{{#Wiki_filter:Attachment 1 MAINE YANKEE LICENSE TERMINATION PLAN REVISION 3 (enclosed CD-ROM) 1 Maine Yankee to NRC Correspondence Supporting the LTP Review 5  Letter No Date Topic MN-01-034 August 16, 2001 Early Release of Backlands (Combined) MN-01-038 October 1, 2001 Submittal of Initial Characterization Survey Report and Historical Site Assessment MN-01-039 October 4, 2001 Maine Yankee LTP Related Calculations MN-01-041 October 16, 2001 Maine Yankee LTP Related Hydro-Geological Reports MN-01-040 October 17, 2001 Request for Expedited NRC Finding on the Status of the Intertidal Zone MN-01-044 November 19, 2001 Early Release of Backlands-Combined (Supplement to MN-01-034; addressed NRC Staff comments on the MY August 16, 2001 submittal) MN-02-002 January 16, 2002 Transmittal of Special Report: "Transuranic and Other Hard to Detect Radionuclides in Maine Yankee Sample Media" MN-02-009 February 14, 2002 Maine Yankee LTP Related Support Document - Resource Conservation Recovery Act (RCRA) Quality Assurance Project Plan (QAPP) MN-02-010 February 20, 2002 Maine Yankee Response to NRC RAI #16 (dated December 18, 2001) Addressing Site Hydrogeology MN-02-011 March 13, 2002 Response to NRC Request(s) for Additional Information for Maine Yankee Atomic Power Station License Termination Plan MN-02-012 March 13, 2002 Maine Yankee LTP Related Support Document -
{{#Wiki_filter:Attachment 1 MAINE YANKEE LICENSE TERMINATION PLAN REVISION 3 (enclosed CD-ROM)
 
Attachment 2 Maine Yankee to NRC Correspondence Supporting the LTP Review5 Letter No                 Date                                           Topic MN-01-034       August 16, 2001               Early Release of Backlands (Combined)
MN-01-038       October 1, 2001               Submittal of Initial Characterization Survey Report and Historical Site Assessment MN-01-039       October 4, 2001               Maine Yankee LTP Related Calculations MN-01-041       October 16, 2001               Maine Yankee LTP Related Hydro-Geological Reports MN-01-040       October 17, 2001               Request for Expedited NRC Finding on the Status of the Intertidal Zone MN-01-044       November 19, 2001             Early Release of Backlands-Combined (Supplement to MN-01-034; addressed NRC Staff comments on the MY August 16, 2001 submittal)
MN-02-002       January 16, 2002               Transmittal of Special Report: Transuranic and Other Hard to Detect Radionuclides in Maine Yankee Sample Media MN-02-009       February 14, 2002             Maine Yankee LTP Related Support Document - Resource Conservation Recovery Act (RCRA) Quality Assurance Project Plan (QAPP)
MN-02-010       February 20, 2002             Maine Yankee Response to NRC RAI #16 (dated December 18, 2001) Addressing Site Hydrogeology MN-02-011       March 13, 2002                 Response to NRC Request(s) for Additional Information for Maine Yankee Atomic Power Station License Termination Plan MN-02-012       March 13, 2002                 Maine Yankee LTP Related Support Document -
Comprehensive Natural Resource Protection Act (NRPA)
Comprehensive Natural Resource Protection Act (NRPA)
Application MN-02-015 April 11, 2002 Revised Maine Yankee Response to NRC RAI #5 (dated December 18, 2001) - Supplementary Historical Site  
Application MN-02-015       April 11, 2002                 Revised Maine Yankee Response to NRC RAI #5 (dated December 18, 2001) - Supplementary Historical Site Assessment (HSA) Data MN-02-017        April 23, 2002                Package 1 of RAI Related LTP Changes MN-02-030        June 26, 2002                  Submittal of CWPH NRPA Application and Other Related NRPA Review Documentation MN-02-037        August 28, 2002                Maine Yankee Addendum Report Regarding Site Hydrogeology MN-02-119        October 3, 2002                Minor Corrections to Maine Yankee Reponses to NRC Requests for Additional Information 5
This table provides a listing of key Maine Yankee to NRC correspondence supporting the NRCs review of LTP Revision 2, i.e., letters filed after the submittal of LTP Revision 2.
1
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Preface - Revision 3 Changes Section          Change / Topic                                          Source              Date P.2              Revised DCGL from 17,000 to 18,000                      MYAPC              100702 Section 1 - Revision 3 Changes Section          Change / Topic                                          Source              Date 1.1, 1.2        Decommissioning updates                                MYAPC              100702 1.2              SA / TIRP / RAI - Added updated discussion              MYAPC              042402 1.4.1            Revised to clearly reference the relevant license      RAI1-1              042302 condition 1.4.1            Revised to include an explanation of each of the        RAI1-23            042302 change criteria in the license condition 1.4.1            Revised to incorporate commitment (increase in a        RAI1-23-1          042302 DCGL).                                                  SA / A4-2, 3, 4 1.4.1            Added commitment to provide prior notification to      RAI1-23            072402 NRC re: survey unit classification downgrade.
1.4.1            Clarified sentence re: MYs effort to over perform    MYAPC              072602 1.4.1            Added additional clarification on less than 10 mrem    NRC Letter          091602 release criteria / ref to Table 6-11                    8/23/02            092102 092602 Revised 1.4.1 to be consistent with 5.6.4 regarding    RAI2-13b            092702 area classification downgrade to Class 2 or 3.
Reference to 5.6.4 added Updated to reflect MY agreement to provide NRC prior notice (at least 2 weeks) re: intent to downgrade SU classification.
1.4.1            Corrected license condition from 2.B(9) to (10)        MYAPC              100702 1.4.2            NRC letter to Maine Yankee, dated July 30, 2002,        NRC Ltr 7/30/02    091602 1.7              Issuance of Amendment No. 167, license amendment approving partial release of site lands. (Reference added to 1.7) 1.4.2.c          Updated to reflect the consolidated partial site        RAI1-2              042302 release application dated August 16, 2001 and the acreage will be corrected 1.5.2, 1.7      Revised titles used for GTS report to be consistent;    RAI1-3/4            081902 corrected ref 1.7 (same as in Section 2 and 5) 1.7              Add references to PSDAR, DSAR, LD2688-SP1084            MYAPC              090602 072602 Attach 1A        Removed Draft from footer, numbered pages as a        MYAPC              092502 separate attachment                                                        042402 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 1
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 2 - Revision 3 Changes Section          Change / Topic                                          Source              Date Various          Updated various references to attachments (adding      NRC comment        100902 subsections      2 to Rev 0 attachment titles)                        10/8/02 2.1, 2.2.5,      Various clarification updates re: ICS/CCS              RAI1-3, 4          081902 2.2.6, 2.3,      nomenclature in text.
2.3.2a, 2.3.4b, Table 2-2, 2.3.5, 2.3.5a/b, 2.4.4, 2.4.7, 2.5, 2.5.2a, 2.1 thru 2.7    (Same as above entry)                                  RAI1-4              053102 2.2.1            Added CSB spill events to HSA key items listing;      RAI1-5              042302 updated total HSA items 2.2.5            Updated refueling cavity water processing              MYAPC              053102 2.2.5            Updated to reflect Backlands license amendment          MYAPC              082902 2.2.5            Updated to reflect the August 13, 2001 and              RAI1-7              042302 November 19, 2001 partial site release applications.
The references to Attachment A will be deleted; Attachment 2A updated.
2.2.5            Updated to reflect fuel transfer to ISFSI              MYAPC              100602 2.3.4.d          Clarified the exposure rate of soil for 5 pCi/g        RAI1-8              042302 2.3.7            Added footnotes to clarify survey packages              MYAPC              100902 2.4.7.b          numbering system (i.e., ICS to later CCS) 2.4.7            Updated embedded piping footage                        MYAPC              092102 091002 090302 2.4.8            Clarified core population samples                      RAI1-9              080602 2.5.2.b          Corrected MDAs of 0.01 pCi/g to 1.0 pCi/g              RAI1-11b            082802 2.5.2.b &        Added ref to new Attachment 2I                          RAI1-11a & 15a      090302 2.5.3.c 2.5.2.d          Clarified buried pipe contribution (relationship) to    RAI1-12            042302 annual dose (i.e., much less) 2.5.2.f (g)      Corrected typo - should be 2.5.2f                      MYAPC              090902 2.5.2.g,        Forebay characterization discussion. Added NEW          RAI1-17.1          091602 2.5.3.e,        Attachment 2H                                                              071202 Attach 2H 2.5.3.a          Revised wording to provide ref. to Att 2F for core      RAI1-14.4          092402 Table 2-7,8      variability for BOP and Special Areas                                      052202 (titles)        Expand discussion of O/A trench to include all special areas Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 2
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date 2.5.3.b          Added:...an evaluation will be performed to            RAI1-14-1          042302 determine if changes to the nuclide fraction are warranted.
2.5.3.c          Added footnote to 2.5.3c reflecting wording from        RAI1-15a            092002 RAI1-15a response about HPCI/LPCI lines.
2.5.3.d          Revised discussion on site hydrogeology, primarily      RAI1- 16            092002 2.5.2.f          reference to latest reports to NRC of 2/20/02 and 2.7              8/28/02 on groundwater.
Table 2C-3 2.5.3f revised to reference 2.5.3d. Also revised to reference Table 2C-3. And revised to explain why fire pond data is not in Table 2C-3 MY submittals to NRC (RAI1-16 response and Stratex reports) added to References in 2.7 Table 2C-3 revised; added note regarding Attachment 2H.
2.5.3.f          Added new section title; Future Sampling              RAI1-13.e          042302 RAI1-15 RAI1-17 2.5.3.f          Editorial changes to Future Sampling section;        MYAPC              052102 providing updated references to tables in text.
2.7.11          Updated NRC ref                                        RAI2-16            082602 2.7.16          Added reference to TIRPs TRU-HTD report                RAI1-14.3          082802 2.7.18          Added EC-041-01 to references                          RAI1-17.1          091502 2.7.23          Added reference to supplemental HSA information        RAI1-5              100902 NRC comment 10/08/02 Attach 2A        Revised to be consistent with the consolidated partial  RAI1-7              042302 site release application package                        RAI1-18 Attach 2F        Revised to be consistent with Calculation EC 011        Numerous RAIs      073102 and per TIRP/LTP Team comments                          TIRP Attach 2G        Added new Attachment 2G to describe processing          RAI1-14.3          080502 (and other details) re: concrete cores Attach 2H        New Attachment 2H added to provide detail on            RAI1-17.1          100902 forebay/diffuser characterization.                      FOTC comment Updated status of forebay dike boring effort; indicated schedule for providing NRC results Attach 2I        Added new Attachment 2I                                RAI1-11a & 15a      090302 Attachments      All attachments created as separate files              MYAPC              092002 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 3
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date Table 2-10      1.5 to 3.5 depth, Variance of act concrete              RAI1-14.2          042302 ACTIVITY with depth / added ***note per JCD and                            100902 corrected 0-0.5" sample activity.
Corrected entry (i.e., label on slice) to 1.5 to 4.0 Table 2-12      Corrected title: fractions vs concentrations            RAI1-17            042302 Table 2-13 Table 2-5        Added a row to segregate the exposure rate for the      RAI1-10            042302 woodland and scrub areas Table 2-6        H-3 should be 400 (max)                                RAI1-10            042302 Table 2-8        Updated Special Area nuclide fractions                  RAI1-14-4          092402 Table 2A-3      1997 GTS: Eaton Farm = 0.45 vs 0.46,                    MYAPC              053002 Merrymeeting = 0.42 vs 0.35 Table 2A-7      Corrected Eaton Farm / Merrymeeting                    MYAPC              053002 Table 2A-8 &    Added new tables                                        MYAPC              053002 9
Table 2B-5      Revised Cs-137 numbers / Added footnote:
* MYAPC              053002 Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.
Table 2B-6      Added discrete particle footnote                        RAI1-11c            082802 Table 2B-8      Revised to show the MDA values for each of the          RAI1-10            042302 above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L).
Table 2C-2      Added note to title, i.e., geometry corrected except as MYAPC              100602 noted (1)
Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data Table 2C-2      Sample 10-3A: added a decimal point (21.5)              RAI1-14-3          053002 Added footnote on geometry correction Table 2C-2      Added note (2) on net count rate                        RAI1-14.3          090302 Table 2C-3      Corrected Sb-125 = 0.4                                  RAI1-17            042302 Section 3 - Revision 3 Changes Section          Change / Topic                                          Source              Date 3.0 etc          General updates to sections to reflect current state of MYAPC              100702 decommissioning 3.1.2            Updated to include a description of the August 16th    RAI1-19            042302 and November 19th application supplements.
3.1.2            Updated to reflect completed construction of ISFSI      MYAPC              091902 and commencement of fuel movement
 
====3.1.2 Updated====
NRC approval of backlands license              MYAPC              091902 3.7.7            amendment. Added reference to NRC letter in Sect.
3.7 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 4
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date 3.1.3            Revised to include the requirement to perform FSS      RAI1-20            042302 prior to allowing a basement to be backfilled.
3.1.3            Revised / Added ref to NRC Circular 81-07              SA / A3-1          091002 3.7.7            Deleted reference to Cumulative Risk letter            MYAPC              042402 Section 4 - Revision 3 Changes Section          Change / Topic                                          Source              Date Attach 4A        Created separate file to allow consistency in format /  MYAPC              092202 page numbering Attach 4B        Created separate file to allow consistency in format /  MYAPC              092202 page numbering Section 5 - Revision 3 Changes Section          Change / Topic                                          Source              Date 5.1.3            Updated to reflect NRC license amendment on            MYAPC              092902 backlands 5.1.4            Reference to 1.4.2.c - made consistent with the        RAI2-2              042302 current partial site release application package 5.1.4, 5.12      Updated NRC / EPA references                            RAI2-16            082602 5.10.1          Updated Organization                                    RAI2-15            092202 Figure 5-6      - Corrected title of ISPRE                                                  080102
                  - Radiochemist role per 5.14 of PMP 6.0 5.11.3          Changed work order process to administrative            MYAPC (QA)          071602 controls 5.2.3            Changed the "may" to "will" to require FSS prior to    RAI2-3f            042302 backfilling excavated foundations. / replaced "RA" with "Industrial Area 5.2.3            Described survey unit design limitations                RAI2-3d            053102 5.2.3            Added RAI response excerpt, rationale for              RAI2-3e            060402 classifying bldg footprint lower than foundation surface.
5.2.3            Added reference to Attachment 5A in text                RAI2-3c            060402 5.2.4, 5.4.5.b,  Updated forebay discussion (5.2.4); clarified          RAI1-3/4            081902 Attach 5A        ICS/CCS.
5.3.1            Added rationale for survey unit size                    RAI2-4              042302 5.3.1.a          Clarified: survey unit size for standing buildings is  RAI2-4              092102 based on scenario pathways 5.4.2            Corrected typo: Appendix E of NUREG 1727                                    092402 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date 5.4.2.c          Added RAI excerpt on conservative use of sigma and RAI2-3g                  091902 5.2.3            discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 5.4.3            Added SA Item B.3                                      SA / B.3            042402 5.4.3            Added statement re: how significant variations in      RAI2-6              060402 background reference areas would be addressed.
5.4.3            Added paragraph on background subtraction              MYAPC              100702 5.4.4            Added recognition of triangular grid method            RAI2-7b            042302
 
====5.4.4 Clarified====
if sole use of GPS , a more accurate system RAI2-7a              042302 will be obtained 5.4.4.b          Deleted FSSC                                            MYAPC              071702 5.4.5            Added QC measures in SU design and FSS                  RAI2-8              060302 5.4.5.d, f      implementation.
5.10.5.c        Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response 5.4.5.b          Clarified data list                                    MYAPC              042402 5.4.5.f          Changed floppy disc: to appropriate storage media      MYAPC              100702 5.5.1.a          Expanded discussion on activated concrete              State of Maine      101002 (Comment #73) 5.5.1.a          Added paragraph on removable contamination              RAI2-12a            060402 surveys (excerpt from RAI2-12a response) 5.5.1.a          Corrected land scan speed to = 0.25m/sec                MYAPC              100702 5.5.2.d          deleted para on Land Area Scans 5.5.1.a,d        Added T2-8 reference and add. paragraph on Vol.        RAI2-9              060402 Conc. Meas.
5.5.1.b          Clarified last para under Stored Excavated Soil        MYAPC              042402 5.5.1.b          Clarified 2nd para under Volumetric Samples            MYAPC              042402 5.5.1.b          Added RAI response excerpt, additional detail of        RAI2-11            060302 actions taken to survey and handle stored soil for future re-use on site.
5.5.1.d          Updated forebay discussion                              MYAPC              053002 5.5.1.d          Changed Section title to specific from special -    MYAPC              092502 to avoid confusion with Section 2 Special Areas 5.5.2.d          Added reference to EC-009-01 (Ref 5.12.32)              RAI2-12.c          092502 5.5.2.d          Added ref to Section 6.7.2                              RAI2-12.d          042402 5.5.2.d          Reorganized; added discussion on Structure MDC          RAI2-12.e.2        050102 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date 5.5.2.d          Expanded detail on land survey technique re:            RAI2-12.e.3        091002 distance to surface, peak trap mode, etc.
5.5.2.d          Changed soil DCGL from 3.0 to 3.2                      MYAPC              091002 Table5-6 5.5.2.e          Added discussion on Co-60 discrete particle            RAI2-12.e.3        050102 capability and confirms E600 operation in SCA          RAI2-1.3 mode. Added statement on Cs-137 (at 3 pCi/g) 5.5.2.f          Added discussion on Es                                  RA12-12g            053002 5.5.2.g          Expanded Pipe crawler discussion                        RAI2-12h            092502 053002
 
===5.6 Clarified===
elevated measurement was the result of a RAI2-3a                042302 discrete particle or a distributed source 5.6.2            E600 closure action. Added more detailed                RAI2-12.f.3        050202 discussion on actions upon receiving confirmed indication of elevated area.. Added reference to 5.6.4 re: more discussion on reclassification.
5.6.3            Added note from MARSSIM 8.5.2 (Rev 1 as                MYAPC              081202 published in FedReg, 6/01) 5.6.3            Added TIRP PS-4 Unity Rule changes, including          MYAPC              091002 5.8.1.d          NEW Section 5.8.1.d                                    TIRP                081702 5.8.1d revised to remove exact dose result of 7.52                          093002 5.6.4            5.6.4: further revised to address downgrade from        RAI2-13.b          092102 5.12            Class 1 or 2 to Class 3.                                                    091602 050102 Further revisions to 5.6.4 to reference 8/23/02 NRC letter on downgrades and to clearly specify Class 1 to Class 2 downgrade considerations Expanded discussion on evaluation actions in an investigation 5.8.1.b          Corrected Wr value criteria                            MYAPC              042402 5.8.1.b,c        Corrected WRS Test and Sign Test equations to be        RAI2-14            042302 consistent with MARSSIM 5.8.1.b,c        Corrected N nomenclature, added 40% or fewer RAI2-14                      042302 less than values qualifier.
5.9.4            Clarifications for consistency with FSS procedures      MYAPC (QA)          071602 Attach 5A        Updated piping data                                    MYAPC              090402 Table 5-1A      Revised survey area sizes                              MYAPC              060502 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 7
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date Table 5-1A      Section 5, QA/Licensing Compliance Review              MYAPC              082102 to 5-1C          changes Table 5-1E 5.4.5.i 5.5.1 5.1.2 5.6 5.6.1 5.6.3 5.7.2 5.8.1.c 5.9.1 5.10.2.d,f Table 5-1B      Inserted N/A for Information Center (B1400)            MYAPC              100702 exterior Table 5-2        Revised by removing the reference to buried            RAI2-4              042302 piping/conduit.
Added footnote will be added to Table 5-2 indicating that the 180 m2 includes floor and lower walls Table 5-3a      Corrected typo for Sr-90                                MYAPC              100702 Table 5-4        Added revised detector areas for 43-37 and 43-37-1      RAI2-12.b          061902 instruments; revised column header: total detector area Table 5-4        Added Ludlum window info.                              RAI2-12b            042302 Corrected window data in response.
Table 5-4a      Correct typo for land area scan MDC for Type 1=0.5      MYAPC              061902 at 16 and 15 m2 area Table 5-4a      New title (Land Area Scan MDC) since new Table          RAI2-12.e.3        050202 5-4b covers Structure Scan MDC Added reference in table to Section 6.7 (4.2 Ci/g DCGL explanation)                                      RAI2-12.c Table 5-4b      New table on Structure Scan MDC                        RAI2-12.e.2        050102 Table 5-6        Updated liquid beta parameters                          MYAPC              042402 Table 5-6        Added TBD scan MDCs / corrected detector                RAI2-12f-1          042402 nomenclature Table 5-7        Added footnote on scan MDC: Must be calculated a        MYAPC              091002 priori Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 8
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 6 - Revision 3 Changes Section          Change / Topic                                          Source              Date 6.1              Removed the word conduit associated with buried      MYAPC              092102 6.5.1            pipe 6.5.4 6.6.8 6.7.2 Table 6-1 6.10.6          Added calculation EC 004-01 ref                        RAI1-17.1          082802 6.3              Deleted obsolete NRC ref to Regulatory Guide DG-        RAI2-16            082602 4006 6.3              Reworded passage on contamination on basement          MYAPC              100702 surfaces 6.6.1.a and d    Added flowable fill to discussion                    MYAPC              100702 6.6.1.c          Corrected soil depth from 5.8 to 2.8 m                  MYAPC              100702 6.6.2            Updated concrete / rebar dose                          MYAPC              092102 6.6.2.b          Corrected inventory form 3.43 to 3.30E+08              MYAPC              100702 6.6.3            Updated to reflect Embedded Spray Pump piping          MYAPC              092102 6.6.3 / 6.7.2    Updated embedded piping info                                                082602 6.6.5.a          Corrected vol. source term = 28500 m3                  MYAPC              100702 6.6.6            Updated groundwater discussion to reflect              RAI1-16            092002 commitment for routine sampling of CFS and PAB test pit. Include reference back to 2.5.3d.
6.6.9            Added new text                                          RAI1-17.1          082802 6.7              Added explanation of 4.2 pCi/g                          RAI1-21.1          053002 6.7              Revised soil DCGL to 3.2                                MYAPC              091002 6.7, 6.7.2      Revised OA trench text to special areas              MYAPC              082802 6.7.16          Added EC 041-01 to Section 6 references                MYAPC              091502 6.7.2            Added explanation of 4.2 pCi/g (DCGL outside RA)        RAI2-12.c          060502 6.7.2            TIRP PS-4 Unity Rule changes                            RAI2-12d            093002 TIRP Revised to replace exact dose value of 7.52 mrem/y for more general language 6.8.3            Added new sections to address AF for buried and        RAI1-25a & c        091602 6.8.4            embedded piping 6.8.5 Attach 6-13      Updated DCGLs / dose                                    MYAPC              092002 Attach 6-17      Updated activated rebar table                          MYAPC              092002 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 9
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section          Change / Topic                                          Source              Date Attach 6-18      Updated / corrected title (special areas)              MYAPC              092002 Attach 6-19      Added: Special Areas Unitized Dose Factors              MYAPC              092002 Attach 6-2, 6-  Updated per latest engineering calculations            EC-041-01          092502 6, 6-8, 6-9, 6-11, 6-12, 6-14, 6-15, 6-16 Attach 6-7      Updated per latest engineering calculations and/or      MYAPC              090302 new version      technical basis document Table 6-10      Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-11      Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-12      Updated per latest engineering calculations and/or      MYAPC              092302 technical basis document Table 6-14      Updated per latest engineering calculations and/or      MYAPC              092302 technical basis document Table 6-3        Updated per latest engineering calculations and/or      MYAPC              092102 technical basis document Table 6-4        Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-5        Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-6a      Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-6b      Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Table 6-8        Updated per latest engineering calculations and/or      MYAPC              092302 technical basis document Table 6-9        Updated per latest engineering calculations and/or      MYAPC              092002 technical basis document Section 7 - Revision 3 Changes Section          Change / Topic                                          Source              Date 7.0              Updated per Financial                                  MYAPC              042302 7.1              Removed ref. To Appendix C                              RAI2-18            042302 Table 7-1        Added TLG Site Specific Cost Estimate to title        RAI2-17            042302 Table 7-2        Added to title: and Financial Planning Estimate        RAI2-17            042302 and updated data Table 7-3        Added new table                                        RAI2-19            042302 Table 7-3        Added footnote re: FSS cost estimate.                  RAI2-19            073002 Table 7-3        Added Notes label to bottom of table                  MYAPC              091202 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 10
 
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 8 - Revision 3 Changes Section          Change / Topic                                          Source              Date 8.1.1            Identified specific document that bounds the env        RAI1-27            073002 8.1.4            impact per RAI request 8.1.8 8.3 8.1.1            Updated NRC ref for NUREG 1700                          RAI2-16            082602


Assessment (HSA) Data MN-02-017 April 23, 2002 Package 1 of RAI Related LTP Changes MN-02-030 June 26, 2002 Submittal of CWPH NRPA Application and Other Related NRPA Review Documentation MN-02-037 August 28, 2002 Maine Yankee Addendum Report Regarding Site Hydrogeology MN-02-119 October 3, 2002 Minor Corrections to Maine Yankee Reponses to NRC Requests for Additional Information
===8.2 Updated===
Comprehensive NRPA re: alternative            RAI1-32            060602 8.9              analysis for demolition of forebay and diffuser.
Numerous additions to Reference (8.9) as appropriate to support NRPA related changes.
8.2, 8.4.6      Various updates/ larifications from MY RCRA            MYAPC              081202 8.6.3            specialist; included clarification of LTP use of        EPA comments 8.6.13          unrestricted release under 50.82 vs. use of            (various) 8.8              institutional controls re: to non-rad assessment.
Updates, in part, address several related EPA comments as well.
8.2              Expanded discussion on forebay remediation /            State of Maine      100902 8.6.4            NRPA review process / MDEP conditional approval        (MDEP comment 10/8/02) 8.3.2            Clarified the reference to Regulatory Guide 1.185 RAI1-28                  030602 Section C.6 "Changes to the PSDAR" 8.3.2            Added discussion: meeting RG 1.185 per RAI              RAI1-28            073002 (bounded by FGEIS; no PSDAR revision needed) 8.4.1            Updated to reflect the partial site release application RAI1-29            030602 submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies.
8.4.1            Updated to reflect granting of license amendment.      RAI1-29            072602 8.4.11          Added review by State re: historical and                RAI1-30            040302 archeological resources 8.6.13          Clarification on meaning of radiological                EPA#71              072602 8.1.2            unrestricted use; clarify potential for institutional 8.2              controls.
8.6.2            RCRA update, per response to RAI                        RAI1-33            072602 100902 Revised per 10/9/02 comments from MDEP; clarify        State of Maine conditional aspects of forebay NRPA permit.            (MDEP comment 10/8/02)
Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 11


5  This table provides a listing of key Maine Yankee to NRC correspondence supporting the NRC's review of LTP Revision 2, i.e., letters filed after the submittal of LTP Revision 2. Summary Listing of LTP Revision 3 Changes - by Section Source Key
Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section         Change / Topic                                         Source             Date 8.6.4           -Relocated NRPA info to 8.6.4, added discussion on     RAI1-31            040202 8.4             Circ Water Pump House NRPA                              RAI1-32            053102
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 1 Preface - Revision 3 Changes Section  Change / Topic Source Date P.2 Revised DCGL from 17,000 to 18,000 MYAPC 100702  Section 1 - Revision 3 Changes Section  Change / Topic Source Date 1.1, 1.2 Decommissioning updates MYAPC 100702 1.2 SA / TIRP / RAI - Added updated discussion MYAPC 042402 1.4.1 Revised to clearly reference the relevant license condition RAI1-1 042302 1.4.1 Revised to include an explanation of each of the change criteria in the license condition RAI1-23 042302 1.4.1 Revised to incorporate commitment (increase in a DCGL). RAI1-23-1 SA / A4-2, 3, 4 042302 1.4.1 Added commitment to provide prior notification to NRC re: survey unit classification downgrade. RAI1-23 072402 1.4.1 Clarified sentence re: MY's effort to "over perform" MYAPC 072602 1.4.1 Added additional clarification on less than 10 mrem release criteria / ref to Table 6-11 Revised 1.4.1 to be consistent with 5.6.4 regarding area classification downgrade to Class 2 or 3. Reference to 5.6.4 added Updated to reflect MY agreement to provide NRC prior notice (at least 2 weeks) re: intent to downgrade SU classification. NRC Letter 8/23/02  RAI2-13b 091602 092102 092602 092702 1.4.1 Corrected license condition from 2.B(9) to (10)
                  -Added reference to Section 8.5 and 8.6 in 8.4                             080502
MYAPC 100702 1.4.2 1.7 NRC letter to Maine Yankee, dated July 30, 2002, Issuance of Amendment No. 167, license amendment approving partial release of site lands.  (Reference added to 1.7) NRC Ltr 7/30/02 091602 1.4.2.c Updated to reflect the consolidated partial site release application dated August 16, 2001 and the acreage will be corrected RAI1-2 042302 1.5.2, 1.7 Revised titles used for GTS report to be consistent; corrected ref 1.7 (same as in Section 2 and 5) RAI1-3/4  081902 1.7 Add references to PSDAR, DSAR, LD2688-SP1084 MYAPC 090602 072602 Attach 1A Removed "Draft" from footer, numbered pages as a separate attachment MYAPC 092502 042402    Summary Listing of LTP Revision 3 Changes - by Section Source Key
                  -Revised 8.6.4 to update for CWPH and Comp                                  100702 NRPA app and approvals 8.6.4 Revised per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan.
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 2 Section 2 - Revision 3 Changes Section Change / Topic Source Date Various subsections Updated various references to attachments (adding "2" to Rev 0 attachment titles) NRC comment 10/8/02 100902 2.1, 2.2.5, 2.2.6, 2.3, 2.3.2a, 2.3.4b, Table 2-2, 2.3.5, 2.3.5a/b, 2.4.4, 2.4.7, 2.5, 2.5.2a,  Various clarification updates re:  ICS/CCS nomenclature in text. RAI1-3, 4 081902 2.1 thru 2.7 (Same as above entry) RAI1-4 053102 2.2.1 Added CSB spill events to HSA "key" items listing; updated total HSA items RAI1-5 042302 2.2.5 Updated refueling cavity water processing MYAPC 053102 2.2.5 Updated to reflect Backlands license amendment MYAPC 082902 2.2.5 Updated to reflect the August 13, 2001 and November 19, 2001 partial site release applications. The references to Attachment A will be deleted; Attachment 2A updated. RAI1-7 042302 2.2.5 Updated to reflect fuel transfer to ISFSI MYAPC 100602 2.3.4.d Clarified the exposure rate of soil for 5 pCi/g RAI1-8 042302 2.3.7 2.4.7.b Added footnotes to clarify survey packages numbering system (i.e., ICS to later CCS)
8.6.7            Discharges will be iaw requirements of the              EPA#69              072602 appropriate discharge permit.
MYAPC 100902 2.4.7 Updated embedded piping footage MYAPC 092102 091002 090302 2.4.8 Clarified core population samples RAI1-9 080602 2.5.2.b Corrected MDAs of 0.01 pCi/g to 1.0 pCi/g RAI1-11b 082802 2.5.2.b & 2.5.3.c Added ref to new Attachment 2I RAI1-11a & 15a 090302 2.5.2.d Clarified buried pipe contribution (relationship) to annual dose (i.e., much less) RAI1-12 042302 2.5.2.f (g) Corrected typo - should be 2.5.2f MYAPC 090902 2.5.2.g, 2.5.3.e,  Attach 2H  Forebay characterization discussion. Added NEW Attachment 2H RAI1-17.1 091602 071202  2.5.3.a Table 2-7,8 (titles) Revised wording to provide ref. to Att 2F for core variability for BOP and Special Areas Expand discussion of O/A trench to include all "special areas" RAI1-14.4 092402 052202    Summary Listing of LTP Revision 3 Changes - by Section Source Key
8.6.9            Amended to reflect noise control provisions            EPA#50.b            072602 8.9             Updated Reference listing and all ref cites in text. MYAPC              090302 080102 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12}}
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 3 Section  Change / Topic Source Date 2.5.3.b Added:...an evaluation will be performed to determine if changes to the nuclide fraction are warranted. RAI1-14-1 042302 2.5.3.c Added footnote to 2.5.3c reflecting wording from RAI1-15a response about HPCI/LPCI lines. RAI1-15a 092002 2.5.3.d 2.5.2.f 2.7 Table 2C-3 Revised discussion on site hydrogeology, primarily reference to latest reports to NRC of 2/20/02 and 8/28/02 on groundwater.
2.5.3f revised to reference 2.5.3d. Also revised to reference Table 2C-3. And revised to explain why fire pond data is not in Table 2C-3 MY submittals to NRC (RAI1-16 response and Stratex reports) added to References in 2.7 Table 2C-3 revised; added note regarding Attachment 2H. RAI1- 16 092002 2.5.3.f Added new section title; "Future Sampling" RAI1-13.e RAI1-15 RAI1-17 042302 2.5.3.f Editorial changes to "Future Sampling" section; providing updated references to tables in text.
MYAPC 052102 2.7.11 Updated NRC ref RAI2-16 082602 2.7.16 Added reference to TIRP's TRU-HTD report RAI1-14.3 082802 2.7.18 Added EC-041-01 to references RAI1-17.1 091502 2.7.23 Added reference to supplemental HSA information RAI1-5 NRC comment 10/08/02 100902 Attach 2A Revised to be consistent with the consolidated partial site release application package RAI1-7 RAI1-18 042302 Attach 2F Revised to be consistent with Calculation EC 011 and per TIRP/LTP Team comments Numerous RAIs TIRP 073102  Attach 2G Added new Attachment 2G to describe processing (and other details) re: concrete cores RAI1-14.3 080502 Attach 2H New Attachment 2H added to provide detail on forebay/diffuser characterization.
Updated status of forebay dike boring effort; indicated schedule for providing NRC results  RAI1-17.1 FOTC comment 100902 Attach 2I Added new Attachment 2I RAI1-11a & 15a 090302 Attachments All attachments created as separate files MYAPC 092002    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 4 Section  Change / Topic Source Date Table 2-10 1.5 to 3.5 depth, Variance of act concrete ACTIVITY with depth / added ***note per JCD and corrected 0-0.5" sample activity.
Corrected entry (i.e., label on slice) to "1.5 to 4.0" RAI1-14.2 042302 100902 Table 2-12 Table 2-13 Corrected title: fractions vs concentrations RAI1-17 042302 Table 2-5 Added a row to segregate the exposure rate for the woodland and scrub areas  RAI1-10 042302 Table 2-6 H-3 should be 400 (max) RAI1-10 042302 Table 2-8 Updated Special Area nuclide fractions RAI1-14-4 092402 Table 2A-3 1997 GTS: Eaton Farm = 0.45 vs 0.46, Merrymeeting = 0.42 vs 0.35 MYAPC 053002 Table 2A-7 Corrected Eaton Farm / Merrymeeting MYAPC 053002 Table 2A-8 &
9 Added new tables MYAPC 053002 Table 2B-5 Revised Cs-137 numbers /  Added footnote:
* Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.
MYAPC 053002 Table 2B-6 Added discrete particle footnote RAI1-11c 082802 Table 2B-8 Revised to show the MDA values for each of the above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L). RAI1-10 042302 Table 2C-2 Added note to title, i.e., geometry corrected except as noted (1) Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data MYAPC 100602 Table 2C-2  Sample 10-3A: added a decimal point (21.5) Added footnote on geometry correction RAI1-14-3 053002 Table 2C-2 Added note (2) on net count rate RAI1-14.3 090302 Table 2C-3 Corrected Sb-125 = 0.4 RAI1-17 042302  Section 3 - Revision 3 Changes Section  Change / Topic Source Date 3.0 etc General updates to sections to reflect current state of decommissioning MYAPC 100702 3.1.2 Updated to include a description of the August 16th and November 19th application supplements. RAI1-19 042302 3.1.2 Updated to reflect completed construction of ISFSI and commencement of fuel movement MYAPC  091902 3.1.2 3.7.7 Updated: NRC approval of backlands license amendment. Added reference to NRC letter in Sect.
3.7 MYAPC  091902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5 Section  Change / Topic Source Date 3.1.3 Revised to include the requirement to perform FSS prior to allowing a basement to be backfilled. RAI1-20 042302 3.1.3 Revised / Added ref to NRC Circular 81-07 SA / A3-1 091002 3.7.7 Deleted reference to Cumulative Risk letter MYAPC 042402  Section 4 - Revision 3 Changes Section  Change / Topic Source Date Attach 4A Created separate file to allow consistency in format / page numbering MYAPC 092202 Attach 4B Created separate file to allow consistency in format / page numbering MYAPC 092202  Section 5 - Revision 3 Changes Section  Change / Topic Source Date 5.1.3 Updated to reflect NRC license amendment on backlands MYAPC 092902 5.1.4 Reference to 1.4.2.c - made consistent with the current partial site release application package  RAI2-2 042302 5.1.4, 5.12 Updated NRC / EPA references RAI2-16 082602 5.10.1 Figure 5-6 Updated Organization - Corrected title of ISPRE - Radiochemist role per 5.14 of PMP 6.0 RAI2-15 092202 080102 5.11.3 Changed work order process to administrative controls MYAPC (QA) 071602 5.2.3 Changed the "may" to "will" to require FSS prior to backfilling excavated foundations. / replaced "RA" with "Industrial Area RAI2-3f 042302 5.2.3 Described survey unit design limitations RAI2-3d 053102 5.2.3 Added RAI response excerpt, rationale for classifying bldg footprint lower than foundation surface. RAI2-3e 060402 5.2.3 Added reference to Attachment 5A in text RAI2-3c 060402 5.2.4, 5.4.5.b, Attach 5A Updated forebay discussion (5.2.4); clarified ICS/CCS. RAI1-3/4  081902 5.3.1 Added rationale for survey unit size RAI2-4 042302 5.3.1.a Clarified: survey unit size for standing buildings is based on scenario pathways  RAI2-4 092102 5.4.2 Corrected typo: Appendix E of NUREG 1727 092402    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6 Section  Change / Topic Source Date 5.4.2.c 5.2.3 Added RAI excerpt on conservative use of sigma and discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 RAI2-3g 091902 5.4.3 Added SA Item B.3 SA / B.3 042402 5.4.3 Added statement re: how significant variations in background reference areas would be addressed. RAI2-6 060402 5.4.3 Added paragraph on background subtraction MYAPC 100702 5.4.4 Added recognition of triangular grid method RAI2-7b 042302 5.4.4  Clarified: if sole use of GPS , a more accurate system will be obtained RAI2-7a 042302 5.4.4.b Deleted FSSC MYAPC 071702 5.4.5 5.4.5.d, f 5.10.5.c  Added QC measures in SU design and FSS implementation. Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response RAI2-8 060302  5.4.5.b Clarified data list MYAPC 042402 5.4.5.f Changed "floppy disc: to appropriate storage media MYAPC 100702 5.5.1.a Expanded discussion on activated concrete State of Maine (Comment #73) 101002 5.5.1.a Added paragraph on removable contamination surveys (excerpt from RAI2-12a response) RAI2-12a 060402 5.5.1.a 5.5.2.d Corrected land scan speed to = 0.25m/sec deleted para on Land Area Scans MYAPC 100702 5.5.1.a,d Added T2-8 reference and add. paragraph on Vol. Conc. Meas. RAI2-9 060402 5.5.1.b Clarified last para under Stored Excavated Soil MYAPC 042402 5.5.1.b Clarified 2 nd para under Volumetric Samples MYAPC 042402 5.5.1.b Added RAI response excerpt, additional detail of actions taken to survey and handle stored soil for future re-use on site. RAI2-11 060302  5.5.1.d Updated forebay discussion MYAPC 053002 5.5.1.d Changed Section title to "specific" from "special" - to avoid confusion with Section 2 "Special Areas" MYAPC 092502 5.5.2.d Added reference to EC-009-01 (Ref 5.12.32) RAI2-12.c 092502 5.5.2.d Added ref to Section 6.7.2 RAI2-12.d 042402 5.5.2.d Reorganized; added discussion on Structure MDC RAI2-12.e.2 050102    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 7 Section  Change / Topic Source Date 5.5.2.d Expanded detail on land survey technique re: distance to surface, peak trap mode, etc. RAI2-12.e.3 091002 5.5.2.d Table5-6 Changed soil DCGL from 3.0 to 3.2 MYAPC  091002 5.5.2.e Added discussion on Co-60 discrete particle capability and confirms E600 operation in SCA mode. Added statement on Cs-137 (at 3 pCi/g) RAI2-12.e.3 RAI2-1.3 050102 5.5.2.f Added discussion on Es RA12-12g 053002 5.5.2.g Expanded Pipe crawler discussion RAI2-12h 092502 053002 5.6  Clarified: elevated measurement was the result of a discrete particle or a distributed source RAI2-3a 042302  5.6.2 E600 closure action. Added more detailed discussion on actions upon receiving confirmed indication of elevated area.. Added reference to 5.6.4 re: more discussion on reclassification. RAI2-12.f.3 050202 5.6.3 Added note from MARSSIM 8.5.2 (Rev 1 as published in FedReg, 6/01)
MYAPC 081202 5.6.3 5.8.1.d Added TIRP PS-4 Unity Rule changes, including NEW Section 5.8.1.d 5.8.1d revised to remove exact dose result of 7.52 MYAPC TIRP  091002 081702  093002 5.6.4 5.12 5.6.4: further revised to address downgrade from Class 1 or 2 to Class 3.
Further revisions to 5.6.4 to reference 8/23/02 NRC letter on downgrades and to clearly specify Class 1 to Class 2 downgrade considerations Expanded discussion on evaluation actions in an investigation RAI2-13.b 092102 091602 050102    5.8.1.b Corrected W r value criteria MYAPC 042402 5.8.1.b,c Corrected WRS Test and Sign Test equations to be consistent with MARSSIM RAI2-14 042302  5.8.1.b,c Corrected "N" nomenclature, added 40% or fewer "less than" values qualifier. RAI2-14 042302 5.9.4 Clarifications for consistency with FSS procedures MYAPC (QA) 071602 Attach 5A Updated piping data MYAPC 090402 Table 5-1A Revised survey area sizes MYAPC 060502    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 8 Section  Change / Topic Source Date Table 5-1A to 5-1C Table 5-1E 5.4.5.i 5.5.1 5.1.2 5.6 5.6.1 5.6.3 5.7.2 5.8.1.c 5.9.1 5.10.2.d,f Section 5, QA/Licensing Compliance Review changes MYAPC 082102 Table 5-1B Inserted N/A for Information Center (B1400) exterior MYAPC 100702 Table 5-2 Revised by removing the reference to buried piping/conduit. Added footnote will be added to Table 5-2 indicating that the 180 m 2 includes floor and lower walls RAI2-4 042302 Table 5-3a Corrected typo for Sr-90 MYAPC 100702 Table 5-4 Added revised detector areas for 43-37 and 43-37-1 instruments; revised column header: "total detector area" RAI2-12.b 061902 Table 5-4 Added Ludlum window info. Corrected window data in response. RAI2-12b 042302 Table 5-4a Correct typo for land area scan MDC for Type 1=0.5 at 16 and 15 m 2 area MYAPC 061902 Table 5-4a New title (Land Area Scan MDC) since new Table 5-4b covers Structure Scan MDC Added reference in table to Section 6.7 (4.2 Ci/g DCGL explanation) RAI2-12.e.3 RAI2-12.c 050202 Table 5-4b New table on Structure Scan MDC RAI2-12.e.2 050102 Table 5-6 Updated liquid beta parameters MYAPC 042402 Table 5-6 Added TBD scan MDCs / corrected detector nomenclature RAI2-12f-1 042402 Table 5-7 Added footnote on scan MDC: Must be calculated a priori MYAPC 091002    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 9 Section 6 - Revision 3 Changes Section  Change / Topic Source Date 6.1 6.5.1 6.5.4 6.6.8 6.7.2 Table 6-1 Removed the word "conduit" associated with buried pipe MYAPC 092102 6.10.6 Added calculation EC 004-01 ref RAI1-17.1 082802 6.3 Deleted obsolete NRC ref to Regulatory Guide DG-4006 RAI2-16 082602 6.3 Reworded passage on 'contamination on basement surfaces' MYAPC 100702 6.6.1.a and d Added "flowable fill" to discussion MYAPC 100702 6.6.1.c Corrected soil depth from 5.8 to 2.8 m MYAPC 100702 6.6.2 Updated concrete / rebar dose MYAPC 092102 6.6.2.b Corrected inventory form 3.43 to 3.30E+08 MYAPC 100702 6.6.3 Updated to reflect Embedded Spray Pump piping MYAPC 092102 6.6.3 / 6.7.2 Updated embedded piping info 082602 6.6.5.a Corrected vol. source term = 28500 m3 MYAPC 100702 6.6.6 Updated groundwater discussion to reflect commitment for routine sampling of CFS and PAB test pit. Include reference back to 2.5.3d. RAI1-16 092002 6.6.9 Added new text RAI1-17.1 082802 6.7 Added explanation of 4.2 pCi/g RAI1-21.1 053002 6.7 Revised soil DCGL to 3.2 MYAPC 091002 6.7, 6.7.2 Revised OA trench text to "special areas" MYAPC 082802 6.7.16 Added EC 041-01 to Section 6 references MYAPC 091502 6.7.2 Added explanation of 4.2 pCi/g (DCGL outside RA) RAI2-12.c 060502 6.7.2 TIRP PS-4 Unity Rule changes Revised to replace exact dose value of 7.52 mrem/y for more general language RAI2-12d TIRP  093002  6.8.3 6.8.4 6.8.5 Added new sections to address AF for buried and embedded piping RAI1-25a & c 091602 Attach 6-13 Updated DCGLs / dose MYAPC 092002 Attach 6-17 Updated activated rebar table MYAPC 092002    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 10 Section  Change / Topic Source Date Attach 6-18 Updated / corrected title (special areas)
MYAPC 092002 Attach 6-19 Added: Special Areas Unitized Dose Factors MYAPC 092002 Attach 6-2, 6-6, 6-8, 6-9, 6-11, 6-12, 6-14, 6-15, 6-16 Updated per latest engineering calculations EC-041-01 092502 Attach 6-7 new version Updated per latest engineering calculations and/or technical basis document MYAPC 090302 Table 6-10 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-11 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-12 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-14 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-3 Updated per latest engineering calculations and/or technical basis document MYAPC 092102 Table 6-4 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-5 Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-6a Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-6b Updated per latest engineering calculations and/or technical basis document MYAPC 092002 Table 6-8 Updated per latest engineering calculations and/or technical basis document MYAPC 092302 Table 6-9 Updated per latest engineering calculations and/or technical basis document MYAPC 092002  Section 7 - Revision 3 Changes Section  Change / Topic Source Date 7.0 Updated per Financial MYAPC 042302 7.1 Removed ref. To Appendix C RAI2-18 042302 Table 7-1 Added "TLG Site Specific Cost Estimate" to title RAI2-17 042302 Table 7-2 Added to title: "and  Financial Planning Estimate and updated data" RAI2-17 042302 Table 7-3 Added new table RAI2-19 042302 Table 7-3 Added footnote re: FSS cost estimate. RAI2-19 073002 Table 7-3 Added "Notes" label to bottom of table MYAPC 091202    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item;  EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA));  FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 11  Section 8 - Revision 3 Changes Section  Change / Topic Source Date 8.1.1 8.1.4 8.1.8 8.3 Identified specific document that bounds the env impact per RAI request RAI1-27 073002 8.1.1 Updated NRC ref for NUREG 1700 RAI2-16 082602 8.2 8.9 Updated: Comprehensive NRPA re: alternative analysis for demolition of forebay and diffuser. Numerous additions to Reference (8.9) as appropriate to support NRPA related changes. RAI1-32 060602 8.2, 8.4.6 8.6.3 8.6.13 8.8 Various updates/ larifications from MY RCRA specialist; included clarification of LTP use of unrestricted release under 50.82 vs. use of institutional controls re: to non-rad assessment. Updates, in part, address several related EPA comments as well.
MYAPC EPA comments (various) 081202 8.2 8.6.4  Expanded discussion on forebay remediation / NRPA review process / MDEP conditional approval State of Maine (MDEP comment 10/8/02) 100902 8.3.2 Clarified the reference to Regulatory Guide 1.185 Section C.6 "Changes to the PSDAR" RAI1-28 030602 8.3.2 Added discussion: meeting RG 1.185 per RAI (bounded by FGEIS; no PSDAR revision needed) RAI1-28 073002 8.4.1 Updated to reflect the partial site release application submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies. RAI1-29 030602 8.4.1 Updated to reflect granting of license amendment. RAI1-29 072602 8.4.11 Added review by State re: historical and archeological resources RAI1-30 040302 8.6.13 8.1.2 8.2 Clarification on meaning of radiological "unrestricted use"; clarify potential for institutional controls.
EPA#71 072602 8.6.2 RCRA update, per response to RAI Revised per 10/9/02 comments from MDEP; clarify conditional aspects of forebay NRPA permit. RAI1-33  State of Maine (MDEP comment 10/8/02) 072602 100902    Summary Listing of LTP Revision 3 Changes - by Section Source Key
: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12 Section  Change / Topic Source Date 8.6.4 8.4    -Relocated NRPA info to 8.6.4, added discussion on Circ Water Pump House NRPA -Added reference to Section 8.5 and 8.6 in 8.4 -Revised 8.6.4 to update for CWPH and Comp NRPA app and approvals 8.6.4 Revised per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan. RAI1-31 RAI1-32 040202 053102 080502 100702  8.6.7 Discharges will be iaw requirements of the appropriate discharge permit.
EPA#69 072602 8.6.9 Amended to reflect noise control provisions EPA#50.b 072602 8.9 Updated Reference listing and all ref cites in text.
MYAPC 090302 080102}}

Latest revision as of 05:07, 24 November 2019

Maine Yankee'S License Termination Plan
ML022970058
Person / Time
Site: Maine Yankee
Issue date: 10/15/2002
From: Williamson T
Maine Yankee Atomic Power Co
To:
Document Control Desk, NRC/FSME
References
+sisprbs20060109, -RFPFR, MN-02-048, RA-02-124
Download: ML022970058 (18)


Text

Attachment 1 MAINE YANKEE LICENSE TERMINATION PLAN REVISION 3 (enclosed CD-ROM)

Attachment 2 Maine Yankee to NRC Correspondence Supporting the LTP Review5 Letter No Date Topic MN-01-034 August 16, 2001 Early Release of Backlands (Combined)

MN-01-038 October 1, 2001 Submittal of Initial Characterization Survey Report and Historical Site Assessment MN-01-039 October 4, 2001 Maine Yankee LTP Related Calculations MN-01-041 October 16, 2001 Maine Yankee LTP Related Hydro-Geological Reports MN-01-040 October 17, 2001 Request for Expedited NRC Finding on the Status of the Intertidal Zone MN-01-044 November 19, 2001 Early Release of Backlands-Combined (Supplement to MN-01-034; addressed NRC Staff comments on the MY August 16, 2001 submittal)

MN-02-002 January 16, 2002 Transmittal of Special Report: Transuranic and Other Hard to Detect Radionuclides in Maine Yankee Sample Media MN-02-009 February 14, 2002 Maine Yankee LTP Related Support Document - Resource Conservation Recovery Act (RCRA) Quality Assurance Project Plan (QAPP)

MN-02-010 February 20, 2002 Maine Yankee Response to NRC RAI #16 (dated December 18, 2001) Addressing Site Hydrogeology MN-02-011 March 13, 2002 Response to NRC Request(s) for Additional Information for Maine Yankee Atomic Power Station License Termination Plan MN-02-012 March 13, 2002 Maine Yankee LTP Related Support Document -

Comprehensive Natural Resource Protection Act (NRPA)

Application MN-02-015 April 11, 2002 Revised Maine Yankee Response to NRC RAI #5 (dated December 18, 2001) - Supplementary Historical Site Assessment (HSA) Data MN-02-017 April 23, 2002 Package 1 of RAI Related LTP Changes MN-02-030 June 26, 2002 Submittal of CWPH NRPA Application and Other Related NRPA Review Documentation MN-02-037 August 28, 2002 Maine Yankee Addendum Report Regarding Site Hydrogeology MN-02-119 October 3, 2002 Minor Corrections to Maine Yankee Reponses to NRC Requests for Additional Information 5

This table provides a listing of key Maine Yankee to NRC correspondence supporting the NRCs review of LTP Revision 2, i.e., letters filed after the submittal of LTP Revision 2.

1

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Preface - Revision 3 Changes Section Change / Topic Source Date P.2 Revised DCGL from 17,000 to 18,000 MYAPC 100702 Section 1 - Revision 3 Changes Section Change / Topic Source Date 1.1, 1.2 Decommissioning updates MYAPC 100702 1.2 SA / TIRP / RAI - Added updated discussion MYAPC 042402 1.4.1 Revised to clearly reference the relevant license RAI1-1 042302 condition 1.4.1 Revised to include an explanation of each of the RAI1-23 042302 change criteria in the license condition 1.4.1 Revised to incorporate commitment (increase in a RAI1-23-1 042302 DCGL). SA / A4-2, 3, 4 1.4.1 Added commitment to provide prior notification to RAI1-23 072402 NRC re: survey unit classification downgrade.

1.4.1 Clarified sentence re: MYs effort to over perform MYAPC 072602 1.4.1 Added additional clarification on less than 10 mrem NRC Letter 091602 release criteria / ref to Table 6-11 8/23/02 092102 092602 Revised 1.4.1 to be consistent with 5.6.4 regarding RAI2-13b 092702 area classification downgrade to Class 2 or 3.

Reference to 5.6.4 added Updated to reflect MY agreement to provide NRC prior notice (at least 2 weeks) re: intent to downgrade SU classification.

1.4.1 Corrected license condition from 2.B(9) to (10) MYAPC 100702 1.4.2 NRC letter to Maine Yankee, dated July 30, 2002, NRC Ltr 7/30/02 091602 1.7 Issuance of Amendment No. 167, license amendment approving partial release of site lands. (Reference added to 1.7) 1.4.2.c Updated to reflect the consolidated partial site RAI1-2 042302 release application dated August 16, 2001 and the acreage will be corrected 1.5.2, 1.7 Revised titles used for GTS report to be consistent; RAI1-3/4 081902 corrected ref 1.7 (same as in Section 2 and 5) 1.7 Add references to PSDAR, DSAR, LD2688-SP1084 MYAPC 090602 072602 Attach 1A Removed Draft from footer, numbered pages as a MYAPC 092502 separate attachment 042402 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 1

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 2 - Revision 3 Changes Section Change / Topic Source Date Various Updated various references to attachments (adding NRC comment 100902 subsections 2 to Rev 0 attachment titles) 10/8/02 2.1, 2.2.5, Various clarification updates re: ICS/CCS RAI1-3, 4 081902 2.2.6, 2.3, nomenclature in text.

2.3.2a, 2.3.4b, Table 2-2, 2.3.5, 2.3.5a/b, 2.4.4, 2.4.7, 2.5, 2.5.2a, 2.1 thru 2.7 (Same as above entry) RAI1-4 053102 2.2.1 Added CSB spill events to HSA key items listing; RAI1-5 042302 updated total HSA items 2.2.5 Updated refueling cavity water processing MYAPC 053102 2.2.5 Updated to reflect Backlands license amendment MYAPC 082902 2.2.5 Updated to reflect the August 13, 2001 and RAI1-7 042302 November 19, 2001 partial site release applications.

The references to Attachment A will be deleted; Attachment 2A updated.

2.2.5 Updated to reflect fuel transfer to ISFSI MYAPC 100602 2.3.4.d Clarified the exposure rate of soil for 5 pCi/g RAI1-8 042302 2.3.7 Added footnotes to clarify survey packages MYAPC 100902 2.4.7.b numbering system (i.e., ICS to later CCS) 2.4.7 Updated embedded piping footage MYAPC 092102 091002 090302 2.4.8 Clarified core population samples RAI1-9 080602 2.5.2.b Corrected MDAs of 0.01 pCi/g to 1.0 pCi/g RAI1-11b 082802 2.5.2.b & Added ref to new Attachment 2I RAI1-11a & 15a 090302 2.5.3.c 2.5.2.d Clarified buried pipe contribution (relationship) to RAI1-12 042302 annual dose (i.e., much less) 2.5.2.f (g) Corrected typo - should be 2.5.2f MYAPC 090902 2.5.2.g, Forebay characterization discussion. Added NEW RAI1-17.1 091602 2.5.3.e, Attachment 2H 071202 Attach 2H 2.5.3.a Revised wording to provide ref. to Att 2F for core RAI1-14.4 092402 Table 2-7,8 variability for BOP and Special Areas 052202 (titles) Expand discussion of O/A trench to include all special areas Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 2

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date 2.5.3.b Added:...an evaluation will be performed to RAI1-14-1 042302 determine if changes to the nuclide fraction are warranted.

2.5.3.c Added footnote to 2.5.3c reflecting wording from RAI1-15a 092002 RAI1-15a response about HPCI/LPCI lines.

2.5.3.d Revised discussion on site hydrogeology, primarily RAI1- 16 092002 2.5.2.f reference to latest reports to NRC of 2/20/02 and 2.7 8/28/02 on groundwater.

Table 2C-3 2.5.3f revised to reference 2.5.3d. Also revised to reference Table 2C-3. And revised to explain why fire pond data is not in Table 2C-3 MY submittals to NRC (RAI1-16 response and Stratex reports) added to References in 2.7 Table 2C-3 revised; added note regarding Attachment 2H.

2.5.3.f Added new section title; Future Sampling RAI1-13.e 042302 RAI1-15 RAI1-17 2.5.3.f Editorial changes to Future Sampling section; MYAPC 052102 providing updated references to tables in text.

2.7.11 Updated NRC ref RAI2-16 082602 2.7.16 Added reference to TIRPs TRU-HTD report RAI1-14.3 082802 2.7.18 Added EC-041-01 to references RAI1-17.1 091502 2.7.23 Added reference to supplemental HSA information RAI1-5 100902 NRC comment 10/08/02 Attach 2A Revised to be consistent with the consolidated partial RAI1-7 042302 site release application package RAI1-18 Attach 2F Revised to be consistent with Calculation EC 011 Numerous RAIs 073102 and per TIRP/LTP Team comments TIRP Attach 2G Added new Attachment 2G to describe processing RAI1-14.3 080502 (and other details) re: concrete cores Attach 2H New Attachment 2H added to provide detail on RAI1-17.1 100902 forebay/diffuser characterization. FOTC comment Updated status of forebay dike boring effort; indicated schedule for providing NRC results Attach 2I Added new Attachment 2I RAI1-11a & 15a 090302 Attachments All attachments created as separate files MYAPC 092002 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 3

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date Table 2-10 1.5 to 3.5 depth, Variance of act concrete RAI1-14.2 042302 ACTIVITY with depth / added ***note per JCD and 100902 corrected 0-0.5" sample activity.

Corrected entry (i.e., label on slice) to 1.5 to 4.0 Table 2-12 Corrected title: fractions vs concentrations RAI1-17 042302 Table 2-13 Table 2-5 Added a row to segregate the exposure rate for the RAI1-10 042302 woodland and scrub areas Table 2-6 H-3 should be 400 (max) RAI1-10 042302 Table 2-8 Updated Special Area nuclide fractions RAI1-14-4 092402 Table 2A-3 1997 GTS: Eaton Farm = 0.45 vs 0.46, MYAPC 053002 Merrymeeting = 0.42 vs 0.35 Table 2A-7 Corrected Eaton Farm / Merrymeeting MYAPC 053002 Table 2A-8 & Added new tables MYAPC 053002 9

Table 2B-5 Revised Cs-137 numbers / Added footnote:

  • MYAPC 053002 Includes twelve marine sediment samples taken the New Meadows River and the Damariscotta River.

Table 2B-6 Added discrete particle footnote RAI1-11c 082802 Table 2B-8 Revised to show the MDA values for each of the RAI1-10 042302 above sample locations. (743, 3126 and 2255 respectively, Ave: 2024 pCi/L).

Table 2C-2 Added note to title, i.e., geometry corrected except as MYAPC 100602 noted (1)

Corrected samples 3-3A, 10-3A, 12-4a, and 13-2A data Table 2C-2 Sample 10-3A: added a decimal point (21.5) RAI1-14-3 053002 Added footnote on geometry correction Table 2C-2 Added note (2) on net count rate RAI1-14.3 090302 Table 2C-3 Corrected Sb-125 = 0.4 RAI1-17 042302 Section 3 - Revision 3 Changes Section Change / Topic Source Date 3.0 etc General updates to sections to reflect current state of MYAPC 100702 decommissioning 3.1.2 Updated to include a description of the August 16th RAI1-19 042302 and November 19th application supplements.

3.1.2 Updated to reflect completed construction of ISFSI MYAPC 091902 and commencement of fuel movement

3.1.2 Updated

NRC approval of backlands license MYAPC 091902 3.7.7 amendment. Added reference to NRC letter in Sect.

3.7 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 4

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date 3.1.3 Revised to include the requirement to perform FSS RAI1-20 042302 prior to allowing a basement to be backfilled.

3.1.3 Revised / Added ref to NRC Circular 81-07 SA / A3-1 091002 3.7.7 Deleted reference to Cumulative Risk letter MYAPC 042402 Section 4 - Revision 3 Changes Section Change / Topic Source Date Attach 4A Created separate file to allow consistency in format / MYAPC 092202 page numbering Attach 4B Created separate file to allow consistency in format / MYAPC 092202 page numbering Section 5 - Revision 3 Changes Section Change / Topic Source Date 5.1.3 Updated to reflect NRC license amendment on MYAPC 092902 backlands 5.1.4 Reference to 1.4.2.c - made consistent with the RAI2-2 042302 current partial site release application package 5.1.4, 5.12 Updated NRC / EPA references RAI2-16 082602 5.10.1 Updated Organization RAI2-15 092202 Figure 5-6 - Corrected title of ISPRE 080102

- Radiochemist role per 5.14 of PMP 6.0 5.11.3 Changed work order process to administrative MYAPC (QA) 071602 controls 5.2.3 Changed the "may" to "will" to require FSS prior to RAI2-3f 042302 backfilling excavated foundations. / replaced "RA" with "Industrial Area 5.2.3 Described survey unit design limitations RAI2-3d 053102 5.2.3 Added RAI response excerpt, rationale for RAI2-3e 060402 classifying bldg footprint lower than foundation surface.

5.2.3 Added reference to Attachment 5A in text RAI2-3c 060402 5.2.4, 5.4.5.b, Updated forebay discussion (5.2.4); clarified RAI1-3/4 081902 Attach 5A ICS/CCS.

5.3.1 Added rationale for survey unit size RAI2-4 042302 5.3.1.a Clarified: survey unit size for standing buildings is RAI2-4 092102 based on scenario pathways 5.4.2 Corrected typo: Appendix E of NUREG 1727 092402 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 5

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date 5.4.2.c Added RAI excerpt on conservative use of sigma and RAI2-3g 091902 5.2.3 discussion on evaluation of survey units with two different classifications Added ref to 5.4.2 in 5.2.3 5.4.3 Added SA Item B.3 SA / B.3 042402 5.4.3 Added statement re: how significant variations in RAI2-6 060402 background reference areas would be addressed.

5.4.3 Added paragraph on background subtraction MYAPC 100702 5.4.4 Added recognition of triangular grid method RAI2-7b 042302

5.4.4 Clarified

if sole use of GPS , a more accurate system RAI2-7a 042302 will be obtained 5.4.4.b Deleted FSSC MYAPC 071702 5.4.5 Added QC measures in SU design and FSS RAI2-8 060302 5.4.5.d, f implementation.

5.10.5.c Added portion of RAI excerpt on CR process Added ref to Section 5.4.5(f), added detail on investigation process from RAI response 5.4.5.b Clarified data list MYAPC 042402 5.4.5.f Changed floppy disc: to appropriate storage media MYAPC 100702 5.5.1.a Expanded discussion on activated concrete State of Maine 101002 (Comment #73) 5.5.1.a Added paragraph on removable contamination RAI2-12a 060402 surveys (excerpt from RAI2-12a response) 5.5.1.a Corrected land scan speed to = 0.25m/sec MYAPC 100702 5.5.2.d deleted para on Land Area Scans 5.5.1.a,d Added T2-8 reference and add. paragraph on Vol. RAI2-9 060402 Conc. Meas.

5.5.1.b Clarified last para under Stored Excavated Soil MYAPC 042402 5.5.1.b Clarified 2nd para under Volumetric Samples MYAPC 042402 5.5.1.b Added RAI response excerpt, additional detail of RAI2-11 060302 actions taken to survey and handle stored soil for future re-use on site.

5.5.1.d Updated forebay discussion MYAPC 053002 5.5.1.d Changed Section title to specific from special - MYAPC 092502 to avoid confusion with Section 2 Special Areas 5.5.2.d Added reference to EC-009-01 (Ref 5.12.32) RAI2-12.c 092502 5.5.2.d Added ref to Section 6.7.2 RAI2-12.d 042402 5.5.2.d Reorganized; added discussion on Structure MDC RAI2-12.e.2 050102 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 6

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date 5.5.2.d Expanded detail on land survey technique re: RAI2-12.e.3 091002 distance to surface, peak trap mode, etc.

5.5.2.d Changed soil DCGL from 3.0 to 3.2 MYAPC 091002 Table5-6 5.5.2.e Added discussion on Co-60 discrete particle RAI2-12.e.3 050102 capability and confirms E600 operation in SCA RAI2-1.3 mode. Added statement on Cs-137 (at 3 pCi/g) 5.5.2.f Added discussion on Es RA12-12g 053002 5.5.2.g Expanded Pipe crawler discussion RAI2-12h 092502 053002

5.6 Clarified

elevated measurement was the result of a RAI2-3a 042302 discrete particle or a distributed source 5.6.2 E600 closure action. Added more detailed RAI2-12.f.3 050202 discussion on actions upon receiving confirmed indication of elevated area.. Added reference to 5.6.4 re: more discussion on reclassification.

5.6.3 Added note from MARSSIM 8.5.2 (Rev 1 as MYAPC 081202 published in FedReg, 6/01) 5.6.3 Added TIRP PS-4 Unity Rule changes, including MYAPC 091002 5.8.1.d NEW Section 5.8.1.d TIRP 081702 5.8.1d revised to remove exact dose result of 7.52 093002 5.6.4 5.6.4: further revised to address downgrade from RAI2-13.b 092102 5.12 Class 1 or 2 to Class 3. 091602 050102 Further revisions to 5.6.4 to reference 8/23/02 NRC letter on downgrades and to clearly specify Class 1 to Class 2 downgrade considerations Expanded discussion on evaluation actions in an investigation 5.8.1.b Corrected Wr value criteria MYAPC 042402 5.8.1.b,c Corrected WRS Test and Sign Test equations to be RAI2-14 042302 consistent with MARSSIM 5.8.1.b,c Corrected N nomenclature, added 40% or fewer RAI2-14 042302 less than values qualifier.

5.9.4 Clarifications for consistency with FSS procedures MYAPC (QA) 071602 Attach 5A Updated piping data MYAPC 090402 Table 5-1A Revised survey area sizes MYAPC 060502 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 7

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date Table 5-1A Section 5, QA/Licensing Compliance Review MYAPC 082102 to 5-1C changes Table 5-1E 5.4.5.i 5.5.1 5.1.2 5.6 5.6.1 5.6.3 5.7.2 5.8.1.c 5.9.1 5.10.2.d,f Table 5-1B Inserted N/A for Information Center (B1400) MYAPC 100702 exterior Table 5-2 Revised by removing the reference to buried RAI2-4 042302 piping/conduit.

Added footnote will be added to Table 5-2 indicating that the 180 m2 includes floor and lower walls Table 5-3a Corrected typo for Sr-90 MYAPC 100702 Table 5-4 Added revised detector areas for 43-37 and 43-37-1 RAI2-12.b 061902 instruments; revised column header: total detector area Table 5-4 Added Ludlum window info. RAI2-12b 042302 Corrected window data in response.

Table 5-4a Correct typo for land area scan MDC for Type 1=0.5 MYAPC 061902 at 16 and 15 m2 area Table 5-4a New title (Land Area Scan MDC) since new Table RAI2-12.e.3 050202 5-4b covers Structure Scan MDC Added reference in table to Section 6.7 (4.2 Ci/g DCGL explanation) RAI2-12.c Table 5-4b New table on Structure Scan MDC RAI2-12.e.2 050102 Table 5-6 Updated liquid beta parameters MYAPC 042402 Table 5-6 Added TBD scan MDCs / corrected detector RAI2-12f-1 042402 nomenclature Table 5-7 Added footnote on scan MDC: Must be calculated a MYAPC 091002 priori Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 8

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 6 - Revision 3 Changes Section Change / Topic Source Date 6.1 Removed the word conduit associated with buried MYAPC 092102 6.5.1 pipe 6.5.4 6.6.8 6.7.2 Table 6-1 6.10.6 Added calculation EC 004-01 ref RAI1-17.1 082802 6.3 Deleted obsolete NRC ref to Regulatory Guide DG- RAI2-16 082602 4006 6.3 Reworded passage on contamination on basement MYAPC 100702 surfaces 6.6.1.a and d Added flowable fill to discussion MYAPC 100702 6.6.1.c Corrected soil depth from 5.8 to 2.8 m MYAPC 100702 6.6.2 Updated concrete / rebar dose MYAPC 092102 6.6.2.b Corrected inventory form 3.43 to 3.30E+08 MYAPC 100702 6.6.3 Updated to reflect Embedded Spray Pump piping MYAPC 092102 6.6.3 / 6.7.2 Updated embedded piping info 082602 6.6.5.a Corrected vol. source term = 28500 m3 MYAPC 100702 6.6.6 Updated groundwater discussion to reflect RAI1-16 092002 commitment for routine sampling of CFS and PAB test pit. Include reference back to 2.5.3d.

6.6.9 Added new text RAI1-17.1 082802 6.7 Added explanation of 4.2 pCi/g RAI1-21.1 053002 6.7 Revised soil DCGL to 3.2 MYAPC 091002 6.7, 6.7.2 Revised OA trench text to special areas MYAPC 082802 6.7.16 Added EC 041-01 to Section 6 references MYAPC 091502 6.7.2 Added explanation of 4.2 pCi/g (DCGL outside RA) RAI2-12.c 060502 6.7.2 TIRP PS-4 Unity Rule changes RAI2-12d 093002 TIRP Revised to replace exact dose value of 7.52 mrem/y for more general language 6.8.3 Added new sections to address AF for buried and RAI1-25a & c 091602 6.8.4 embedded piping 6.8.5 Attach 6-13 Updated DCGLs / dose MYAPC 092002 Attach 6-17 Updated activated rebar table MYAPC 092002 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 9

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date Attach 6-18 Updated / corrected title (special areas) MYAPC 092002 Attach 6-19 Added: Special Areas Unitized Dose Factors MYAPC 092002 Attach 6-2, 6- Updated per latest engineering calculations EC-041-01 092502 6, 6-8, 6-9, 6-11, 6-12, 6-14, 6-15, 6-16 Attach 6-7 Updated per latest engineering calculations and/or MYAPC 090302 new version technical basis document Table 6-10 Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-11 Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-12 Updated per latest engineering calculations and/or MYAPC 092302 technical basis document Table 6-14 Updated per latest engineering calculations and/or MYAPC 092302 technical basis document Table 6-3 Updated per latest engineering calculations and/or MYAPC 092102 technical basis document Table 6-4 Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-5 Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-6a Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-6b Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Table 6-8 Updated per latest engineering calculations and/or MYAPC 092302 technical basis document Table 6-9 Updated per latest engineering calculations and/or MYAPC 092002 technical basis document Section 7 - Revision 3 Changes Section Change / Topic Source Date 7.0 Updated per Financial MYAPC 042302 7.1 Removed ref. To Appendix C RAI2-18 042302 Table 7-1 Added TLG Site Specific Cost Estimate to title RAI2-17 042302 Table 7-2 Added to title: and Financial Planning Estimate RAI2-17 042302 and updated data Table 7-3 Added new table RAI2-19 042302 Table 7-3 Added footnote re: FSS cost estimate. RAI2-19 073002 Table 7-3 Added Notes label to bottom of table MYAPC 091202 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 10

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section 8 - Revision 3 Changes Section Change / Topic Source Date 8.1.1 Identified specific document that bounds the env RAI1-27 073002 8.1.4 impact per RAI request 8.1.8 8.3 8.1.1 Updated NRC ref for NUREG 1700 RAI2-16 082602

8.2 Updated

Comprehensive NRPA re: alternative RAI1-32 060602 8.9 analysis for demolition of forebay and diffuser.

Numerous additions to Reference (8.9) as appropriate to support NRPA related changes.

8.2, 8.4.6 Various updates/ larifications from MY RCRA MYAPC 081202 8.6.3 specialist; included clarification of LTP use of EPA comments 8.6.13 unrestricted release under 50.82 vs. use of (various) 8.8 institutional controls re: to non-rad assessment.

Updates, in part, address several related EPA comments as well.

8.2 Expanded discussion on forebay remediation / State of Maine 100902 8.6.4 NRPA review process / MDEP conditional approval (MDEP comment 10/8/02) 8.3.2 Clarified the reference to Regulatory Guide 1.185 RAI1-28 030602 Section C.6 "Changes to the PSDAR" 8.3.2 Added discussion: meeting RG 1.185 per RAI RAI1-28 073002 (bounded by FGEIS; no PSDAR revision needed) 8.4.1 Updated to reflect the partial site release application RAI1-29 030602 submittal of August 16, 2001, supplemented on November 19, 2001 and will correct the acreage inconsistencies.

8.4.1 Updated to reflect granting of license amendment. RAI1-29 072602 8.4.11 Added review by State re: historical and RAI1-30 040302 archeological resources 8.6.13 Clarification on meaning of radiological EPA#71 072602 8.1.2 unrestricted use; clarify potential for institutional 8.2 controls.

8.6.2 RCRA update, per response to RAI RAI1-33 072602 100902 Revised per 10/9/02 comments from MDEP; clarify State of Maine conditional aspects of forebay NRPA permit. (MDEP comment 10/8/02)

Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 11

Attachment 3 Summary Listing of LTP Revision 3 Changes - by Section Section Change / Topic Source Date 8.6.4 -Relocated NRPA info to 8.6.4, added discussion on RAI1-31 040202 8.4 Circ Water Pump House NRPA RAI1-32 053102

-Added reference to Section 8.5 and 8.6 in 8.4 080502

-Revised 8.6.4 to update for CWPH and Comp 100702 NRPA app and approvals 8.6.4 Revised per 10/10/02 State comments; clarified conditional aspects of forebay NRPA permit and MDEP approval of Phase II plan.

8.6.7 Discharges will be iaw requirements of the EPA#69 072602 appropriate discharge permit.

8.6.9 Amended to reflect noise control provisions EPA#50.b 072602 8.9 Updated Reference listing and all ref cites in text. MYAPC 090302 080102 Source Key: RAI1 = 12/18/2001 NRC RAIs; RAI2 = 01/17/2002 NRC RAIs; SA = 08/30/2001 ASLB Settlement Agreement Item; EPA = 05/10/2002 EPA comment; TIRP = Technical Issue Resolution Process (part of the Settlement Agreement (SA)); FOTC = 03/30/2001 and 04/10/2001 Friends of the Coast Comments 12