:

Comment:

Provides repeat back of iniiiating cue. Evaluator acknowledges the repeat back. Handout first page of STUDENT HANDOUT.

~

J Performance Step: 2

~-

~~~~

Procedure Step: Classifies ihe emergency as a General Emergency (FG1).

Standard:

Classifies the emergency as a General Emergency (FGI). This classification is made within 15 minutes from the JPM Start Time.

Reasons: Loss of Fuel Clad barrier (RPV water level c -20); Loss of Reactor Coolant barrier (RPV water level Loss of Primary Containment barrier (CHRRMS than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after shutdown).

0); and Potential 121 0 R/hr less Note:

Record time that the first page of the STUDENT HANOUT is received from each Candidate.

Comment:

~

~

SAT/U NSAT NRC JPM ADMIN SR05 Page 3 of 9

L Appendix C h

Job Performarwce Measure Form ES-C-1 WORKSHEET Performance Information

~

J Performance Step: 3 JPM Start Time: __

Note:

Once the first page of the STUDENT HANDOUT is collected from all Candidates, provide the second page, read the Additional Conditions, the Cue. and record new start time for this section.

Determine the Protective Action Recommendations (PARs) IAW EP-AA-111 and EP-AA-11 I -F-10. Provides repeat back of initiating cue. Evaluator acmowledges the repeat back Cue:

Procedure Step: Determines the Protective Action Recommendations (PARS),

Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwind include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages Standard:

Determines the Protective Action Recommendations (PARs):

Evacuate 2-mile radius and 5-mile downwind; shelter areas not evacuated (since there are no travel impediments). These areas 5-miles downwincr include the SSW, SW, and WSW Recommend KI for the General Public within the EPZ Advise the EPZ to monitor EAS messages The PARs are determined within 15 minutes from the General Emergency classification.

Note:

Comment:

Record time that the second page of the STUDENT HANOUT is received from each Candidate.

~

~-

~-

~ __

SATUNSAT NRC JPM ADMIN SR05 Page 4 of 9

Appendix C Job Performarice Measure Form ES-C-1 WORKSHEET Performance Information Terminating Cue: The emergency has been classified and the PARS have been determined. Record stop time on each Candidates second page.

NRC JPM ADMIN SR05 Page 5 of 9

Appendix C Job Performance Measure WORKSHEET Form ES-C-1

~~

Va I id at ion of Co m p I e t io n NRC JPM ADMIN SR05

- - ~

JPM Number:

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

_~

Question:

Result:

Sat isfactory/U nsatisfactory Examiners Signature and Date:

NRC JPM ADMIN SR05 Page 6 of 9

Appendix C G

I Job Performarice Measure Form ES-C-1 WORKSHEET Simulator Setup

1. None.

NRC JPM ADMIN SR05 Page 7 of 9

, 9.

Appendix C Job Performance Measure Form ES-C-1 WORKSHEET STUDENT HANDOUT Initial Conditions:

The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:

All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60 with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 o/o CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 115mRem Task Cue:

Classify the emergency event IAW EP-AA-1010 (include the EAL designation) and state the reason for this classification.

Emergency Classification:

Emergency Action Level designation:

Reason:

Name:

Time:..______I___

(NRC Only)

When complete, hand in this paqe.

NRC JPM ADMIN SR05 Page 8 of 9

d

0.

Appendix C Job Performance Measure Form ES-C-1 WORKS 1-1 E ET STUDENT hANDOUT Initial Conditions:

The plant was at rated power when an automatic scram occurred 45 minutes ago. The following conditions currently exist:

All but 8 control rods indicate full-in APRMs indicate downscale Reactor Engineering has determined that the reactor will remain shutdown under all conditions without boron RPV water level is -60' with Core Spray injecting Drywell pressure is 28 psig Drywell temperature is 270 O F Main Stack RAGEMS indicates 4.1 pCi/cc HRN Drywell hydrogen indicates 3.1 O h CHRRMS #1 indicates 1320 R/hr CHRRMS #2 is downscale due to a loss of power Dose assessment shows the highest dose at or beyond the site boundary is 11 5 mRem Additional Initial Conditions:

Environmental conditions show that the wind is from 50" at 20 mph There are no travel impediments Task Cue:

e Actibn Recommendations (PARS)

Protective Action Recommendations:

Time: ~

Name:

(NRC Only)

NRC JPM ADMIN SR05 Page 9 of 9